|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML16097A280 | | | number = ML16097A280 |
| | issue date = 05/02/2016 | | | issue date = 05/02/2016 |
| | title = Change of Safety Project Manager for the Grand Gulf License Renewal Application Review (TAC No. ME7493) | | | title = Change of Safety Project Manager for the Grand Gulf License Renewal Application Review |
| | author name = Diaz-Sanabria Y K | | | author name = Diaz-Sanabria Y |
| | author affiliation = NRC/NRR/DLR/RPB1 | | | author affiliation = NRC/NRR/DLR/RPB1 |
| | addressee name = Mulligan K J | | | addressee name = Mulligan K |
| | addressee affiliation = Entergy Operations, Inc | | | addressee affiliation = Entergy Operations, Inc |
| | docket = 05000416, 05000417 | | | docket = 05000416, 05000417 |
| | license number = | | | license number = |
| | contact person = Sayoc E C, NRR/DLR, 415-4084 | | | contact person = Sayoc E, NRR/DLR, 415-4084 |
| | case reference number = DLR-16-0076, TAC ME7493 | | | case reference number = DLR-16-0076, TAC ME7493 |
| | document type = Letter | | | document type = Letter |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2, 2016 Docket No(s). 50-416 Dear Kevin J. Mulligan This letter provides notification of a change to the safety project manager assigned to the Grand Gulf Nuclear Station, Unit 1 (GGNS) license renewal review. Effective immediately, Mr. |
| -0001 May 2, 2016 Docket No (s). 50-416 Dear Kevin J. Mulligan | | Emmanuel Sayoc will be the safety project manager for GGNS. |
| | | All correspondence for the project manager, associated with the safety review for GGNS, license renewal should be sent to: |
| This letter provides notification of a change to the safety project manager assigned to the Grand Gulf Nuclear Station, Unit 1 (GGNS) license renewal review. Effective immediately, Mr. | | Mr. Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-11F1 Washington, DC 20555 Mr. Emmanuel Sayoc may be reached at 301-415-4084 or by e-mail at emmanuel.sayoc@nrc.gov. |
| Emmanuel Sayoc will be the safety project manager for GGNS. All correspondence for the project manager, associated with the safety review for GGNS , license renewal should be sent to: | | Sincerely, |
| Mr. Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O | | /RA/ |
| -11F1 Washington, DC 20555 Mr. Emmanuel Sayoc may be reached at 301 | | Yoira K. Diaz-Sanabria, Branch Chief Division of License Renewal Office of Nuclear Reactor Regulation (NRR) |
| -415-4084 or by e-mail at emmanuel.sayoc@nrc.gov. | | U.S. Nuclear Regulatory Commission 301-415-4084 Yoira.Diaz-Sanabria@nrc.gov. |
| Sincerely, /RA/ Yoira K. Diaz | | cc: Listserv E-mail ADAMs No. ML16097A280 |
| -Sanabria, Branch Chief Division of License Renewal Office of Nuclear Reactor Regulation (NRR) | | *concurrence via email OFFICE PM: DLR/RPB1 *BC: DLR/RPB1 PM: DLR/RPB1 NAME ESayoc YDiazSanabria ESayoc DATE 4/5/16 4/11/16 5/2/16}} |
| U.S. Nuclear Regulatory Commission 301-415-4084 Yoira.Diaz | |
| -Sanabria@nrc.gov. cc: Listserv E-mail ADAMs No. ML16097A280 | |
| *concurrence via email OFFICE PM: DLR/RPB1
| |
| *BC: DLR/RPB1 PM: DLR/RPB1 NAME ESayoc YDiazSanabria ESayoc DATE 4/5/16 4/11/16 5/2/16}}
| |
Letter Sequence Other |
---|
|
|
MONTHYEARML11350A0532012-01-0404 January 2012 Plan for the Scoping and Screening Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1 License Renewal Application Review Project stage: Other ML12009A1052012-01-18018 January 2012 Plan for the Aging Management Program Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Review Project stage: Other ML12067A2352012-04-0303 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12068A2332012-04-0404 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12080A1912012-04-11011 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Grand Gulf LRA RAI Set 3 Project stage: RAI ML12074A0082012-04-12012 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12076A0142012-04-16016 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA Draft RAI Set 5 Project stage: Draft RAI ML12076A0092012-04-17017 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal (TAC ME7493) Grand Gulf LRA Draft RAI Set 6 Project stage: Draft RAI ML12087A0012012-04-18018 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC ME7493)Grand Gulf LRA RAI Set 07 Project stage: RAI ML12094A0092012-04-25025 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nulcear Station Licesne Renewal Application Project stage: RAI ML12101A3602012-04-26026 April 2012 Request for Additional Information for the Review of Th Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 09 Project stage: RAI ML12104A2192012-04-30030 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493)LRA RAI Set 10 Project stage: RAI GNRO-2012/00029, Response to Request for Additional Information (RAI) Regarding the License Renewal Application2012-05-0101 May 2012 Response to Request for Additional Information (RAI) Regarding the License Renewal Application Project stage: Response to RAI ML12109A2132012-05-0303 May 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 11 Project stage: RAI GNRO-2012/00036, Response to Request for Additional Information (RAI) Dated April 12, 20122012-05-0909 May 2012 Response to Request for Additional Information (RAI) Dated April 12, 2012 Project stage: Response to RAI ML12118A5392012-05-15015 May 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12125A3732012-05-24024 May 2012 Requests for Additional Information for the Review of the Grant Gulf Nuclear Station License Renewal Application (TAC No. ME7493)Grand Gulf LRA RAI Set 17 Project stage: RAI ML12139A0552012-05-29029 May 2012 LRA RAI Set 19 Project stage: RAI ML12151A2652012-06-15015 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 20 Project stage: RAI ML12165A3872012-06-20020 June 2012 Scoping and Screening Methodology Audit Report Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Project stage: Other ML12151A3682012-06-20020 June 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12152A3932012-06-22022 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12152A3452012-06-22022 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (Tac No. ME7493) Project stage: RAI ML12157A0562012-06-27027 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493)Grand Gulf LRA RAI Set 24 Project stage: RAI ML12164A7262012-06-27027 June 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12180A5412012-07-17017 July 2012 Summary of Telephone Conference Call Held on March 14, 2012, Between NRC and Entergy Operations, Inc., Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12188A7062012-07-17017 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12188A5162012-07-23023 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12200A1382012-07-27027 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B4762012-07-27027 July 2012 LRA RAI Set 30 Project stage: RAI ML12191A1872012-07-31031 July 2012 LRA RAI Telecon 2012-04-13 Project stage: RAI ML12208A2672012-08-0707 August 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12193A0712012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12220A3372012-08-15015 August 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B5042012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/23/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning the RAIs Pertaining to the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12202A2142012-08-15015 August 2012 5/30/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12230A3102012-08-21021 August 2012 Correction to Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B5452012-08-28028 August 2012 Summary of Telephone Conference Call Held on 6/5/12, Between NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12209A1482012-08-28028 August 2012 6/8/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12234A6712012-09-0505 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12242A5452012-09-0707 September 2012 Revision of Schedule for the Conduct of Review of the Grand Gulf Nuclear Station, LRA Project stage: Approval ML12230A2472012-09-0707 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12214A5482012-09-14014 September 2012 7/18/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12248A1582012-09-14014 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12270A2492012-10-0303 October 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12278A0362012-10-17017 October 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12286A0242012-10-19019 October 2012 RAI for the Review of the Grand Gulf Nuclear Station LRA Project stage: RAI GNRO-2012/00128, Response to Requests for Additional Information (RAI) Set 38 Dated 10/03/20122012-10-22022 October 2012 Response to Requests for Additional Information (RAI) Set 38 Dated 10/03/2012 Project stage: Response to RAI ML12264A3872012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/21/12, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12250A1052012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI 2012-05-15
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2, 2016 Docket No(s). 50-416 Dear Kevin J. Mulligan This letter provides notification of a change to the safety project manager assigned to the Grand Gulf Nuclear Station, Unit 1 (GGNS) license renewal review. Effective immediately, Mr.
Emmanuel Sayoc will be the safety project manager for GGNS.
All correspondence for the project manager, associated with the safety review for GGNS, license renewal should be sent to:
Mr. Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-11F1 Washington, DC 20555 Mr. Emmanuel Sayoc may be reached at 301-415-4084 or by e-mail at emmanuel.sayoc@nrc.gov.
Sincerely,
/RA/
Yoira K. Diaz-Sanabria, Branch Chief Division of License Renewal Office of Nuclear Reactor Regulation (NRR)
U.S. Nuclear Regulatory Commission 301-415-4084 Yoira.Diaz-Sanabria@nrc.gov.
cc: Listserv E-mail ADAMs No. ML16097A280
- concurrence via email OFFICE PM: DLR/RPB1 *BC: DLR/RPB1 PM: DLR/RPB1 NAME ESayoc YDiazSanabria ESayoc DATE 4/5/16 4/11/16 5/2/16