CP-201700402, Response to RIS 2017-03: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:/ 'I Luminant April 2s; 2017 CP-201700402 David Coit Operat!ons Initial Tra!nlng Supeivisor David.Gox@luminant.com U.S. Nuclear Regulatory Commission
{{#Wiki_filter:David Coit                               Luminant Power Luminant                              Operat!ons Initial Tra!nlng Supeivisor David.Gox@luminant.com P 0Box1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5578 F 254 897 5400 April 2s; 2017 CP-201700402 U.S. Nuclear Regulatory Commission
_ ATI'.N': Document Control Oesk Washington, DC 20S55-0001 Re: Response to RIS 2017-03 T,o whom it may concern, Luminant Power P 0Box1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5578 F 254 897 5400 Please find attached NRC 'Form *536 for Comanche Peak. This is in response to RJS 2017-03, requesting update of initial examination schedules for CY s 2019 through 2022. The attached document has also been electronically submitted to Vincent Gaddy in the Region . IV office, as requested in the RIS.
_ATI'.N': Document Control Oesk Washington, DC 20S55-0001 Re: Response to RIS 2017-03 T,o whom it may concern, Please find attached NRC 'Form *536 for Comanche Peak. This is in response to RJS 2017-03, requesting update of initial examination schedules for CYs 2019 through 2022.
* Art: NRC Form 536, Comanche Peak Nuc::lear Power Plant   
The attached document has also been electronically submitted to Vincent Gaddy in the Region
    . IV office, as requested in the RIS.                                           *
/ 'I Art: NRC Form 536, Comanche Peak Nuc::lear Power Plant
 
  *~
..........
..........
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
NRC FORM 536                               U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                                         EXPIRES: 10/31/2017 (05-2016)                                                                       Estimated burden per response to comply with this voluntary information collection request: 1 hour, This
Estimated burden per response to comply with this voluntary information collection request: 1 hour, This " .... 0 OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations.
                        <>""""**~,
Send " comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 /!! n < 0 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to ; i EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory
                    "                     ....0 information collection is used to plan budgets and resources for operator examinations. Send
: Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means ,..,.. ...... used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
                  "
FACILITY NRC REGION Comanche Peak Nuclear Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ---------NUMBER OF REACTOR 6 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 6 3 3 3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 9 9 6 6 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
                /!!
-LIMITED PROPOSED DATES PRIMARY DATE 06/10/2019 06/15/2020 06/14/2021 06/13/2022 I ALTERNATE DATE 06/17/2019 06/22/2020 06/21/2021 06/20/2022
                <
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY CY ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRG FORM 536 (05-2016)}}
                                              ~n 0
OPERATOR LICENSING                comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to
                ;  ..;-1'~
i     EXAMINATION DATA               lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,
                            ,..,.. ...... ~.o~                                        NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                                     NRC REGION Comanche Peak Nuclear Power Plant                                                                                                                   IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 19               CY 20                                   CY 21                                       CY 22 PROPOSED NUMBER
                                                              -                   --                                         --                                           --
ESTIMATED NUMBER OF LICENSEE-PREPARED                                   1                   1                                         1                                           1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                                   0                   0                                         0                                           0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 19             CY 20                               CY 21                                     CY 22 PROPOSED NUMBER
                                                              --                 --                                   --                                         ---
NUMBER OF REACTOR OPERATORS                                    6                   3                                         3                                           3 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT                                  6                   3                                         3                                           3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                                    9                   9                                         6                                           6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                                  0                   0                                         0                                           0 PROPOSED DATES PRIMARY DATE                               06/10/2019           06/15/2020                             06/14/2021                                 06/13/2022 I
ALTERNATE DATE                               06/17/2019           06/22/2020                             06/21/2021                                 06/20/2022
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY                                                                 CY PROPOSED NUMBER MARCH
                                                                ---   SEPTEMBER                           MARCH                                           SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRG FORM 536 (05-2016)}}

Revision as of 03:54, 30 October 2019

Response to RIS 2017-03
ML17143A232
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/28/2017
From: Cox D
Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201700402, RIS-17-003
Download: ML17143A232 (2)


Text

David Coit Luminant Power Luminant Operat!ons Initial Tra!nlng Supeivisor David.Gox@luminant.com P 0Box1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5578 F 254 897 5400 April 2s; 2017 CP-201700402 U.S. Nuclear Regulatory Commission

_ATI'.N': Document Control Oesk Washington, DC 20S55-0001 Re: Response to RIS 2017-03 T,o whom it may concern, Please find attached NRC 'Form *536 for Comanche Peak. This is in response to RJS 2017-03, requesting update of initial examination schedules for CYs 2019 through 2022.

The attached document has also been electronically submitted to Vincent Gaddy in the Region

. IV office, as requested in the RIS. *

/ 'I Art: NRC Form 536, Comanche Peak Nuc::lear Power Plant

  • ~

..........

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, This

<>""""**~,

" ....0 information collection is used to plan budgets and resources for operator examinations. Send

"

/!!

<

~n 0

OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

..;-1'~

i EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

,..,.. ...... ~.o~ NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Comanche Peak Nuclear Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 19 CY 20 CY 21 CY 22 PROPOSED NUMBER

- -- -- --

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 19 CY 20 CY 21 CY 22 PROPOSED NUMBER

-- -- -- ---

NUMBER OF REACTOR OPERATORS 6 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 6 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 9 9 6 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/10/2019 06/15/2020 06/14/2021 06/13/2022 I

ALTERNATE DATE 06/17/2019 06/22/2020 06/21/2021 06/20/2022

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY CY PROPOSED NUMBER MARCH

--- SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRG FORM 536 (05-2016)