{{#Wiki_filter:Attachment II Marked Up Copy of R.E.Ginna Nuclear Power Plant Technical Specifications Included Pages: 3.3-27 B 3.3-95*B 3.3-96*These bases pages are being provided for information only to show the changes RG&E intends to make following NRC approval of the I.AR.The bases are under RGRE control for all changes in accordance with Specification 5.5.13.'P6i03fOi22 9hi029 PDR ADOCK 05000244 PDR~l ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)Engineered Safety Feature Actuation System InstrINIcntation FUNCTION APPLICABLE HOOES OR OTHER SPECIFIED COHO I T IONS REQUIRED CHANNELS SURVEILLANCE ALLOWABLE COHOITIONS REQUIREKENTS VALUE TRIP SETPOIHT 5.FeedIIater Isolation a.Automatic Actuation Logic and Actuation Relays 1,2(c)3(c)2 trains E,G SR 3.3.2.7 NA b.SG Mater Level-High 1,2(c),3()3 per SG F,G SR 3.3.2.1 s 94X SR 3.3.2.2 SR 3.3.2.5 s 85X c.Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
{{#Wiki_filter:Attachment   II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:
6.Auxiliary FeedIIatcr (AF'W)a.Hanual Initiation AFW Standby AFM 1,2,3 1,2,3 1 per pump 1 pcr pump SR 3.3.2.4 SR 3.3.2.4 HA NA NA b.Automatic Actuation Logic and Actuation Relays 1,2,3 2 trains E,G SR 3.3.2.7 c.SG Mater Level-Lou Lou 1,2,3 F 3 per SG~G SR 3.3.2~1 2 16X SR 3.3.2.2 SR 3.3.2.5 z 17X d.Safety Injection (Hotor driven pImps only)Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
3.3-27 B 3.3-95*
e.Undervoltagc-Bus 11A and 11B (Turbine driven punp only)1,2,3 2 pcI'us D,G SR 3.3.2.3 SR 3.3.2.5~2450 V~2579 V uith s 3.6 with s 3.6 sec time sec time delay delay f.Trip of Both Hain FeedIIater PImps (Hotor driven pumps only)1,2 2 pcl HFM pump B,C SR 3.3.2.4 HA (c)Except IIhen all Hain FecdIIatcr Regulating and associated bypass valves are closed and dc-activated or isolated by a closed manual valve.R.E.Ginna Nuclear Power Plant 3.3-27 Amendment No.Q, 63 ESFAS Instrumentation B 3.3.2 BASES ACTIONS (continued)
B 3.3-96*
D.l Condition 0 applies to the following ESFAS Functions:
These bases pages are being provided for information only to show the changes RG&E intends to make following NRC approval of the I.AR. The bases are under RGRE control for all changes in accordance with Specification 5.5.13.
~Manual Initiation of SI;~Hanual Initiation of Steam Line Isolation; n~AFW-Undervoltage
'P6i03fOi22 9hi029 PDR   ADOCK     05000244 PDR   ~l
-Bus 11A and llB.If a channel is inoperable, 48 hours is allowed to restore it to OPERABLE status.The specified Completion Time of 48 hours is reasonable considering that there are two automatic actuation trains and another manual initiation channel OPERABLE for each manual initiation, Fun'ction additional AFW actuation channels available besides the Undervoltage
 
-Bus 11A and 118 AFW Initiation unctions, and the low probability of an event occurring during this interval.E.1 Condition E applies to the automatic actuation logic and actuation relays for the following ESFAS Functions:
ESFAS   Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)
~Steam Line Isolation;
Engineered Safety Feature Actuation System InstrINIcntation APPLICABLE HOOES OR OTHER SPECIFIED       REQUIRED                          SURVEILLANCE    ALLOWABLE      TRIP FUNCTION              COHO I T IONS     CHANNELS           COHOITIONS     REQUIREKENTS       VALUE     SETPOIHT
~Feedwater Isolation; and~AFW.Condition E addresses the train orientation of the protection system and the master and slave relays.If one train is inoperable, a Completion Time of 6 hours is allowed to restore the train to OPERABLE status.This Completion Time is reasonable considering that there is another train OPERABLE, and the low probability of an event occurring during this time interval.The Completion Time of 6 hours is consistent with Reference 7.(continued)
: 5. FeedIIater Isolation
R.E.Ginna Nuclear Power Plant B 3.3-95 Revision 0 ESFAS Instrumentation B 3.3.2 BASES ACTIONS (continued)
: a. Automatic               1,2(c) 3(c)       2   trains             E,G       SR   3.3.2.7         NA Actuation Logic and Actuation Relays
F.1 Condition F applies to the following Functions:
: b. SG Mater               1,2(c),3( )       3 per       SG       F,G       SR   3.3.2.1       s 94X       s 85X Level -High                                                                SR   3.3.2.2 SR   3.3.2.5
~Steam Line Isolation-Containment Pressure-High High;~Steam Line Isolation-High Steam Flow Coincident With Safety Injection and Coincident With T.,-Low;~Steam Line Isolation-High-High Steam Flow Coincident With Safety Injection; n~Feedwater Isolation-SG Water Level-High, Condition F applies to Functions that typically operate on two-out-of-three logic.Therefore, failure of one channel places the Function in a two-out-of-two configuration.
: c. Safety Injection       Refer to Function 1 (Safety Injection)             for all initiation functions and requirements.
One channel must be tripped to place the Function in a one-out-of-two configuration that satisfies redundancy requirements.
: 6. Auxiliary FeedIIatcr (AF'W)
If one channel is inoperable, a Completion Time of 6 hours is allowed to restore the channel to OPERABLE status or to place it in the tripped condition.
: a. Hanual   Initiation AFW                         1,2,3           1   per                        SR  3.3.2.4         HA          NA pump Standby  AFM              1,2,3            1  pcr                        SR   3.3.2.4                     NA pump
Placing the channel in the tripped condition conservatively compensates for the inoperability, restores capability to accommodate a single failure, and allows operation to continue.The Required Actions are modified by a Note that allows the inoperable channel to be bypassed for up to 4 hours for surveillance testing of other channels.This 4 hours applies to each of the remaining OPERABLE channels.The Completion Time of 6 hours allowed to restore the channel to OPERABLE status or to place the inoperable channel in the tripped condition, and the 4 hour s allowed for testing, are justified in Reference 7.(continued)
: b. Automatic                   1,2,3         2 trains             E,G       SR   3.3.2.7 Actuation Logic and Actuation Relays F
R.E.Ginna Nuclear Power Plant 8 3.3-96 Revision 0 h
: c. SG Mater                   1,2,3         3   per     SG       ~G         SR   3.3.2 1
Attachment III Proposed Technical Specifications Included Pages: 3.3-27 0 ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)Engineered Safety Feature Actuation System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS SURVEILLANCE ALLOMABLE TRIP COND IT IOHS REQUIREMENTS VALUE SETPOINT 5.Feedwater Isolation a.Automatic Actuation Logic and Actuation Relays 1,2 3 2 trains E,G SR 3.3.2.7 HA NA b.SG Mater Level-High 1i2(c)3(c)3 per SG FiG SR 3 3 2 1 i 947, SR 3.3'.2 SR 3.3.2.5 s 85K c.Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
                                                                                                    ~       2 16X       z 17X Level -Lou Lou                                                              SR   3.3.2.2 SR   3.3.2.5
6.Auxiliary Feedwater (AFM)a.Manual Initiation AFM Standby AFM 1,2,3 1,2,3 1 per pwp 1 pcl'R 3.3.2.4 SR 3.3.2.4 NA HA b.Automatic Actuation Logic and Actuation Relays 1,2,3 2 trains E,G SR 3.3.2.7 NA c.SG Mater Level-Low Low 1,2,3 3 per SG F,G'R 3.3.2.1 SR 3.3.2.2 SR 3.3.2.5 a 16'17X d.Safety Injection (Motor driven pumps only)Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
: d. Safety Injection           Refer to Function           1 (Safety Injection) for   all (Hotor driven                    initiation functions         and requirements.
e.Under vol tage-Bus 11A and 11B (Turbine driven pump only)1,2,3 2 per bus D,G SR 3.3.2.3?2450 V a 2579 V with s 3.6 with s 3.6 sec time sec time delay delay f.Trip of Both Main Feedwater Pumps (Motor driven pumps only)1,2 2 per MFM punp B,C SR 3.3.2.4 HA NA (c)Except when all Main Feedwater Regulating and associated bypass valves are closed and de-activated or isolated by a closed manual valve.R.E.Ginna Nuclear Power Plant 3.3-27 Amendment No.g, Q Attachment IV NUREG-1431 Included pages: 3.3-24 3.3-37 O ESFAS Instrumentation 3.3.2 ACTIONS continued CONDITION REQUIRED ACTION COMPLETION TIME C.One train inoperable.
pImps  only)
C.l----NOTE-----One train may be bypassed for up to[4]hours for surveillance testing provided the other train is OPERABLE.OR Restore train to OPERABLE status.6 hours C.2.1 Be in MODE 3.AND C.2.2 Be in MODE 5.12 hours 42 hours D.One channel inoperable.
: e. Undervoltagc -Bus           1,2,3           2 pcI'us D,G       SR 3.3.2.3       ~ 2450 V    ~ 2579 V 11A and 11B                                                                SR 3.3.2.5       uith s 3.6 with s 3.6 (Turbine driven                                                                              sec time   sec time punp  only)                                                                                    delay       delay
S~a.t+<~~%, C4+ui~cL~prov 0.1----NOTE-----The inoperable channel may be bypassed for up to[4]hours for.surveillance testing of other channels.OR Place channel in trip.6 hours+<M&cl Qt+g~$~@+a~G.h~k G.W D.2.1 Be in MODE 3.AND 0.2.2 Be in MODE 4.12 hours 18 hour (continued)
: f. Trip of Both Hain           1,2             2 pcl               B,C       SR 3.3.2.4           HA FeedIIater PImps                          HFM pump (Hotor driven pumps  only)
WOG STS 3.3-24 Rev 1, 04/07/95  
(c) Except IIhen all Hain FecdIIatcr Regulating       and associated         bypass valves are closed and dc-activated or isolated by a closed manual valve.
~-s~ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 8)Engineered Safety Feature Actuation System Instruncntation RNCT I ON APPLICABLE KCOES OR OTHER SPECIFIED CONDITIONS REOUI RED CHANNELS SURVEILLANCE ALLOMABLE CONDI'TIOHS REQUIREKENTS VALUE TRIP SETPOIHT<'>
R.E. Ginna Nuclear Power Plant                                 3.3-27                             Amendment No. Q,     63
5.Turbine Trip and Feedwater Isolation a.Automatic Actuation Logic and Actuation Relays 1 2(j)[3)(j)2 trains H[G]SR 3.3.2.2 SR 3.3.2.4 SR 3.3.2.6 NA b.SG Mater Level-High Nigh (P-14)1,2<j>,[3)<j)[3]per SG 1[D)'R 3.3.2.1<[84.2]X SR 3.3.2.5 SR 3.3.2.9 SR 3.3.2.10[82.4)X'.Safety Injection Refer to Fmction 1 (Safety Injection) for all initiation functions and requirements.
 
6.Auxiliary Feedwater a.Automatic Actuation Logic and Actuation Relays (Solid State Protection System)1,2,3 2 trains SR 3.3.2.2 SR 3.3.2.4 SR 3.3.2.6 b.Automatic Actuation Logic and Actuation Relays (Balance of Plant ESFAS)1,2,3 2 trains SR 3.3.2-3 NA Z~cled (i<v me~ACkdA C,'.~c.SG Mater Level-Low Low 1,2,3[3]per SG SR 3.3-2.1>[30.4)X I Q2.2]X SR 3.3.2.5 SR 3.3.2.9 SR 3.3.2.1D (continued)(a)Reviewer's Note: Unit specific implementations may contain only Allowable Value depending on Setpoint Study methodology used by the unit.(j)Except when all KFIVs, KFRVs,[and associated bypass valves)are closed and[de-activated]
ESFAS Instrumentation B 3.3.2 BASES ACTIONS           D.l (continued)
[or isolated by a closed manual valve].WOG STS 3~3 37 Rev 1, 04/07/95 0 E T J}}
Condition   0 applies to the following     ESFAS Functions:
                  ~     Manual Initiation of SI;
                  ~     Hanual Initiation of Steam   Line Isolation; n
                  ~     AFW- Undervoltage Bus 11A and     llB.
If a channel is inoperable,     48 hours   is allowed to restore it to OPERABLE status. The       specified Completion Time of 48 hours is reasonable considering that there are two automatic actuation trains and another manual initiation channel OPERABLE for each manual initiation, Fun'ction additional AFW actuation channels available besides the Undervoltage Bus   11A and 118 AFW     Initiation unctions, and the low probability of       an event occurring during this interval.
E.1 Condition E applies to the automatic actuation logic and actuation relays for the following ESFAS Functions:
                  ~     Steam Line   Isolation;
                  ~     Feedwater   Isolation; and
                  ~     AFW.
Condition   E addresses   the train orientation of the protection system and the master and slave relays. If one train is inoperable, a Completion Time of 6 hours is allowed to restore the train to OPERABLE status. This Completion Time is reasonable considering that there is another train OPERABLE, and the low probability of an event occurring during this time interval. The Completion Time of 6 hours is consistent with Reference 7.
(continued)
R.E. Ginna Nuclear Power Plant       B 3.3-95                               Revision 0
 
ESFAS Instrumentation B 3.3.2 BASES ACTIONS           F.1 (continued)
Condition   F applies to the following Functions:
                  ~   Steam   Line Isolation Containment Pressure High High;
                  ~   Steam   Line Isolation High Steam Flow Coincident With Safety Injection and Coincident With T., Low;
                  ~     Steam Line   Isolation High -High   Steam Flow Coincident With Safety Injection; n
                  ~     Feedwater   Isolation SG   Water Level High, Condition   F applies to Functions that typically operate on two-out-of-three logic. Therefore, failure of one channel places the Function in a two-out-of-two configuration. One channel must be tripped to place the Function in a one-out-of-two configuration that satisfies redundancy requirements.
If one channel is inoperable, a Completion Time of 6 hours is allowed to restore the channel to OPERABLE status or to place it in the tripped condition. Placing the channel in the tripped condition conservatively compensates for the inoperability, restores capability to accommodate a single failure, and allows operation to continue.
The Required   Actions are modified by a Note that allows the inoperable channel to be bypassed for up to 4 hours for surveillance testing of other channels. This 4 hours applies to each of the remaining OPERABLE channels.
The Completion Time     of 6 hours allowed to restore the channel to OPERABLE status or to place the inoperable channel in the tripped condition, and the 4 hour s allowed for testing, are justified in Reference 7.
(continued)
R.E. Ginna Nuclear Power Plant       8 3.3-96                           Revision 0
 
h Attachment III Proposed Technical Specifications Included Pages:
3.3-27
 
0                                                             ESFAS   Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)
Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED       REQUIRED                       SURVEILLANCE     ALLOMABLE       TRIP FUNCTION                CONDITIONS        CHANNELS        COND IT IOHS REQUIREMENTS       VALUE     SETPOINT
: 5. Feedwater Isolation
: a. Automatic               1,2       3       2 trains           E,G       SR   3.3.2.7         HA         NA Actuation Logic and Actuation Relays
: b. SG Mater Level -High 1i2(c) 3(c)       3 per   SG         FiG       SR SR 3 3 2 3.3 '.2 1      i  947,    s 85K SR   3.3.2.5
: c. Safety Injection       Refer to Function 1 (Safety Injection)           for all initiation functions and requirements.
: 6. Auxiliary Feedwater (AFM)
: a. Manual   Initiation AFM Standby   AFM 1,2,3 1,2,3 1
1 pcl'R per pwp SR 3.3.2.4 3.3.2.4 NA HA
: b. Automatic                   1,2,3         2 trains           E,G       SR   3.3.2.7         NA Actuation Logic and Actuation Relays
: c. SG Mater                     1,2,3         3 per   SG         F,G     'R   3.3.2.1       a  16'        17X Level -Low Low                                                            SR 3.3.2.2 SR   3.3.2.5
: d. Safety Injection           Refer to Function     1   (Safety Injection) for   all (Motor driven                    initiation functions       and requirements.
pumps  only)
: e. Under vol tage Bus         1,2,3           2 per           D,G       SR 3.3.2.3       ? 2450 V   a 2579 V 11A and 11B                                    bus                                        with s 3.6   with s 3.6 (Turbine driven                                                                            sec time   sec time pump  only)                                                                                  delay       delay
: f. Trip of Both Main             1,2           2 per             B,C       SR 3.3.2.4           HA         NA Feedwater Pumps                            MFM  punp (Motor driven pumps  only)
(c) Except when     all Main Feedwater Regulating and associated bypass valves are closed and de-activated or isolated by   a closed manual valve.
R.E. Ginna Nuclear Power Plant                                 3.3-27                               Amendment No. g,   Q
 
Attachment IV NUREG-1431 Included pages:
3.3-24 3.3-37
 
O ESFAS   Instrumentation 3.3.2 ACTIONS       continued CONDITION                 REQUIRED ACTION             COMPLETION TIME C. One train inoperable. C.l     NOTE One train may be bypassed   for up to
[4] hours for surveillance testing provided the other train is   OPERABLE.
Restore train to         6  hours OPERABLE   status.
OR C.2.1   Be   in MODE 3.           12  hours AND C.2.2   Be   in MODE 5.           42 hours
            ~prov D. One   channel           0.1      NOTE inoperable.                     The  inoperable channel may be bypassed for up    to S~ a.t
            +<~~%,   C4+ui~cL
[4] hours for.
surveillance testing of other channels.
Place channel in           6  hours trip.
OR D.2.1    Be  in  MODE  3.          12  hours
              +<M&cl Qt+g~$       AND
              ~@+a~     G.h
              ~k G.W         0.2.2   Be in MODE 4.           18 hour (continued)
WOG STS                             3.3-24                         Rev 1, 04/07/95
 
        ~-s ~
ESFAS   Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 8)
Engineered Safety Feature Actuation System Instruncntation APPLICABLE KCOES OR OTHER SPECIFIED       REOUI RED                   SURVEILLANCE   ALLOMABLE     TRIP RNCT I ON            CONDITIONS      CHANNELS      CONDI'TIOHS   REQUIREKENTS     VALUE   SETPOIHT<'>
: 5. Turbine Trip and Feedwater   Isolation
: a. Automatic               1 2(j)       2 trains         H[G]     SR 3.3.2.2         NA Actuation Logic                                                        3.3.2.4
[3) (j)
SR and Actuation                                                      SR 3.3.2.6 Relays
: b. SG Mater Level -High Nigh 1,2<j>,       [3] per SG 1[D)   'RSR 3.3.2.1 3.3.2.5
                                                                                                                < [84.2]X     [82.4)
(P-14)                    [3)<j)                                  SR 3.3.2.9                          X'.
SR 3.3.2.10 Safety Injection     Refer to Fmction 1 (Safety Injection)         for all initiation functions and requirements.
: 6. Auxiliary Feedwater
: a. Automatic                 1,2,3       2 trains                   SR 3.3.2.2 Actuation Logic                                                    SR 3.3.2.4 and Actuation                                                      SR 3.3.2.6 Relays  (Solid State Protection System)
: b. Automatic                 1,2,3       2 trains                   SR 3.3.2-3                     NA Actuation Logic and Actuation Relays (Balance of Plant  ESFAS)
Z~
(i <v me cled      ~   c. SG Mater
                                    -
Level Low Low 1,2,3       [3] per SG SR SR 3.3-2.1 3.3.2.5
                                                                                                                > [30.4)X   I Q2.2]X
~ACkdA                                                                                          SR 3.3.2.9 SR 3.3.2.1D C,'.
(continued)
(a)   Reviewer's Note: Unit specific implementations may contain only Allowable Value depending on Setpoint Study methodology used by the unit.
(j)   Except when all KFIVs, KFRVs, [and associated bypass valves) are closed and [de-activated] [or isolated by a closed manual valve].
WOG     STS                                             3 ~ 3 37                               Rev 1, 04/07/95
 
0 E T
J}}

Revision as of 18:02, 29 October 2019

Proposed Tech Specs Re Actions for Inoperable Channels Associated with Auxiliary Feedwater Pump
ML17264A713
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/29/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A711 List:
References
NUDOCS 9610310122
Download: ML17264A713 (11)


Text

Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:

3.3-27 B 3.3-95*

B 3.3-96*

These bases pages are being provided for information only to show the changes RG&E intends to make following NRC approval of the I.AR. The bases are under RGRE control for all changes in accordance with Specification 5.5.13.

'P6i03fOi22 9hi029 PDR ADOCK 05000244 PDR ~l

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)

Engineered Safety Feature Actuation System InstrINIcntation APPLICABLE HOOES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION COHO I T IONS CHANNELS COHOITIONS REQUIREKENTS VALUE SETPOIHT

5. FeedIIater Isolation
a. Automatic 1,2(c) 3(c) 2 trains E,G SR 3.3.2.7 NA Actuation Logic and Actuation Relays
b. SG Mater 1,2(c),3( ) 3 per SG F,G SR 3.3.2.1 s 94X s 85X Level -High SR 3.3.2.2 SR 3.3.2.5
c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
6. Auxiliary FeedIIatcr (AF'W)
a. Hanual Initiation AFW 1,2,3 1 per SR 3.3.2.4 HA NA pump Standby AFM 1,2,3 1 pcr SR 3.3.2.4 NA pump
b. Automatic 1,2,3 2 trains E,G SR 3.3.2.7 Actuation Logic and Actuation Relays F
c. SG Mater 1,2,3 3 per SG ~G SR 3.3.2 1

~ 2 16X z 17X Level -Lou Lou SR 3.3.2.2 SR 3.3.2.5

d. Safety Injection Refer to Function 1 (Safety Injection) for all (Hotor driven initiation functions and requirements.

pImps only)

e. Undervoltagc -Bus 1,2,3 2 pcI'us D,G SR 3.3.2.3 ~ 2450 V ~ 2579 V 11A and 11B SR 3.3.2.5 uith s 3.6 with s 3.6 (Turbine driven sec time sec time punp only) delay delay
f. Trip of Both Hain 1,2 2 pcl B,C SR 3.3.2.4 HA FeedIIater PImps HFM pump (Hotor driven pumps only)

(c) Except IIhen all Hain FecdIIatcr Regulating and associated bypass valves are closed and dc-activated or isolated by a closed manual valve.

R.E. Ginna Nuclear Power Plant 3.3-27 Amendment No. Q, 63

ESFAS Instrumentation B 3.3.2 BASES ACTIONS D.l (continued)

Condition 0 applies to the following ESFAS Functions:

~ Manual Initiation of SI;

~ Hanual Initiation of Steam Line Isolation; n

~ AFW- Undervoltage Bus 11A and llB.

If a channel is inoperable, 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is allowed to restore it to OPERABLE status. The specified Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is reasonable considering that there are two automatic actuation trains and another manual initiation channel OPERABLE for each manual initiation, Fun'ction additional AFW actuation channels available besides the Undervoltage Bus 11A and 118 AFW Initiation unctions, and the low probability of an event occurring during this interval.

E.1 Condition E applies to the automatic actuation logic and actuation relays for the following ESFAS Functions:

~ Steam Line Isolation;

~ Feedwater Isolation; and

~ AFW.

Condition E addresses the train orientation of the protection system and the master and slave relays. If one train is inoperable, a Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is allowed to restore the train to OPERABLE status. This Completion Time is reasonable considering that there is another train OPERABLE, and the low probability of an event occurring during this time interval. The Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is consistent with Reference 7.

(continued)

R.E. Ginna Nuclear Power Plant B 3.3-95 Revision 0

ESFAS Instrumentation B 3.3.2 BASES ACTIONS F.1 (continued)

Condition F applies to the following Functions:

~ Steam Line Isolation Containment Pressure High High;

~ Steam Line Isolation High Steam Flow Coincident With Safety Injection and Coincident With T., Low;

~ Steam Line Isolation High -High Steam Flow Coincident With Safety Injection; n

~ Feedwater Isolation SG Water Level High, Condition F applies to Functions that typically operate on two-out-of-three logic. Therefore, failure of one channel places the Function in a two-out-of-two configuration. One channel must be tripped to place the Function in a one-out-of-two configuration that satisfies redundancy requirements.

If one channel is inoperable, a Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is allowed to restore the channel to OPERABLE status or to place it in the tripped condition. Placing the channel in the tripped condition conservatively compensates for the inoperability, restores capability to accommodate a single failure, and allows operation to continue.

The Required Actions are modified by a Note that allows the inoperable channel to be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels. This 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> applies to each of the remaining OPERABLE channels.

The Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowed to restore the channel to OPERABLE status or to place the inoperable channel in the tripped condition, and the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> s allowed for testing, are justified in Reference 7.

(continued)

R.E. Ginna Nuclear Power Plant 8 3.3-96 Revision 0

h Attachment III Proposed Technical Specifications Included Pages:

3.3-27

0 ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOMABLE TRIP FUNCTION CONDITIONS CHANNELS COND IT IOHS REQUIREMENTS VALUE SETPOINT

5. Feedwater Isolation
a. Automatic 1,2 3 2 trains E,G SR 3.3.2.7 HA NA Actuation Logic and Actuation Relays
b. SG Mater Level -High 1i2(c) 3(c) 3 per SG FiG SR SR 3 3 2 3.3 '.2 1 i 947, s 85K SR 3.3.2.5
c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
6. Auxiliary Feedwater (AFM)
a. Manual Initiation AFM Standby AFM 1,2,3 1,2,3 1

1 pcl'R per pwp SR 3.3.2.4 3.3.2.4 NA HA

b. Automatic 1,2,3 2 trains E,G SR 3.3.2.7 NA Actuation Logic and Actuation Relays
c. SG Mater 1,2,3 3 per SG F,G 'R 3.3.2.1 a 16' 17X Level -Low Low SR 3.3.2.2 SR 3.3.2.5
d. Safety Injection Refer to Function 1 (Safety Injection) for all (Motor driven initiation functions and requirements.

pumps only)

e. Under vol tage Bus 1,2,3 2 per D,G SR 3.3.2.3  ? 2450 V a 2579 V 11A and 11B bus with s 3.6 with s 3.6 (Turbine driven sec time sec time pump only) delay delay
f. Trip of Both Main 1,2 2 per B,C SR 3.3.2.4 HA NA Feedwater Pumps MFM punp (Motor driven pumps only)

(c) Except when all Main Feedwater Regulating and associated bypass valves are closed and de-activated or isolated by a closed manual valve.

R.E. Ginna Nuclear Power Plant 3.3-27 Amendment No. g, Q

Attachment IV NUREG-1431 Included pages:

3.3-24 3.3-37

O ESFAS Instrumentation 3.3.2 ACTIONS continued CONDITION REQUIRED ACTION COMPLETION TIME C. One train inoperable. C.l NOTE One train may be bypassed for up to

[4] hours for surveillance testing provided the other train is OPERABLE.

Restore train to 6 hours OPERABLE status.

OR C.2.1 Be in MODE 3. 12 hours AND C.2.2 Be in MODE 5. 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br />

~prov D. One channel 0.1 NOTE inoperable. The inoperable channel may be bypassed for up to S~ a.t

+<~~%, C4+ui~cL

[4] hours for.

surveillance testing of other channels.

Place channel in 6 hours trip.

OR D.2.1 Be in MODE 3. 12 hours

+<M&cl Qt+g~$ AND

~@+a~ G.h

~k G.W 0.2.2 Be in MODE 4. 18 hour (continued)

WOG STS 3.3-24 Rev 1, 04/07/95

~-s ~

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 8)

Engineered Safety Feature Actuation System Instruncntation APPLICABLE KCOES OR OTHER SPECIFIED REOUI RED SURVEILLANCE ALLOMABLE TRIP RNCT I ON CONDITIONS CHANNELS CONDI'TIOHS REQUIREKENTS VALUE SETPOIHT<'>

5. Turbine Trip and Feedwater Isolation
a. Automatic 1 2(j) 2 trains H[G] SR 3.3.2.2 NA Actuation Logic 3.3.2.4

[3) (j)

SR and Actuation SR 3.3.2.6 Relays

b. SG Mater Level -High Nigh 1,2<j>, [3] per SG 1[D) 'RSR 3.3.2.1 3.3.2.5

< [84.2]X [82.4)

(P-14) [3)<j) SR 3.3.2.9 X'.

SR 3.3.2.10 Safety Injection Refer to Fmction 1 (Safety Injection) for all initiation functions and requirements.

6. Auxiliary Feedwater
a. Automatic 1,2,3 2 trains SR 3.3.2.2 Actuation Logic SR 3.3.2.4 and Actuation SR 3.3.2.6 Relays (Solid State Protection System)
b. Automatic 1,2,3 2 trains SR 3.3.2-3 NA Actuation Logic and Actuation Relays (Balance of Plant ESFAS)

Z~

(i <v me cled ~ c. SG Mater

-

Level Low Low 1,2,3 [3] per SG SR SR 3.3-2.1 3.3.2.5

> [30.4)X I Q2.2]X

~ACkdA SR 3.3.2.9 SR 3.3.2.1D C,'.

(continued)

(a) Reviewer's Note: Unit specific implementations may contain only Allowable Value depending on Setpoint Study methodology used by the unit.

(j) Except when all KFIVs, KFRVs, [and associated bypass valves) are closed and [de-activated] [or isolated by a closed manual valve].

WOG STS 3 ~ 3 37 Rev 1, 04/07/95

0 E T

J