| title = IR 05000305/2015-001; January 1, 2015 through March 31, 2015; Kewaunee Power Station, NRC Inspection Report
| title = IR 05000305/2015-001; January 1, 2015 Through March 31, 2015; Kewaunee Power Station, NRC Inspection Report
| author name = Orlikowski R J
| author name = Orlikowski R
| author affiliation = NRC/RGN-III/DNMS/MCID
| author affiliation = NRC/RGN-III/DNMS/MCID
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
| license number = DPR-043
| license number = DPR-043
| contact person = Edwards R A
| contact person = Edwards R
| document report number = IR 2015001
| document report number = IR 2015001
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES May 12, 2015
[[Issue date::May 12, 2015]]


Mr. David President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
==SUBJECT:==
 
NRC INSPECTION REPORT NO. 05000305/2015001(DNMS) - KEWAUNEE POWER STATION
SUBJECT: NRC INSPECTION REPORT NO. 05000305/2015001(DNMS) - KEWAUNEE POWER STATION


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
On March 31, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for January through March 2015, at the permanently shut down Kewaunee Power Station (KPS) in Kewaunee, Wisconsin. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with Mr. S. Yuen and other members of your staff on April 22, 2015. During the inspection period, the NRC inspectors reviewed the following aspects of onsite activities: spent fuel pool safety, maintenance and surveillance activities, and environmental monitoring. The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, and interviews with personnel.
On March 31, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for January through March 2015, at the permanently shut down Kewaunee Power Station (KPS) in Kewaunee, Wisconsin. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with Mr. S. Yuen and other members of your staff on April 22, 2015.


Based on the results of this inspection, no violations of NRC requirements were identified. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, will be made available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC's website at http://www.nrc.gov/reading-rm/adams.html.
During the inspection period, the NRC inspectors reviewed the following aspects of onsite activities: spent fuel pool safety, maintenance and surveillance activities, and environmental monitoring. The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, and interviews with personnel.


Sincerely,/RA Wayne J. Slawinski Acting for/
Based on the results of this inspection, no violations of NRC requirements were identified. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, will be made available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No: 50-305 License No: DPR-43


===Enclosure:===
Sincerely,
/RA Wayne J. Slawinski Acting for/
Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No: 50-305 License No: DPR-43 Enclosure:
IR 05000305/2015001(DNMS)
IR 05000305/2015001(DNMS)
cc w/encl: Distribution via LISTSERV
cc w/encl: Distribution via LISTSERV
}}
}}

Latest revision as of 11:20, 31 October 2019

IR 05000305/2015-001; January 1, 2015 Through March 31, 2015; Kewaunee Power Station, NRC Inspection Report
ML15133A498
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/12/2015
From: Robert Orlikowski
NRC/RGN-III/DNMS/MCID
To: Heacock D
Dominion Energy Kewaunee
Edwards R
References
IR 2015001
Download: ML15133A498 (10)


Text

UNITED STATES May 12, 2015

SUBJECT:

NRC INSPECTION REPORT NO. 05000305/2015001(DNMS) - KEWAUNEE POWER STATION

Dear Mr. Heacock:

On March 31, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for January through March 2015, at the permanently shut down Kewaunee Power Station (KPS) in Kewaunee, Wisconsin. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with Mr. S. Yuen and other members of your staff on April 22, 2015.

During the inspection period, the NRC inspectors reviewed the following aspects of onsite activities: spent fuel pool safety, maintenance and surveillance activities, and environmental monitoring. The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, and interviews with personnel.

Based on the results of this inspection, no violations of NRC requirements were identified. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, will be made available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA Wayne J. Slawinski Acting for/

Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No: 50-305 License No: DPR-43 Enclosure:

IR 05000305/2015001(DNMS)