ML17292B402: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17292B402 | | number = ML17292B402 | ||
| issue date = 10/19/2017 | | issue date = 10/19/2017 | ||
| title = | | title = Notification of NRC Triennial Heat Sink Performance Inspection (05000313/2017004 and 05000368/2017004) and Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Anderson R | | addressee name = Anderson R | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000313, 05000368 | | docket = 05000313, 05000368 | ||
Line 14: | Line 14: | ||
| page count = 6 | | page count = 6 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000313/2017004]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:October 19, 2017 | {{#Wiki_filter:October 19, 2017 | ||
Mr. Richard L. Anderson, Vice President | |||
Entergy Operations, Inc. | |||
Mr. Richard L. Anderson, Vice President Entergy Operations, Inc. | 1448 S.R. 333 | ||
1448 S.R. 333 | Russellville, AR 72802-0967 | ||
Russellville, AR 72802-0967 | SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF NRC TRIENNIAL HEAT SINK | ||
PERFORMANCE INSPECTION (05000313/2017004 AND 05000368/2017004) | |||
AND REQUEST FOR INFORMATION | |||
Dear Mr. Anderson: | |||
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) | |||
staff will conduct a triennial heat sink performance inspection at your Arkansas Nuclear One, | |||
Units 1 and Unit 2, from November 13-17, 2017. The inspection will consist of one reactor | |||
inspector from the NRCs Region IV office for one week. The inspection will be conducted in | |||
accordance with NRC Inspection Procedure 71111.07, "Heat Sink Performance." | |||
Experience has shown that this inspection is resource intensive both for the NRC inspectors | |||
and your staff. In order to minimize the impact to your on-site resources and to ensure a | |||
productive inspection, we have enclosed a request for documents needed for this inspection. | |||
Please note that the documents are requested to be provided by November 6, 2017. We | |||
request that during the on-site inspection week you ensure that copies of analyses, evaluations, | |||
or documentation regarding the implementation and maintenance of your heat exchanger | |||
program are available. Of specific interest are those documents that establish that your heat | |||
exchanger program satisfies NRC regulatory requirements and conforms to applicable NRC | |||
guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should | |||
be available to support the inspector at the site during the inspection. | |||
We have discussed the schedule for this inspection activity with your staff and understand that | |||
our regulatory contact for this inspection will be Michael Hall of your licensing organization. If | |||
there are any questions about this inspection or the material requested, please contact the | |||
inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at chris.smith@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
R. Anderson 2 | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of | |||
this letter and its enclosure will be available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of NRC's document | |||
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA Wayne C. Sifre Acting for/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-313, 50-368 | |||
License Nos. DPR-51, NPF-6 | |||
Enclosure: | |||
Triennial Heat Sink Performance Inspection | |||
Request for Information | |||
cc: Electronic Distribution | |||
ML17292B402 | |||
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: WSifre Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE RI:EB1 C:EB1 C:DRP/E C:EB1 | |||
NAME CSmith TFarnholtz NOKeefe TFarnholtz | |||
SIGNATURE /RA/ /RA/ WSifre for /RA/ /RA/ WSifre for | |||
DATE 10/13/17 10/19/17 10/19/17 10/19/17 | |||
Request for Information | |||
Triennial Heat Sink Performance Inspection | |||
Arkansas Nuclear One | |||
Inspection Report: 05000313/2017004 and 05000368/2017004 | |||
Inspection Dates: November 13-17, 2017 | |||
Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance | |||
Inspector: Chris Smith, Reactor Inspector | |||
Request for Information | |||
Triennial Heat Sink Performance Inspection Arkansas Nuclear One | |||
Inspection Report: | |||
Inspection Dates: | |||
Inspector: | |||
Information Requested for the In-Office Preparation Week | Information Requested for the In-Office Preparation Week | ||
The following information should be sent to the Region IV office in hard copy or electronic | |||
format, to the attention of Chris Smith, by November 6, 2017. | format, to the attention of Chris Smith, by November 6, 2017. The inspector will review specific | ||
items from the information requested below and then request from your staff additional documents needed during the on-site inspection week. | items from the information requested below and then request from your staff additional | ||
documents needed during the on-site inspection week. Also, we request that you categorize the | |||
documentation electronically if possible. | documents in your response with the numbered list below. Please provide requested | ||
formats are available, please inform the inspector, and provide subject documentation during the first day of the on-site inspection. | documentation electronically if possible. If requested documents are large and only hard copy | ||
request, please call the lead inspector as soon as possible. | formats are available, please inform the inspector, and provide subject documentation during | ||
the first day of the on-site inspection. If you have any questions regarding this information | |||
request, please call the lead inspector as soon as possible. | |||
The following heat exchangers/heat sinks have been selected for inspection: | |||
* Unit 1 Loop Decay Heat Cooler (Train B), E-35B | * Unit 1 Reactor Building Service Water Cooler Coil (Train A), VCC-2A | ||
* Unit 2 Component Cooling Water Heat Exchanger (Train A), 2E-28A | * Unit 1 Loop Decay Heat Cooler (Train B), E-35B B | ||
* Unit 2 Emergency Cooling Pond, T-250 | * Unit 2 Component Cooling Water Heat Exchanger (Train A), 2E-28A | ||
* Unit 2 Emergency Cooling Pond, T-250 | |||
For all samples listed above: | |||
1. Copies of any self-assessments or audits performed in the previous three years | |||
2. Copies of any documents such as a Generic Letter 89-13 heat exchanger program | |||
description, heat exchanger program document, etc. | |||
3. List of commitments (with descriptions) to the Generic Letter 89-13 program | |||
4. Copies of system health reports and maintenance rule system notebooks | |||
5. Copies of design bases documents, updated final safety analysis report pages, technical | |||
specification (and bases) pages, and technical requirements manual (and bases) pages | |||
6. List of corrective action program documents (with descriptions) for the past three years | |||
7. List of any design changes (with descriptions) implemented during the past three years | |||
8. List of preventive maintenance tasks (with descriptions) and frequency | |||
Enclosure | |||
9. Copies of simplified piping and instrumentation drawings or diagrams and operator | |||
training manuals, if available | |||
For the specific heat exchangers selected: | |||
Testing Documents | |||
10. Copies of the two most recent completed tests confirming thermal performance for those | |||
heat exchangers which are performance tested | |||
11. Instrument uncertainties of the instruments used during testing | |||
12. Copy of any operability determinations or other documentation of degradation | |||
associated with the heat exchangers or the systems that support the operation for the | |||
selected heat exchangers | |||
13. Documents that show the as-found results are recorded, evaluated, and appropriately | |||
dispositioned such that the as-left condition is acceptable | |||
Cleaning Documents | |||
14. The cleaning and inspection maintenance schedule for each heat exchanger for the next | |||
five years | |||
15. Copy of the document describing the inspection results for the last two cleaning and | |||
inspection activities completed on each heat exchanger | |||
16. Cleaning procedures with acceptance criteria for the selected heat exchangers | |||
17. Copies of the documents that verify the structural integrity of the heat exchanger | |||
(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection | |||
results) | |||
18. Copies of those documents that describe the methods taken to control water chemistry | |||
in the heat exchangers | |||
Design Documents | |||
19. Provide a list of calculations (with descriptions) which currently apply to each heat | |||
exchanger | |||
20. Copies of vendor data sheets and design basis data for the selected heat exchangers | |||
21. Copy of the calculation which establishes the limiting (maximum) design basis heat load | |||
which is required to be removed by each of these heat exchangers | |||
22. Copy of the calculation which correlates surveillance testing results from these heat | |||
exchangers with design basis heat removal capability (e.g., basis for surveillance test | |||
acceptance criteria) | |||
23. Copy of the calculations or documents which evaluate the potential for water hammer or | |||
excessive tube vibration in the heat exchanger or associated piping | |||
2 | |||
24. Copy of the document which identifies the current number of tubes in service for each | |||
heat exchanger and the supporting calculation which establishes the maximum number | |||
of tubes which can be plugged in each heat exchanger | |||
25. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes | |||
which are identified in each heat exchanger | |||
For the ultimate heat sink or safety-related service water system: | |||
26. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable) | |||
27. Copies of calculations and surveillances that determine the ultimate heat sink reservoir | |||
capacity and heat transfer capability (if applicable) | |||
28. Copies of procedures for a loss of ultimate heat sink or safety-related service water | |||
system | |||
29. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, | |||
debris, etc.) and aquatic life | |||
30. Copies of inspections and/or maintenance related to preventing biotic fouling | |||
31. Copies of procedures and/or test results to survey or monitor interface valves between | |||
the safety-related section of the service water system and the nonsafety-related section | |||
32. Copy of the most recent service water flow balance test results, both as-found and as- | |||
left | |||
33. History of any thru-wall pipe leaks on the safety-related service water system | |||
Inspector Contact Information: | |||
Chris Smith | |||
Reactor Inspector | |||
817-200-1095 | |||
Chris.Smith@nrc.gov | Chris.Smith@nrc.gov | ||
Mailing Address: | |||
Mailing Address: | U.S. NRC, Region IV | ||
ATTN: Chris Smith | |||
1600 East Lamar Blvd. | |||
U.S. NRC, Region IV ATTN: | Arlington, TX 76011-4511 | ||
3 | |||
Arlington, TX | |||
}} | }} |
Latest revision as of 13:00, 29 October 2019
ML17292B402 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear ![]() |
Issue date: | 10/19/2017 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Richard Anderson Entergy Operations |
References | |
IR 2017004 | |
Download: ML17292B402 (6) | |
See also: IR 05000313/2017004
Text
October 19, 2017
Mr. Richard L. Anderson, Vice President
Entergy Operations, Inc.
1448 S.R. 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF NRC TRIENNIAL HEAT SINK
PERFORMANCE INSPECTION (05000313/2017004 AND 05000368/2017004)
AND REQUEST FOR INFORMATION
Dear Mr. Anderson:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)
staff will conduct a triennial heat sink performance inspection at your Arkansas Nuclear One,
Units 1 and Unit 2, from November 13-17, 2017. The inspection will consist of one reactor
inspector from the NRCs Region IV office for one week. The inspection will be conducted in
accordance with NRC Inspection Procedure 71111.07, "Heat Sink Performance."
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by November 6, 2017. We
request that during the on-site inspection week you ensure that copies of analyses, evaluations,
or documentation regarding the implementation and maintenance of your heat exchanger
program are available. Of specific interest are those documents that establish that your heat
exchanger program satisfies NRC regulatory requirements and conforms to applicable NRC
guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should
be available to support the inspector at the site during the inspection.
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Michael Hall of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at chris.smith@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
R. Anderson 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA Wayne C. Sifre Acting for/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-313, 50-368
Enclosure:
Triennial Heat Sink Performance Inspection
Request for Information
cc: Electronic Distribution
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: WSifre Yes No Publicly Available Sensitive NRC-002
OFFICE RI:EB1 C:EB1 C:DRP/E C:EB1
NAME CSmith TFarnholtz NOKeefe TFarnholtz
SIGNATURE /RA/ /RA/ WSifre for /RA/ /RA/ WSifre for
DATE 10/13/17 10/19/17 10/19/17 10/19/17
Request for Information
Triennial Heat Sink Performance Inspection
Arkansas Nuclear One
Inspection Report: 05000313/2017004 and 05000368/2017004
Inspection Dates: November 13-17, 2017
Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance
Inspector: Chris Smith, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format, to the attention of Chris Smith, by November 6, 2017. The inspector will review specific
items from the information requested below and then request from your staff additional
documents needed during the on-site inspection week. Also, we request that you categorize the
documents in your response with the numbered list below. Please provide requested
documentation electronically if possible. If requested documents are large and only hard copy
formats are available, please inform the inspector, and provide subject documentation during
the first day of the on-site inspection. If you have any questions regarding this information
request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
- Unit 1 Reactor Building Service Water Cooler Coil (Train A), VCC-2A
- Unit 1 Loop Decay Heat Cooler (Train B), E-35B B
- Unit 2 Component Cooling Water Heat Exchanger (Train A), 2E-28A
- Unit 2 Emergency Cooling Pond, T-250
For all samples listed above:
1. Copies of any self-assessments or audits performed in the previous three years
2. Copies of any documents such as a Generic Letter 89-13 heat exchanger program
description, heat exchanger program document, etc.
3. List of commitments (with descriptions) to the Generic Letter 89-13 program
4. Copies of system health reports and maintenance rule system notebooks
5. Copies of design bases documents, updated final safety analysis report pages, technical
specification (and bases) pages, and technical requirements manual (and bases) pages
6. List of corrective action program documents (with descriptions) for the past three years
7. List of any design changes (with descriptions) implemented during the past three years
8. List of preventive maintenance tasks (with descriptions) and frequency
Enclosure
9. Copies of simplified piping and instrumentation drawings or diagrams and operator
training manuals, if available
For the specific heat exchangers selected:
Testing Documents
10. Copies of the two most recent completed tests confirming thermal performance for those
heat exchangers which are performance tested
11. Instrument uncertainties of the instruments used during testing
12. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers
13. Documents that show the as-found results are recorded, evaluated, and appropriately
dispositioned such that the as-left condition is acceptable
Cleaning Documents
14. The cleaning and inspection maintenance schedule for each heat exchanger for the next
five years
15. Copy of the document describing the inspection results for the last two cleaning and
inspection activities completed on each heat exchanger
16. Cleaning procedures with acceptance criteria for the selected heat exchangers
17. Copies of the documents that verify the structural integrity of the heat exchanger
(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection
results)
18. Copies of those documents that describe the methods taken to control water chemistry
in the heat exchangers
Design Documents
19. Provide a list of calculations (with descriptions) which currently apply to each heat
exchanger
20. Copies of vendor data sheets and design basis data for the selected heat exchangers
21. Copy of the calculation which establishes the limiting (maximum) design basis heat load
which is required to be removed by each of these heat exchangers
22. Copy of the calculation which correlates surveillance testing results from these heat
exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)
23. Copy of the calculations or documents which evaluate the potential for water hammer or
excessive tube vibration in the heat exchanger or associated piping
2
24. Copy of the document which identifies the current number of tubes in service for each
heat exchanger and the supporting calculation which establishes the maximum number
of tubes which can be plugged in each heat exchanger
25. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes
which are identified in each heat exchanger
For the ultimate heat sink or safety-related service water system:
26. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
27. Copies of calculations and surveillances that determine the ultimate heat sink reservoir
capacity and heat transfer capability (if applicable)
28. Copies of procedures for a loss of ultimate heat sink or safety-related service water
system
29. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,
debris, etc.) and aquatic life
30. Copies of inspections and/or maintenance related to preventing biotic fouling
31. Copies of procedures and/or test results to survey or monitor interface valves between
the safety-related section of the service water system and the nonsafety-related section
32. Copy of the most recent service water flow balance test results, both as-found and as-
left
33. History of any thru-wall pipe leaks on the safety-related service water system
Inspector Contact Information:
Reactor Inspector
817-200-1095
Chris.Smith@nrc.gov
Mailing Address:
U.S. NRC, Region IV
ATTN: Chris Smith
1600 East Lamar Blvd.
Arlington, TX 76011-4511
3