{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION R.E.GINNA NUCLEAR POWER PLANT Revision 19 to: Quality Assurance Program for Station Operation DOCKET NO.50-244 December, 1993p 10034 R nDaCK'OSO0OZOO PDR' TABLE OF CONTENTS Section Title Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION 2.Quality Assurance Program I Organization 3.Design Control 10 5.6.Procurement Document Control Instructions, Procedures.and Drawings.Document Control 13 14 16 7.Control of Purchased Material, Equipment and Services 18 Identification and Control of Materials, Parts and Components 22 12.13.14.15.16.17.18.Control of Special Processes Inspection Test Control Control of Measuring and Test Equipment Handling, Storage and Shipping Inspection, Test and Operating Status Nonconforming Materials, Parts and Components Corrective Action Quality Assurance Records Audits 23 25 27.28 29 30 31 33 Revision 19 December 1993 LIST OF TABLES Table Number Title Pacae Quality Assurance Program Procedures Subject Listing 37 4-1 Procurement Document Requirements Audit List 58 59 LIST OF FIGURES Fi ure Number Title Pacae 2-2 Management Organization Quality Performance Organization 63i.-Nuclear Production Division Organization 65 Gas and Electric Distribution Division 66 Organization Technical Services Division Organization 67 Ginna Station Review and Audits Functions 68 Revision 19 December 1993 0 0 UALITY ASSURANCE PROGRAM FOR STATION OPERATION l.ualit Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation.
{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION R.E. GINNA NUCLEAR POWER PLANT Revision 19 to:
of the R.E.Ginna Nuclear Power Plant.This program applies to all activities affecting the safety related functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modif ication, test and inspection.
Quality Assurance Program for Station Operation DOCKET NO. 50-244 December,   1993 p  10034 R nDaCK'OSO0OZOO PDR'
In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with lOCFR Part 71 excluding fabrication and.design of shipping casks.The basic Rochester Gas and Electric Corporation quality assurance policy is established by the Chairman of the Board, President and Chief Executive Officer.This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering through the: Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station;Division Manager-Technical Services and Chief Engineer;and heads of other supporting departments.
 
The program is governed by a Ginna Station Quality Assurance Manual whi'ch contains the requirements and assignment of responsibilities for implementation.of the program.The manual is prepared, reviewed,-
TABLE OF CONTENTS Section                   Title                           Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program I
and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.
: 2.      Organization
The program is implemented through Quality Assurance/Quality Control, Ginna Station,'uclear Engineering Services, Production Division Tx'aining, Materials Engineering and Inspection Services, Gas and Electric Distribution Division, and Purchasing procedures.
: 3.     Design Control                                       10 Procurement Document Control                         13
These procedures are prepared, approved and maintained by the responsible organization and reviewed by Quality Performance.
: 5.      Instructions, Procedures   .and Drawings .           14
In addition to its procedure review, Quality Performance assures procedure adequacy through audits and surveillances of a sample of procedures in use.These procedures are reviewed for adequacy at least once every two years by the responsible organization.
: 6.      Document Control                                   16
Table 1-1 provides a listing of the subjects Revision 19 December, 1993 0 0 and a short.description of the subject matter which is contained in each procedure.
: 7.     Control of Purchased Material, Equipment             18 and Services Identification and Control of Materials,             22 Parts and Components Control of Special Processes                         23 Inspection Test Control                                         25
Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual.Organizational responsibilities are described in Section 2.The Quality Assurance Program covers all existing Seismic Category I and Class 1E structures, systems, and components, including their foundations and supports.Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance.
: 12. Control of Measuring and Test Equipment             27.
A detailed listing of the structures, systems and components covered by the Quality Assurance Program and based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in a controlled database.The criteria for determining if the quality assurance program applies are reviewed by Quality.Performance.
: 13. Handling, Storage and Shipping                       28
Details of the water-and-steam-containing system boundaries are contained on system flow drawings;Modifications or additions to existing structures, systems, and components are designated the, same seismic classification as the existing system.New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to'assure they understand'hat these are mandatory requirements which must be implemented and enforced.Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements, purpose, scope, and implementation of applicable quality related program manuals and procedures.
: 14. Inspection, Test and Operating Status               29
Refresher sessions are held periodically.
: 15. Nonconforming Materials, Parts and Components       30
: 16. Corrective Action                                   31
: 17. Quality Assurance Records                             33
: 18. Audits Revision   19 December   1993
 
LIST OF TABLES Table Number         Title                               Pacae Quality Assurance Program                   37 Procedures   Subject Listing 4-1           Procurement Document Requirements           58 Audit List                                 59 LIST OF FIGURES Fi ure Number       Title                               Pacae Management  Organization                  63 2-2           Quality Performance Organization Nuclear Production Division                 65 Organization i.-            Gas and Electric Distribution Division Organization 66 Technical Services Division                 67 Organization Ginna Station Review and Audits             68 Functions Revision   19 December 1993
 
0 0
 
UALITY ASSURANCE   PROGRAM FOR STATION OPERATION
: l. ualit   Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation. of the R. E. Ginna Nuclear Power Plant.
This program applies to all activities affecting the safety related functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modif ication, test and inspection. In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with lOCFR Part 71 excluding fabrication and .design of shipping casks.
The basic Rochester Gas and Electric Corporation quality assurance policy is established by the Chairman of the Board, President and Chief Executive Officer. This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering through the:
Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station; Division Manager-Technical Services and Chief Engineer; and heads of other supporting departments.
The program is governed by a Ginna Station Quality Assurance Manual whi'ch contains the requirements and assignment of responsibilities for implementation .of the program. The manual is prepared, reviewed,- and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.
The program is implemented through Quality Assurance/Quality Control, Ginna Station,'uclear Engineering Services, Production Division Tx'aining, Materials Engineering and Inspection Services, Gas and Electric Distribution Division, and Purchasing procedures. These procedures are prepared, approved and maintained by the responsible organization and reviewed by Quality Performance. In addition to its procedure review, Quality Performance assures procedure adequacy through audits and surveillances of a sample of procedures in use. These procedures are reviewed for adequacy at least once every two years by the responsible organization. Table 1-1 provides a listing of the subjects Revision 19 December, 1993
 
0 0
 
and a short. description of the subject matter which is contained in each procedure.
Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.
The Quality Assurance Program covers all existing Seismic Category   I and Class 1E structures, systems, and components, including their foundations and supports. Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance. A detailed listing of the structures, systems and components covered by the Quality Assurance Program and based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in a controlled database.                   The criteria for determining if the quality assurance program applies are reviewed by Quality. Performance.
Details of the water-and-steam-containing system boundaries are contained on system flow drawings; Modifications or additions to existing structures, systems, and components are designated the, same seismic classification as the existing system. New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.
Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to 'assure they   understand'hat these are mandatory requirements which must be implemented and enforced. Personnel responsible for performing   activities affecting quality are trained and indoctrinated in the requirements, purpose, scope, and implementation of applicable quality related program manuals and procedures. Refresher sessions are held periodically.
Retraining may be required whenever a new procedure is issued or a major revision is made to an existing procedure.
Retraining may be required whenever a new procedure is issued or a major revision is made to an existing procedure.
Training of personnel not in the Quality Performance organization is the responsibility of, each.department performing an activity affecting quality.Quality Performance assists in establishing training requirements and assures that personnel are trained by auditing training.Xn addition to training in quality assurance, each department conducts training, including on-the-job training, to the extent necessary to assure that personnel are Revision 19 December, 1993 qualified for their primary work assignments.
Training of personnel not in the Quality Performance organization is the responsibility of, each. department performing an activity affecting quality. Quality Performance assists in establishing training requirements and assures that personnel are trained by auditing training.
The Vice President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of operators, as necessary.
Xn addition to training in quality assurance,     each department conducts training, including on-the-job training, to the extent necessary to assure that personnel are Revision             19 December,             1993
As appropriate, personnel granted unescorted access to Ginna Station are trained in radiation protection, plant safety and security.The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B.This review consists of audits or a review equivalent to an audit performed by company personnel or outside organizations.
 
The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B,"Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:
qualified for their primary   work assignments.
a.NRC Regulatory Guide 1.8, Revision 1,"Personnel Selection and Training".
The Vice President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of operators, as necessary. As appropriate, personnel granted unescorted access to Ginna Station are trained in radiation protection, plant safety and security.
b.NRC Regulatory Guide 1.28, Revision 2,"Quality Assurance Program Requirements (Design and Construction)
The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B. This review consists of audits or   a review equivalent to an audit performed by company personnel   or outside organizations.
".C.AEC Regulatory Guide 1.30, Revision 0,"Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment".
The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:
d.AEC Regulatory Guide 1.33, Revision 0,"Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled"Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", Revision 0 dated October 1973 (Orange Book-Revision-0)e.AEC Regulatory Guide 1.37, Revision 0,"Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants".f.NRC Regulatory Guide 1.38, Revision 2,"Quality Revision 19 December, 1993 0
: a. NRC Regulatory Guide 1.8, Revision 1, "Personnel Selection and Training".
g~Assurance Requirements for, Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants".NRC Regulatory Guide l.39, Revision 2,"Housekeeping Requirements for Water-Cooled Nuclear Power Plants".NRC Regulatory Guide 1.58, Revision 1,"Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel".
: b. NRC Regulatory Guide 1.28, Revision 2, "Quality Assurance Program Requirements (Design and Construction) ".
NRC Regulatory Guide l.64, Revision 1,"Quality Assurance Requirements for the Design of Nuclear Power Plants k.NRC Regulatory Guide 1.74, Revision 0,"Quality Assurance Terms and Definitions".
C. AEC Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment".
NRC Regulatory Guide 1.88, Revision 2,"Collection, Storage and Maintenance of Nuclear Power Plant Records".NRC Regulatory Guide l.ll6, Revision O-R,"Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems".NRC Regulatory Guide 1.123, Revision 1,"Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants".n.NRC Regulatory Guide 1.144, Revision 1,"Auditing of Quality Assurance Programs for Nuclear Power Plants" except that supplier audit frequencies and performance evaluations are as described in the Quality Assurance Manual.NRC Regulatory Guide 1.146, Revision 0,"Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants".anization The major organizations participating in the Quality Assurance Program are Purchasing, Technical Services, Ginna Nuclear Production, Gas and Electric Distribution Division, Quality Performance, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board.Figure 2-l is an organizational chart showing these organizations and Revision 19 December, 1993 0
: d. AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", Revision 0 dated October 1973 (Orange Book   Revision -0)
their relationship to the corporate organization.
: e. AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants".
Positions responsible for the principal elements of the quality assurance program are: Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna Nuclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services Department Manager, Quality Performance Manager, Quality Assurance Manager, Production and Engineering Systems Department Manager and Purchasing Agent, Materials Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Manager, Nuclear Assurance Division Manager, Systems Engineering and Design Division Manager, Rochester Construction and Maintenance Department Manager, Distributive Information Systems Support Manager, Materials Engineering and Inspection Services In addition to the above individuals, two advisory groups are utilized to review and audit plant operations.
: f. NRC Regulatory Guide 1.38, Revision 2, "Quality Revision 19 December, 1993
These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board.The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering.
 
The qualifications of members and the responsibilities of these organizations are described in Section 6.0, Technical Specifications, Appendix A to the Full Term Operating License No.DPR-18.The Chairman of the Board, President and Chief Executive Off'icer of the Rochester Gas and Electric Corporation dir'ected the establishment of the Quality Assurance Program and issued the governing policy statement.
0 Assurance Requirements for, Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants".
He has established the Nuclear Safety Audit and Review Board to review and audit plant operations.
g ~  NRC Regulatory Guide l.39, Revision 2, "Housekeeping Requirements   for Water-Cooled Nuclear Power Plants".
The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Chairman of the Board, President and Chief Executive Officer Revision 19 December, 1993 on all activities of the Nuclear Safety Audit and Review Board.The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements.
NRC Regulatory Guide 1.58, Revision 1, "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel".
Xn addition, he has overall responsibility and authority for directing the Quality.Assurance Program and shall be responsible for the approval of the Quality Assurance Manual.He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station.He is also responsible for those items delineated in Section 6.0, Technical Specifications.
NRC Regulatory Guide l.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants NRC Regulatory Guide 1.74, Revision 0, "Quality Assurance Terms and Definitions".
The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing Ginna Nuclear Production activities and those support activities associated with Nuclear Engineering Services;Production Division Training, and Corporate Radiation Protection.
: k. NRC Regulatory Guide 1.88, Revision 2, "Collection, Storage and Maintenance of Nuclear Power Plant Records".
The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the.overall on-site safe operation of Ginna Station.He is responsible for: the performance of all Ginna Station quality affecting activities in accordance with the.requirements of the quality assurance program;providing qualified personnel to'erform these activities.
NRC Regulatory Guide l.ll6, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems".
in accordance with approved drawings, specifications, and procedures; those items delineated in Section 6.0, Technical Specifications; and assuring-that significant conditions adverse to quality are identified and corrected.
NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants".
The Superintendent, Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of plant maintenance and scheduling activities in compliance with the requirements of the Quality Assurance Program.The Superintendent, Ginna Production reports to the Plant Manager, Ginna Station, and is-responsible for operations, health physics and chemistry, refueling, minor and temporary modifications, fire protection, results and tests, Ginna computer systems, technical engineering and surveillance testing in compliance with the requirements of the quality assurance program.Revision 19 December, 1993 The Plant Manager, Ginna.Station and Superintendents are assisted by other designated staff members, Figure 2-3, in the implementation of certain Quality Assurance Program requirements at the plant.These staff members are assigned responsibility for testing, procurement,, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, operating experience assessment, maintenance of'material handling equipment, and control of all activities involving operation; maintenance, repair, refueling and modification.
: n. NRC Regulatory Guide 1.144, Revision 1, "Auditing of Quality Assurance Programs for Nuclear Power Plants" except that supplier audit frequencies and performance evaluations are as described in the Quality Assurance Manual.
The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an Institute of Nuclear Power Operations accredited, training program and, in conjunction with Materials Engineering and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related.activities.
NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants".
The Department Manager, Nuclear Engineering Services is responsible to the Vice President', Ginna Nuclear Production for designing and'constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management.
anization The major organizations participating in the Quality Assurance Program are Purchasing, Technical Services, Ginna Nuclear Production, Gas and Electric Distribution Division, Quality Performance, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board. Figure 2-l is an organizational chart showing these organizations and Revision 19 December, 1993
As requested by Ginna Station, he is responsible for reviewing unique maintenance and repair procedures for major equipment and providing technical support.He is also responsible for tracking and preparing corrective action report and commitments action tracking report summaries.
 
The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station.These activities include long range planning for.low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention,~document control, chemistry and environmental requirements support.The Manager, Production and Engineering Systems is responsible to the Division Manager, Technical Services and.Chief Engineer for providing records management and document control support services for nuclear related activities.
0 their relationship to the corporate organization.
The-Department Manager, Quality Performance is responsible to the Senior Vice President, Production and Engineering for Revision 19 December, 1993 0
Positions responsible for the principal elements of the quality assurance program are:
establishing the overall Quality Assurance Program.He is responsible for assuring that all planned and systemati'c actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and fol'lowed.
Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna Nuclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services Department Manager, Quality Performance Manager, Quality Assurance Manager, Production and Engineering Systems Department Manager and Purchasing Agent, Materials Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Manager, Nuclear Assurance Division Manager, Systems Engineering and Design Division Manager, Rochester Construction and Maintenance Department Manager, Distributive Information Systems Support Manager, Materials Engineering and Inspection Services In addition to the above individuals, two advisory groups are utilized to review and audit plant operations.     These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering. The qualifications of members and the responsibilities of these organizations are described in Section 6.0, Technical Specifications, Appendix A to the Full Term Operating License No. DPR-18.
He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.He has the authority and organizational freedom to assure all necessary quality'ctivities are performed.
The Chairman   of the Board, President and Chief Executive Off'icer of the Rochester Gas and Electric Corporation dir'ected the establishment of the Quality Assurance Program and issued the governing policy statement. He has established the Nuclear Safety Audit and Review Board to review and audit plant operations. The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Chairman of the Board, President and Chief Executive Officer Revision 19 December, 1993
In addition, he is responsible for special processes and the inservice inspection program.He is responsible for, maintaining a staff, Figure 2-2, for the conduct of staff training and for directing its activities.
 
The staff assists in the preparation and maintenance of the Quality Assurance Manual and applicable corrective action report summaries.
on all activities   of the Nuclear Safety Audit and Review Board.
The Manager, Quality Assurance reports to the Department Manager, Quality Performance..
The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements. Xn addition, he has overall responsibility and authority for directing the Quality
He and the Quality Assurance.Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation.
. Assurance Program and shall be responsible for the approval of the Quality Assurance Manual. He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications.
This includes writing Quality Assurance policies,'ssuring that.the program satisfies the requirements of 10CFR50, Appendix B, and..for maintaining the total program up to'date.The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program.The staff is also responsible for auditing and surveillance of aspects of the Qual,ity.Assurance Program.They are responsible.for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents.
The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing Ginna Nuclear Production activities and those support activities associated with Nuclear Engineering Services; Production Division Training, and Corporate Radiation Protection.
They are responsible for assuring that the suppliers, of safety-related material, equipment and services are properly qualified, maintaining a listing of qualified suppliers and for conducting audits and surveillances at these suppliers'acilities.
The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the. overall on-site safe operation of Ginna Station. He is responsible for: the performance of all Ginna Station quality affecting activities in accordance with the. requirements of the quality assurance program; providing qualified personnel these activities. in accordance with approved       to'erform drawings, specifications, and procedures;     those items delineated in Section 6.0, Technical Specifications; and assuring- that significant conditions adverse to quality are identified and corrected.
In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule and audit status reports.The Manager, Quality Assurance is a graduate, engineer with at least six years of responsible experience, of which at least two years are in quality assurance and at least three years in the design or operation of nuclear power plants.The Manager, Materials Engineering and Inspection Services is responsible to the Department Manager, Quality Revision 19 December, 1993 Performance for the development and qualification of procedures utilized for special processes.
The Superintendent, Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of plant maintenance and scheduling activities in compliance with the requirements of the Quality Assurance Program.
He is responsible for providing functi'onal guidance and direction for those methods.He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto.He is also responsible for the routine maintenance of lifting and handling equipment and for the testing and evaluation of Ginna Station materials.
The Superintendent,   Ginna Production reports to the Plant Manager,   Ginna Station, and is -responsible for operations, health physics and chemistry, refueling, minor and temporary modifications, fire protection, results and tests, Ginna computer systems, technical engineering and surveillance testing in compliance with the requirements of the quality assurance   program.
He is responsible
Revision 19 December, 1993
'or supporting training and qualification of welders, riggers and crane operators.
 
The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures.
The Plant Manager, Ginna.Station and Superintendents are assisted by other designated staff members, Figure 2-3, in the implementation of certain Quality Assurance Program requirements at the plant. These staff members are assigned responsibility for testing, procurement,, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, operating experience assessment, maintenance of 'material handling equipment, and control of all activities involving operation; maintenance, repair, refueling and modification.
He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance and quality control planning and work monitoring responsibilities to his staff of Quality Control Engineers, Foreman and QC Inspectors.
The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an Institute of Nuclear Power Operations accredited, training program and, in conjunction with Materials Engineering and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related.
The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing..Nuclear Assurance is'responsible for assuring performance of verification inspection activities and assuring that.inspection requirements are included in approved procedures and work packages.This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.The Nuclear Assurance Quality Control Inspectors also perform compliance oriented surveillance of nuclear:related activities.
activities.
The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers,.
The Department Manager,   Nuclear Engineering Services is responsible to the Vice President', Ginna Nuclear Production for designing and 'constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management. As requested by Ginna Station, he is responsible for reviewing unique maintenance and repair procedures for major equipment and providing technical support. He is also responsible for tracking and preparing corrective action report and commitments action tracking report summaries.
in accordance with applicable commercial, technical, and quality requirements.
The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station. These activities include long range planning for.
The Division Manager, Rochester Construction and Maintenance is responsible for providing a staff, Figure 2-4, to perform routine maintenance and testing services for Ginna Station meters and relays.He is also responsible for providing laboratory testing of some electrical equipment and devices.The Division Manager, System Engineering and Design is responsible for providing a staff, Figure 2-4, to perform relay engineering services.He is responsible for design, Revision 19 December, 1993 modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna.He is also responsible for coordinating and for providing support documentation for any design modifications initiated within the Gas and Electric Distribution Division.The Department Manager, Distributive Information Systems Support is responsible for suporting interdepartmental communications
low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention,
.Desi n Control Design activities are performed by Rochester Gas and-Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.Nuclear Engineering Services is responsible for the design.and control of design activities (including design interfaces) for major modifications of structures, systems ,or components.
~
Augmenting this effort is the design and technical support~provided by, the System Engineering and Design Division for.the systems and equipment.
document control, chemistry and environmental requirements support.
which Gas and Electric Distribution Division is responsible for.maintaining.
The Manager,   Production and Engineering Systems is responsible to the Division Manager, Technical Services and   .
In this regard they support Nuclear, Engineering Services for design of safety related modifications.
Chief Engineer for providing records management and document control support services for nuclear related activities.
Ginna Station is responsible for the design and control of design activities for Minor modifications of.structures, systems, or components.
The -Department Manager, Quality Performance is responsible to the Senior Vice President, Production and Engineering for Revision 19 December, 1993
Ginna Station is also responsible for classifying station.originated modifications as either" Major or Minor.Nuclear Engineering Services reviews and concurs with modifications being.classified as Minor.Minor modifications typically involve (1)component changes which involve vendor design and are limited to the extent that the change does not impact existing performance requirements, (2)additions within Seismic Category I buildings which perform no safety functions and'hich neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component required for safe shutdown of the plant to an unacceptable level, (3)changes to a safety related system determined not to be major (e.g., vents, drains, alarms, indicating lights, etc.).-10-Revision 19 December, 1993 Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution, control, and revision requirements; and corrective action.Design considerations include, as appropriate:
 
physics, stress, materials, thermal, hydraulic, radiation and accident analyses;appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair;acceptance and rejection criteria;and quality standards and other quality assurance requirements.
0 establishing the overall Quality Assurance Program. He is responsible for assuring that all planned and systemati'c actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and fol'lowed. He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.
Design verification utilizes various methods such as formal design reviews, alternate calculations, or tests;as appropriate, to.assure the adequacy of the design.I The design of plant modifications is verified by an engineer other than the one who performed the original design.For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested.
He has the authority and organizational freedom to assure all necessary quality'ctivities are performed. In addition, he is responsible for special processes and the inservice inspection program. He is responsible for, maintaining a staff, Figure 2-2, for the conduct of staff training and for directing its activities. The staff assists in the preparation and maintenance of the Quality Assurance Manual and applicable corrective action report summaries.
For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers or consulting.
The Manager, Quality Assurance reports to the Department Manager,   Quality Performance.. He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation. This
.
includes writing Quality Assurance policies,'ssuring that.
the program satisfies the requirements of 10CFR50, Appendix B, and..for maintaining the total program up to 'date.                     The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program. The staff is also responsible for auditing and surveillance of aspects of the Qual,ity
  .Assurance Program. They are responsible .for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents.
They are responsible for assuring that the suppliers, of safety-related material, equipment and services are properly qualified, maintaining a listing of qualified suppliers and for conducting audits and surveillances at these In addition, the staff assists the Manager, suppliers'acilities.
Quality Assurance, in the preparation of the audit schedule and audit status reports.
The Manager, Quality Assurance is a graduate, engineer with at least six years of responsible experience, of which at least two years are in quality assurance and at least three years in the design or operation of nuclear power plants.
The Manager, Materials Engineering and Inspection Services is responsible to the Department Manager, Quality Revision                   19 December,                   1993
 
Performance   for the development and qualification of procedures   utilized for special processes. He is responsible for providing functi'onal guidance and direction for those methods. He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto. He is also responsible for the routine maintenance of lifting and handling equipment and for the testing and evaluation of Ginna Station materials. He is responsible
'or   supporting training and qualification of welders, riggers and crane operators.
The Manager,   Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures. He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance and quality control planning and work monitoring responsibilities to his staff of Quality Control Engineers, Foreman and QC Inspectors. The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing. .Nuclear Assurance is 'responsible for assuring performance of verification inspection activities and assuring that. inspection requirements are included in approved procedures and work packages. This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.
The Nuclear Assurance Quality Control Inspectors also perform compliance oriented surveillance of nuclear:related activities.
The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers,. in accordance with applicable commercial, technical, and quality requirements.
The Division Manager, Rochester Construction and Maintenance is responsible for providing a staff, Figure 2-4, to perform routine maintenance and testing services for Ginna Station meters and relays. He is also responsible for providing laboratory testing of some electrical equipment and devices.
The Division Manager, System Engineering and Design is responsible for providing a staff, Figure 2-4, to perform relay engineering services. He is responsible for design, Revision 19 December, 1993
 
modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna. He is also responsible for coordinating and for providing support documentation for any design modifications initiated within the Gas and Electric Distribution Division.
The Department Manager, Distributive Information Systems Support is responsible for suporting interdepartmental communications     .
Desi n Control Design   activities   are performed by Rochester   Gas and-Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.
Nuclear Engineering Services is responsible for the design.
and control of design activities (including design interfaces) for major modifications of structures, systems
,or components.
Augmenting     this effort is the design   and technical support
~
provided   by, the System Engineering and Design Division for
  .the systems and equipment. which Gas and Electric Distribution Division is responsible for. maintaining. In this regard they support Nuclear, Engineering Services for design of safety related modifications.
Ginna   Station is responsible for the design and control of design   activities for Minor modifications of. structures, systems, or components.       Ginna Station is also responsible for classifying station. originated modifications as either" Major or Minor. Nuclear Engineering Services reviews and concurs with modifications being. classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design and are limited to the extent that the change does not impact existing performance requirements, (2) additions within Seismic Category I buildings which perform no safety functions and'hich neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component required for safe shutdown of the plant to an unacceptable level, (3) changes to a safety related system determined not to be major (e.g., vents, drains, alarms, indicating lights, etc.) .
Revision 19 December, 1993
 
Design control is implemented by means of procedures which include: design considerations, design review requirements; internal   and external interface control considerations; design document review, approval, distribution, control, and revision requirements; and corrective action. Design considerations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analyses; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; and quality standards and other quality assurance requirements.       Design verification   utilizes various methods such as formal design reviews, alternate calculations, or tests;     as appropriate, to. assure the adequacy of the design.
I The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested.     For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers or consulting.
engineers, as appropriate.
engineers, as appropriate.
Spare or replacement parts must at least meet the original equipment's technical and quality requirements.
Spare or replacement parts must at least meet the original equipment's technical and quality requirements.       For plant modifications, standard, "off-the-shelf", commercial or previously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.
For plant modifications, standard,"off-the-shelf", commercial or previously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.Changes to a modification design are normally reviewed and approved in*accordance with the same procedures as the original modification design.Supplemental procedures are established for the review and approval of field changes.In general, design changes including field, changes, are reviewed and approved by the.organizations or individuals that performed, reviewed and approved the original"design.
Changes   to a modification design are normally reviewed and approved in* accordance with the same procedures as the original modification design. Supplemental procedures are established for the review and approval of field changes.
Where this is not practical,'ther responsible design organizations or individuals are designated, provided they have access to pertinent background information and are competent in the specific design area.Design verification and field change systems are methods utilized to detect, document and correct design process errors and deficiencies.
In general, design changes including field, changes, are reviewed and approved by the. organizations or individuals that performed, reviewed and approved the original"design.
In addition, the corrective action system, described in Section 16, is utilized to control and document corrective action to preclude recurrence of those-ll-Revision 19 December, 1993 design process errors and deficiencies which are considered to be a significant condition adverse to quality.Quality Assurance is responsible for assuring that, design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews.Design control procedures are reviewed to assure that an independent verification is performed.
Where this is not practical,'ther responsible design organizations or individuals are designated, provided they have access to pertinent background information and are competent in the specific design area.
Production and Engineering Systems, Nuclear Engineering Services and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions thereto, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded.
Design verification     and field change systems are methods utilized to detect,   document and correct design process errors   and deficiencies. In addition, the corrective action system, described in Section 16, is utilized to control and document corrective action to preclude recurrence of those
design information.
                              -ll-Revision 19 December, 1993
The measures include the use of document revision levels, document transmit tais, release stamps, f ield change request forms and distribution lists.Design documents are collected, stored, and maintained in accordance with Section 6 an'd 17, as appropriate.
 
Design documents include design criteria, analyses, specifications, drawings, design review records, and changes thereto.Quality Performance, through preparation assistance and/or review, assure the proper inclusion of quality standards in the design of major and minor modifications.
design process errors and deficiencies which are considered to be a significant condition adverse to quality.
Quality Performance is also responsible for assuring that adequate test, examination and inspection requirements are included in specifications.
Quality Assurance is responsible for assuring that, design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. Design control procedures are reviewed to assure that an independent verification is performed.
The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.-Plant modifications are controlled by means of applicable Ginna Station, Nuclear Engineering Services, Gas and Electric Distribution Division, Materials Engineering and Inspection Services, Production Division Training and Quality Assurance/Quality Control procedures.
Production and Engineering Systems, Nuclear Engineering Services and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions thereto, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded. design information. The measures include the use of document revision levels, document transmit tais, release stamps, field change request forms and   distribution lists.
These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures.
Design documents are collected, stored, and maintained in accordance with Section 6 an'd 17, as appropriate. Design documents include design criteria, analyses, specifications, drawings, design review records, and changes thereto.
Plant modifications are reviewed by the Plant Operations Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications. Revision 19 December, 1993 Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.
Quality Performance, through preparation assistance and/or review, assure the proper inclusion of quality standards in the design of major and minor modifications. Quality Performance is also responsible for assuring that adequate test, examination and inspection requirements are included in specifications. The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include puxchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.Procurement of materials,'parts, components, and services is initiated by department staff personnel..Procurement procedures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.Procurement documents, including those requesting spare or replacement parts,.initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision.
-Plant modifications are controlled by means of applicable Ginna Station, Nuclear Engineering Services, Gas and Electric Distribution Division, Materials Engineering and Inspection Services, Production Division Training and Quality Assurance/Quality Control procedures. These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures. Plant modifications are reviewed by the Plant Operations Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.
Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Gas and Electric Distribution Division and Quality Assurance/Quality Control are reviewed by..Quality Performance and approved by designated departmental supervision..Evidence of review-and approval of procurement documents is recorded on the documents and identifies to Purchasing a procurement method which will ensure'hat the selected supplier is capable of providing thd item or service in accordance with the requirements of the procurement documents.
Revision 19 December, 1993
Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.After purchase requisitions, service agreements, contracts, specifications, and drawings have received the required reviews and approvals, a purchase order is issued by Purchasing to the selected.supplier and controlled as described in Section 7.These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.
 
Under no circumstances are purchasing requirements altered (except for quantity or pricing)during order placement unless review and concurrence is obtained from those who were required to review, concur, with, and approve the-13-Revision 19 December, 1993 original documents as described above.Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.
Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.
Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements.
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include puxchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.
Quality Performance review of the above includes checks to verify proper inclusion of the quality standards, quality assurance program requirements, method of procurement and the applicable.acceptance.
Procurement of materials, 'parts, components, and services is initiated by department staff personnel. .Procurement procedures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.
criteria.Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, compatibility, and acceptance criteria of the original design.Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.
Procurement documents, including those requesting spare or replacement parts,.initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision. Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Gas and Electric Distribution Division and Quality Assurance/Quality Control are reviewed by ..
Instructions Procedures and Drawin s Each Rochester Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing procedures as required to implement the Quality Assurance Program.These procedures cover'ctivities such as document control, training of personnel, and responsibilities and duties of personnel'uality Performance reviews these procedures for inclusion of quality assurance program~requirements.
Quality Performance and approved by designated departmental supervision.
Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement.
.Evidence of review -and approval of procurement documents is recorded on the documents and identifies to Purchasing a procurement method which will ensure'hat the selected supplier is capable of providing thd item or service in accordance with the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.
the quality assurance program.'rocurement, documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modification and testing.This includes instructions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control;general plant operation; startup, operation, and shutdown of safety related systems;correction of abnormal, of f normal, or alarm conditions; response to emergencies and other significant events;radioactivity control;control of measuring and test equipment; chemical and radiochemical control;and fuel handling and refueling.
After purchase requisitions, service agreements, contracts, specifications, and drawings have received the required reviews and approvals, a purchase order is issued by Purchasing to the selected .supplier and controlled as described in Section 7. These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.
Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from-14-Revision 19 December, 1993  
Under no circumstances   are purchasing requirements altered (except for quantity or pricing) during order placement unless review and concurrence is obtained from those who were required to review, concur, with, and approve the Revision 19 December, 1993


Rochester Gas and Electric management, or the completion of plant modifications.
original  documents as described above.        Changes or revisions to procurement documents      are  subject  to  the same review and approval requirements    as  the  original  documents.
Ginna Station is also responsible for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.Gas and Electric Distribution Division is responsible for the preparation and implementation of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible.
Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements.        Quality Performance review of the above  includes  checks  to  verify  proper inclusion of the quality  standards,  quality    assurance  program requirements, method of   procurement  and  the  applicable  .acceptance.
Gas and Electric Distribution Division also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.Nuclear Engineering Services is responsible for providing approved specifications and drawings for major modifications and for minor modifications when necessary.
criteria. Ginna Station   reviews  procurement    documents for spare or  replacement    parts  to  determine  similarity, compatibility, and acceptance criteria of the original design. Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.
These documents require those performing the work to obtain, understand, and ,comply with appropriate procedures, specifications and.drawings.Engineering has established procedures for revising drawings and specifications..
Instructions Procedures        and Drawin s Each Rochester Gas and     Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing procedures as required to implement the Quality Assurance Program. These procedures cover'ctivities such as document control, training of personnel, and responsibilities and duties of personnel'uality Performance reviews these procedures for inclusion of quality assurance program
These procedures cover updating of as-built drawings after.plant modifications and.the revision,'approval, distribution, and control of all drawings and specifications.
~
Quality Performance is responsible for: preparing and implementing inspection procedures utilized for detailed inspection activities for Ginna Station;providing and implementing procedures for audit and surveillance related activities; and providing and implementing instructions and procedures associated with special processes, routine'aintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.
requirements. Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement. the quality assurance program.'rocurement, documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.
Persons preparing, reviewing and approving documents are responsible for assuring that specificatio'ns, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents'n addition, Quality Performance department assessment as described in Section 10 and Section 18 are used to verify that commitments are being addressed and Revision 19 December, 1993  
Ginna  Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modification and testing. This includes instructions and procedures listed in USAEC Regulatory Guide 1. 33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, of f normal, or alarm conditions; response to emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling. Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Revision 19 December, 1993


quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.Document Control Procedures are established to control the issuance of procedures, instructions, drawings, and.specifications.
Rochester Gas and Electric management, or the completion of plant modifications. Ginna Station is also responsible for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.
Standard document control requirements are contained in the Quality Assurance Manual.The Plant Manager, Ginna Station is responsible for the control of all documents issued by Ginna Station personnel.
Gas and Electric Distribution Division is responsible for the preparation and implementation of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible. Gas and Electric Distribution Division also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.
Gas and Electric Distribution Division and Production Division Training are responsible for the control of documents issued by their respective organizations.
Nuclear Engineering Services is responsible for providing approved specifications and drawings for major modifications and for minor modifications when necessary. These documents require those performing the work to obtain, understand, and
Production and Engineering Systems controls the distribution of controlled.
,comply with appropriate procedures, specifications and                .
manuals issued for the other organizations performing activities which implement this'uality Assurance Program (Table 1-1).Each organization controlling documents has a separate procedure to control: documents in accordance with the requirements of the'uality Assurance Manual.The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and.approval of documents.
drawings. Engineering has established procedures for revising drawings and specifications.. These procedures cover updating of as-built drawings after .plant modifications and .the revision, 'approval, distribution, and control of all drawings and specifications.
Each department, responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to.assure that they are.adequate, and include appropriate qualitative and quantitative requirements.
Quality Performance is responsible for: preparing and implementing inspection procedures utilized for detailed inspection activities for Ginna Station; providing and implementing procedures for audit and surveillance related activities; and providing and implementing instructions and procedures associated with special processes, and inspection of cranes and handling equipment routine'aintenance as well as materials testing and inservice inspection.
Nuclear Assurance Quality Control representatives, who are assigned to support departmental maintenance, repair, refueling and modification activities, are respon'sible for reviewing, prior to use;governing procedures to assure quality assurance requirements are included.The Plant Operations Review Committee has the, responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications.
Persons preparing, reviewing and approving documents are responsible for assuring that specificatio'ns, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.
Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with that activity.Ginna Station, Nuclear Engineering Services, Material.Engineering and Inspection Services, Purchasing, Production Division Training and Gas and Electric Distribution Division quality assurance implementing procedures (Table 1-1)require the review of Quality Performance and the approval of the appropriate department supervisor.
Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents'n addition, Quality Performance department assessment as described in Section 10 and Section 18 are used  to verify that commitments are being addressed              and Revision              19 December,              1993
Quality Assurance/Quality Control procedures are approved by Revision 19 December, 1993 the Department Manager, Quality Performance or designee.'he Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document.It identifies the difference between controlled and uncontrolled copies of the same document;includes the method for identifying holders of, controlled copies;requires that only controlled copies of a document be used for official purposes;requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
 
Types of documents which are controlled include.Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel.handling, modification, and administrative), specifications and drawings.Suppliers of materials, equipment, and services under an approved 10CFR50 Appendix B supplier quality assurance program are.required in procurement documents to provide for control, of documents, including manufacturing, inspection and testing instructions.
quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.
The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when.required;to properly review and approve documents such as procedures, instructions, specifications and drawings to provide the same reviews and approvals for changes to documents as was required of the original document;to require that organiza-tions which review and approve documents.have access to pertinent information and adequate knowledge of the original document intent;to'ssure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.Quality Performance is responsible for review and concurrence of procurement documents for all procuring organizations and, therefore, procurement document control=-requirements.
Document Control Procedures are established to control the issuance of procedures, instructions, drawings, and.specifications.
Quality Performance is responsible for review and assessment of document control systems to assure adequate systems are implemented. Revision 19 December, 1993 0
Standard document control requirements are contained in the Quality Assurance Manual. The Plant Manager, Ginna Station is responsible for the control of all documents issued by Ginna Station personnel. Gas and Electric Distribution Division and Production Division Training are responsible for the control of documents issued by their respective organizations. Production and Engineering Systems controls the distribution of controlled. manuals issued for the other organizations performing activities which implement Assurance Program (Table 1-1). Each organization this'uality controlling documents has a separate procedure to control
Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.All procurement is conducted in accordance with procurement documents as stated in Section 4.All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products'rocurement planning by the procuring organizations consists of determining the methods to be used for acceptance of the item or service and the requirements for control of the supplier performance.
: documents in accordance with the requirements of the'uality Assurance Manual.
Source inspection (surveillance), certificate of conformance, receipt inspection and post installation test are methods which are considered for item acceptance..
The Quality Assurance Manual designates responsibilities             and defines requirements for the preparation, review and .
Receipt inspection is utilized in the acceptance of all items.In lieu of these methods, acceptance of services is based on either or a combination of: (1)surveillance of the activity and (2)review of objective evidence for conformance to.the procurement document requirements (i.e.certifications, stress reports etc.).The extent of the acceptance methods and associated verification activities will vary depending upon the relative importance and complexity of the purchased item or service and the supplier's past performance.
approval of documents. Each department, responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to.
assure that they are. adequate, and include appropriate qualitative and quantitative requirements. Nuclear Assurance Quality Control representatives, who are assigned to support departmental maintenance, repair, refueling and modification activities, are respon'sible for reviewing, prior to use; governing procedures to assure quality assurance requirements are included. The Plant Operations Review Committee has the, responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with that activity. Ginna Station, Nuclear Engineering Services, Material. Engineering and Inspection Services, Purchasing, Production Division Training and Gas and Electric Distribution Division quality assurance implementing procedures (Table 1-1) require the review of Quality Performance and the approval of the appropriate department supervisor.
Quality Assurance/Quality Control procedures are approved by Revision     19 December,             1993
 
the Department Manager, Quality Performance or   designee.'he Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. It identifies the difference between controlled and uncontrolled copies of the same document; includes the method for identifying holders of, controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
Types of documents which are controlled include. Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel. handling, modification, and administrative), specifications and drawings. Suppliers of materials, equipment, and services under an approved 10CFR50 Appendix B supplier quality assurance program are. required in procurement documents to provide for control, of documents, including manufacturing, inspection and testing instructions.
The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when. required; to properly review and approve documents such as procedures, instructions, specifications and drawings to provide the same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents .have access to pertinent information and adequate knowledge of the original document intent; to'ssure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.
Quality Performance is responsible for review and concurrence of procurement documents for all procuring organizations and, therefore, procurement document control
=-requirements.
Quality Performance is responsible for review and assessment of document control systems to assure adequate systems are implemented.
Revision         19 December,         1993
 
0 Control of Purchased Material     E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.
All procurement is conducted in accordance with procurement documents as stated in Section 4. All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality planning by the procuring organizations consists products'rocurement of determining the methods to be used for acceptance of the item or service and the requirements for control of the supplier performance. Source inspection (surveillance),
certificate of conformance, receipt inspection and post installation test are methods which are considered for item acceptance.. Receipt inspection is utilized in the acceptance   of all items. In lieu of these methods, acceptance of services is based on either or a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to .the procurement document requirements (i.e. certifications, stress reports etc.) . The extent of the acceptance methods and associated verification activities will vary depending upon the relative importance and complexity of the purchased item or service and the supplier's past performance.
Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and.under what situation the supplier is to report nonconformances.
Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and.under what situation the supplier is to report nonconformances.
Results.of.the planning are incorporated in the procurement documents.
Results. of. the planning are incorporated in the procurement documents.
Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents.
Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents. 'The evaluation, which is accomplished during procurement planning, determines the necessity for the supplier selection to be made from the approved suppliers list.
'The evaluation, which is accomplished during procurement planning, determines the necessity for the supplier selection to be made from the approved suppliers list.Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program.The evaluation guidelines for source selection considers the item complexity, method(s)of acceptance and for a replacement Revision 19 December, 1993 item, whether the source is to be restricted to the original supplier.For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is made from the approved suppliers lists or one who is in the process of being added to a list, after having its capability evaluated to purchaser satisfaction.
Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program. The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement Revision 19 December, 1993
Items or services, which meet industry standards and are typically utilized in applications other than nuclear, may be purchased from suppliers not listed on the approved suppliers list, provided that item acceptance can be based on acceptance of standard commercial quality which is supplemented, as necessary, with source surveillance, pre-or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection.
 
Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed on the approved suppliers list,.provided that verification of nuclear quality can be accomplished by methods such as source surveillance, pre-or post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance.
item, whether the source is to be restricted to the original supplier. For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is made from the approved suppliers lists or one who is in the process of being added to a list, after having its capability evaluated to purchaser satisfaction.
Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of.the corresponding procurement method.The purchase requisition will also identify the source when replacement parts are to be procured, from the original equipment supplier.Addition of a supplier'to the approved suppliers list is based on satisfactory evaluation of the supplier,'s quality assurance program by Quality Assurance.
Items or services, which meet industry standards and are typically utilized in applications other than nuclear, may be purchased from suppliers not listed on the approved suppliers list, provided that item acceptance can be based on acceptance of standard commercial quality which is supplemented, as necessary, with source surveillance, pre-or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection. Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed on the approved suppliers list,.
provided that verification of nuclear quality can be accomplished by methods such as source surveillance, pre- or post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance. Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of. the corresponding procurement method. The purchase requisition will also identify the source when replacement parts are to be procured, from the original equipment supplier.
Addition of a supplier 'to the approved suppliers list is based on satisfactory evaluation of the supplier,'s quality assurance program by Quality Assurance.
For engineered items, Nuclear Engineering Services or Ginna Station are responsible for evaluating the overall design or manufacturing capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the, procurement documents.
For engineered items, Nuclear Engineering Services or Ginna Station are responsible for evaluating the overall design or manufacturing capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the, procurement documents.
As part of this review, the supplier'.s design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are.reviewed.Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas-19-Revision 19 December, 1993 and Electric Corporation requirements.
As part of this review, the supplier'.s design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are .
The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, acceptance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors.
reviewed.
Supplier evaluation is conducted by means of procedures or checklists which identify applicable regu1atory or code quality assurance requirements., Ginna Station, Quality Performance and Gas and Electric Distribution Division evaluate the suppliers of inspection, test, and calibration services which they intend to use.The departments responsible for performing supplier evaluations shall document their results in reports which discuss areas investigated, findings, and conclusions..
Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas Revision 19 December, 1993
Measures are established by Nuclear Engineering Services, Ginna Station and Quality Assurance to control supplier performance for engineered items.These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier.In addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance.
 
With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.Quality Assurance is responsible-for determining and documenting the degree of supplier surveillance (including review, inspection, or audit)required during design, fabrication, inspection, testing, and shipping,, and for providing the required surveillance.
and Electric Corporation requirements. The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, acceptance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regu1atory or code quality assurance requirements.,
The objective of.supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.
Ginna Station, Quality Performance and Gas and Electric Distribution Division evaluate the suppliers of inspection, test, and calibration services which they intend to use.
For complex engineered items, Quality Assurance and Nuclear Engineering Services are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which-20-Revision 19 December, 1993 e I initiated the procurement.
The departments responsible for performing supplier evaluations shall document their results in reports which discuss areas investigated,   findings, and conclusions..
When a deviation from purchase order requirements is noted, the Quality Assurance representative has the authority to inform the vendor that a particular item is unacceptable,.
Measures are established by Nuclear Engineering Services, Ginna Station and Quality Assurance to control supplier performance for engineered items. These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier. In addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance.
to issue a nonconformance report or to stop work, if necessary.
With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.
Quality Performance is responsible for surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements.
Quality Assurance is responsible-for determining and documenting the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection, testing, and shipping,, and for providing the required surveillance. The objective of.
The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements. For complex engineered items, Quality Assurance and Nuclear Engineering Services are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.
The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which Revision 19 December,   1993
 
e I
 
initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance representative has the authority to inform the vendor that a particular item is unacceptable,. to issue a nonconformance report or to stop work,   if necessary.
Quality Performance is responsible for surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.
Department supervision is responsible for receiving and storing items pending their acceptance.
Department supervision is responsible for receiving and storing items pending their acceptance. Upon receipt, .the department stockkeeper logs the item,, places a "hold" tag on
Upon receipt,.the department stockkeeper logs the item,, places a"hold" tag on.the item, and notifies Quality Performance that the item has arrived.Quality Performance is responsible for receipt inspection at.Ginna'Station upon delivery of items and associated services for maintenance, repair, modification, and refueling.
.the item, and notifies Quality Performance that the item has arrived.
This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of, conformance is'vailable at the plant prior to installation or use.Documentary evidence sufficient toidentify the codes, standards or specifications met by the.purchased material, equipment, and services is retained.In the event.a final source inspection, for the acceptance is conducted prior to receipt by RG&E, Quality Performance performs an inspection for shipping damage or lost parts and a document check to assure that the required documentation has been reviewed and is complete.A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.If the item and documentation are adequate, Quality Performance labels the item as"Accepted", files the documentation and receipt inspection results, and releases the item for storage or use.If the item is nonconforming or the documentation is unsatisfactory, Quality Performance Revision 19 December, 1993 initiates controls on the item in accordance with Section l5.All items issued must bear an have documentation to support In the event the traceability review is unsatisfactory, the may not be released for use.Identification and Control of Com onents acceptance tag or label and the acceptability of the item.is lost or the documentation item becomes nonconforming and Materials Parts and The identification and control of materials, parts, and components is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication., storage, or installation.
Quality Performance is responsible for receipt inspection at.
Identification and control requirements are established by either*an existing procedure or requirements documents which are prepared during the planning stages of a project.The identification and control requirements cover items such as: traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test.data and inspection documents, and physical and chemical mill test reports;specification of the degree of identification to preclude a degradation of the item's functional capability or quality;and the proper identification of materials, parts, and components prior to release, for manufacturing, shipping, construction, and installation.
Ginna 'Station upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of, conformance is'vailable at the plant prior to installation or use. Documentary evidence sufficient toidentify the codes, standards or specifications met by the .purchased material, equipment, and services is retained. In the event.
Nuclear Engineering Services, Ginna Station and Quality'erformance are responsible for'assuring that drawings and specifications contain appropriate requirements for the identification and control of materials, parts, or components, as appropriate.
a final source inspection, for the acceptance is conducted prior to receipt by RG&E, Quality Performance performs an inspection for shipping damage or lost parts and a document check to assure that the required documentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.
Suppliers are required to assure that all required documentation for an item is properly identified and related to the item..Each item is required to be physically.identified, either by marking on the item or by tags.Physical identification by purchase order number is used to the maximum.extent possible for relating an item at any time to applicable documentation.
If the item and documentation are adequate, Quality Performance labels the item as "Accepted", files the documentation and receipt inspection results, and releases the item for storage or use. If the item is nonconforming or the documentation is unsatisfactory, Quality Performance Revision 19 December, 1993
Identification is either.on the item or records traceable to the item.Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.The Plant Manager, Ginna Station is responsible for maintaining identification and control of materials, parts, or components received, stored, installed, and used at the-22-Revision 19 December, 1993 0 p 1 plant in accordance with approved procedures.
 
The responsible supervision of other departments which receive material that is to be stored away from the plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, parts, or components, stored or used in their area of responsibility.
initiates controls   on the item   in accordance with Section l5.
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 1S.Control of S ecial Processes Written procedures are established to control special processes, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.
All items issued must bear an acceptance tag or    label and have documentation to support the acceptability      of the item.
Qualification of personnel and special process procedures comply with the requirements of applicable codes and standards.
In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.
When special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requirements.
Identification and Control of Materials Parts and Com onents The identification and control of materials, parts, and components   is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication., storage, or installation.
Identification and control requirements are established by either*an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:
traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test. data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials, parts, and components prior to release, for manufacturing, shipping, construction, and installation.
Nuclear Engineering Services, Ginna Station and are responsible for 'assuring that drawings and Quality'erformance specifications contain appropriate requirements for the identification and control of materials, parts, or components, as appropriate.     Suppliers are required to assure that all required documentation for an item is properly identified and related to the item.. Each item is required to be physically .identified, either by marking on the item or by tags. Physical identification by purchase order number is used to the maximum. extent possible for relating an item at any time to applicable documentation. to Identification is either. on the item or records traceable the item. Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.
The Plant Manager, Ginna Station is responsible for maintaining identification and control of materials, parts, or components received, stored, installed, and used at the Revision               19 December,               1993
 
0 1
p
 
plant in accordance with approved procedures. The responsible supervision of other departments which receive material that is to be stored away from the plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, parts, or components, stored or used in their area of responsibility.
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 1S.
Control of S ecial Processes Written procedures are established to control special processes, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.
Qualification of personnel and special process procedures comply with the requirements of applicable codes and standards. When special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requirements.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.
Quality Performance personnel are responsible for reviewing procurement documents to ensure that.requirements for control of special processes are included.Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering and Inspection Services.Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications, and standards.
Quality Performance personnel are responsible for reviewing procurement documents to ensure that .requirements   for control of special processes are included.
Within the Quality Performance Department, the Manager,-23-Revision 19 December, 1993  
Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering and Inspection Services. Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.
The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications, and standards.
Within the Quality Performance Department, the Manager, Revision 19 December,  1993
 
Materials Engineering and Inspection Services is responsible for the qualification of NDE personnel and procedures. The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures.
The Manager, Materials Engineering and Inspection Services along with the Department Manager, Production Division Training are responsible for the training and qualification of welders, riggers and crane operators used for nuclear related activities. Records for personnel and procedures to demonstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.
Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to, assure effective compliance with procedures.
Ins ection Procedures  prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifications, codes, standards, or regulatory requirements. For clarification and. to. distinguish from preventive maintenance 'inspections, the following controls are"'associated with the quality assurance'unction inspections and referred to as verification inspections.
Instructions for conducting detailed verification inspections are contained in inspection procedures.. These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection. Inspections and hold points are utilized to verify conformance of materials, parts, appurtenances, components, processes or structures to        .
* predetermined quality. requirements. Inspection procedures include the identification of quality characteristics to,be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the .acceptance and rejection criteria, the requirements for the recording of inspection    .
results, and the requirements for providing evidence of completion and certification of the inspection activity.
Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors. Inspectors are Revision  19 December, 1993
 
k J


Materials Engineering and Inspection Services is responsible for the qualification of NDE personnel and procedures.
sufficiently trained to   adequately evaluate the activity they are inspecting.
The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures.
Quality Performance personnel are responsible for assuring performance of verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and Electric personnel.     The adequacy of inspections not directly performed by Quality Performance personnel will be assessed on a sample basis through the QA/QC surveillance program. Inspection equipment is calibrated and controlled in accordance with Section 12. Calibration status is verified by inspection personnel prior to performing an inspection operation.
The Manager, Materials Engineering and Inspection Services along with the Department Manager, Production Division Training are responsible for the training and qualification of welders, riggers and crane operators used for nuclear related activities.
In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing methods; equipment, and personnel is provided.
Records for personnel and procedures to demonstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to, assure effective compliance with procedures.
Both inspection and process monitoring are required when control is inadequate without both.
Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifications, codes, standards, or regulatory requirements.
Quality Performance is responsible for verifying .adequate inclusion of inspection requirements in specifications.
For clarification and.to.distinguish from preventive maintenance
The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included'in maintenance, repair, refueling, modification and testing instructions and procedures and related fabrication processes. He is also responsible. for the assignment of qualified personnel required for the performance of verification inspections and quality, control surveillances of quality affecting activities.
'inspections, the following controls are"'associated with the quality assurance'unction inspections and referred to as verification inspections.
the exception'of that which pertains to Pump and Valve
Instructions for conducting detailed verification inspections are contained in inspection procedures..
                                    'ith Testing, the Manager, Materials Engineering and Inspection Services is responsible for establishing the requirements, for. the Inservice Inspection Program. Nuclear Engineering Services is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.
These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection.
Test Control Checks or testing performed to verify the adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings. Whenever Revision 19 December, 1993
Inspections and hold points are utilized to verify conformance of materials, parts, appurtenances, components, processes or structures to.*predetermined quality.requirements.
Inspection procedures include the identification of quality characteristics to,be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the.acceptance and rejection criteria, the requirements for the recording of inspection
.results, and the requirements for providing evidence of completion and certification of the inspection activity.Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work.Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.
Inspectors are Revision 19 December, 1993 k J sufficiently trained to adequately evaluate the activity they are inspecting.
Quality Performance personnel are responsible for assuring performance of verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and Electric personnel.
The adequacy of inspections not directly performed by Quality Performance personnel will be assessed on a sample basis through the QA/QC surveillance program.Inspection equipment is calibrated and controlled in accordance with Section 12.Calibration status is verified by inspection personnel prior to performing an inspection operation.
In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing methods;equipment, and personnel is provided.Both inspection and process monitoring are required when control is inadequate without both.Quality Performance is responsible for verifying.adequate inclusion of inspection requirements in specifications.
The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included'in maintenance, repair, refueling, modification and testing instructions and procedures and related fabrication processes.
He is also responsible.
for the assignment of qualified personnel required for the performance of verification inspections and quality, control surveillances of quality affecting activities.
'ith the exception'of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible for establishing the requirements, for.the Inservice Inspection Program.Nuclear Engineering Services is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program.The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.
Test Control Checks or testing performed to verify the adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings.Whenever-25-Revision 19 December, 1993  


testing is required to demonstrate that a material, part, component, or system will.perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established'in Technical Specifications, drawings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements.
testing is required to demonstrate that a material, part, component, or system will. perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established'in Technical Specifications, drawings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements. The test program requires the identification, control, and documentation of all tests, and the preparation of written procedures required for satisfactory accomplishment of the testing.
The test program requires the identification, control, and documentation of all tests, and the preparation of written procedures required for satisfactory accomplishment of the testing.Together the written procedures and checklists for the testing program include: necessary test equipment and calibration requirements; material requirements; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria;instructions for disposition of deviations; data collection requirements; and test result approval.The Plant Manager, Ginna Station is responsible for the station test program, which, includes the surveillance.
Together the written procedures and checklists for the testing program include: necessary test equipment and calibration requirements; material requirements; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instructions for disposition of deviations; data collection requirements; and test result approval.
test program required by Section 4.0, Technical Specifications.
The Plant Manager, Ginna Station is responsible for the station test program, which, includes the surveillance. test program required by Section 4.0, Technical Specifications.
Nuclear Engineering Services, is responsible.
Nuclear Engineering Services, is responsible. for preparing
for preparing'test procedures and performing testing associated with modifications.
'test procedures and performing testing associated with modifications.                                               I Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved'y the Plant Manager, Ginna Station'. The Plant Manager, Ginna Station .is responsible for the correct and timely performance of the required, tests utilizing written and approved procedures. When contractors are employed for tests, the contractor is required to perform testing in accordance with their approved quality assurance program requirements. All test results are required to be documented, reviewed, and approved by those responsible for performing the test.
I Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved'y the Plant Manager, Ginna Station'.The Plant Manager, Ginna Station.is responsible for the correct and timely performance of the required, tests utilizing written and approved procedures.
When requested by Ginna Station, Gas and Electric Distribution Division performs test activities to determine the cause of protective relay malfunctions. These test activities are performed in accordance with approved procedures by qualified personnel.
When contractors are employed for tests, the contractor is required to perform testing in accordance with their approved quality assurance program requirements.
Nuclear Engineering Services and Quality Performance are responsible .for assuring that required tests for major Revision 19 December, 1993
All test results are required to be documented, reviewed, and approved by those responsible for performing the test.When requested by Ginna Station, Gas and Electric Distribution Division performs test activities to determine the cause of protective relay malfunctions.
These test activities are performed in accordance with approved procedures by qualified personnel.
Nuclear Engineering Services and Quality Performance are responsible.for assuring that required tests for major-26-Revision 19 December, 1993 0
modifications are included in specifications.
Nuclear Engineering Services and Gas and Electric Distx'ibution Division assistance in the preparation of modification-related test procedures may be provided'to the Ginna Station staff.The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing tqodification-related test results for, acceptability to design requirements.
Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requirements.
Control of Measurin and Test'ui ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test.equipment which are to be.used in the measurement, inspection, and.monitoring of components, systems, and structures.
Calibration procedures include step-by-step methods for.calibration and requirements for.instrument accuracy.Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations; experience, and other conditions affecting measurement capability.
Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration.
test data, and identification of the next calibration date on the equipment;..a..system providing traceability of shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates;and a system controlling the purchase requirements of new equip-, ment to be entered into the calibration and control system including requirements for accuracy, stability, and repeatability under normal use conditions.
In the event a measuring instrument (i.e.shop or field standard)is found out of calibration,an'investigation is conducted to determine the validity of previous measurements. Revision 19 December, 1993 Cl 0 The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordancel'.with the above requirements.
Instruments specified in Section 4.1, Technical Specifications, are included in the program.Tools, gauges, and instruments necessary for maintenance, inspection, and test are calibrated and controlled in accordance with station procedures.
Measuring, test or inspection equipment used by Nuclear Assurance Quality Control is included in the program.P The Manager, Materials Engineering and Inspection Services and, Division Manager, Rochester Construction and Maintenance are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.
13.Handlin Stora e and Shi in Ginna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.Gas and Electric Distribution Division, and Materials Engineering and Inspection Services are responsible for preparing and implementing procedures for the handling, storage, shipping," preservation, and cleaning of material and equipment delivered to or located in their"work areas.In addition, the Manager, Materials Engineering and Inspection Services.is responsible for preparing and implementing procedures for the routine maintenance and.inspection of lifting and handling equipment.
Under normal circumstances, manufacturer's specific-written instructions and recommendations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to.environmental requirements.
In the.absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in accordance with department.
procedures.
The Department Manager, Nuclear Engineering Services or Plant Manager, Ginna Station are responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for major modifications. Revision 19 December, 1993  


These procedures are prepared by contractors, by the station staff, or by.staff members of Gas and Electric Distribution Division as appropriate.
0 modifications are included in specifications. Nuclear Engineering Services and Gas and Electric Distx'ibution Division assistance in the preparation of modification-related test procedures may be provided'to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing tqodification-related test results for, acceptability to design requirements. Reviews of minor modification design by  Quality Performance  verifies adequate inclusion of test requirements.
Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.Xn the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.
Control of Measurin    and Test'  ui ment The  calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test. equipment which are to be. used in the measurement, inspection, and.
Quality Performance, Ginna Station and Nuclear Engineering Services are responsible for review of engineering-specifications to assure that proper handling, storing, and shipping requirements have been specified.
monitoring of components, systems, and structures.
Quality Performance is responsible for assessment of handling, storage, and shipping.activities by suppliers, Rochester Gas and Electric personnel, and contractors.
Calibration procedures include step-by-step methods for .
ns ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly"identified by use of tags, control.logs,.and other suitable means to indicate the status in a positive manner.The identification is sufficient to positively indicate the status.of the particular equipment or system being isolated.The Plant Manager, Ginna Station is, responsible for indicating the status of operating equipment or systems to be removed from service for maintenance, repair, or modification in accordance with the approved Electric System Operating Rules.The Plant Manager designates personnel who have station holding authority.
calibration and requirements for. instrument accuracy.
Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations; experience, and other conditions affecting measurement capability.
Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration. test data, and identification of the next calibration date on the equipment;..a..system providing traceability of shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates; and a system controlling the purchase requirements of new equip-,
ment to be entered into the calibration and control system including requirements for accuracy, stability, and repeatability under normal use conditions. In the event a measuring instrument (i.e. shop or field standard) is found out of calibration,an'investigation is conducted to determine the  validity of  previous measurements.
Revision  19 December,  1993
 
Cl 0
 
The  Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordancel'.with the above requirements. Instruments specified in Section 4.1, Technical Specifications, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are calibrated and controlled in accordance with station procedures. Measuring, test or inspection equipment used by Nuclear Assurance Quality Control is included in the program.
P The Manager, Materials Engineering and Inspection Services and, Division Manager, Rochester Construction and Maintenance are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.
: 13. Handlin    Stora  e and Shi    in Ginna  Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station. Gas and Electric Distribution Division, and Materials Engineering and Inspection Services are responsible for preparing and implementing procedures for the handling, storage, shipping, "
preservation, and cleaning of material and equipment delivered to or located in their "work areas. In addition, the Manager, Materials Engineering and Inspection Services    .
is responsible for preparing and implementing procedures for the routine maintenance and .inspection of lifting and handling equipment. Under normal circumstances, manufacturer's specific-written instructions and recommendations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to. environmental requirements. In the
    . absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in accordance with department. procedures.
The Department Manager, Nuclear Engineering Services or Plant Manager, Ginna Station are responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for major modifications.
Revision  19 December,  1993
 
These procedures   are prepared by contractors, by the station staff, or by. staff members of Gas and Electric Distribution Division as appropriate. Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.
Xn the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.
Quality Performance, Ginna Station and Nuclear Engineering Services are responsible for review of engineering-specifications to assure that proper handling, storing, and shipping requirements have been specified. Quality Performance is responsible for assessment of handling, storage, and shipping .activities by suppliers, Rochester Gas and Electric personnel, and contractors.
ns ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly"identified by use of tags, control. logs,. and other suitable means to indicate the status in a positive manner.
The identification is sufficient to positively indicate the status .of the particular equipment or system being isolated.
The Plant Manager, Ginna Station is, responsible for indicating the status of operating equipment or systems to be removed from service for maintenance, repair, or modification in accordance with the approved Electric System Operating Rules. The Plant Manager designates personnel who have station holding authority.
Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.
Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.
System status is indicated through the use of hold tags, block tags and corresponding control logs.Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets.Written procedures control.the use of hold tags, test tags, and labels.-29-Revision 19 December, 1993 0
System status is indicated through the use of hold tags, block tags and corresponding control logs.
1 Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.
Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets. Written procedures control .the use of hold tags, test tags, and labels.
Fuel handling operations involving, fuel assemblies or other radioactive sources are identified and controlled by the use of tags, stamps, or other suitable means.Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejection for a particular component, system, or structure.
Revision 19 December, 1993
These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a designated control location to indicate the status and the completion of required inspections and tests.Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and'ssures that inspection.
 
results are properly documented, Material Engineering and Inspection Services.'stablishes the procedures for implementing the inspection status sheets utilized during inservice inspection.
0 1
Nonconformin Materials Parts and Com onents Procedures are.established for the control, evaluation and disposition of deficient material, parts, and components.
Systems, components,   and equipment which are found to be unacceptable during   or after testing are clearly identified.
Materials, parts, or components which do,not conform to the.drawing or specification requirements are identify'.ed, controll'ed and reported.RGEE personnel are responsible for initiating nonconformance reports and initiating dispositions.
Fuel handling operations involving, fuel assemblies or other radioactive sources are identified and controlled by the use of tags, stamps, or other suitable means.
Nuclear Assurance Quality Control personnel are responsible for inspecting and approving closeout-of nonconformance reports.Prior to installation or.use, nonconforming items generally remain in a hold area until an approved disposition has been implemented.
Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejection for a particular component, system, or structure.
Nonconforming items may be released for installation-to meet critical fabrication schedules provided controls are established to prevent inadvertent use prior to implementing the nonconformance disposition.
These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a designated control location to indicate the status and the completion of required inspections and tests.
After installation, nonconforming items are identified and controlled until approved disposition has been implemented.
Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and'ssures that inspection. results are properly documented,   Material Engineering and Inspection the procedures for implementing the inspection Services.'stablishes status sheets utilized during inservice inspection.
Nonconformances identified.at a supplier's facility and reported-to RGEE, which have supplier recommended dispositions of use-as-is, or repair, are normally processed-30-Revision 19 December, 1993  
Nonconformin Materials Parts and Com onents Procedures are. established for the control, evaluation and disposition of deficient material, parts, and components.
Materials, parts, or components which do,not conform to the.
drawing or specification requirements are identify'.ed, controll'ed and reported. RGEE personnel are responsible for initiating nonconformance reports and initiating dispositions. Nuclear Assurance Quality Control personnel are responsible for inspecting and approving closeout- of nonconformance reports. Prior to installation or .use, nonconforming items generally remain in a hold area until an approved disposition has been implemented. Nonconforming items may be released for installation- to meet critical fabrication schedules provided controls are established to prevent inadvertent use prior to implementing the nonconformance disposition. After installation, nonconforming items are identified and controlled until approved disposition has been implemented.
Nonconformances   identified .at   a supplier's facility and reported- to RGEE, which have supplier recommended dispositions of use-as-is, or repair, are normally processed Revision                   19 December,                   1993


by the department originating the procurement.
by the department originating the procurement.
Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.
Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.
Items are repaired and reworked in accordance with approved procedures and current drawings.The repair or rework must be verified as acceptable, by an inspection of the affected item or process which is at least equal to the original inspection method.Items which are accepted"use-as-is" are fully documented.with the drawing or specification requi'rement and technical justification for acceptances All such items are approved prior to use by the cognizant organization having responsibility for the requirement.
Items are repaired and reworked in accordance with approved procedures and current drawings. The repair or rework must be verified as acceptable, by an inspection of the affected item or process which is at least equal to the original inspection method.
In addition, those"use-as-is" nonconformances which also deviate from a Design Criteria requirement, shall require additional approval of the Senior Vice President; Production and Engineering.
Items which are accepted "use-as-is" are fully documented
-Nuclear Assurance Quality Control personnel provide nonconformance status information periodically.
  .with the drawing or specification requi'rement and technical justification for acceptances All such items are approved prior to use by the cognizant organization having responsibility for the requirement. In addition, those "use-as-is" nonconformances which also deviate from a Design Criteria requirement, shall require additional approval of the Senior Vice President; Production and Engineering.
Quality Performance and other.organizations analyze nonconformance report data for.'adverse trends and provide periodic reports to management.
Nuclear Assurance Quality Control personnel provide nonconformance status information periodically. Quality Performance and other. organizations analyze nonconformance report data for.'adverse trends and provide periodic reports to management. Adverse trends form a basis for supplier re-
Adverse trends form a basis for supplier re-evaluation or for other corrective action.Corrective Action Conditions adverse to quality are those conditions which compromise confidence that a structure, system or component at Ginna Station will perform satisfactorily in, service.Significant conditions adverse to quality are those conditions which, if uncorrected, could affect the health'nd safety of the public, seriously affect the ability to operate the plant in a safe manner, represent a serious breakdown in activity controls, or will require a major.effort to restore capability to perform specified.
- evaluation or for other corrective action.
functions.
Corrective Action Conditions adverse to quality are those conditions which compromise confidence that a structure, system or component at Ginna Station will perform satisfactorily in, service.
Conditions adverse to quality shall be promptly identified and reported to supervision.
Significant conditions adverse to quality are those conditions which,   if uncorrected, could affect the health safety of the public, seriously affect the ability to     'nd operate the plant in a safe manner, represent a serious breakdown in activity controls, or will require a major.
The condition adverse to quality shall be identified, corrected and evaluated to-determine if a significant.
effort to restore capability to perform specified. functions.
condition adverse to quality exists.When a significant condition adverse to quality at Ginna Station is identified, the Corrective Action Coordinator is-31-Revision 19 December, 1993 responsible for evaluating the effect of continuing the activity.If continuing the activity would obscure or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.The Manager Nuclear Assurance has authority to stop work on maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies at Ginna Station, as well as other locations.
Conditions adverse to quality shall be promptly identified and reported to supervision. The condition adverse to quality shall be identified,   corrected and evaluated to-determine if a significant. condition adverse to quality exists.
When a significant condition adverse to quality at Ginna Station is identified, the Corrective Action Coordinator is Revision 19 December, 1993
 
responsible for evaluating the effect of continuing the activity. If continuing the activity would obscure or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.
The Manager Nuclear Assurance has authority to stop work on maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies at Ginna Station, as well as other locations.
Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.
Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.
The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engineering Services, Materials Engineering and Inspection
The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engineering Services, Materials Engineering and Inspection
.Services, Gas and Electric Distribution Division or cognizant supplier associations.
. Services, Gas and Electric Distribution Division or cognizant supplier associations.
For significant conditions adverse to quality, affected RGSE management shall review initiated reports to.determine causes and develop corrective action plans to resolve the identified concerns and preclude recurrence'f, the significant condition adverse to quality involves a design deficiency or the recommended corrective action involves a design change, the review of the condition adverse to'quality includes Nuclear Engineering Services or Ginna Station design personnel, as'appropriate.
For significant conditions adverse to quality, affected RGSE management shall review initiated reports to. determine causes and develop corrective action plans to resolve the identified concerns and preclude recurrence'f, the significant condition adverse to quality involves a design deficiency or the recommended corrective action involves a design change, the review of the condition adverse to
The Corrective Action Coordinator assures root cause determination and corrective action plans.are developed to resolve the identified concern and to preclude recurrence.
'quality includes Nuclear Engineering Services or Ginna Station design personnel, as 'appropriate.
Cognizant nuclear supervision reviews each Corrective Action Report initiated.
The Corrective Action Coordinator assures root cause determination and corrective action plans. are developed to resolve the identified concern and to preclude recurrence.
at Ginna Station and may recommend additional corrective action if the action already taken does not result in adequate resolution.
Cognizant nuclear supervision reviews each Corrective Action Report initiated. at Ginna Station and may recommend additional corrective action does not result in adequate if the action already taken resolution.
The Plant Operations Review Committee CAR Subcommittee reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective'ction has been taken to preclude repetition.
The Plant Operations Review Committee CAR Subcommittee reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective'ction has been taken to preclude repetition.
Corrective action summary reports are submitted to departmental supervision to keep them aware of significant conditions adverse to quality, related causes and corrective Revision 19 December, 1993  
Corrective action summary reports are submitted to departmental supervision to keep them aware of significant conditions adverse to quality, related causes and corrective Revision 19 December, 1993
 
action being taken. Senior Management is advised of the causes and actions of the more significant Corrective Action Reports.
Quality Assurance provides additional assurance of the corrective action program effectiveness through semi-annual audits and periodic surveillances.
ualit    Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance.      Production and Engineering Systems, as directed by the Division Manager,, Technical Services and Chief Engineer, is responsible for,.the retention and maintenance of records. Quality Performance, Purchasing, Nuclear Engineering Services, and Gas and Electric
. Di'stribution Division departments          are responsible for forwarding the records they initiate to the appropriate
    'Production and Engineering Systems record retention locations. Each organization generating records is responsible for preparation,, review, approval, and implementation of specific quality assurance .record procedures for their areas of responsibility in, accordance with these requirements. The records which fall within quality assurance record requirements include those records
:  required by Section 6.10 of the Technical Specifications and the Quality Assurance Program.          All records associated with
~
the operation, maintenance, repair, inservice inspection,
~
refuel'ing, modification, inspection and testing systems, and components covered by the    of'tructures, quality assurance  program are included.
Records  initiated at  Ginna  Station include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses; calibration procedures. and reports; and Nonconformance and Corrective Action Reports.            Records of the qualification of personnel,        procedures,  and  equipment for special processes    and  the results  of  reviews                are maintained  at  the  appropriate  Production  and  Engineering Systems record retention location.
Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
Revision                19 December,                1993
 
The  requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate.                                Requirements and responsibilities for'reparation, inspection, identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents.                                Records are  available to authorized personnel.
Removal  of records from storage is documented and accountability is maintained by the responsible record control activity.
Records. are either stored in record storage .facilities"which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept .in two separate storage locations in separate buildings which .are physically isolated from each                  other.'ecord keeping .procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage. The procedures establish retention- requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records; Production and Engineering Systems is responsible for maintaining plant operating records as. required in Section 6.10, Technical Specifications.
Production and Engineering Systems is also responsible for.
maintaining off-si'te prepared design records, such as specifications, drawings, design review reports, and design control documentation; 'quality assurance records, .such as audit reports and surveillance reports; purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.'udits Compliance with                all aspects of the Quality Assurance Program and the  effectiveness              of the program is determined by audits and  surveillances              of  all  organizations performing quality affecting                activities. Quality              Assurance is responsible for conducting                audits of  those  organizations              and. activities involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status. and Revision  19 December,  1993
 
safety importance of activities being performed, as well as group performance and related management concerns.
Table 18-1 is a list of the audits with activities to be examined for each. Frequencies are based on the level of activity in each area. Audit schedules are established to assure that each of the activities is audited at the frequency specified in Section 6.0. Technical Specifications. Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concexns.
Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names of those .who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations. Audit planning and  .
performance utilize performance based techniques that will facilitate effectiveness assessments as well as compliance verification. The audits are performed in accordance 'with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.
Audit results are documented and reported to the supervisor and division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board. Within a specified period of time, the person having supervisory
-
responsibility in the; area audited is required to review the audit results, take necessary action to correct the deficiencies identified by the audit, and document and report the corrective action.
Quality Assurance is responsible for developing audit-plans and audit checklists, designating and training audit personnel,,and conducting audits.
Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procurement, as required, to evaluate their quality assurance program for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance Revision  19 December,  1993
 
programs  in accordance with procurement documents. During the project or procurement process additional audits are performed, as required, to assure all quality assurance program requirements are properly implemented in accordance with procurement documents.
Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends. Results of these analyses are provided to management for their regular review.
Revision  19 December,  1993
 
Table 1-1 Quality Assurance  Program Procedures Subject Listing Appendix  B ualit    Assurance  ualit  Control Procedures          Criteria Xndoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management  Review of the  Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Planning and Reporting Results      for QA/QC Subcommittee Meetings Quality Assurance/Quality Control Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality .Assurance Review and Approval of Field Change-              IXI Reguests and Review of ECN's Quality Assurance Review of Rochester Gas and                      .IXI Electric Engineering Specifications Preparation, Review and Approval of Quality Verification            .III Specifications Computer Software Product Evaluation Quality Assurance, Review of Computer Software Production Evaluations Master Software Index Requisitioning. Quality Assurance/Qual'ity Control Services
'Quality Review of Rochester    Gas and Electric  Procurement Documents Preparation,    Review and Approval of Rochester Gas and Electric  Q.A. Specifications Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B ualit  Assurance  ualit Control  Procedures          Criteria Preparation,  Review and Approval  of Ginna Station Quality Assurance Manual Preparation, Review and Approval'f Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision and Control of the QA Program for Station Operation Review of Nuclear Directives Review  of Departmental Procedures                              VI Preparation,'eview and Approval. of Procedure                    VI Deviation Requests by Quality Assurance/Quality Control Evaluation of Suppliers by Quality Assurance                    VII Supplier Surveillance Control of Supplier Performance                                  VII Quality Assurance Evaluation of Bids                            VII Conducting Commercial Grade Supplier Surveys                    VII Evaluation of Commercial Suppliers by Quality                    VII Assurance Document  Deficiency Reports                                    VII Establishment and Maintenance of Qualified                      VII Suppliers List Establishment and Maintenance of the Commercial                  VII Grade  Supplier List Verification Inspection Program Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B ualit Assurance  ualit  Control Procedures          Criteria Qualification of Inspection Personnel Quality Assurance Nonconformance Processing                    XV Corrective Action Reports                                      XVI Quality Assurance Commitments and Action Items                  XVI Review of Ginna Maintenance Work .Order Packages                XVI Identified Deficiency Reports,                                  XVI Records Turnover Plan                                            XVII Qualification of Audit/Survey Personnel                        ,XVIII Audit Scheduling and Planning                                    XVIII Performance of Quality Assurance Audits                          XVIII Reporting and Follow-Up of Audit Findings                        XVIII Conduct  of Quality Assurance During and in                      XVIII Follow-Up of NSARB Audits Response to Audits and Surveillance                              XVIII Qualifications of Surveillance Personnel                        XVIII Review of Audit Program                                          XVII Auditing of the Nuclear Emergency Response Plan                  XVXI Performance Based Surveillance. Program                          XVIII Availability and Use of INPO and NRC Inspection/                XVIII Assessment Reports in Audit and QA Surveillance Quality Assurance Planning Guides                                XVIII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix    B Materials  En  ineerin  Ins ection Services          Criteria Indoctrination  and  Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase                    IV Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures Quality Materials Engineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Preparation, Review and Approval of Materials Engineering Laboratory Test Procedures Control and Distribution of Documents. Regulating                VI Safety Related Activities Control of Purchased Materials                                , VII Preparation, Review and Approval of Supplier                    VII Evaluation Control of Purchased Services                                    VII Welding Procedure Preparation Review and Approval Welding Procedure  Qualification                                IX Heat Treating Procedures                                        IX Welder  Qualification  and Currency                              IX Nondestructive Examination Procedures                            IX Nondestructive Examination Procedures Manual                    IX Nondestructive Examination Personnel Qualification              IX Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Materials  En ineerin  Ins ection Services            Criteria Qualification of Visual Examination Personnel                      IX Erosion/Corrosion Program                                          IX General Brazing Procedures    Preparation and Approval            IX General Brazing Procedures    Qualification                        IX Inservice Inspection Program and Plans ASME Section XI Repair, Replacement and Modification Procedure Incorporating Ginna Modifications into Inservice Inspection Program Duties of the ANII Tests conducted by MEIS Laboratories                              XI Requesting MEIS Laboratories Services                              XI Test Personnel Qualifications Vendor. Tests under MEIS  Direction                            . XI.
Calibration  and  Control of Nondestructive                        XII Examination Instruments Inspection and Maintenance of Material Handling    .              XIII.
Equipment Overhead and Gantry Cranes                                        XIII Inspection and Maintenance    of Portable Lifting                  XIII and Handling Equipment Underhung Cranes,  Jib Cranes and Monorail Systems                XIII Slings and Related Apparatus                                      XIII Classification and Training of Material Handling                  XIII Equipment Personnel Revision  19 December,  1993
 
,
0 0
 
Table 1-1 (cont'd)
Appendix 8 Materials En  ineerin  Ins ection Services          Criteria Mobile Hydraulic Cranes                                        XIII Inspection and Maintenance of Jacks, Hydraulic    Rams          XIII and  Cylinders Forklift Loading  Forks                                        XIII Inspection of Designated Monorails                              XIII Training and Qualification of Crane Operators                  XIII Lifting Devices in  the Containment Vessel                    XIII Pre-Shipment Inspection of Radioactive Material                XIII Shipping Containers Nonconformance Reports.                                        XV Initiating  and Responding  to Corrective Action              XVI Reports
'uality Materials    Engineering  and, Inspection                XV.II.
Services Records Response  to Audits                                            XVII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix        B Ginna Procedures                                    Criteria Ginna  Quality Assurance Program Implementation Fire Watch Training R.E. Ginna Training Plan Ginna Station Training General Employee Training Temporary Employee Training Hazardous/Mixed Waste Emergency Response Trainipg Operator Training Responsibilities R.E. Ginna Health Physics Orientation Program Fire Brigade Training Radiation Protection Technician Entry Level Requirements, Responsibilities, and Training
                        ~
Chemistry Technician Entry .Level Requirements, Responsibilities, and Training
        ~
Maintenance Training Program Ginna Station Administrative and Engineering Staff Responsibilities Ginna Station Management Responsibilities                      XI Physics and Chemistry Section Organization,              'ealth and Responsibilities Support Services Organization and Responsib'ilities Operations Section Organization and Responsibilities Technical Section Organization and Responsibilities Material and Procurement Section Organization                  XI and Responsibilities Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                    Criteria Operational Assessment Section Ginna  Station Staff Responsibilities for Fire Prevention Ginna  Modification Project Organization Plant Operations Review Committee Operating Procedure Radiation Emergency Plan Implementing Procedure Committee Emergency Procedures    Committee (EPC)
Ginna Standard Nomenclature                                  XI Preparing and Dispositioning of Technical Staff.
Request Control of Station Modification Station Modif'ication Classification and Review Station Modification Planning Control                        XXI Station Modification Installation and Acceptance Station Modification Completion Preparation, Review &. Approval of Design Input Documents for Minor Modifications Component  Classification Request/Reanalysis,                XII Evaluation of Parts to Determine 'Safety Classification      XXI Preparation, Review and Approval of. Safety Analysis Preparation, Review, Approval and Distribution of Design Output and Design Review Documents for Minor Modifications Technical Evaluation Revision  19 December,  1993
 
0 Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                          Criteria Preparation of Configuration Data Change Forms Computer Software Product Evaluation Control of Procurement Documents Prepared at                        IV Ginna  Station Evaluation of Commercial Grade Items for Safety                    IV Related Applications Evaluation of Items for In-Storage Maintenance                      IV Requirements Plant Procedures Preparation and Classification t
V Plant Procedure Content and Format Requirements                    V Emergency and Abnormal. Operating Procedures Writers'uide-Operating Procedures Writers'uide "Health Physics and Chemistry Procedures  Writers'uide Plant Procedure Adherence Requirements Emergency and Abnormal Operating Procedures Users'.
Guide Procedure Control Procedure Control-New Procedures Procedure Control-Permanent  Changes                                VI Procedure Control-Temporary Changes                                VI Procedure Control-Periodic Review                                  VI Procedure Control-Index                                            VI Procedure Control of Emergency and Abnormal Procedures Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                    Criteria Procedure Control - Amendments to Licensing                    VI Documents and Changes to the Facility Procedure Change Control 10CFR 50  '9  Review Emergency and Abnormal Operating Procedure Support Documentation Control Procedure  Distribution                                        Vj Control of Construction Documents                              VI Vendor Manual Control Program                                  Vj Vendor Manual Information/Discrepancy/Incorpor'ation          VI Request.
Drawing Change Request                                        VI Conditional Release Program                                    VII Receipt and Acceptance of Materials/Parts                      Vjj Control of Purchased Services                                  VII Inventory Control of Material, Parts and Components at Ginna Station Identification and Marking of Accepted Material,              VIII Parts, and Components
. Bulk Storage of Combustible'Materials and Their Use            VIII Trailer Admittance  Requirements                              VIII Control of Consumable Materials at 'Ginna Station              VIII Control of Welding Nondestructive Examination Control                            IX Welding Equipment Performance    Verifications Revision  19 December,  1993
 
0 Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                      Criteria Open Flame,,  Welding and Grinding Permit (Hot Work Permit)      IX Control of Inservice Inspection      Activities ASME  Section XI Repair, Replacement and Modification Procedure  for Ginna  Station Electrical Preventive Maintenance Program Environmentally, Qualified Equipment Maintenance Program Mechanical Preventive Maintenance Program      for              X Rotating 'Equipment Equipment Inspection and Lubricant List Valve Preventive Maintenance Program                            X Condenser  Inservice Inspection Program Preventive Maintenance Program for Plant Security                X Equipment Performance  of Tests.                                          XI Qualification and Certification of Test. Personnel=
Test Tag Control Program Calibration, Test, Check and Replacement. Surveillance Program for Instrumentation and Equipment Important to Safety                                                        XI Ginna Station Surveillance Schedule                              XI Inservice Testing of Pumps and Valves Calibration and Control of Test Equipment                        XII Maintenance and Inspection of Material Handling Equipment                                                        XIII Revision  19 December,  1993
 
0 Table 1-1 (cont'd)
Appendix    B Ginna Procedures                                    Criteria Control of Material Handling and Handling Equipment                                              XIII Storage and Preservation of Materials and Equipment  at Ginna Station                                    XIII Control of Heavy Loads at Ginna Station                        XIII Control of Heavy Loads for the Containment Overhead Crane                                      XIII Control of Heavy Loads for the Auxiliary Building    Overhead Crane                            XIII Control of Heavy Loads for the    7 1/2 Ton Screenhouse  Crane                                            XIII Control of Heavy Loads for Jib Cranes in.
Containment                                                    XIII Control of Heavy Loads in Safety-Related Areas                  XIII Housekeeping Control                                            XIII,  .
Station Holding Rules                                          XIV Bypass of Safety Function of    Jumper Control                XIV Operational Assessment .Program                                -XIV Effectiveness Evaluation of the Operational Assessment    Program                                            XIV Installation  -and Removal  of Temporary Cables                XIV.
Control of .Temporary Modifications                            XIV Installation, Removal and Control of Scaffolding                XIV
'Installation and Removal of Temporary Fluid System Provisions                                              XIV
'Program  to Prevent Degradation of Reactor Coolant Pressure  Boundary                                              XIV Revision  19 December,  1993
 
0 Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                                  Criteria Independent  Verification                                                  XIV Control of Nonconforming Items                                              XV Nonconformance Reports                                                      XV Corrective Action Reports                                                  XVI Root Cause Analysis                                                        XVI Overview of the Ginna Station    Work  Control System                      XVI Work Request/Trouble  Report  Initiation                                  XVI Work Order  Initiation                                                      XVI Work Order Planning                                                        XVI Work Ord'er Scheduling                                                      XVI Work Order Execution                                                        XVI Post Maintenance Testing                                                    XVI Work Order Close Out                                                        XVI Work Order Processing  After  Hours                                        XVI Work  Control System Performance Indicators                                XVI Station Work Authorization Request                                          XVI Safety Classification of Mainten'ance Work Activities                      XVI Identified Deficiency Reports                                              XVI Ginna Records                                                              XVII Records Storage  Facilities  and Equipment                                XVII Special Nuclear Material Inventory and Record
                                                  'equirements              XVII Maintenance History Program                                                XVII Ginna Station Response    to Internal Audits                                XVII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix      B Nuclear  En ineerin  Services Procedures                          Criteria Indoctrination    and Training Engineering Department Organization and Responsibilities Ginna Modification Project Organization Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Preparation; Review and Approval of Engineering Drawings                  - III Review and Approval of Engineering          ..              III ',
                                                                                .'reparation, Specifications Preparation, Review and Approval of Design Verification,:
Integrated Design Process Preparation, Review and Approval of, Safety Analyses Review and Approval of Architect Engineer or                              ~
III Design Documents                    'onsultant Preparation,  Review and Approval  of Field'hange Requests Preparation, Review and Approval of Engineering Change Notices
                                                                    '.      XII Review. of the Classification of Station Modifications Preparation, Review, and Approval of CAD Piping and                        IIX Instrumentation Drawings Preparation,  Review and  Disposition of Drawing Change Requests ALARA/  Radiation Safety Design'Review Revision  19 December,  1993
 
'k Table 1-1 (cont'd)
Appendix    B Nuclear  En  ineerin Services Procedures                                            Criteria Preparation, Review and Approval of Appendix R Conformance Verifications Preparation, Review, and Approval of the Environmental Qualification Data Electrical'quipment Summary Form EEQ-1 and IEEE 323-1974 Waiver                    .
Authorization Form EEQ-2 Review, Approval and Implementation of Changes to the Safety Assessment System Software Engineering Computer Software Documentation and Control Human. Factors Review of. Control Room and Local                                        I I I,.
Control Panel Modifications                          'mergency Preparation, Review and Approval of PAID Database                                      IIX and Configuration Data Change Forms Erosion/Corrosion Control Monitoring Program for Carbon Steel Piping Preparation, Review and Approval .of Changesto the                          .
Updated Final Safety Analysis Report ASME  Section XI Repair, Replacement and Modification Program Implementation
'. Component  Safety Classification Drawing Review Process, Component Safety Classification Component                                              IIX Classification  Form Component  Safety Classification Request/Re-Analysis System, Structure,. or .Component Safety Classification                                III" Criteria Preparation,  Review and Approval of CAD  Electrical Drawings Revision  19 December,  1993
 
i Table 1-1 (cont'd)
Appendix            B Nuclear  En  ineerin  Services Procedures                      Criteria Requests  for  Nuclear Engineering Services Preparation,  Review and Approval of Procurement                      IV Documents  for Purchases Covered by the QA. Program Evaluation of Commercial Grade Items for Safety                          IV Related Applications Evaluation of Quality Verification Items for Safety                      IV Significant Applications Preparation,  Review, and Approval of Engineering Procedures Review, and Approval    of Engineering                V'reparation, Procedure Deviation Request Distribution  and Control of Documents by                            VI the Control Number Method Distribution  and Control  of Documents by  Project  .    ..      . VI Correspondence  Procedures Preparation,  Review,and Approval of Supplier Evaluations            VII Review and Approval    of Vendor Design and Manufacturing        .. VII Technical Documents Preparation, Review and'pproval of Bid Requests, Bid,                  VII Evaluations and Recommendations for Award Engineering Review of Nonconforming Materials, Parts                  VX or Components Initiating  and Responding  to Corrective Action Reports            XVI Processing Identified Deficiency Reports                                XVI Documenting and Reporting Potential Conditions                          XVI Adverse to Quality Performing "Substantial Safety Hazard" Evaluations                      XVI for  10CFR21  Reportability Revision  19 December,    1993
 
Table 1-1 (cont'd)
Appendix  B Nuclear En ineerin  Services Procedures            Criteria Records                                                XVII Records Turnover Plan                                  XVII Engineering Response to Internal Audits                XVIII Revision  19 December,  1993
 
Table 1-1 (cont',d)
Appendix  B Purchasin  Procedures                              Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities Preparation, Review, Approval and Issuance of                IV Purchase Orders and Changes to Purchase Orders Requests  for  Bids and Bid Evaluation                        IV Purchasing Procedures Purchasing Procedure Deviation Request                        V Supplier Evaluation                                          VII Supplier Material Deficiency Processing                      XV Supplier Corrective Action Reporting                          XV1 Purchasing Response.to    Corrective,                        XVI Action Reports and Corrective Action Reporting Purchasing Records and Turnover Plan                          XVII Purchasing Response  to Audits                              XVIII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix            B Production Division Trainin Procedures                                      Criteria Indoctrination and Training Production Division Training Organization and Responsibilities Operations and Technical Training Organization                        and Responsibilities Training Systems Organization and    Responsibilities'aintenance Training Organization and Responsibilities Curriculum Committee Organization and Responsibilities Software Quality Assurance Program Preparation, Review and Approval of Quality Training Procedures Review and'pproval of Training                                        V'reparation, Procedures, Guidelines, and Policies
                                  ~ ~
Preparation, Review and Approval of Nuclear                                          V, Training Programs Style Guide for Training Procedure Development Nuclear Training Procedure Revision Training Change Request/Notice Control .and Distribution of Production. Division                                    VI Training Documents Training Programs for Crane Operators and Riggers                                    XIII Corrective Action                                                                    XVI Nuclear Production Division Training                                                  XVII Records Management Production Division Training Response to                          QA Audits          XVIII Revision  19 December, 1993
 
Table 1-1 (cont'd)
Gas and Electric Distribution Division Procedures Appendix B Criteria Quality Assurance Program Implementation for Gas and Electric Distribution Division Department Indoctrination and Training of Gas and Electric Distribution Division Personnel Gas and Electric Distribution Division Organization Design/Modification Activities Control at Ginna Station Design/Modification Activities Control at Station 13A and on Circuit 751, Equipment and Line Control of Procurement Documents for Purchased                IV Parts, Components and Services Preparation, Review and Approval of Electric                  V Transmission and Distribution Procedures Preparation and Approval of Laboratory Test Procedures Preparation and Approval of Electric Meter and  .
Laboratory Calibrate.on Schedules Preparation and Approval of Electric Substation Department    V Relay Test Schedules Preparation and Approval of Electric Transmission and          V Distribution Deviation  Requests Control of  Gas and.Electric Distribution Division            VI.
Procedures Control and Distribution of Electric Meter and Laboratory      VI Department and Laboratory Test Procedures Control of Electric Meter and Laboratory Department-Calibration Services Control of Electric Substations Department Relay              VI Test Schedule Revision  19 December,  1993
 
0 Table 1-1 (cont'd)
,      Gas and  Electric Distribution Division Procedures Appendix B Criteria Supplier Technical Evaluation                                      VII Receipt and Acceptance of Instrumentation and                      VII Standards  Equipment ..
Control of Purchased. Services for Electric Meter and Lab          VII Identification and Control of Materials, Parts and                VIII Components Surveillance at the Gas and Electric Distribution Division. X Division Performance of Tests at Ginna Station                          :  XI Personnel'I Performance of Tests at the Electrical Laboratory Qualification of Test and Control of Test Instruments                      XII, XI'alibration Nonconforming Parts and:Components and Processing  of Corrective Action Reports          .XVI          'nitiating Control of Quality Assurance Records                              .XVII Gas and  Electric Distribution Division  Response to Audits.'VIII.
Revision  19 December,  1993
 
TABLE  4-1 Procurement Document      Re  uirements Items to    be considered  for inclusion in      procurement documents include:
: 1. Sco e  of  Work -  Detailed statement of the work to        be performed.
: 2. Technical  Re  uirements    by reference to    specific drawings; specifications, codes, regulations;        procedures  or instructions, including, revisions,        that  describe  the items or services to be furnished. Also        identified    shall  be  test, inspection and acceptance requirements,          and  any'special  .
requirements for such activities as designing, identification, fabrication, cleaning, erecting,. packaging, handling, shipping, extended storage and shelf life.
*3      ualit    Assurance Pro ram Re uirements - which require. the.
supplier to have a documented quality assurance progiam that          ~
implements portions or all of lOCFR50 Appendix B as well as
      ~
applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall  be  the requirement that the supplier incorporate appropriate quality assurance program requirements. in subtier procurement documents.
Ri ht of Access - to include the facilities and records of.- -          .
the supplier for source inspection .and audit. by the Purchaser or'parties designated by =the purchaser. . Also included shall be provisions for the identification of witness, and hold points and the minimum time of advance .notice'.,
  *5. Documentation. Re uirements  Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.
*6. Nonconformance - Requirements-for reporting .and;disposition of nonconformance to procurement requirements' Items reviewed by Quality Assurance          or Quality Control.
Revision  19 December,  1993
 
Table 18-1 Audit List Audit Title                          Audit To ic Areas Corrective Action                    Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods of operation.
Operational Assessment Nonconformance Control
*Outage Activities                    Refueling and Special Nuclear Material-ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA
*Health Physics, Chemistry 'and      Radwaste  Shipping and Process Radwaste                          Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation" Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program
+Fire and Safety                      Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program Revision  19 December,  1993


action being taken.Senior Management is advised of the causes and actions of the more significant Corrective Action Reports.Quality Assurance provides additional assurance of the corrective action program effectiveness through semi-annual audits and periodic surveillances.
Table 18-1 (con't)
ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance.
Audit List Audit  Title                          Audit  To  ic  Areas Independent  Inspections and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety Program Housekeeping Instructions, Procedures,             Drawing Control and Document Control            Vendor Manual Control Procedure Control Records Control    ~
Production and Engineering Systems, as directed by the Division Manager,, Technical Services and Chief Engineer, is responsible for,.the retention and maintenance of records.Quality Performance, Purchasing, Nuclear Engineering Services, and Gas and Electric.Di'stribution Division departments are responsible for forwarding the records they initiate to the appropriate
Security                              Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program
'Production and Engineering Systems record retention locations.
*Operations                            Limiting Conditions for Operation.
Each organization generating records is responsible for preparation,, review, approval, and implementation of specific quality assurance.record procedures for their areas of responsibility in, accordance with these requirements.
Surveillance Testing Operator Performance Operations Administration PORC  Activities NSARB  Activities Materials Engineering and             ISI Program Inspection Services              NDE  Qualifications Welding Qualifications MHE  Program Miscellaneous    QA  Controls
The records which fall within quality assurance record requirements include those records: required by Section 6.10 of the Technical Specifications and the Quality Assurance Program.All records associated with~the operation, maintenance, repair, inservice inspection,~refuel'ing, modification, inspection and testing of'tructures, systems, and components covered by the quality assurance program are included.Records initiated at Ginna Station include operating logs;the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses;calibration procedures.
*Maintenance and Testing              Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment  History Control of Measuring and Test Equipment Revision 19 December, 1993
and reports;and Nonconformance and Corrective Action Reports.Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering Systems record retention location.Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances. Revision 19 December, 1993  


The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate.
Table 18-1 (con't)
Requirements and responsibilities for'reparation, inspection, identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents.
Audit List Audit  Title                          Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response  Plan      Nuclear Emergency Response Plan and Procedures Offsite  Agency Interface Response Personnel Training Emergency Information Plan Training/performance and             Licensed Operator qualifications of the                 Auxiliary, Operator operating and technical staff        Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General, Employee Training Procurement                          Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Program Configuration Control                Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 19 December, 1993
Records are available to authorized personnel.
Removal of records from storage is documented and accountability is maintained by the responsible record control activity.Records.are either stored in record storage.facilities"which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept.in two separate storage locations in separate buildings which.are physically isolated from each other.'ecord keeping.procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage.The procedures establish retention-requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records;Production and Engineering Systems is responsible for maintaining plant operating records as.required in Section 6.10, Technical Specifications.
Production and Engineering Systems is also responsible for.maintaining off-si'te prepared design records, such as specifications, drawings, design review reports, and design control documentation;
'quality assurance records,.such as audit reports and surveillance reports;purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.'udits Compliance with all aspects of the Quality Assurance Program and the effectiveness of the program is determined by audits and surveillances of all organizations performing quality affecting activities.
Quality Assurance is responsible for conducting audits of those organizations and.activities involved in the quality assurance program on a planned, periodic basis.Audit intervals are based on the status.and-34-Revision 19 December, 1993  


safety importance of activities being performed, as well as group performance and related management concerns.Table 18-1 is a list of the audits with activities to be examined for each.Frequencies are based on the level of activity in each area.Audit schedules are established to assure that each of the activities is audited at the frequency specified in Section 6.0.Technical Specifications.
i Table 18-1 (con't)
Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concexns.Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names of those.who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations.
Audit List Audit  Title                            Audit  To  ic  Areas Gas and Electric                        Systems Engineering and Distribution Division                          Design Rochester Construction and Maintenance Distributive Information Systems Support
Audit planning and.performance utilize performance based techniques that will facilitate effectiveness assessments as well as compliance verification.
* Noted audits will also address  relevant activities to .verify conformance of facility operat'ion  to all provisions contained in Technical Specifications and 'appl'icable license conditions..
The audits are performed in accordance
Revision 19 December, 1993
'with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.Audit results are documented and reported to the supervisor and division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board.Within a specified period of time, the person having supervisory
-responsibility in the;area audited is required to review the audit results, take necessary action to correct the deficiencies identified by the audit, and document and report the corrective action.Quality Assurance is responsible for developing audit-plans and audit checklists, designating and training audit personnel,,and conducting audits.Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procurement, as required, to evaluate their quality assurance program for compliance with all aspects of the procurement documents.
Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance-35-Revision 19 December, 1993  


programs in accordance with procurement documents.
R.E. GINNA NUCLEAR POWER PLANT MANAGEMENTORGANIZATION CHART UNES OF COMMUNCATIQN UNES OF SU~      AND ADMIMSTRATION CHAIRMANOF THE BOARD, PRESDEMT AND CHIEF EXECUTIVE OFFCER SEMR                                                              SENIOR VCE                                      SENIOR VCE VICE PRESDENT                                                          PRESDENT,                                      PRESIDEMT, GAS & ELECTRIC                                                      PRODUCTON AND                                      CONTR OI.LER IXSmlBVTKW                                                            ENGWEERWG                                          & CHIEF AND CUSTOMER                                                                                                            FINANCIAL SERVICES                                                                                                              OFFCER VCE PRESDENT                                                                          DMSON MANAGERTECHNCAL                VCE PRESDENT          NSARB      VCE EMPLOYEE                                                                                  SERVICES AMO                    GINNANUCLEAR PRES DENT, RELATIONS.                                                                              CHIEF ENGINEER                    PRODUCTION SECRETARY PUBUC AFFAIRS                                                    DEPARTMENT                                                                                AND AND MATERIAL                                                        MANAGER                            MANAGER      DIRECTOR      DEPARTMENT        TREASURER MANAGEMENT                                                                                          PRODVCilON    CORPORATE        MANAGER QUAUTY PERFORMANCE                              ANO        RADIATION      PRODUCTION DEPARTMENT DIVISON                          DIVISON                                            ENGWEERING    PROTECTION        DMSON MANAGER MANAGER                        MANAGER SYSTEMS                      .-TRAINING PROJECT                                                                  RSK SYSTEM                        ROCHESTER                        MANAGEMENT                        CORPORATE                        MANAGEMENT ENGINEERIHG                    CONSTRUCTION                                          RECORDS            HEALTH        TRAIMWG AND DESGN                            AND                                            MANAGEMENT,    PHYSCS AND      SERVICES MAINTENANCE                                                            NUCLEAR                          IXRECTOR TECH NCAL QUAUTY                                              EMERGENCY                        OF SECURITY WFORMATlOM ASSURANCE                            CENTER,CNS,      PLANNWG PROCVREMENT,                        WFORMATKW DEPARTMENT    DEPARTMENT      DEPARlllEMT                                                                                            SUPERVISOR ENGWEERWG,                          SERVICES &
During the project or procurement process additional audits are performed, as required, to assure all quality assurance program requirements are properly implemented in accordance with procurement documents.
MANAGER        MANAGER        MANAGER                                                            DEPARTMENT          PLANT            NUCLEAR AIXXT&                                DMSON SYSTEM      IXSTRIBIflIVE    METER AND                                                            MANAGER        MANAGER            SECURIlY SVRVBLLANCE                          SYSTEMS DESGN      INFORMATION          tAB                                                              HUCLEAR            GWNA SERVICES ENGWEERWG        SYSTEMS        OPERATIONS                                                          ENGWEERING        STATION          SECURITY SUPPORT                                                                              SERVCES                            SERVICES FIELD & SHOP      ENVIRONMENTAL                          c RBAY                          ELECTRC FABRCAllON        SC ENCE, SERVCES            LABORATORY    DESGM,         STATION ENGINEERWG  COMMVNCAIIONS    METER CHEIIISTRY    CONSTR UCTCN,   OPERATlONS.
Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends.Results of these analyses are provided to management for their regular review.-36-Revision 19 December, 1993
OPERATIONS SERVICES AND                  MAINTENANCE, QVAUIYc                            RESEARCH &    FUEL            KP &
LABORATORY        COHTROL AND                                      MANAGEMENT&    CHEMISTRY DEVELOPMENT EMIPLOYEE                                        SERVICES        QUAUlY                                            TECHNICAL      COMmOL, RELATIONS                                                        ENGINEERING                                      SUPPORT        TECHNICAL DEPARTMENT      SERVCES                                          SERVICES        SUPPORT, IOWAGER                                                                        TESTING, OVERHEAD          MANAGER                                                        MATERIAL CON SIR VCDOM      MATERIALS                                                      CONTROL, AND        ENGWEERWG                                                        PROCUREMENT, MAINTENANCE-          AMD                                                          FIRE EAST        INSPECTION                                                      PROTECTION, SERVCES                                                        SAFETY, MODIFCATIOM, CONSTR  UCilON OPERATING RBAYTEST EXPERIENCE &
ENGWEERWG.                                                       COMPVTER SYSTEMS MHE ISNP.
SERVCES        FIGURE 2-1


Table 1-1 Quality Assurance Program Procedures Subject Listing ualit Assurance ualit Control Procedures Xndoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Appendix B Criteria Planning and Reporting Results for QA/QC Subcommittee Meetings Quality Assurance/Quality Control Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design CriteriaQuality.Assurance Review and Approval of Field Change-Reguests and Review of ECN's Quality Assurance Review of Rochester Gas and Electric Engineering Specifications IXI.IXI Preparation, Review and Approval of Quality Verification.III Specifications Computer Software Product Evaluation Quality Assurance, Review of Computer Software Production Evaluations Master Software Index Requisitioning.
QUALITYPERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE MANAGER        MANAGER              MANAGER      QUALITY QUAI ITY      NUCLEAR              MATERIALS PERFORMANCE ASSURANCE      ASSURANCE          ENGINEERING    SENIOR 8 INSPECTION  ANALYST
Quality Assurance/Qual'ity Control Services'Quality Review of Rochester Gas and Electric Procurement Documents Preparation, Review and Approval of Rochester Gas and Electric Q.A.Specifications Revision 19 December, 1993 Table 1-1 (cont'd)ualit Assurance ualit Control Procedures Appendix B Criteria Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval'f Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision and Control of the QA Program for Station Operation Review of Nuclear Directives Review of Departmental Procedures Preparation,'eview and Approval.of Procedure Deviation Requests by Quality Assurance/Quality Control Evaluation of Suppliers by Quality Assurance Supplier Surveillance Control of Supplier Performance Quality Assurance Evaluation of Bids Conducting Commercial Grade Supplier Surveys Evaluation of Commercial Suppliers by Quality Assurance VI VI VII VII VI I VII VII Document Deficiency Reports VII Establishment and Maintenance of Qualified Suppliers List VII Establishment and Maintenance of the Commercial Grade Supplier List VII Verification Inspection Program-38-Revision 19 December, 1993 Table 1-1 (cont'd)ualit Assurance ualit Control Procedures Appendix B Criteria Qualification of Inspection Personnel Quality Assurance Nonconformance Processing Corrective Action Reports Quality Assurance Commitments and Action Items Review of Ginna Maintenance Work.Order Packages XV XVI XVI XVI Identified Deficiency Reports, Records Turnover Plan Qualification of Audit/Survey Personnel Audit Scheduling and Planning Performance of Quality Assurance Audits Reporting and Follow-Up of Audit Findings Conduct of Quality Assurance During and in Follow-Up of NSARB Audits XVI XVII ,XVIII XVIII XVIII XVIII XVIII Response to Audits and Surveillance Qualifications of Surveillance Personnel XVIII XVIII Review of Audit Program XVII Auditing of the Nuclear Emergency Response Plan Performance Based Surveillance.
                                  - SERVICES QUALITY  QUALITY    QUALITY      MATERIAL8      STAFF ASSURANCE  CONTROL    CONTROL        MATERIAL ENGINEERS ENGINEERS  FOREMAN        HANDLING ENGINEERS 8 FOREMEN STAFF            TECHNICIANS 8
Program Availability and Use of INPO and NRC Inspection/
INSPECTORS FIGURE 2-2
Assessment Reports in Audit and QA Surveillance XVXI XVIII XVIII Quality Assurance Planning Guides XVIII-39-Revision 19 December, 1993


Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix B Criteria Indoctrination and Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents IV Quality Materials Engineering and Inspection Services Procedures Quality Materials Engineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Preparation, Review and Approval of Materials Engineering Laboratory Test Procedures Control and Distribution of Documents.
GINNA NUCLEAR PRODUCTION ORGANIZATION VCE PRESDEMT 0 INNA NUCLEAR PRODUCTION BUDGET AND COST PLANT MANAGER                                DEPARlMENT      DEPARTlIENT OINNASTATION                                  MANAGER    MANAGER NUCLEAR PRODVCllON NVISON    ENGINEKRINO TRAJNINO        SERVCES SV PERINTENDENT  NITIALUCENSED    DESGM GINNASUPPORT    OPERATOR I
Regulating Safety Related Activities Control of Purchased Materials Preparation, Review and Approval of Supplier Evaluation VI , VII VII Control of Purchased Services Welding Procedure Preparation Review and Approval VII Welding Procedure Qualification Heat Treating Procedures Welder Qualification and Currency Nondestructive Examination Procedures IX IX IX IX Nondestructive Examination Procedures Manual Nondestructive Examination Personnel Qualification IX IX-40-Revision 19 December, 1993 Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix B Criteria Qualification of Visual Examination Personnel Erosion/Corrosion Program General Brazing Procedures Preparation and Approval General Brazing Procedures Qualification Inservice Inspection Program and Plans IX IX IX IX ASME Section XI Repair, Replacement and Modification Procedure Incorporating Ginna Modifications into Inservice Inspection Program Duties of the ANII Tests conducted by MEIS Laboratories Requesting MEIS Laboratories Services Test Personnel Qualifications XI XI Vendor.Tests under MEIS Direction.XI.Calibration and Control of Nondestructive Examination Instruments XII Inspection and Maintenance of Material Handling.Equipment XIII.Overhead and Gantry Cranes XIII Inspection and Maintenance of Portable Lifting and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems Slings and Related Apparatus XIII XIII XIII Classification and Training of Material Handling Equipment Personnel XIII-41-Revision 19 December, 1993
SERVCES                        CONSTRUCTION OPERATOR REOUAL I                                                                                               UCEN SINO OPERAllONS      OPERATINO              PlhNNINO d         AUX OPERATOR CORPORATE HEALTH                  EXPERIENCE              ECHE DVUNO                          FUEL MANAGEMENT PHYSICS          HEALTH PHYSCS d                                             STA INITIAL CHEMISTRY        MATERIALS              MAINTENANCE                          TECHNCAL SUPPORT NUCLEAR                          PROCUREMENT            SYSTEMS            STA REOVAL        SERVCES EMERGENCY        TECHNCAL PLANNINO        ENGINEERING                              MAINTENANCERULE    CHEMISTRY TECH PROJECT COMPUTER SYSTEMS                                            RAD PROTKCIIOM ELECTRCAL ANO ldC TECH MAINTENANCE CONTRACT RAD MKCHANCAL        PROTECTION TECH MAINTENANCE ELECTRCAL MAINTENANCE MECHANCAL MAINTENANCE r0 UI Id C TECHNXXAM RdT TECHNCIAM LO lA FIGURE 2-3
, 0 0 Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix 8 Criteria Mobile Hydraulic Cranes Inspection and Maintenance of Jacks, Hydraulic Rams and Cylinders Forklift Loading Forks Inspection of Designated Monorails XIII XIII XIII XIII Training and Qualification of Crane Operators XIII Lifting Devices in the Containment Vessel Pre-Shipment Inspection of Radioactive Material Shipping Containers XIII XIII Nonconformance Reports.XV Initiating and Responding to Corrective Action Reports'uality Materials Engineering and, Inspection Services Records XVI XV.I I.Response to Audits XVII-42-Revision 19 December, 1993 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Ginna Quality Assurance Program Implementation Fire Watch Training R.E.Ginna Training Plan Ginna Station Training General Employee Training Temporary Employee Training Hazardous/Mixed Waste Emergency Response Trainipg Operator Training Responsibilities R.E.Ginna Health Physics Orientation Program Fire Brigade Training Radiation Protection Technician Entry Level Requirements, Responsibilities, and Training~~Chemistry Technician Entry.Level Requirements, Responsibilities, and Training Maintenance Training Program Ginna Station Administrative and Engineering Staff Responsibilities Ginna Station Management Responsibilities XI'ealth Physics and Chemistry Section Organization, and Responsibilities Support Services Organization and Responsib'ilities Operations Section Organization and Responsibilities Technical Section Organization and Responsibilities Material and Procurement Section Organization and Responsibilities XI Revision 19 December, 1993 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Operational Assessment Section Ginna Station Staff Responsibilities for Fire Prevention Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Radiation Emergency Plan Implementing Procedure Committee Emergency Procedures Committee (EPC)Ginna Standard Nomenclature XI Preparing and Dispositioning of Technical Staff.Request Control of Station Modification Station Modif'ication Classification and Review Station Modification Planning Control XXI Station Modification Installation and Acceptance Station Modification Completion Preparation, Review&.Approval of Design Input Documents for Minor Modifications Component Classification Request/Reanalysis, XII Evaluation of Parts to Determine'Safety Classification Preparation, Review and Approval of.Safety Analysis XXI Preparation, Review, Approval and Distribution of Design Output and Design Review Documents for Minor Modifications Technical Evaluation Revision 19 December, 1993 0
Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Preparation of Configuration Data Change Forms Computer Software Product Evaluation Control of Procurement Documents Prepared at Ginna Station IV Evaluation of Commercial Grade Items for Safety Related Applications IV Evaluation of Items for In-Storage Maintenance Requirements IV Plant Procedures Preparation and Classification t Plant Procedure Content and Format Requirements V V Emergency and Abnormal.Operating Procedures Writers'uide-Operating Procedures Writers'uide"Health Physics and Chemistry Procedures Writers'uide Plant Procedure Adherence Requirements Emergency and Abnormal Operating Procedures Users'.Guide Procedure Control Procedure Control-New Procedures Procedure Control-Permanent Changes Procedure Control-Temporary Changes Procedure Control-Periodic Review Procedure Control-Index Procedure Control of Emergency and Abnormal Procedures VI VI VI VIRevision 19 December, 1993 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Procedure Control-Amendments to Licensing Documents and Changes to the Facility Procedure Change Control 10CFR 50'9 Review VI Emergency and Abnormal Operating Procedure Support Documentation Control Procedure Distribution Control of Construction Documents Vendor Manual Control Program Vendor Manual Information/Discrepancy/Incorpor'ation Request.Vj VI Vj VI Drawing Change Request Conditional Release Program Receipt and Acceptance of Materials/Parts Control of Purchased Services VI VII Vjj VII Inventory Control of Material, Parts and Components at Ginna Station Identification and Marking of Accepted Material, Parts, and Components
.Bulk Storage of Combustible'Materials and Their Use Trailer Admittance Requirements Control of Consumable Materials at'Ginna Station Control of Welding Nondestructive Examination Control Welding Equipment Performance Verifications VIII VIII VIII VIII IX Revision 19 December, 1993 0
Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Open Flame,, Welding and Grinding Permit (Hot Work Permit)IX Control of Inservice Inspection Activities ASME Section XI Repair, Replacement and Modification Procedure for Ginna Station Electrical Preventive Maintenance Program Environmentally, Qualified Equipment Maintenance Program Mechanical Preventive Maintenance Program for Rotating'Equipment X Equipment Inspection and Lubricant List Valve Preventive Maintenance Program X Condenser Inservice Inspection Program Preventive Maintenance Program for Plant Security Equipment X Performance of Tests.Qualification and Certification of Test.Personnel=
XI Test Tag Control Program Calibration, Test, Check and Replacement.
Surveillance Program for Instrumentation and Equipment Important to Safety Ginna Station Surveillance Schedule Inservice Testing of Pumps and Valves Calibration and Control of Test Equipment Maintenance and Inspection of Material Handling Equipment XI XI XII XIII Revision 19 December, 1993 0
Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Control of Material Handling and Handling Equipment Storage and Preservation of Materials and Equipment at Ginna Station XIII XIII Control of Heavy Loads at Ginna Station XIII Control of Heavy Loads for the Containment Overhead Crane XIII Control of Heavy Loads for the Auxiliary Building Overhead Crane Control of Heavy Loads for the 7 1/2 Ton Screenhouse Crane Control of Heavy Loads for Jib Cranes in.Containment XIII XIII XIII Control of Heavy Loads in Safety-Related Areas XIII Housekeeping Control Station Holding Rules XIII,.XIV Bypass of Safety Function of Jumper Control Operational Assessment.Program XIV-XIV Effectiveness Evaluation of the Operational Assessment Program XIV Installation-and Removal of Temporary Cables Control of.Temporary Modifications Installation, Removal and Control of Scaffolding XIV.XIV XIV'Installation and Removal of Temporary Fluid System Provisions XIV'Program to Prevent Degradation of Reactor Coolant Pressure Boundary XIVRevision 19 December, 1993 0
Table 1-1 (cont'd)Ginna Procedures Independent Verification Appendix B Criteria XIV Control of Nonconforming Items Nonconformance Reports XV XV Corrective Action Reports Root Cause Analysis Overview of the Ginna Station Work Control System Work Request/Trouble Report Initiation Work Order Initiation XVI XVI XVI XVI XVI Work Order Planning Work Ord'er Scheduling XVI XVI Work Order Execution XVI Post Maintenance Testing Work Order Close Out Work Order Processing After Hours XVI XVI XVI Work Control System Performance Indicators XVI Station Work Authorization Request Safety Classification of Mainten'ance Work Activities Identified Deficiency Reports Ginna Records Records Storage Facilities and Equipment XVI XVI XVI XVII XVII Special Nuclear Material Inventory and Record'equirements XVII Maintenance History Program Ginna Station Response to Internal Audits XVII XVII Revision 19 December, 1993 Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Indoctrination and Training Engineering Department Organization and Responsibilities Ginna Modification Project Organization Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Preparation; Review and Approval of Engineering Drawings-III.'reparation, Review and Approval of Engineering
..Specifications III', Preparation, Review and Approval of Design Verification,:
Integrated Design Process Preparation, Review and Approval of, Safety Analyses Review and Approval of Architect Engineer or'onsultant Design Documents~III Preparation, Review and Approval of Field'hange Requests Preparation, Review and Approval of Engineering Change'.XII Notices Review.of the Classification of Station Modifications Preparation, Review, and Approval of CAD Piping and Instrumentation Drawings IIX Preparation, Review and Disposition of Drawing Change Requests ALARA/Radiation Safety Design'Review Revision 19 December, 1993
'k Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Preparation, Review and Approval of Appendix R Conformance Verifications Preparation, Review, and Approval of the Electrical'quipment Environmental Qualification Data Summary Form EEQ-1 and IEEE 323-1974 Waiver.Authorization Form EEQ-2 Review, Approval and Implementation of Changes to the Safety Assessment System Software Engineering Computer Software Documentation and Control Human.Factors Review of.Control Room and Local'mergency Control Panel Modifications Preparation, Review and Approval of PAID Database and Configuration Data Change Forms Erosion/Corrosion Control Monitoring Program for Carbon Steel Piping I I I,.IIX Preparation, Review and Approval.of Changesto the.Updated Final Safety Analysis Report ASME Section XI Repair, Replacement and Modification Program Implementation
'.Component Safety Classification Drawing Review Process, Component Safety Classification Component Classification Form IIX Component Safety Classification Request/Re-Analysis System, Structure,.
or.Component Safety Classification Criteria III" Preparation, Review and Approval of CAD Electrical Drawings Revision 19 December, 1993 i
Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Requests for Nuclear Engineering Services Preparation, Review and Approval of Procurement Documents for Purchases Covered by the QA.Program IV Evaluation of Commercial Grade Items for Safety Related Applications IV Evaluation of Quality Verification Items for Safety Significant Applications IV Preparation, Review, and Approval of Engineering Procedures V'reparation, Review, and Approval of Engineering Procedure Deviation Request Distribution and Control of Documents by the Control Number Method VI Distribution and Control of Documents by Project....VI Correspondence Procedures Preparation, Review,and Approval of Supplier Evaluations VII VII Review and Approval of Vendor Design and Manufacturing
..VII Technical Documents Preparation, Review and'pproval of Bid Requests, Bid, Evaluations and Recommendations for Award Engineering Review of Nonconforming Materials, Parts or Components VX Initiating and Responding to Corrective Action Reports Processing Identified Deficiency Reports Documenting and Reporting Potential Conditions Adverse to Quality XVI XVI XVI Performing"Substantial Safety Hazard" Evaluations for 10CFR21 Reportability XVI-52-Revision 19 December, 1993 Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Records Records Turnover Plan Engineering Response to Internal Audits XVII XVII XVIII-53-Revision 19 December, 1993


Table 1-1 (cont',d)Purchasin Procedures Appendix B Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities Preparation, Review, Approval and Issuance of Purchase Orders and Changes to Purchase Orders IV Requests for Bids and Bid Evaluation Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation IV V VII Supplier Material Deficiency Processing XV Supplier Corrective Action Reporting Purchasing Response.to Corrective, Action Reports and Corrective Action ReportingXV1 XVI Purchasing Records and Turnover Plan Purchasing Response to Audits XVII XVIII Revision 19 December, 1993
GAS AND ELECTRIC DISTRIBUTION DIVlSION SENIOR VICE PRESIDENT GAS AND ELECTRIC DISTRIBUTION AND CUSTOMER SERVICES DIVISION MANAGER                                                                      DIVISION MANAGER SYSTEM ENGINEERING            ------ ~-------------                    ~  ~      0~
ROCHESTER AND DESIGN                                                                          CONSTRUCTION .
AND MAINTENANCE DEPARTMENTMANAGER                      DEPARTMENT MANAGER            QUALITY      DEPARTMENT MANAGER        DEPARTMENT MANAGER SYSTEM DESIGN                          DISTRIBUTIVE          SERVICES          METER AND LAB                OVERHEAD ENGINEERING                          INFORMATION          COORDINATOR          OPERATIONS            CONSTRUCTION AND SYSTEMS SUPPORT                                                      MAINTENANCE- EAST SUBSTATIONS                  RELAY ENGINEERING              ENGINEERING            COMMUNICATIONS                        ELECTRIC      LABORATORY      CONSTRUCTION METER          SERVICES        RELAYTEST OPERATIONS NOTE: Chart Is abbreviated to show only key positions involved In Implementing the QA program and therefore, does not show all positions In the division.
LINES OFAUINORllY LINES OF COMMUNICATION FIGURE 2-4


Table 1-1 (cont'd)Production Division Trainin Procedures Appendix B Criteria Indoctrination and Training Production Division Training Organization and Responsibilities Operations and Technical Training Organization and Responsibilities Training Systems Organization and Responsibilities'aintenance Training Organization and Responsibilities Curriculum Committee Organization and Responsibilities Software Quality Assurance Program Preparation, Review and Approval of Quality Training Procedures V'reparation, Review and'pproval of Training~~Procedures, Guidelines, and Policies Preparation, Review and Approval of Nuclear Training Programs V, Style Guide for Training Procedure Development Nuclear Training Procedure Revision Training Change Request/Notice Control.and Distribution of Production.
TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MANAGER TECHNICAL SERVICES AND CHIEF ENGINEER MANAGER                      DEPARTMENT    MANAGER PRODUCTION                      MANAGER    DIVISIONAL AND                          GENERAL    SERVICES ENGINEERING                    ENGINEERING SYSTEMS                        SERVICES MANAGER            DIVISION          MANAGER      FOSSIL    . PROJECT SHOP            SYSTEMS        ENVIRONMENTAI ENGINEERING MANAGEMENT OPERATIONS                            SCIENCE                SERVICES RECORDS                          HYDRO MANAGER        MANAGEMENT        MANAGER      ENGINEERING FIELD                          CHEMISTRY SERVICE        FOSSIL/HYDRO      SERVICES      FACILITY OPERATION          SYSTEMS                      ENGINEERING SUPERVISOR MANAGER        TECHNICAL        ENVIRONMENTAL REAL ESTATE ADMINISTRATIVE  INFORMATION        LABORATORY  MANAGEMENT SERVICES AND      CENTER PROJECT                            SENIOR PLANNING                        ENVIRONMENTAL ANALYST MANAGER                          RESEARCH 8 INSPECTION/LAND                    DEVELOPMENT SURVEY AND                          PROGRAM BUILDING SERVICES FIGURE 2-5
Division Training Documents VI Training Programs for Crane Operators and Riggers Corrective Action XIII XVI Nuclear Production Division Training Records Management Production Division Training Response to QA Audits XVII XVIII-55-Revision 19 December, 1993


Table 1-1 (cont'd)Gas and Electric Distribution Division Procedures Appendix B Criteria Quality Assurance Program Implementation for Gas and Electric Distribution Division Department Indoctrination and Training of Gas and Electric Distribution Division Personnel Gas and Electric Distribution Division Organization Design/Modification Activities Control at Ginna Station Design/Modification Activities Control at Station 13A and on Circuit 751, Equipment and Line Control of Procurement Documents for Purchased Parts, Components and Services IV Preparation, Review and Approval of Electric Transmission and Distribution Procedures V Preparation and Approval of Laboratory Test Procedures Preparation and Approval of Electric Meter and.Laboratory Calibrate.on Schedules Preparation and Approval of Electric Substation Department V Relay Test Schedules Preparation and Approval of Electric Transmission and Distribution Deviation Requests Control of Gas and.Electric Distribution Division Procedures V VI.Control and Distribution of Electric Meter and Laboratory VI Department and Laboratory Test Procedures Control of Electric Meter and Laboratory Department-Calibration Services Control of Electric Substations Department Relay Test Schedule VI-56-Revision 19 December, 1993 0
G  IN NA  STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY      PORC PERFORMANCE T            T              T TECHNICAL  MATERIALS    GAS AND      PURCHASING      GENERAL    NUCLEAR  GINNA STATION SERVICES  ENGINEERING    ELECTRIC                  MAINTENANCE ENGINEERING DIVISION    AND      DISTRIBUTION                              SERVICES INSPECTION    DIVISION SERVICES REVIEW AUDITS FIGURE 2-6
, Table 1-1 (cont'd)Gas and Electric Distribution Division Procedures Appendix B Criteria Supplier Technical Evaluation VII Receipt and Acceptance of Instrumentation and Standards Equipment..VII Control of Purchased.
Services for Electric Meter and Lab VII Identification and Control of Materials, Parts and Components VIII Surveillance at the Gas and Electric Distribution Division.X Division Performance of Tests at Ginna Station: XI Performance of Tests at the Electrical Laboratory Qualification of Test Personnel'I XI'alibration and Control of Test Instruments Nonconforming Parts and:Components XII,'nitiating and Processing of Corrective Action Reports Control of Quality Assurance Records.XVI.XVI I Gas and Electric Distribution Division Response to Audits.'VIII. Revision 19 December, 1993


TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents include: 1.Sco e of Work-Detailed statement of the work to be performed.
l ATTACHMENT 2 ROCHESTER GAS AND ELECTRIC CORPORATION R.E. GINNA  NUCLEAR POWER PLANT Revision  19  to:
2.Technical Re uirements-by reference to specific drawings;specifications, codes, regulations; procedures or instructions, including, revisions, that describe the items or services to be furnished.
Quality Assurance Program for Station Operation DOCKET NO. 50-244 December,   1993
Also identified shall be test, inspection and acceptance requirements, and any'special
.requirements for such activities as designing, identification, fabrication, cleaning, erecting,.
packaging, handling, shipping, extended storage and shelf life.*3 ualit Assurance Pro ram Re uirements-which require.the.supplier to have a documented quality assurance progiam that~implements portions or all of lOCFR50 Appendix B as well as~applicable quality assurance program requirements of other nationally recognized codes and standards.
Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements.
in subtier procurement documents.
Ri ht of Access-to include the facilities and records of.--.the supplier for source inspection.and audit.by the Purchaser or'parties designated by=the purchaser.
.Also included shall be provisions for the identification of witness, and hold points and the minimum time of advance.notice'.,*5.Documentation.
Re uirements-Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.*6.Nonconformance
-Requirements-for reporting.and;disposition of nonconformance to procurement requirements'
-Items reviewed by Quality Assurance or Quality Control.-58-Revision 19 December, 1993 Table 18-1 Audit List Audit Title Corrective Action Audit To ic Areas Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods of operation.
Operational Assessment Nonconformance Control*Outage Activities Refueling and Special Nuclear Material-ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA*Health Physics, Chemistry'and Radwaste Radwaste Shipping and Process Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation" Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program+Fire and Safety Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program-59-Revision 19 December, 1993 Table 18-1 (con't)Audit List Audit Title Audit To ic Areas Independent Inspections and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety Program Housekeeping Instructions, Procedures, and Document Control Drawing Control Vendor Manual Control Procedure Control Records Control~Security Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program*Operations Limiting Conditions for Operation.
Surveillance Testing Operator Performance Operations Administration PORC Activities NSARB Activities Materials Engineering and Inspection Services ISI Program NDE Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls*Maintenance and Testing Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment-60-Revision 19 December, 1993 Table 18-1 (con't)Audit List Audit Title Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Training/performance and qualifications of the operating and technical staff Procurement Configuration Control Licensed Operator Auxiliary, Operator Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General, Employee Training Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Program Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 19 December, 1993 i
Table 18-1 (con't)Audit List Audit Title Audit To ic Areas Gas and Electric Distribution Division Systems Engineering and Design Rochester Construction and Maintenance Distributive Information Systems Support*Noted audits will also address relevant activities to.verify conformance of facility operat'ion to all provisions contained in Technical Specifications and'appl'icable license conditions.. Revision 19 December, 1993  


R.E.GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART UNES OF COMMUNCATIQN UNES OF SU~AND ADMIMSTRATION CHAIRMAN OF THE BOARD, PRESDEMT AND CHIEF EXECUTIVE OFFCER SEMR VICE PRESDENT GAS&ELECTRIC IXSmlBVTKW AND CUSTOMER SERVICES SENIOR VCE PRESDENT, PRODUCTON AND ENGWEERWG SENIOR VCE PRESIDEMT, CONTR OI.LER&CHIEF FINANCIAL OFFCER VCE PRESDENT EMPLOYEE RELATIONS.
'
PUBUC AFFAIRS AND MATERIAL MANAGEMENT EMIPLOYEE RELATIONS DIVISON MANAGER SYSTEM ENGINEERIHG AND DESGN DEPARTMENT MANAGER SYSTEM DESGN ENGWEERWG RBAY ENGINEERWG DEPARTMENT MANAGER IXSTRIBIflIVE INFORMATION SYSTEMS SUPPORT COMMVNCAIIONS DIVISON MANAGER ROCHESTER CONSTRUCTION AND MAINTENANCE DEPARlllEMT MANAGER METER AND tAB OPERATIONS ELECTRC METER OPERATIONS LABORATORY SERVICES DEPARTMENT IOWAGER OVERHEAD CON SIR VCDOM AND MAINTENANCE-EAST CONSTR UCilON RBAY TEST DEPARTMENT MANAGER QUAUTY PERFORMANCE QUAUTY ASSURANCE PROCVREMENT, ENGWEERWG, AIXXT&SVRVBL LANCE SERVICES QVAUIYc COHTROL AND QUAUlY ENGINEERING SERVCES MANAGER MATERIALS ENGWEERWG AMD INSPECTION SERVCES ENGWEERWG.
P
MHE ISNP.SERVCES PROJECT MANAGEMENT MANAGER PRODVCilON ANO ENGWEERING SYSTEMS RECORDS MANAGEMENT, TECH NCAL WFORMATlOM CENTER,CNS, WFORMATKW SERVICES&DMSON SYSTEMS FIELD&SHOP FABRCAllON SERVCES ENVIRONMENTAL SC ENCE, LABORATORY CHEIIISTRY SERVICES AND RESEARCH&DEVELOPMENT FIGURE 2-1 DMSON MANAGER TECHNCAL SERVICES AMO CHIEF ENGINEER VCE PRESDENT GINNA NUCLEAR PRODUCTION DIRECTOR CORPORATE RADIATION PROTECTION CORPORATE HEALTH PHYSCS AND NUCLEAR EMERGENCY PLANNWG DEPARTMENT MANAGER PRODUCTION DMSON.-TRAINING TRAIMWG SERVICES DEPARTMENT MANAGER HUCLEAR ENGWEERING SERVCES PLANT MANAGER GWNA STATION c STATION OPERATlONS.
MAINTENANCE, KP&CHEMISTRY COMmOL, TECHNICAL SUPPORT, TESTING, MATERIAL CONTROL, PROCUREMENT, FIRE PROTECTION, SAFETY, MODIFCATIOM, OPERATING EXPERIENCE
&COMPVTER SYSTEMS DESGM, CONSTR UCTCN, FUEL MANAGEMENT
&TECHNICAL SUPPORT SERVICES NSARB VCE PRES DENT, SECRETARY AND TREASURER DEPARTMENT MANAGER RSK MANAGEMENT IXRECTOR OF SECURITY SUPERVISOR NUCLEAR SECURIlY SECURITY SERVICES QUALITY PERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE MANAGER QUAI ITY ASSURANCE MANAGER NUCLEAR ASSURANCE MANAGER QUALITY MATERIALS PERFORMANCE ENGINEERING SENIOR 8 INSPECTION ANALYST-SERVICES QUALITY ASSURANCE ENGINEERS STAFF QUALITY CONTROL ENGINEERS QUALITY CONTROL FOREMAN TECHNICIANS 8 INSPECTORS MATERIAL 8 MATERIAL HANDLING ENGINEERS 8 FOREMEN STAFF FIGURE 2-2 GINNA NUCLEAR PRODUCTION ORGANIZATION VCE PRESDEMT 0 INNA NUCLEAR PRODUCTION BUDGET AND COST PLANT MANAGER OINNA STATION DEPARlMENT MANAGER PRODVCllON NVISON TRAJNINO DEPARTlIENT MANAGER NUCLEAR ENGINEKRINO SERVCES UI r 0 LO lA I I CORPORATE HEALTH PHYSICS NUCLEAR EMERGENCY PLANNINO OPERAllONS HEALTH PHYSCS d CHEMISTRY TECHNCAL ENGINEERING COMPUTER SYSTEMS OPERATINO EXPERIENCE MATERIALS PROCUREMENT SV PERINTENDENT GINNA SUPPORT SERVCES PlhNNINO d ECHE DVUNO MAINTENANCE SYSTEMS MAINTENANCE RULE PROJECT ELECTRCAL ANO ld C MAINTENANCE MKCHANCAL MAINTENANCE NITIAL UCENSED OPERATOR OPERATOR REOUAL AUX OPERATOR STA INITIAL STA REOVAL CHEMISTRY TECH RAD PROTKCIIOM TECH CONTRACT RAD PROTECTION TECH ELECTRCAL MAINTENANCE MECHANCAL MAINTENANCE Id C TECHNXXAM RdT TECHNCIAM DESGM CONSTRUCTION UCEN SINO FUEL MANAGEMENT TECHNCAL SUPPORT SERVCES FIGURE 2-3 GAS AND ELECTRIC DISTRIBUTION DIVlSION SENIOR VICE PRESIDENT GAS AND ELECTRIC DISTRIBUTION AND CUSTOMER SERVICES DIVISION MANAGER SYSTEM ENGINEERING
------~-------------
AND DESIGN~~0~DIVISION MANAGER ROCHESTER CONSTRUCTION
.AND MAINTENANCE DEPARTMENTMANAGER SYSTEM DESIGN ENGINEERING DEPARTMENT MANAGER DISTRIBUTIVE INFORMATION SYSTEMS SUPPORT QUALITY SERVICES COORDINATOR DEPARTMENT MANAGER METER AND LAB OPERATIONS DEPARTMENT MANAGER OVERHEAD CONSTRUCTION AND MAINTENANCE
-EAST SUBSTATIONS RELAY ENGINEERING ENGINEERING NOTE: Chart Is abbreviated to show only key positions involved In Implementing the QA program and therefore, does not show all positions In the division.COMMUNICATIONS ELECTRIC METER OPERATIONS LABORATORY SERVICES CONSTRUCTION RELAY TEST LINES OFAUINORllY LINES OF COMMUNICATION FIGURE 2-4


TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MANAGER TECHNICAL SERVICES AND CHIEF ENGINEER MANAGER PRODUCTION AND ENGINEERING SYSTEMS DEPARTMENT MANAGER GENERAL ENGINEERING SERVICES MANAGER DIVISIONAL SERVICES MANAGER SHOP OPERATIONS MANAGER FIELD SERVICE OPERATION MANAGER ADMINISTRATIVE SERVICES AND PROJECT PLANNING MANAGER INSPECTION/LAND SURVEY AND BUILDING SERVICES DIVISION SYSTEMS RECORDS MANAGEMENT FOSSIL/HYDRO SYSTEMS TECHNICAL INFORMATION CENTER MANAGER ENVIRONMENTAI SCIENCE MANAGER CHEMISTRY SERVICES SUPERVISOR ENVIRONMENTAL LABORATORY SENIOR ENVIRONMENTAL ANALYST RESEARCH 8 DEVELOPMENT PROGRAM FIGURE 2-5 FOSSIL ENGINEERING HYDRO ENGINEERING FACILITY ENGINEERING REAL ESTATE MANAGEMENT
TABLE OF CONTENTS Section                   Title                           Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance  Program
.PROJECT MANAGEMENT SERVICES G IN NA STATION REVIEW AND AUDIT FUNCTIONS NSARB T T T QUALITY PERFORMANCE PORC TECHNICAL MATERIALS SERVICES ENGINEERING DIVISION AND INSPECTION SERVICES GAS AND ELECTRIC DISTRIBUTION DIVISION PURCHASING GENERAL MAINTENANCE NUCLEAR ENGINEERING SERVICES GINNA STATION REVIEW AUDITS FIGURE 2-6 l
: 2.     Organization
ATTACHMENT 2 ROCHESTER GAS AND ELECTRIC CORPORATION R.E.GINNA NUCLEAR POWER PLANT Revision 19 to: Quality Assurance Program for Station Operation DOCKET NO.50-244 December, 1993
: 3.     Design Control Procurement Document Control                       14
'P TABLE OF CONTENTS Section Title Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION 2.3.5.Quality Assurance Program Organization Design Control Procurement Document Control Instructions, Procedures and Drawings Document Control 14 16 7.8.Control of Purchased Material, Equipment and Services Identification and Control of Materials, Parts and Components 20 12.Control of Special Processes Inspection Test Control Control of Measuring and Test Equipment 26 27 28 30 13.Handling, Storage and Shipping Inspection, Test and Operating Status 31 32 15.16.17.18., Nonconforming Materials, Parts and Components Corrective Action Quality Assurance Records Audits 33 36 38 Revision 19 December 1993  
: 5.      Instructions, Procedures   and Drawings             16 Document Control
: 7.     Control of Purchased Material, Equipment           20 and Services
: 8.      Identification and Control of Materials, Parts and Components Control of Special Processes                       26 Inspection                                         27 Test Control                                       28
: 12. Control of Measuring and Test Equipment             30
: 13. Handling, Storage and Shipping                     31 Inspection, Test and Operating Status               32
: 15. Nonconforming Materials, Parts and Components       33
: 16. Corrective Action
: 17. Quality Assurance Records                           36 18.,    Audits                                             38 Revision   19 December 1993


UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R.E.Ginna Nuclear Power Plant.This program applies to all activities affecting the safety related.functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modification, test and inspection.
UALITY ASSURANCE       PROGRAM FOR     STATION OPERATION ualit   Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R. E. Ginna Nuclear Power Plant.
In addition, the Quality Assurance Program applies to the activities associated with the packaging of" licensed radioactive materials to be shipped in accordance with lOCFR Part 71 excluding fabrication and design of shipping casks'he basic Rochester Gas and Electric'Corporation quality assurance policy is, established by.the Chairman of the Board, President'and"Chief Executive Officer.This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering through the: Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station;Division Manager-Technical Services and Chief Engineer;and heads of other supporting departments.
This program applies to all activities affecting the safety related. functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modification, test and inspection. In addition, the Quality Assurance Program applies to the activities associated with the packaging of" licensed radioactive materials to be shipped in accordance with lOCFR Part 71 excluding fabrication and design of shipping casks'he basic Rochester Gas and Electric 'Corporation quality assurance policy is, established by. the Chairman of the Board, President 'and"Chief Executive Officer. This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering through the:
The program is governed by a.Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program.The manual is prepared, reviewed, and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.
Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station; Division Manager-Technical Services and Chief Engineer; and heads of other supporting departments.
The program is governed by a.Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program. The manual is prepared, reviewed, and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.
The program is implemented through Quality Assurance/Quality Control, Ginna Station, Nuclear Engineering Services, Production Division Training, Materials Engineering and Inspection Services(,:-:,Gas,t',:'and::.':;:lBlectrac.,',";,'Das't'ai'butao'nj!
The program is implemented through Quality Assurance/Quality Control, Ginna Station, Nuclear Engineering Services, Production Division Training, Materials Engineering and Inspection Services(,:-:,Gas,t',:'and::.':;:lBlectrac.,',";,'Das't'ai'butao'nj!
Diva~ii'~fief
                                                                ", 'an'"'pure asrng Diva~ii'~fief procedures. These procedures are prepared, approved and maintained by the responsible organization and reviewed by Quality Performance. In addition to its procedure review, Quality Performance assures procedure adequacy through use.
",'an'"'pure asrng procedures.
audits and surveillances of a sample of procedures in
These procedures are prepared, approved and maintained by the responsible organization and reviewed by Quality Performance.
  -
In addition to its procedure review, Quality Performance assures procedure adequacy through audits and surveillances of a sample of procedures in use.-These procedures are reviewed for adequacy at least once every two years by the responsible organization.
These procedures are reviewed for adequacy at least once every two years by the responsible organization.
Revision 19 December, 1993  
Revision   19 December,     1993


Table l-l provides a listing of the subjects and a short description of the subject matter which is contained in~Ka.ch:-:.'procedures Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual.Organizational responsibilities are described in Section 2.The Quality Assurance Program covers all existing Seismic Category l and Class 1E structures, systems, and components, including their foundations and supports.Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance.
Table   l-l provides a listing of the subjects and a short description of the subject matter which is contained in             ~
A detailed listing of the structures, systems and components covered by the Quality Assurance Program and,based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in a controlled database.The criteria for determining if the quality assurance program applies are reviewed by Quality Performance.
Ka.ch:-:.'procedures Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.
Details of-the water-and-steam-containing system boundaries are contained on system flow drawings.Modifications or additions to existing structures,.systems, and components are designated the same seismic classification.as the existing system.New structures, systems,.and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure.they understand, that these are mandatory requirements whichmust be implemented and.enforced.
The Quality Assurance Program covers all existing Seismic Category     l and Class 1E structures, systems, and components, including their foundations and supports. Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance. A detailed listing of the structures, systems and components covered by the Quality Assurance Program and,based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in a controlled database.               The criteria for determining if the quality           assurance program applies are reviewed by Quality Performance.
Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements, purpose, scope,and implementation of ajj3.'fegb3ygj.,quality related program manuals and procedures.
Details of -the water-and-steam-containing system boundaries are contained on system flow drawings.
Refre'sher" sessions are held periodically.
Modifications or additions to existing structures,.systems, and components are designated the same seismic classification .as the existing system. New structures, systems,. and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.
Retraining may be required whenever a new procedure is issued or a major revision is made to an existing procedure.
Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure .they understand, that these are mandatory requirements which must be implemented and .enforced.         Personnel responsible for performing     activities     affecting quality are trained and indoctrinated in the requirements, purpose, scope,and implementation of ajj3.'fegb3ygj.,quality related program manuals and procedures.         Refre'sher" sessions are held periodically.
Training of personnel not in the Quality Performance organization is the responsibility of each department performing an activity affecting quality.Quality Performance assists in establishing training requirements and assures that personne3, are trained by auditing training.Revision 19 December, 1993 In addition to training in quality assurance, each department conducts training, including on-the-job training, to the extent necessary to assure that personnel are qualified for their primary work assignments.
Retraining may       be required whenever a new procedure is issued or a major revision is made to an existing procedure.
The Vice President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of o erators, as necessar.As ap ro riate, personnel'g'@Ag't'8'i9':'..,gpiiier548@'iePes'i~tc!
Training of personnel not in the Quality Performance organization is the responsibility of each department performing an activity affecting quality. Quality Performance assists in establishing training requirements and assures that personne3, are trained by auditing training.
$8 j;::i trained in radiation protection, plant safety and'"security.
Revision 19 December, 1993
The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B.This review consists of audits or a review equivalent to an audit performed by company personnel or outside organizations.
 
In addition to training in quality assurance, each department conducts training, including on-the-job training, to the extent necessary to assure that personnel are qualified for their primary work assignments.
The Vice President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of o erators, as necessar . As ap ro riate, personnel 'g'@Ag't'8'i9':'..,gpiiier548@'iePes'i~tc! $ 8 j;::i trained in radiation protection, plant safety and'"security.
The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B. This review consists of audits or a review equivalent to an audit performed by company personnel or outside organizations.
The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B,,"Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:
The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B,,"Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:
a.NRC Regulatory Guide 1.8, Revision 1,"Personnel Selection and Training".
: a. NRC Regulatory Guide 1.8, Revision 1, "Personnel Selection and Training".
b.NRC Regulatory Guide 1.28, Revision 2,"Quality Assurance Program Requirements (Design and Construction)
: b. NRC Regulatory Guide 1.28, Revision 2, "Quality Assurance Program Requirements (Design and Construction) ".
".C.AEC Regulatory Guide 1.=30, Revision 0,"Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment".
C. AEC Regulatory Guide 1.=30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment".
d.AEC Regulatory Guide 1;33, Revision 0,"Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in: the document, entitled"Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", Revision 0 dated October 1973 (Orange Book-Revision 0)Revision 19 December, 1993 0
: d. AEC Regulatory Guide 1;33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in: the document, entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", Revision 0 dated October 1973 (Orange Book - Revision 0)
AEC Regulatory Guide 1.37, Revision.0,"Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants".NRC Regulatory Guide 1.38, Revision 2,"Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants".NRC Regulatory Guide 1.39, Revision 2,"Housekeeping Requirements for Water-Cooled Nuclear Power Plants".h.NRC Regulatory Guide 1.58, Revision 1,"Qualification of Nuclear, Power Plant Inspection, Examination and Testing Personnel".
Revision 19 December, 1993
NRC Regulatory Guide 1.64, Revision 1,"Quality Assurance Requirements for the Design of Nuclear Power Plants." j.NRC Regulatory Guide 1.74, Revision 0,"Quality Assurance Terms and Definitions"~k.NRC Regulatory Guide 1.88, Revision 2,"Collection, Storage and Maintenance of Nuclear Power Plant Records".NRC Regulatory Guide 1.116, Revision O-R,"Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment.and Systems".NRC Regulatory Guide 1.123, Revision 1,"Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants".n.NRC Regulatory Guide 1.144, Revision 1,"Auditing of Quality Assurance Programs for Nuclear Power Plants" except that supplier audit frequencies and performance evaluations are as described in the Quality Assurance Manual.Revision 19 December, 1993 0 0 e o.NRC Regulatory Guide 1.146, Revision 0,"Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants".Or anization The major organizations participating in the Quality Assurance Program are Purchasinq, Technical Services, Ginna'uclear production
~ggasj!and":"."::::El'ectrwcl!'S'distr'r'hut'aozj!Xfi!lfi~8xp~A
",""'ua"i y'rea OimanCe, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board.Figure 2-1 is an organizational chart'showing these organizations and their relationship to the corporate organization.
Positions responsible for the principal elements of the quality assurance program are: Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna Nuclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services piphx;:tgjig.j:.:Nieige',i":
Quality Pi r ormance Manager, Quality Assurance Production and Engineering Department Manager and, Purchasing Agent, Materials Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Mana er, Nuclear Assurance Piijry',eao 9 zv'i!er''on:::;:!Man'ager'~~Ra'ahii'eL e+rLonereuti.,:Li>ai'i~<:::aii'0
,, axnt',"u,,nancer.
~D'e',,ax:tmeiit$
~Namage Manager, Materials Engineering and Inspection Services Revision 19 December, 1993  


In addition to the above individuals, two advisory groups are utilized to review and audit plant operations.
0 AEC  Regulatory Guide 1.37, Revision. 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants".
These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board.The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering.
NRC Regulatory Guide 1.38, Revision 2, "Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants".
The qualifications of members and the responsibilities of these organizations are described in Section 6.0, Technical Specifications, Appendix A to the Full Term Operating License No.DPR-18.The Chairman of the Board, President and Chief Executive Officer of the Rochester Gas and Electric Corporation directed the establishment of the Quality Assurance Program and issued the governing policy statement.
NRC  Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements  for Water-Cooled Nuclear Power Plants".
He has established the Nuclear Safety Audit and Review Board to review and audit plant operations:
: h. NRC  Regulatory Guide 1.58, Revision 1, "Qualification of Nuclear, Power Plant Inspection, Examination and Testing Personnel".
The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Chairman of the Board, President.and Chief Executive Officer on all activities of the Nuclear Safety Audit and Review Board.The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in.accordance with applicable regulatory requirements.
NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants."
In addition, he has overall responsibility and authority for directing the Quality Assurance Program and shall be responsible for the approval of the Quality Assurance Manual.He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station.He is also responsible for those items delineated in Section 6.0, Technical Specifications.
: j. NRC Regulatory Guide 1.74, Revision 0, "Quality Assurance Terms and Definitions"  ~
: k. NRC  Regulatory Guide 1.88, Revision 2, "Collection, Storage and Maintenance of Nuclear Power Plant Records".
NRC  Regulatory Guide 1.116, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment .and Systems".
NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants".
: n. NRC  Regulatory Guide 1.144, Revision 1, "Auditing of Quality Assurance Programs for Nuclear Power Plants" except that supplier audit frequencies and performance evaluations are as described in the Quality Assurance Manual.
Revision  19 December,  1993
 
0 0
e
: o. NRC    Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants".
Or anization The major organizations participating in the Quality Assurance Program are Purchasinq,                        Technical Services, Ginna production          ~ggasj!and":"."::::El'ectrwcl!'S'distr'r'hut'aozj!Xfi!lfi~8xp~A
                                                              "," " 'ua "i      'rea OimanCe,
                                                                                                'uclear y
the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board. Figure 2-1 is an organizational chart 'showing these organizations and their relationship to the corporate organization.
Positions responsible for the principal elements of the quality assurance program are:
Chairman        of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna Nuclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services piphx;:tgjig.j:.:Nieige',i":                                      Quality Pi r ormance Manager, Quality Assurance Production and Engineering Department Manager and, Purchasing Agent, Materials Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Mana er, Nuclear Assurance Piijry',eao 9 zv'i!er''on:::;:!Man'ager'~~Ra'ahii'eL      e+rLonereuti.,:Li>ai'i~<:::aii'0
              ,, axnt',"u,,nancer.
      ~D'e',,ax:tmeiit$~Namage Manager,          Materials Engineering and Inspection Services Revision      19 December,      1993
 
In addition to the above individuals, two advisory groups are utilized to review and audit plant operations. These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering. The qualifications of members and the responsibilities of these organizations are described in Section 6.0, Technical Specifications, Appendix A to the Full Term Operating License No. DPR-18.
The Chairman of the Board, President and Chief Executive Officer of the Rochester Gas and Electric Corporation directed the establishment of the Quality Assurance Program and issued the governing policy statement. He has established the Nuclear Safety Audit and Review Board to review and audit plant operations: The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Chairman of the Board, President.and Chief Executive Officer on all activities of the Nuclear Safety Audit and Review Board.
The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in .accordance with applicable regulatory requirements. In addition, he has overall responsibility and authority for directing the Quality Assurance Program and shall be responsible for the approval of the Quality Assurance Manual. He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications.
The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing'Ginna Nuclear Production activities and those support activities associated with Nuclear Engineering Services, Production Division Training, and Corporate Radiation Protection.
The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing'Ginna Nuclear Production activities and those support activities associated with Nuclear Engineering Services, Production Division Training, and Corporate Radiation Protection.
Revision 19 December, 1993  
Revision 19 December, 1993


The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the overall on-site safe operation of Ginna Station.He is responsible for: the performance of all Ginna Station'uality affecting activities in accordance with the requirements of the quality assurance program;providing qualified personnel to perform these activities in accordance with approved drawings, specifications, and procedures; those items delineated in Section 6.0, Technical Specifications; and assuring that significant conditions adverse to quality are identified and corrected.
The   Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the overall on-site safe operation of Ginna Station. He is responsible for: the performance of all Ginna Station'uality affecting activities in accordance with the requirements of the quality assurance program; providing qualified personnel to perform these activities in accordance with approved drawings, specifications, and procedures;                                           those items delineated in Section 6.0, Technical Specifications; and assuring that significant conditions adverse to quality are identified and corrected.
The Superintendent; Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of The Superintendent, Ginna Production, reports to the Plant Manager, Ginna Station, and is responsible for operations, health physi'cs and.chemistry, refueling, Lf'r''rs,."lip'r'oLeptieng!::
The Superintendent; Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of The   Superintendent,                 Ginna Production, reports to the Plant Manager,       Ginna         Station, and is responsible for operations, health physi'cs and. chemistry, refueling, Lf'r''rs,."lip'r'oLeptieng!::
results and tests, Ginna computer systems, man 0 rj''a8n@e%p'OX!BX4~+C-';l1RG:
results and tests, Ginna computer systems, man0 rj'' a8n
'3','3."CCQ"'3"QDBjgf vramirf~~q."., 0;:ephor%:O'A.;.
@e%p'OX!BX4~+C-';l1RG: '3 ','3."CCQ "'3 "QDBjgf vramirf~ q
a nghineex'g'age'an'',:,!sary'a'i'<ilia'nceii't''e''at'ingle'h requirements o'"t"e qutalrtty'assuran'ce.
                                                                                                                    ~
program The Plant Manager, Ginna Station and Superintendents, are assisted by other designated staff members, Figure 2-3;in the implementation of certain Quality Assurance Program requirements at the plant.These staff members are assigned responsibility for testing, procurement, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, op'ei',:a''Piixg~7exper'i'eniaaiaipsm'e''nba) maintenance of material handTing.equipment, and control of all activities involving operation, maintenance, repair, refueling and modification.
                                                                                                .".,
The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an ximrzev~s~Ssa."'"y
0;:ephor%:O'A.;.
""wreais c..em., gsesex~~sc.qxyasaga,,iaG+i~i@~A'sc'xtlxtc.".,',:of~;;Mu'cl;;.Bax;:..,'',:Pow8x+OpBx:a t&oQB: Mraa"teiials Eangineering
a nghineex'g'age'an'',:,!sary'a'i'<ilia'nceii't''e''at'ingle'h requirements           o'"t       "e qutalrtty 'assuran'ce.                 program The   Plant Manager, Ginna Station and Superintendents, are assisted by other designated staff members, Figure 2-3; in the implementation of certain Quality Assurance Program requirements at the plant. These staff members are assigned responsibility for testing, procurement, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, op'ei',:a''Piixg~7exper'i'eniaaiaipsm'e''nba)                     maintenance of material handTing .equipment,                     and   control         of   all activities involving operation,         maintenance,               repair,         refueling         and modification.
'and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related activities.
The Department Manager,                       Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and                     implementing an ximrzev~s~Ssa."'"y ""wreais c..em., gsesex~~sc .qxyasaga, ,iaG+i~i
Revision 19 December, 1993  
                      @~A'sc'xtlxtc.".,',:of~;;Mu'cl;;.Bax;:..,'',:Pow8x+OpBx:a t&oQB:
Mraa"teiials Eangineering 'and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related activities.
Revision             19 December,             1993


The Department Manager, Nuclear Engineering Services is responsible to the Vice President, Ginna Nuclear Production for designing and constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management.
The Department Manager,   Nuclear Engineering Services is responsible to the Vice President, Ginna Nuclear Production for designing and constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management. As requested by Ginna Station, he is responsible for reviewing unique maintenance and repair procedures for major equipment and providing technical support. He is also responsible for tracking and preparing corrective action report a udice CLaertilf&A tl:: ac~tictiiigX!~8,: Ckangf summaries .
As requested by Ginna Station, he is responsible for reviewing unique maintenance and repair procedures for major equipment and providing technical support.He is also responsible for tracking and preparing corrective action report a udice CLaertilf&A tl:: ac~tictiiigX!~8,:
The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station. These activities include long range planning for low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention, document control, chemistry and environmental requirements support..
Ckangf summaries.The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station.These activities include long range planning for low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention, document control, chemistry and environmental requirements support..Production and Engineering Systems is responsible to the Division Manager, Technical Services and Chief Engineer for providing records management and document control support services for nuclear related activities.
Production and Engineering Systems is responsible to   the Division   Manager, Technical Services and Chief Engineer   for providing   records management and document control support   services for nuclear related activities.
The Department Manager, Quality Performance is responsible to the Senior Vice President, Production and Engineering for establishing the overall Quality Assurance Program.He is responsible for assuring that all planned and systematic actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed.He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.Revision 19 December, 1993 0
The Department Manager,   Quality Performance is responsible to the Senior Vice President,   Production and Engineering for establishing the overall Quality Assurance Program. He is responsible for assuring that all planned and systematic actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed. He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.
He has the authority and organizational freedom to assure all necessary quality activities are performed.
Revision       19 December,       1993
In addition, he is responsible, for special processes and the inservice inspection program.He is responsible for maintaining a staff, Figure 2-2, for the conduct of staff training and.for directing its activities.
The staff assists in the preparation and maintenance of.the Quality Assurance Manual and applicable corrective action report summaries.
The Manager, Quality Assurance reports to the Department Manager, Quality Performance.
He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation.
This includes writing Quality Assurance policies, assuring that the program satisfies the requirements of.lOCFR50, Appendix B, and for maintaining the total program up to date.The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program.The staff is also, responsible for auditing and surveillance of aspects of the Quality Assurance Program.They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents., They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified Q!'itig'iA't'i5+xygPi::::!3!9,':::itgBgFo'ggggfiliigke6:::guy@'3!
jyiiand at these suppliers'acilities In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule and audit status reports.The Manager, Quality Assurance is a graduate engineer with at least six years of responsible experience, of which at least two years are in quality assurance and at least three years in the design or operation of nuclear power plants.The Manager, Materials Engineering and Inspection Services is responsible to the Department Manager, Quality Performance for the development and qualification of procedures utilized for special processes.
Revision 19 December, 1993  


He is responsible for providing functional guidance and direction for those methods.'e is responsible for establishing the Xnservice Xnspection Program and for coordinating changes thereto.He is also responsible for the routine maintenance of lifting and handling equipment and for the testing and evaluation of Ginna Station mater'is is.I~sH~e,:',::,:::s~!re8ponsa''
0 He has the  authority and organizational freedom to assure all  necessary  quality activities are performed. In addition, he is responsible, for special processes and the inservice inspection program. He is responsible for maintaining a staff, Figure 2-2, for the conduct of staff training and.for directing its activities. The staff assists in the preparation and maintenance of .the Quality Assurance Manual and applicable corrective action report summaries.
The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures.gj4He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance andP''q'uaX!it@,,control planning and work monitoring responsibilities to his staff of Quality Control Engineers, Foreman and QC Xnspectors.
The Manager, Quality Assurance reports to the Department Manager, Quality Performance.                He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation. This includes writing Quality Assurance policies, assuring that the program satisfies the requirements of.lOCFR50, Appendix B, and for maintaining the total program up to date.                          The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program. The staff is also, responsible for auditing and surveillance of aspects of the Quality Assurance Program. They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents.,
The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing.Nuclear Assurance is responsible for assuring performance of verification inspection i activities and assuring that inspection requirements are included in approved procedures and work packages.This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.The Nuclear Assurance Quality Control Xnspectors also perform compliance oriented surveillance of nuclear~elated activities.
They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified Q!'itig'iA't'i5+xygPi::::!3!9,':::itgBgFo'ggggfiliigke6:::guy@'3!jyiiand at these suppliers'acilities In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule and audit status reports.
The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements. Revision 19 December, 1993 I He is also responsible for providing laboratory testing of some electrical equipment and devices'hhg:""i!i',,'i":::,i!i:,,',iI'i',::i'i!i!s i::, silII'.i, i'is!'mi'...'i$Design is resposns'i.ble for"'providing a s'tsaffs", P'i.gure 2-4, to perf'orm relay engineering services.He is responsible for design, modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna.p::;-:NikTj'is><alppji ejsi'ons'abTpgfc'ig, FOTSDQD~$<CO'.t''.XQ~A's.':x
The Manager, Quality Assurance is a graduate engineer with at least six years of responsible experience, of which at least two years are in quality assurance and at least three years in the design or operation of nuclear power plants.
~~Desi n Control Design activities are performed by Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.Nuclear Engineering Services is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or components.
The Manager,   Materials Engineering and Inspection Services is responsible to the Department Manager, Quality Performance for the development and qualification of procedures utilized for special processes.
Augmenting this effort is the design and technical support provided by the Syihge'llChgaiiie'e'i'iiig)'',"ariWi'",,'-Z)Faxga':',:;Pi87ipi:;:on
Revision    19 December,    1993
'r'e systems" an'ui ment which 5a''s-: O'AC&1'SCCA'XC+jPX%t!XAVQKxp'6j+9'ivan'i'ca';
 
is responsible for maintaining.
He is responsible for providing functional guidance and direction for those methods.'e is responsible for establishing the Xnservice Xnspection Program and for coordinating changes thereto. He is also responsible for the routine maintenance of lifting and handling equipment and for the testing and evaluation of Ginna Station mater'is is I ~sH~e,:',::,:::s~!re8ponsa''
Xn%is regard Grays support Nuclear Engineering Services for design of safety related modifications.
          .
Revision 19 December, 1993 Ginna Station is responsible for the design and control of design activities for Minor modifications of structures, systems, or components.
The Manager,     Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures.gj4He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance andP''q'uaX!it@,,control planning and work monitoring responsibilities to his staff of Quality Control Engineers, Foreman and QC Xnspectors. The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing. Nuclear Assurance is responsible for assuring performance of verification inspection              i activities and assuring that inspection requirements are included in approved procedures and work packages. This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.
Ginna Station is also responsible for classifying station originated modifications as either Major or Minor.Nuclear Engineering Services reviews and concurs with modifications being classified as Minor.Minor modifications typically involve (1)component changes which involve vendor design.and are limited to the extent that the change does not impact existing performance requirements, (2)additions within Seismic Category I buildings which perform no safety functions and which neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component required for safe, shutdown of the plant to an unacceptable
The Nuclear Assurance Quality Control Xnspectors also perform compliance oriented surveillance of nuclear ~elated activities.
'evel, (3)changes to a safety related system determined not to be major (e.g., vents, drains, alarms, indicating lights, etc.).Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution,'ontrol, and revision requirements; and corrective action.Design considerations include, as appropriate:
The Department Manager and Purchasing Agent,      Materials Management is responsible for the procurement      of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements.
physics, stress, materials, thermal, hydraulic, radiation and accident analyses;appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair;acceptance and rejection criteria;and quality standards and other quality assurance requirements.
Revision  19 December,  1993
Design verification utilizes.various methods such as formal design reviews, alternate calculations, or tests, as appropriate, to assure the adequacy of the design.The design of plant modifications is verified by an engineer other than the one who performed the original design.For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested.
 
For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers'r consulting engineers, as appropriate.
I He    is also responsible for providing laboratory testing of                                            some      electrical equipment and devices'hhg:"
Spare or replacement parts must at least meet the original equipment's technical and quality requirements.
                                          "i!i',,'i":::,i!i:,,',iI'i',::i'i!i!s i::, sil II'.i, i'is! 'mi '...'i$
For plant modifications, standard,"off-the-shelf", commercial or previously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.-12-Revision 19 December, 1993 Changes to a modification design are normally reviewed and approved in accordance with the same procedures as the original modification design.Supplemental procedures are established for the review and approval of field changes.In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed, reviewed and approved the original design.Where this is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent background information and are competent in the specific design area.Design verification and field change systems are.methods utilized to detect, document and correct design process errors and deficiencies.
Design is          resposns'i.ble for"'providing a                                s'tsaffs", P'i.gure 2-4,            to perf'orm relay engineering services. He is responsible for design, modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna.p::;-:NikTj'is><alppji ejsi'ons'abTpgfc'ig, FOTSDQD~$ <CO'.t''.XQ~A's.':x
In addition, the corrective action system, described in Section 16, is utilized to control and document corrective action to preclude recurrence of those design process errors and deficiencies which are'considered
                              ~          ~
, to be a significant condition adverse to quality.Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews.Design, control procedures are reviewed to assure that an independent verification is performed.
Desi n Control Design    activities                        are performed by Rochester                      Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.
Production and Engineering Systems, Nuclear Engineering Services and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions Were~a.:44ex$
Nuclear Engineering Services is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or components.
5@, to assure.that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information.
Augmenting this                          effort is            the design and technical support provided by the ui  ment which
The measures.include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.Design documents are collected, stored, and.maintained in accordance with Section 6 and 17, as appropriate.
                                                                          'r Syihge'llChgaiiie'e'i'iiig)'',"ariWi'",,'-Z)Faxga':',:;Pi87ipi:;:on
Design documents include design criteria, analyses, specifications, drawings, design review records, and changes thereto.-13-Revision 19 December, 1993
                                                                                  'e systems"      an' 5a''s-:
~Quality Performance, through preparation assistance and/or review, assure the proper inclusion of quality standards in-the design of major and minor modifications.
O'AC&1'SCCA'XC+jPX%t!XAVQKxp'6j+9'ivan'i'ca'; is responsible                                          for maintaining. Xn %is regard Grays support Nuclear                                                    Engineering Services        for design of safety related modifications.
Quality Performance is also responsible for assuring that adequate test, examination and inspection.
Revision      19 December,       1993
requirements are included in specifications.
 
The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.Plant modifications are controlled by means of applicable Ginna Station, Nuclear Engineering Services,fi8i'Sillery ,s::-,~!-::-::::-
Ginna  Station is responsible for the design and control of design  activities for Minor modifications of structures, systems, or components.      Ginna Station is also responsible for classifying station originated modifications as either Major or Minor. Nuclear Engineering Services reviews and concurs with modifications being classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design. and are limited to the extent that the change does not impact existing performance requirements, (2) additions within Seismic Category I buildings which perform no safety functions and which neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component required for safe, shutdown of the plant to an unacceptable (3) changes to a safety related system determined not    'evel, to be major (e.g., vents, drains, alarms, indicating lights, etc.) .
-:I-:::::,-::.::::::-::::::':::.
Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution,'ontrol, and revision requirements; and corrective action. Design considerations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analyses; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; and quality standards and other quality assurance requirements.        Design verification utilizes. various methods such as formal design reviews, alternate calculations, or tests, as appropriate, to assure the adequacy of the design.
:':::::--:::::":-:::
The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested.       For Minor modification station design, this may    be  done  by Ginna Station, Nuclear Engineering    Services  design engineers'r consulting engineers, as appropriate.
':::,:: x.r''p Production Division Training and Quality Assurance/Quality Control procedures.
Spare or replacement parts must at least meet the original equipment's technical and quality requirements.      For plant modifications, standard, "off-the-shelf", commercial or previously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.
These procedures provide for, the preparation, review, and approval of design documents, safety analyses, and plant modification procedures.
Revision  19 December, 1993
Plant modifications are reviewed by the Plant'Operations.
 
Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.
Changes  to a modification design are normally reviewed and approved  in accordance with the same procedures as the original modification design. Supplemental procedures are established for the review and approval of field changes.
In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed, reviewed and approved the original design.
Where this is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent background information and are competent  in the specific design area.
Design  verification and field change systems are    .methods utilized to detect,   document and correct design process errors and deficiencies. In addition, the corrective action system, described in Section 16, is utilized to control and document corrective action to preclude recurrence of those design process errors and deficiencies which are 'considered
, to be a significant condition adverse to quality.
Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. Design, control procedures are reviewed to assure that an independent verification is performed.
Production and Engineering Systems, Nuclear Engineering Services and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions Were~a.:44ex$ 5@, to assure. that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information. The measures. include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.
Design documents are collected, stored, and .maintained in accordance with Section 6 and 17, as appropriate.       Design documents  include  design criteria, analyses,   specifications, drawings, design review records, and changes thereto.
Revision  19 December,  1993
 
~
Quality Performance, through preparation assistance and/or review, assure the proper inclusion of quality standards in
  -the design of major and minor modifications. Quality Performance is also responsible for assuring that adequate test, examination and inspection. requirements are included in specifications. The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.
Ginna x.r''p Plant modifications are controlled by means of applicable Station, Nuclear Engineering Services,fi8i'Sillery
  ,s::-,~!-::-::::-            -:I-:::::,-::.::::::-::::::':::.:':::::- -:::::":-:::
Production Division Training and Quality Assurance/Quality Control procedures. These procedures provide for, the preparation, review, and approval of design documents,
                                                                                      ':::,::
safety analyses, and plant modification procedures. Plant modifications are reviewed by the Plant 'Operations. Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.
Procurement Document Control Procurement document control applies to the control of-procurement documents for materials, parts, components,,and services required to perform quality affecting activities.
Procurement Document Control Procurement document control applies to the control of-procurement documents for materials, parts, components,,and services required to perform quality affecting activities.
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts., specifications, and drawings.Procurement of materials, parts, components, and services is initiated by department staff personnel.
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts.,
Procurement procedures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision.
specifications, and drawings.
Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Gaa":::,,~h'kaid.:':';,:El'gcYi3'4':,"'Da'ptxxbutxori-.::.!P'iy ipibn3(pand Qual i ty Performance and approved by designated departmental supervision.
Procurement of materials, parts, components, and services is initiated by department staff personnel. Procurement procedures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.
Revision 19 December, 1993 Evidence of review and approval of procurement documents is recorded on the documents and identifies to Purchasing a procurement method which will ensure that the selected supplier is capable of providing the item or service in accordance with the requirements of the procurement documents.
Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision. Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Gaa":::,,~h'kaid.:':';,:El'gcYi3'4':,"'Da'ptxxbutxori-.::.!P'iy ipibn3(pand                 Qual ity Performance and approved by designated departmental supervision.
Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.After purchase requisitions, service agreements, contracts, specifications, and drawings have received the required reviews and approvals, a purchase order is issued by Purchasing to the selected supplier and controlled as described in Section 7."'hese documents are maintained by Purchasing, by the originating department, and/or by the.receiving locations, as appropriate, until procurement is completed.
Revision 19 December, 1993
Under no circumstances are purchasing requirements altered (except for quantity.or pricing)during order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above.Changes or rev'isions to procurement documents are subject to the same review and approval requirements as the original documents.
 
Evidence of review and approval of procurement documents is recorded on the documents and identifies to Purchasing a procurement method which will ensure that the selected supplier is capable of providing the item or service in accordance with the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.
After purchase requisitions, service agreements, contracts, specifications, and drawings have received the required reviews and approvals, a purchase order is issued by Purchasing to the selected supplier and controlled as described in Section 7."'hese documents are maintained by Purchasing, by the originating department, and/or by the.
receiving locations, as appropriate, until procurement is completed.
Under no circumstances   are purchasing requirements altered (except for quantity. or pricing) during order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above. Changes or rev'isions to procurement documents are subject to the same review and approval requirements as the original documents.
Originating department technical review of procurement documents includes verification of applicable regulatory,.
Originating department technical review of procurement documents includes verification of applicable regulatory,.
code and design requirements.
code and design requirements. Quality Performance review of the above includes checks to verify proper inclusion of the quality standards, quality assurance p~~gram requirements, method of procurement and the applicable acceptance criteria. Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, compatibility, and acceptance criteria of the original design. Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.
Quality Performance review of the above includes checks to verify proper inclusion of the quality standards, quality assurance p~~gram requirements, method of procurement and the applicable acceptance criteria.Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, compatibility, and acceptance criteria of the original design.Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements. Revision 19 December, 1993 instructions Procedures and Drawin s Each Rochester Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing procedures as required to implement the Quality Assurance Program.These procedures cover activities such as document control, training of personnel, and responsibilities and duties of personnel.
Revision 19 December, 1993
Quality Performance reviews these procedures for inclusion of quality assurance program requirements.
Table 1-1 prov&des a summary of the subject matter contained in the procedures which are used to implement the quality assurance program.Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modif ication and testing.This'ncludes instructions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control;general plant operation; startup, operation, and shutdown of safety related systems;correction of abnormal, of f normal, or alarm conditions; response to emergencies and other significant events;radioactivity control;control of measuring and test equipment; chemical and radiochemical control;and fuel handling and refueling.
Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Rochester Gas and Electric management, or the completion of plant modifications.
Ginna Station is also responsible.
for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.Ga&#xc3;~j%'riNF48:l"eati:ga,':':'DiSFi'i~b+8i%n!ISi;vi.''si':0rB, Rv>SNW''s4':i'%5i'>WC:jv v: vNM'NQN@k'.jhivNkvNNNRN@vSN%'j'"w'"s~
"~SNR'''v'" is responsible ior the preparation and implementation.
of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible.
P$%jYFi)cPjBl'ectii6 P~,e.tj":j:.k,ijg'~ogPjP),,:,;~i'i~oe:.-::
also assists in the preparation of routine relay mai,ntenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.-16-Revision 19 December, 1993 0
Nuclear Engineering Services is responsible for.providing approved specifications and drawings'-'.lpga major modifications and for minor modifications when<aiam 4g4$$j~.-These documents require those performing the work'"Fo obtain, understand, and comply with appropriate procedures, specifications and drawings.Engineering has established procedures for revising drawings and specifications.
These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.
Quality, Performance is responsible for: preparing and implementing inspection procedures utilized for detailed inspection activities for Ginna Station;providing and implementing procedures for audit and surveillance related activities; providing and implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.
Persons preparing, reviewing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents.
In addition, Quality Performance department assessment as described in Section 10 and Section 18 are used to verify that commitments are being addressed and'uality affecting activities are being performed in accordance with approved instructions, procedures and drawings.Document Control Procedures are established to control the'ssuance of procedures, instructions, drawings, and specifications. Revision 19 December, 1993  


Standard document control requirements are contained in the Quality Assurance Manual.The Plant Manager, Ginna Station is responsible for the control of all documents issued by Ginna Station ersonnel.98".8.,'.:'-'.-8gj9,l::;:'.EX$
instructions                    Procedures        and Drawin s Each Rochester Gas and                          Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing procedures as required to implement the Quality Assurance Program.                These procedures cover activities such as document control, training of personnel, and responsibilities and duties of personnel. Quality Performance reviews these procedures for inclusion of quality assurance program requirements.                    Table 1-1 prov&des a summary of the subject matter contained in the procedures which are used to implement the quality assurance program. Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.
c,Q:X;x'C::::::,';QMCg',i:.
Ginna          Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modif ication and testing. This'ncludes instructions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, of f normal, or alarm conditions; response to emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling. Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Rochester Gas and Electric management, or the completion of plant modifications. Ginna Station is also responsible. for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.
'g:giegi~iD$
Ga&#xc3;~j%'riNF48:l"eati:ga,':':'DiSFi'i~b+8i%n!ISi;vi.''si':0rB, v: vNM'NQN@k'.jhivNkvNNNRN@vSN%'j'"w'"s~"~SNR'' 'v'"
ygkioegand Production Divi:si;on Trai'ning are respons'i.ble
Rv>SNW''s4':i'%5i'>WC:jv is responsible ior the preparation and implementation. of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible. P$%jYFi)cPjBl'ectii6 P~,e.tj":j:.k,ijg'~ogPjP),,:,;~i'i~oe:.-::
'for the control of documents issued.by their respective organizations.
also assists in the preparation of routine relay mai,ntenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.
Production and Engineering Systems controls the distribution of controlled manuals issued for the other organizations performing activities which implement this Quality Assurance Program (Table 1-1).Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and approval of documents.
Revision  19 December,  1993
Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequate, and include appropriate qualitative and quantitative requirements.
 
Nuclear Assurance Quality Control representatives, who are assigned to support departmental maintenance, repair, refueling and modification activities, are responsible for reviewing, prior to use, governing procedures to assure quality assurance requirements are included.The Plant Operations Review Committee has the responsibility for'reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical.Specifications.
0 Nuclear Engineering Services is responsible ' for. providing approved specifications and drawings                    -'.lpga major modifications and for minor modifications when <aiam 4g4$ $ j~.  -These documents require those performing the work'"Fo obtain, understand, and comply with appropriate procedures, specifications and drawings. Engineering has established procedures for revising drawings and specifications. These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.
Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with that activity.Ginna Station, Nuclear Engineering Services, Material Engineering and Xnspection Services, Purchasing, Production Division'i",''ilia"--.'6!i iX"::-,i-::::i!!
Quality, Performance is responsible for: preparing and implementing inspection procedures utilized for detailed inspection activities for Ginna Station; providing and implementing procedures for audit and surveillance related activities; providing and implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.
i'i'i"'":,i:
Persons preparing, reviewing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.
:'i'!8!-.'i-,,',,'*::D-',:-::i'!::-::,-:::-:i~
Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents. In addition, Quality Performance department assessment as described in Section 10 and Section 18 are used to verify that commitments are being addressed and affecting activities are being performed in            'uality accordance with approved instructions, procedures and drawings.
"""'""""assurance""'i.mp"emen ing procedures (Table 1-1)require the review of Quality Performance and the approval of the appropriate department supervisor.
Document  Control Procedures are established to control the'ssuance of procedures, instructions, drawings, and specifications.
Quality Assurance/Quality Control procedures are approved by the Department Manager, Quality Performance or designee.Revision 19 December,, 1993 The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document.It identifies the difference between controlled and.uncontrolled copies of the same document;includes the method for.identifying holders of controlled copies;requires that only controlled copies of a document be used for official purposes;requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
Revision  19 December,  1993
Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and , administrative)., specifications and drawings.Suppliers of materials, equipment, and services under an approved 10CFRSO.Appendix B supplier'quality assurance program are required in procurement documents to provide for control of documents, including-manufacturing, inspection and testing instructions.
 
The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required;to properly review and approve documents such as procedures, instructions, specifications and drawings to provide the same reviews and approvals for changes to documents as was required of the original document;to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent;to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.Quality Performance is responsible for review and concurrence of procurement documents for all procuring organizations and, therefore, procurement document control requirements.
Standard document control requirements are contained in the Quality Assurance Manual. The Plant Manager, Ginna Station is responsible for the control of all documents issued by Ginna Station ersonnel.
Quality Performance is responsible for review and assessment of document control systems to assure adequate systems are implemented. Revision 19 December, 1993 Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.All procurement is conducted in accordance with procurement documents as stated in Section 4.All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.1,'~organizations!c'oTI's'i's%'i of determining the methods to be used for acceptance of the'tem or service and the requirements for control of the supplier performance.
98".8.,'.:'-'.-8gj9,l::;:'.EX$ c,Q:X;x'C::::::,';QMCg',i:. 'g:giegi~iD$ ygkioegand Production Divi:si;on Trai'ning are respons'i.ble 'for the control of documents issued. by their respective organizations.
Source inspection (surveillance), certificate of conformance, receipt inspection and post installation test are methods which are considered for item acceptance
Production and Engineering Systems controls the distribution of controlled manuals issued for the other organizations performing activities which implement this Quality Assurance Program (Table 1-1) . Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.
'ge'c8apg either or a combination of: (1)surveillance of the activity and (2)review of objective evidence for conformance to the p'rocurement document requirements (i.e.certifications, stress reports etc;).The extent of the acceptance methods and associated verification activities will vary Bep'endtn9'!::::!up'od the relative importance and complexity of the pur~cTVased iHem or service and the supplier's past performance.
The Quality Assurance                   Manual designates                     responsibilities             and defines requirements for the preparation, review and approval of documents. Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequate, and include appropriate qualitative and quantitative requirements. Nuclear Assurance Quality Control representatives, who are assigned to support departmental maintenance, repair, refueling and modification activities, are responsible for reviewing, prior to use, governing procedures to assure quality assurance requirements are included. The Plant Operations Review Committee has the responsibility for 'reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical .Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with that activity. Ginna Station, Nuclear Engineering Services, Material Engineering and Xnspection Services, Purchasing, Production Division
              'i",''ilia"--.'6!i iX"::-,i-::::i!!i'i'i"'":,i::'i'!8!-.'i -,,     ',,'*::D -',:-::i'!::-::,-:::-:i~
                                            " ""'" """assurance""'i.mp "emen ing procedures (Table 1-1) require the review of Quality Performance and the approval of the appropriate department supervisor.
Quality Assurance/Quality Control procedures are approved by the Department Manager, Quality Performance or designee.
Revision       19 December,, 1993
 
The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. It identifies the difference between controlled and.uncontrolled copies of the same document; includes the method for. identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and
  , administrative)., specifications and drawings. Suppliers of materials, equipment, and services under an approved 10CFRSO
. Appendix B supplier 'quality assurance program are required in procurement documents to provide for control of documents, including -manufacturing, inspection and testing instructions.
The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required; to properly review and approve documents such as procedures, instructions, specifications and drawings to provide the same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.
Quality Performance is responsible for review and concurrence of procurement documents for all procuring organizations and, therefore, procurement document control requirements.
Quality Performance is responsible for review and assessment of document control systems to assure adequate systems are implemented.
Revision 19 December, 1993
 
Control of Purchased Material       E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.
All procurement is conducted in accordance with procurement documents as stated in Section 4. All reviews, inspections, 1,'~
surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.
organizations!c'oTI's'i's%'i of determining the methods to be used for acceptance of the'tem or service and the requirements for control of the supplier performance. Source inspection (surveillance), certificate of conformance, receipt inspection and post installation test are       '
methods which are considered for item acceptance                             ge'c8apg either or   a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to the p'rocurement document requirements                 (i.e.
certifications, stress reports etc;).             The   extent of the acceptance methods and associated verification activities will vary                           Bep'endtn9'!::::!up'od the relative importance and complexity of the pur~cTVased iHem or service and the supplier's past performance.
Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.
Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.
Results of the planning are incorporated in the procurement documents.
Results of the planning are incorporated in the procurement documents.
Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents.
Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance evaluation, which is accomplished during planning, determines the necessity for the supplier
The evaluation, which is accomplished during~procurement planning, determines the necessity for the supplier selection to be mi8a from the approved suppliers list.-20-Revision 19 December, 1993  
                                                      ~
with the requirements of the procurement documents. The procurement selection to be mi8a from the approved suppliers list.
Revision    19 December,    1993
 
Purchasing          utilizes the approved suppliers list as the selection source                for those suppliers found to have a satisfactory quality assurance program. The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement item,F-'-,;:viPggh'eg if- the source is to be restricted to the original supplier. For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is i'i'de"from the approved suppliers lists or one who is in" the process of being added to a list, after having its capability evaluated to purchaser satisfaction.                  Items or services, which meet industry standards and are typically utilized in applications other than nuclear, may be purchased from suppliers not listed on the approved suppliers list((
provided that item acceptance can be based on acceptance of
,standard commercial quality which is supplemented, as necessary, with source surveillance, pre- or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection. Items or services which have nuclear quality requirements whi'ch normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed on the approved suppliers listg provided that verification of nuclear quality can be accomplished by methods such as source surveillance, 'pre- or post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance.                        Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of the corresponding procurement method. The purchase requisition will also identify the source when replacement parts. are to be procured from the original equipment supplier.
Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's I
                                              'ii(f181'40':,.!!8'880'XP6C8!!igXOg$PN+'5g Q~u$ ':Q~ty+~gPs  su'r'an~+
4w4NOk:v&#xc3;vW.'4Ni05NNCS@s% 'Nvdvg
                                  ~
Revision   19 December,   1993


Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program.The evaluation guidelines for source selection considers the item complexity, method(s)of acceptance and for a replacement item,F-'-,;:viPggh'eg if-the source is to be restricted to the original supplier.For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is i'i'de"from the approved suppliers lists or one who is in" the process of being added to a list, after having its capability evaluated to purchaser satisfaction.
For engineered            items, Nuclear Engineering Services ke o':.
Items or services, which meet industry standards and are typically utilized in applications other than nuclear, may be purchased from suppliers not listed on the approved suppliers list((provided that item acceptance can be based on acceptance of ,standard commercial quality which is supplemented, as necessary, with source surveillance, pre-or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection.
Qiana''.::St5gi''on!.-:,a'x'e responsible for evaluating the or manufacturing capability of the supplier including overall'esign his particular technical ability to produce the design, service, item, or component delineated .in the procurement documents.          As part of this review, the supplier's design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are reviewed.
Items or services which have nuclear quality requirements whi'ch normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed on the approved suppliers listg provided that verification of nuclear quality can be accomplished by methods such as source surveillance,'pre-or post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance.
Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of .10CFR50 Appendix B, and Rochester Gas and Electric Corporation requirements.              The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance calibration practices, acceptance criteria,               .'rocedures, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assurance requirements.
Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of the corresponding procurement method.The purchase requisition will also identify the source when replacement parts.are to be procured from the original equipment supplier.Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's Q~u$':Q~ty+~gPs su'r'an~+~4w4NOk:v&#xc3;vW.'4 Ni05NNCS@s%
Ginna      Station, Quality Performance and~GY8'".':;@ridj)gp!ic'CWg~~p evaluate the suppliers of inspection, test, and calibration services which they intend to use.
'Nvdvg I'ii(f181'40':,.!!8'880'XP6C8!!igXOg$
The departments responsible for performing supplier evaluations shall document their results, in reports which discuss areas investigated, findings, and conclusions.
PN+'5g-21-Revision 19 December, 1993  
Revision             19 December,             1993


For engineered items, Nuclear Engineering Services ke o':.Qiana''.::St5gi''on!.-:,a'x'e responsible for evaluating the overall'esign or manufacturing capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated.in the procurement documents.
These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier. In addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance. ,With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.
As part of this review, the supplier's design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are reviewed.Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of.10CFR50 Appendix B, and Rochester Gas and Electric Corporation requirements.
Quality Assurance is responsible for determining and documenting the degree of supplier surveillance (including review, inspection,. or audit) required during design; fabrication, inspection, testing, and shipping, and for providing the required surveillance. The objective of supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements. For complex engineered items, Quality
The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance.'rocedures, calibration practices, acceptance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors.
                                          -
Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assurance requirements.
Assurance and Nuclear Engineering Services-are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.
Ginna Station, Quality Performance and~GY8'".':;@ridj)gp!ic'CWg~~p evaluate the suppliers of inspection, test, and calibration services which they intend to use.The departments responsible for performing supplier evaluations shall document their results, in reports which discuss areas investigated, findings, and conclusions. Revision 19 December, 1993  
The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance representative has the authority to inform the vendor that a particular  item is unacceptable, to issue a nonconformance report , or  to stop work, if necessary.
Quality- Performance is responsible for surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.
Revision 19 December, 1993


These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier.In addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance.,With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.Quality Assurance is responsible for determining and documenting the degree of supplier surveillance (including review, inspection,.
Department supervision is responsible for receiving and storing items pending their acceptance., Upon receipt, the department stockkeeper logs the item, places a "hold" tag on the item, and notifies Quality Performance that the item has arrived.
or audit)required during design;fabrication, inspection, testing, and shipping, and for providing the required surveillance.
Quality Performance is responsible for receipt inspection at Ginna Station upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use. Documentary evidence sufficient to identify the codes, standards or specifications met by the purchased material, equipment, and services is retained. In the event a final source inspection for the acceptance is conducted prior to receipt by RGGE, Quality Performance performs an inspection for shipping damage or lost parts and a document check to assure that the required documentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.
The objective of supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.
If the item and documentation are adequate, Quality Performance labels the item as "Accepted", files the documentation and receipt inspection results, and.releases the item for storage or use. If the item is nonconforming or the documentation is unsatisfactory, Quality Performance initiates controls on the item in accordance with Section ls.
For complex engineered
All items issued  must bear an acceptance tag or label and have documentation to support the acceptability  of the item.
-items, Quality Assurance and Nuclear Engineering Services-are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement.
In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.
When a deviation from purchase order requirements is noted, the Quality Assurance representative has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report-, or to stop work, if necessary.
Identification  and Control of Materials  Parts  and Com  onents The identification and control of materials, parts, and components  is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication, storage, or installation.
Quality-Performance is responsible for surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements.
Revision 19 December, 1993
The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation. Revision 19 December, 1993  


Department supervision is responsible for receiving and storing items pending their acceptance., Upon receipt, the department stockkeeper logs the item, places a"hold" tag on the item, and notifies Quality Performance that the item has arrived.Quality Performance is responsible for receipt inspection at Ginna Station upon delivery of items and associated services for maintenance, repair, modification, and refueling.
Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:
This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use.Documentary evidence sufficient to identify the codes, standards or specifications met by the purchased material, equipment, and services is retained.In the event a final source inspection for the acceptance is conducted prior to receipt by RGGE, Quality Performance performs an inspection for shipping damage or lost parts and a document check to assure that the required documentation has been reviewed and is complete.A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.If the item and documentation are adequate, Quality Performance labels the item as"Accepted", files the documentation and receipt inspection results, and.releases the item for storage or use.If the item is nonconforming or the documentation is unsatisfactory, Quality Performance initiates controls on the item in accordance with Section ls.All items issued must bear an have documentation to support In the event the traceability review is unsatisfactory, the may not be released for use.acceptance tag or label and the acceptability of the item.is lost or the documentation item becomes nonconforming and Identification and Control of Materials Parts and Com onents The identification and control of materials, parts, and components is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication, storage, or installation.
traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials, parts, and components prior to release for manufacturing, shipping, construction, and installation.
Revision 19 December, 1993 Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project.The identification and control requirements cover items such as: traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test reports;specification of the degree of identification to preclude a degradation of the item's functional capability or quality;and the proper identification of materials, parts, and components prior to release for manufacturing, shipping, construction, and installation.
Nuclear Engineering Services@~8iiii'ai84%b'i'>and Quality Performance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification     and control of materials, parts, or components,   as   appropriate. Suppliers are required to assure that   all   required   documentation   for an item is properly   identified     and related   to the item. Each item is required to   be   physically   identified,   either by marking on the item or by tags.       Physical   identification by purchase order number   is used to the   maximum extent. possible for relating   an item   at any time   to applicable documentation.
Nuclear Engineering Services@~8iiii'ai84%b'i'>and Quality Performance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and control of materials, parts, or components, as appropriate.
Identification is either on the item or records traceable to the item. Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.
Suppliers are required to assure that all required documentation for an item is properly identified and related to the item.Each item is required to be physically identified, either by marking on the item or by tags.Physical identification by purchase order number is used to the maximum extent.possible for relating an item at any time to applicable documentation.
The Plant Manager, Ginna Station is responsible for maintaining identification and control of materials, parts, or components received, stored, installed, and used at the plant in accordance with approved procedures.FS The responsible supervision of other departments which receive material:;44'y8 which is to be stored away from the. plant are.
Identification is either on the item or records traceable to the item.Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.The Plant Manager, Ginna Station is responsible for maintaining identification and control of materials, parts, or components received, stored, installed, and used at the plant in accordance with approved procedures.FS The responsible supervision of other departments which receive material:;44'y8 which is to be stored away from the.plant are.responsibl'e"for establishing procedures for identification and control and for maintaining identification and control of material, parts,'r components, stored or used in their area of responsibility.
responsibl'e "for establishing procedures for identification and control and for maintaining identification and control of material, parts,'r components, stored or used in their area of responsibility.
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.-25-Revision 19 December, 1993  
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.
Revision 19 December, 1993


Control of S ecial Processes Written procedures are established to control special processes, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.
Control of                   S   ecial Processes Written procedures are established to control special processes, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.
Qualification of personnel and special process procedures eemykkee Fo'mply',,::".":with the requirements of applicable codes and standaids.'Shen special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the p'ersonnel qualification requirements, the equipment necessary, and the special process qualification requirements.
Qualification of personnel and special process procedures eemykkee Fo'mply',,::".":with the requirements of applicable codes and standaids.'Shen special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the p'ersonnel qualification requirements, the equipment necessary, and the special process                 qualification requirements.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.
Quality Performance personnel're responsible for reviewing procurement documents to ensure that requirements for control of special processes are included.Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering and Inspection Services.Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications, and standards.
Quality Performance personnel're responsible for reviewing procurement documents to ensure that requirements for control of special processes are included.
Within the Quality Performance Department, the Manager, Materials Engineering and Inspection Services is responsible for the qualification of NDE personnel and procedures.
Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering and Inspection Services. Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.
The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures ca@(<<v<<<<.<<.9)))Y~Q)<<6" gg4...g<<YAK~<<<<w<<<<R<<<<<<<<<<<<<<<<<<&AN)<<h
The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications, and standards.
<<<<%<<<<%1%hw<<<<<<A4 ANh<<,'<<Avh<<<<<<Vh+
Within the Quality Performance Department, the Manager, Materials Engineering and Inspection Services is responsible for the qualification of NDE personnel and procedures. The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures ca@
'NAB<<Y%Nk 4<<SM<<<<<<<<<<<<Y$O'Ctjiei'0:;1''88)~Q()
(<<v<<<< .
Records for personnel ana procedures to dern'onstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.-26-Revision 19 December, 1993 O It II~II Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure effective compliance with procedures.
        <<
Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifications, codes, standards, or regulatory requirements.
          .9)))Y ~
For clarification and to distinguish from preventive maintenance inspections, the following controls are associated with the quality assurance function inspections and referred to as verification inspections.
Q) <<6" O'Ctjiei'0:;1''88)~Q()
Instructions for conducting detailed verification inspections are contained in inspection procedures.
gg4... g<<YAK ~<<<<w <<<<R Records        for personnel ana'NAB
These inspection procedures and all supporting specifications and.drawings are provided to-inspection personnel for-use prior to performing the inspection.
                                                <<<<<<<<<<<<<<<<<<&AN)<<h <<<<%<<<<%1%hw<<<<<<A4 ANh<<, '<<Avh<<<<<<Vh+   <<Y%Nk 4<<SM <<<<<<<<<<<<Y$
Inspections and hold points are.utilized to verify conformance of materials, parts, appurtenances, components, processes or structures to predetermined quality requirements.
procedures to dern'onstrate                   that required               qualifications                     have been obtained and kept                 current are maintained by Production                                           and Engineering Systems.
Inspection'procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work.Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.
Revision             19 December,             1993
Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.
 
Quality Performance personnel are responsible for assuring performance of verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and'Electric personnel.
O It I I~
The adequacy of inspections not directly performed by Quality Performance personnel will be assessed on a sample basis through the QA/QC surveillance program.Inspection equipment is calibrated and controlled in accordance with Section l2.Calibration status is verified by inspection Revision 19 December, 1993  
II
 
Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure effective compliance with procedures.
Ins ection Procedures   prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifications, codes, standards, or regulatory requirements. For clarification and to distinguish from preventive maintenance inspections, the following controls are associated with the quality assurance function inspections and referred to as verification inspections.
Instructions for conducting detailed verification inspections are contained in inspection procedures. These inspection procedures and all supporting specifications and
.drawings are provided to-inspection personnel for-use prior to performing the inspection. Inspections and hold points are. utilized to verify conformance of materials, parts, appurtenances, components, processes or structures to predetermined quality requirements.       Inspection'procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.
Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.       Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.
Quality Performance personnel are responsible for assuring performance of verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and 'Electric personnel.       The adequacy   of inspections not directly performed by Quality Performance personnel will be assessed on a sample basis through the QA/QC surveillance program. Inspection equipment is calibrated and controlled in accordance with Section l2. Calibration status is verified by inspection Revision 19 December, 1993


personnel prior to performing an inspection operation.
personnel   prior to performing an inspection operation.
In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing methods, equipment, and personnel is provided.Both inspection and process monitoring are required when control is inadequate without both.Quality Performance is responsible for verifying adequate inclusion of inspection requirements in specifications.
In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing methods, equipment, and personnel is provided.
I The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing instructions and procedures and related fabrication processes.
Both inspection and process monitoring are required when control is inadequate without both.
He is also responsible for the assignment of qualified personnel required for the performance of verification inspections and quality control surveillances of quality affecting activities.
Quality Performance is responsible for verifying adequate inclusion of inspection requirements in specifications.                 I The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing instructions and procedures and related fabrication processes. He is also responsible for the assignment of qualified personnel required for the performance of verification inspections and quality control surveillances of quality affecting activities.
i With the exception of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible'for establishing the requirements for the Inservice Inspection Program.Nuclear Engineering'ervices is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program.The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.
With the exception of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible'for establishing the requirements for the Inservice Inspection Program. Nuclear is responsible for establishing the requirements Engineering'ervices for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant i    system and other safety related systems is contained in Section 4.2, Technical Specifications.
11.Test Control Checks or testing performed to verify the adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings.Whenever testing is required to demonstrate that a material, pa'rt, component, or system will perform satisfactorily in service,'test program is instituted employing written and ap'proved procedures which are in accordance with basic requirements established in Technical Specifications, drawings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements.
: 11. Test Control Checks or testing performed to verify the adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings. Whenever testing is required to demonstrate that a material, pa'rt, component, or system will perform satisfactorily in service,'
The test program requires the identification, control, and documentation of all tests, and the preparation of written procedures required for satisfactory accomplishment of the testing.Together the written procedures and checklists for the testing program include: necessary test equipment'and calibration requirements; material requirements; test-28-Revision 19 December, 1993  
test program is instituted employing written and ap'proved procedures which are in accordance with basic requirements established in Technical Specifications, drawings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements.     The test program requires the identification, control, and documentation of all tests, and the preparation of written procedures required for satisfactory accomplishment of the testing.
Together the written procedures and checklists for the testing program include: necessary test equipment'and calibration requirements; material requirements; test Revision               19 December,               1993


personnel requirements; prerequisite plant and equipment conditions;-limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria;instructions for disposition of deviations; data collection requirements; and test result approvals The Plant Manager, Ginna Station is responsible for the.station test program, which includes the surveillance test program required by Section 4.0, Technical Specifications
personnel requirements;                                                     prerequisite plant           and equipment conditions;-limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instructions for disposition of deviations; data collection requirements; and test result approvals The Plant Manager, Ginna Station is responsible for the
~@3;:sex~xc ynr vw>>~~q~, i>ug o>>a~.>w~q~...i q>e.~vqpwyeepxcwx~avax v." q:py e, aq~mge~pP<$
.station test program, which includes the surveillance test program required by Section 4.0, Technical Specifications
)@i?j;:<?:;v'K~pip'ii'ed'iijiji:,~!~'ii'8::::-pb'if+'~ini~j
  ~xc ynr vw>>~ ~q~, i o>>a~.>w~q~...i q>e.~vqpwyeepxcwx~avax v." q:py e, aq~mge~pP<$~@3;:sex
:",;ij"i3 j~j'ig':,:':8'i~oci'iiib5 Io":ii:::i:ckt ihrii>>"'%%%'kR%(wACCNAv vA4%4'I&#xc3;RvVN'est procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved by the Plant Manager, Ginna Station.The Plant Manager, Ginna Station is responsible for the correct and timely performance of the required tests.utilizing written and approved procedures..
                                          >ug                                                                )@i?j;:<?:; v'K~
When contractors are employed for tests, the contractor is required to perform testing in accordance with Re gh8)PjpP'pV5V88 quality assurance program requirements.
pip'ii'ed'iijiji:,~!~'ii'8::::-pb'if+'~ini~j:",;ij"i3j~j'ig':,:':8'i~oci'iiib5 Io":ii:::i:ckt vA4%4'I ihrii>>"'%%%'kR%(wACCNAv
"'A'll test results are required to be documented, reviewed, and approved by those responsible for performing the test..When requested by Ginna Station,'",.;'Qi'i
                                          &#xc3;RvVN'est procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved by the Plant Manager, Ginna Station. The Plant Manager, Ginna Station is responsible for the correct and timely performance of the required tests
'';.8;.66<:-'., test activities'""o'e erm'i'ne'" cause" o"'io" e'c'""ive re ay malfunctions.
.utilizing written and approved procedures.. When contractors are employed for tests, the contractor is required to perform testing in accordance with Re gh8)PjpP'pV5V88 quality assurance program requirements. "'A'll test results are required to be documented, reviewed, and approved by those responsible for performing the test..
These test activities are performed in accordance with approved procedures by qualified personnel.
When       requested by Ginna Station,
Nuclear Engineering Seivices and Quality Performance are responsible for assuring that required tests for major modifications are included in specifications.
                                                '",.;'Qi'i '';.8;.66<:-'.,
Nuclear Engineering Services and I'.:",'.Ga%~
test activities'" "o 'e erm'i'ne'" cause" o"'io" e'c'""ive re ay malfunctions.                                                 These test activities are performed in accordance with approved procedures by qualified personnel.
an/~@,":Zl'':iat'xiePDji;0'x.xbetjonY":,',Di'mi.a.:ion assistance in the preparatio'n'"of'modification-related test procedures may be provided'to the Ginna Station staff.The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements.
Nuclear Engineering Seivices and Quality Performance are responsible for assuring that required tests for major modifications are included in specifications. Nuclear Engineering Services and I'.:",'.Ga%~ an/~@,":Zl'':iat'xiePDji;0'x.xbetjonY":,',Di'mi.a.:ion assistance in the preparatio'n'"of'modification-related test procedures may be provided'to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements.                                                       Reviews of minor modification design by   Quality Performance verifies adequate inclusion of test requirements.
Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requirements. Revision 19 December, 1993  
Revision           19 December,           1993


~Control of Measurin and Test E ui ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures.
~
Calibration procedures include step-by-step methods for calibration and requirements for instrument accuracy.Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other conditions affecting measurement capability.
Control of Measurin     and Test   E ui ment The calibration and control system for measuring and test equipment includes   calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures.
Calibration procedures include step-by-step methods for calibration and requirements for instrument accuracy.
Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other conditions affecting measurement capability.
Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability
Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability
'to calibration test data, and identification of the next calibration date on the equipment; a system providing traceability.of shop standards to nationally recognized standards (where national standards do not exist, procedures conta'in instructions to document the basis.for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of'all items under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates;and a system controlling the purchase requirements of new equip-ment to be entered into the calibration and control system including requirements for accuracy, stability, and repeatability under normal use conditions.
  'to calibration test data, and identification of the next calibration date on the equipment; a system providing traceability.of shop standards to nationally recognized standards (where national standards do not exist, procedures conta'in instructions to document the basis. for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of 'all items under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates; and a system controlling the purchase requirements of new equip-ment to be entered into the calibration and control system including requirements for accuracy, stability, and repeatability under normal use conditions. In the event a measuring instrument (i.e. shop or field standard) is found out of calibration, an investigation is conducted to determine the   validity of   previous measurements.
In the event a measuring instrument (i.e.shop or field standard)is found out of calibration, an investigation is conducted to determine the validity of previous measurements.
The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordance with the above requirements. Instruments specified in Section 4.l, Technical Specifications, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are calibrated and controlled in accordance with station procedures. Measuring, -test or inspection equipment used by Nuclear Assurance. Quality Control is included in the program.
The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordance with the above requirements.
Revision 19 December, 1993
Instruments specified in Section 4.l, Technical Specifications, are included in the program.Tools, gauges, and instruments necessary for maintenance, inspection, and test are calibrated and controlled in accordance with station procedures.
Measuring,-test or inspection equipment used by Nuclear Assurance.
Quality Control is included in the program.-30-Revision 19 December, 1993  


The Manager, Materials Engineering and Inspection Services pap',"O'Ci045@eiparwe responsible f'r establishing" a program and the" preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.
The Manager,               Materials Engineering and Inspection Services pap',"O'Ci045@eiparwe responsible the" preparation of procedures for the control and f'r  establishing" a program and calibration of measuring and test equipment used by their respective organizations.
13.Handlin Stora e and Shi inGinna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.F':.',-:";:,'4Qg$
: 13. Handlin               Stora         e     and Shi         in Ginna          Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.F':.',-:";:,'4Qg$ Bd:;.;$ 3'@CQXiC sAn"               '
Bd:;.;$3'@CQXiC sAn"'Services are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located in their work areas.In addition, the Manager, Materials Engineering and Inspection Services is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and handling equipment.
Services are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located in their work areas. In addition, the Manager, Materials Engineering and Inspection Services is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and handling equipment. Under normal circumstances, manufacturer's specific written instructions and recommendations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to environmental requirements.                                       In the absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in accordance with department procedures.
Under normal circumstances, manufacturer's specific written instructions and recommendations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to environmental requirements.
The Department Manager,                                 Nuclear 'Engineering Services p2 Pj3;:8A'+t:"';::885'Age'X~>'":.;.:,,:,bi@$i':.')8t",,@t4e@~i@wi responsible for speci fying in procurement 8ocuments ance in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for major modifications.
In the absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in accordance with department procedures.
These procedures are prepared by contractors, by the station staff; or by staff members of pes'i ap'cl,:,,:MB'acigkiiciPDiSBYibi~Ea'on,.'ipxya;:s'i:on as appropriate. Rocbeste r Cars and Electric proce urea are reviewed and approved as described in Section 6.
The Department Manager, Nuclear'Engineering Services p2 Pj3;:8A'+t:"';::885'Age'X~>'":.;.:,,:,bi@$
Revision   19 December,   1993
i':.')8t",,@t4e@~i@wi responsible for speci f ying in procurement 8ocuments ance in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for major modifications.
These procedures are prepared by contractors, by the station staff;or by staff members of pes'i ap'cl,:,,:MB'acigkiiciPDiSBYibi~Ea'on,.'ipxya;:s'i:on as appropriate.
Rocbeste r Cars and Electric proce urea are reviewed and approved as described in Section 6.-31-Revision 19 December, 1993  


In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.
In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.
Quality Performance, Gin%a!,';,SEa'@ion and Nuclear Engineering Services are responsible for review of engineering specifications to assure that proper handling, storing, and shipping requirements have been specified.
Quality Performance, Gin%a!,';,SEa'@ion and Nuclear Engineering Services are responsible for review of engineering specifications to assure that proper handling, storing, and shipping requirements have been specified. Quality Performance is responsible for assessment of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.
Quality Performance is responsible for assessment of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.
Ins ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly identified by use of tags; control logs, and other suitable means to indicate the status in a positive manner.
Ins ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly identified by use of tags;control logs, and other suitable means to indicate the status in a positive manner.The identification is sufficient to positively indicate.the status of the particular equipment-or system being isolated.~The Plant Manager, Ginna Station is responsible for indicating the status of operating equipment or systems to be-removed from service for maintenance, repair, or modification in accordance with the.approved Electric System Operating Rules.The Plant.Manager designates personnel who have station holding authority.
The identification is sufficient to positively indicate. the status of the particular equipment-or system being isolated.     ~
The Plant Manager, Ginna Station is responsible for indicating the status of operating equipment or systems to be- removed from service for maintenance, repair, or modification in accordance with the. approved Electric System Operating Rules. The Plant. Manager designates personnel who have station holding authority.
Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.
Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.
System status is indicated through the use of hold tags, block tags and corresponding control logs.Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets.Written procedures control the use of hold tags, test tags, and labels.Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.
System status is indicated through the use of hold tags, block tags and corresponding control logs.
Fuel handling operations involving fuel assemblies or other radioactive sources are identified and controlled by the use of tags, stamps, or other suitable means.-32-Revision 19 December,, 1993 Maintenance, repair, or modification of components, systems, or structures, utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejection for a particular component, system, or structure.
Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets. Written procedures control the use of hold tags, test tags, and labels.
These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a des'.gnated control location to indicate the status and the completion of required inspections and tests.Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and assures that inspection results are properly documented..
Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.
Material Engineering and Inspection Services establishes the procedures for implementing the inspection status sheets utilized during inservice inspection.
Fuel handling operations involving fuel assemblies or other radioactive sources are identified and controlled by the use of tags, stamps, or other suitable means.
Nonconformin Materials Parts and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components., Materials, parts, or components which do not conform to the drawing or specification requirements are identified, controlled and reported.RG6E personnel are responsible for initiating nonconformance reports and initiating dispositions'uclear Assurance Quality Control personnel are responsible for inspecting and approving closeout of nonconformance'reports.
Revision 19 December,, 1993
Prior to installation or use, nonconforming items generally remain in a hold area until an approved disposition has been implemented.
 
Nonconforming items may be released for installation to meet critical fabrication schedules provided controls are established to prevent inadvertent use prior to implementing the nonconformance disposition.
Maintenance, repair, or modification of components, systems, or structures, utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejection for a particular component, system, or structure.
After installation,.
These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a des'.gnated control location to indicate the status and the completion of required inspections and tests.
nonconforming items are identified and controlled until approved disposition has been implemented.
Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and assures that inspection results are properly documented.. Material Engineering and Inspection Services establishes the procedures for implementing the inspection status sheets utilized during inservice inspection.
Nonconformances identified at a supplier's facility and reported to RG&E, which have'upplier recommended dispositions of use-as-is, or repair, are normally processed by the department originating the procurement.
Nonconformin   Materials Parts and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.,
Materials, parts, or components which do not conform to the drawing or specification requirements are identified, controlled and reported. RG6E personnel are responsible for initiating nonconformance reports and initiating dispositions'uclear Assurance Quality Control     personnel are responsible for inspecting and approving closeout of nonconformance'reports. Prior to installation or use, nonconforming items generally remain in a hold area until an approved disposition has been implemented. Nonconforming items may be released for installation to meet critical fabrication schedules provided controls are established to prevent inadvertent use prior to implementing the nonconformance disposition. After installation,.
nonconforming items are identified and controlled until approved disposition has been implemented.
Nonconformances identified at a supplier's facility and reported to RG&E, which have'upplier recommended dispositions of use-as-is, or repair, are normally processed by the department originating the procurement.
Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.
Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.
Items are repaired and reworked in accordance with approved procedures and current drawings.The repair or rework must-33-Revision 19 December, 1993  
Items are repaired and reworked in accordance with approved procedures and current drawings. The repair or rework must Revision 19 December, 1993


be verified as acceptable.
be verified as acceptable. by an inspection of the affected item or process which is at least equal to the original inspection method.
by an inspection of the affected item or process which is at least equal to the original inspection method.Items which are accepted"use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance.
Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance. All such items are approved prior to use by the cognizant organization having responsibility for the requirement. In addition, those "use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Senior Vice President, Production and Engineering.
All such items are approved prior to use by the cognizant organization having responsibility for the requirement.
Nuclear Assurance Quality Control personnel provide nonconformance status information periodically. Quality Performance and other organizations analyze nonconformance report data for adverse trends and geeeeee @gpss''j5g periodic reports to management. Adverse trends form' basis for supplier re-evaluation or for other corrective action.
In addition, those"use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Senior Vice President, Production and Engineering.
Corrective Action Conditions adverse to quality are those conditions which compromise confidence that a structure, system or component at Ginna Station will perform satisfactorily in service.,
Nuclear Assurance Quality Control personnel provide nonconformance status information periodically.
Significant conditions adverse to quality are those conditions which, if uncorrected, could affect the health and safety of the public, seriously affect the ability to serious breakdown in activity controls, or will require a major effort to restore capability to perform specified functions.
Quality Performance and other organizations analyze nonconformance report data for adverse trends and geeeeee@gpss''j5g periodic reports to management.
'Conditions adverse to quality shall be promptly identified and reported to supervision. The condition adverse to quality shall be identified,   corrected and evaluated to determine if a significant   condition adverse   to quality exists.
Adverse trends form'basis for supplier re-evaluation or for other corrective action.Corrective Action Conditions adverse to quality are those conditions which compromise confidence that a structure, system or component at Ginna Station will perform satisfactorily in service., Significant conditions adverse to quality are those conditions which, if uncorrected, could affect the health and safety of the public, seriously affect the ability to serious breakdown in activity controls, or will require a major effort to restore capability to perform specified functions.
When a significant condition adverse to quality at Ginna Station is identified, the Corrective Action Coordinator is responsible for evaluating the effect of continuing the activity. If continuing the activity would obscure or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.
'Conditions adverse to quality shall be promptly identified and reported to supervision.
Revision   19 December, 1993
The condition adverse to quality shall be identified, corrected and evaluated to determine if a significant condition adverse to quality exists.When a significant condition adverse to quality at Ginna Station is identified, the Corrective Action Coordinator is responsible for evaluating the effect of continuing the activity.If continuing the activity would obscure or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.-34-Revision 19 December, 1993  
 
%~48.';:-',;
                                                                                  %~48.';:-',; Wan'asg8x'.",!!Sip o'l!8<<tK hssuranc'es                   has     authority to stop work: on mai.ntenance, repair, i'nservice inspection, refueling, modify'.cation,,testing or inspection deficiencies at Ginna Station, as well as other locations.
Wan'asg8x'.",!!Sip o'l!8<<tK hssuranc'es has authority to stop work: on mai.ntenance, repair, i'nservice inspection, refueling, modify'.cation,,testing or inspection deficiencies at Ginna Station, as well as other locations.
Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.
Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.
The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engineering Services, Materials Engineering and Inspection Services,."',':.6.'8'8)<p6.:
The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engineering Services, Materials Engineering and Inspection Services,                                                                                                             ."',':.6.'8'8)<p6.:
B3:,e~atVi~e':,'!Di~a,:ri~biti:ae!,:Sgv'iii.""oD or cognizant supplier'"""'ssocia ions.For significant conditions adverse to quality,gjVgeet'i':::,R'96'8
B3:,e~atVi~e':,'!Di~a,:ri~biti:ae!,:Sgv'iii.""oD or cognizant supplier'"
*,,-...,...,,'",,-;-,:...E,,:,;:;:h, Pl:,:::,::,,:,::,,:;::::,-...,,,:
ions.                                                                                                        ""'ssocia For           significant conditions                                         adverse to quality,gjVgeet'i':::,R'96'8
caQ888 8@6-48%83 og"cd'x@cK+ve" Ac540&#xc3;gg 3;468'o" x88@+v&-tee'::':,0l,::,::,"di'll's%i'.".i'*"(-":i:!i!i iiitei-,"'iiil'iiIi'l:""',"!"*'ll,:.i,:"-"-"--:""::i~
              '",,-;-,:...E,,:,;:;:h, Pl:,:::,::,,:,::,,:;::::,-...,,,:
If the significant condition adverse to quality involves a design deficiency or the recommended corrective action involves a design change, the review of the condition adverse to quality includes Nuclear Engineering Services.or Ginna Station design personnel, as appropriate.
*,,-...,...,,
caQ888 8@6-48%83 og "cd'x@cK+ve" Ac540&#xc3;gg 3;468
'::':,0l,::,::,"di'll's%i'.".i'*"(-":i:!i!iiiitei-,"'iiil'iiIi'l:""',"!"*'ll,:.i,:"-"-"--:""::i~
                                                                                                          'o"x88@+v&                -          tee If the significant condition adverse to quality involves a design deficiency or the recommended corrective action involves a design change, the review of the condition adverse to quality includes Nuclear Engineering Services. or Ginna Station design personnel, as appropriate.
The Corrective Action Coordinator assures root cause determination and corrective action plans are developed to resolve the identified concern and to preclude recurrence.
The Corrective Action Coordinator assures root cause determination and corrective action plans are developed to resolve the identified concern and to preclude recurrence.
s'ugix'hei'op reviews eked eac8 Corrective"Action'Report'"" initi~ated at Ginna Station and may recommend additional corrective action if the action already taken does not result in adequate resolution.
s'ugix'hei'op reviews                                       eked       eac8 Corrective "Action 'Report'""
The Plant Operations Review Committee CAR Subcommittee reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repetition. Revision 19 December, 1993  
initi~ated at Ginna Station and may recommend additional corrective action result in adequate if         the action already taken does not resolution.
The Plant Operations Review Committee CAR Subcommittee reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repetition.
Revision             19 December,               1993


Corrective action summary reports are submitted to departmental supervision to keep them aware of significant conditions adverse to quality, related causes and corrective action being taken.Senior Management is advised of the.causes and actions of the more significant Corrective Action Reports.Quality Assurance provides additional assurance of the corrective action program effectiveness through semi-annual audits and periodic surveillances.
Corrective action summary reports are submitted to departmental supervision to keep them aware of significant conditions adverse to quality, related causes and corrective action being taken. Senior Management is advised of the
ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance.
. causes and actions of the more significant Corrective Action Reports.
Production and Engineering Systems, as directed by the Division Manager, Technical Services and Chief Engineer, is responsible for the retention and maintenance of records.Quality Performance, Purchasing, Nuclear Engineering Services, and Ga Ill an'd':;:!gee'ctrl!OEDi'81'xi'Qllt@otl';':;D'r'v+8!3~on departments are responsible t i otorw a rda'rng't hect" re8cords they initiate to the appropriate Production and Engineering Systems record retention locations'ach organization generating records is responsible for preparation, review, approval, and implementation of specific quality assurance record procedures for their areas of responsibility in accordance with these requirements.
Quality Assurance provides additional assurance of the corrective action program effectiveness through semi-annual audits and periodic surveillances.
The records which fall within quality assurance record requirements include those records, required by Section 6.10 of the Technical Specifications and the Quality Assurance Program.All records associated with the operation, maintenance, repair, inservice inspection, refueling, modification, inspection and testing of structures, systems, and components covered by the quality assurance program are included.Records initiated at Ginna Station include operating logs;the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses;calibration procedures and reports;and Nonconformance and Corrective Action Reports.Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering Systems record retention location.-36-Revision 19 December, 1993  
ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance. Production and Engineering Systems, as directed by the Division Manager, Technical Services and Chief Engineer, is responsible for the retention and maintenance of records. Quality Performance, Purchasing, Nuclear Engineering Services,
                                                            't and Ga Illan'd':;:!gee'ctrl!OEDi'81'xi'Qllt@otl';':;D'r'v+8!3~on departments are responsible t iotorw a rda'rng hect" re8cords they initiate to the appropriate Production and Engineering Systems record retention locations'ach organization generating records is responsible for preparation, review, approval, and implementation of specific quality assurance record procedures for their areas of responsibility in accordance with these requirements.               The records which fall within quality assurance record requirements include those records, required by Section 6.10 of the Technical Specifications and the Quality Assurance Program.                         All records associated with the operation, maintenance, repair, inservice inspection, refueling, modification, inspection and testing of structures, systems, and components covered by the quality assurance     program are included.
Records initiated at   Ginna Station include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses; calibration procedures and reports; and Nonconformance and Corrective Action Reports.                       Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering Systems record retention location.
Revision       19 December,         1993


Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results,, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results,, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate.
The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate. Requirements and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents. Records are available to authorized personnel.
Requirements and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents.
Removal of records from storage is documented and accountability. is maintained by the responsible record control activity.
Records are available to authorized personnel.
Records are either stored in record storage facilities which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are- kept in two separate storage locations in separate buildings which are physically isolated from each other.
Removal of records from storage is documented and accountability.
Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage. The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.
is maintained by the responsible record control activity.Records are either stored in record storage facilities which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are-kept in two separate storage locations in separate buildings which are physically isolated from each other.Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage.The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.Production and Engineering Systems is responsible for maintaining plant operating records as required in Section 6.10, Technical Specifications.
Production and Engineering Systems is responsible for maintaining plant operating records as required in Section 6.10, Technical Specifications.
Production and Engineering Systems is also responsible for maintaining off-site prepared design records, such as specifications, drawings, design review reports, and design control documentation; quality assurance records, such as audit'reports and surveillance reports;purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.-37-Revision 19 December, 1993 Audits Compliance with all aspects of the Quality Assurance Program and the effectiveness of the program is determined by audits and surveillances of all organizations performing quality affecting activities.
Production and Engineering Systems is also responsible for maintaining off-site prepared design records, such as specifications, drawings, design review reports, and design control documentation; quality assurance records, such as audit 'reports and surveillance reports; purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.
Quality Assurance is responsible for conducting audits of those organizations and activities involved in the quality assurance program on a planned, periodic basis.Audit intervals are based on the status and safety importance of activities being performed, as well as group performance and related management concerns.Table 18-1 is a list of the ((4~~te~:;-%X$
Revision 19 December, 1993
'g activities to be on the level of activity in each area.Audit schedules are established to assure that each of the activities are i'i-: audited at the frequency specified in Section 6 Technical Specifications.
 
Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concerns.Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names of those who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations.
Audits Compliance with all aspects of the Quality Assurance Program and the effectiveness   of the program is determined by audits and surveillances of   all organizations performing quality affecting activities. Quality Assurance is responsible for conducting audits of those organizations and activities involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status and safety importance of activities being performed, as well as group performance and related management concerns.
Audit planning and performance utilize performance based techniques that will facilitate effectiveness assessments as well as compliance verification.
Table 18-1 is a list of the ((4~~te~:;-%X$'g activities to be on the level of activity in each area.       Audit schedules are established to assure that each of the activities are i'i-:
The audits are performed in accordance with written procedures or checklists by appropriately, trained personnel not having direct responsibilities in the areas being audited..Audit results are documented and reported to the supervisor and division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board.Within a specified period of time, the.person having supervisory responsibility in the area audited is required to review the audit results, take necessary action to correct the deficiencies identified by the audit, and document and report the corrective action.Quality Assurance is responsible for developing audit plans and audit checklists, designating an'd training audit personnel, and conducting audits.-38-Revision 19 December, 1993 S
audited at the frequency specified in Section 6 Technical Specifications. Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concerns.
Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names of those who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations. Audit planning and performance utilize performance based techniques that will facilitate effectiveness assessments as well as compliance verification. The audits are performed in accordance with written procedures or checklists by appropriately, trained personnel not having direct responsibilities in the areas being audited..
Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procurement, as required, to evaluate their quality assurance program for compliance with all aspects of the procurement documents.
Audit results are documented and reported to the supervisor and division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board. Within a specified period of time, the .person having supervisory responsibility in the area audited is required to review the audit results, take necessary action to correct the deficiencies identified by the audit, and document and report the corrective action.
Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents.
Quality Assurance is responsible for developing audit plans and audit checklists, designating an'd training audit personnel, and conducting audits.
During the project or procurement process additional audits are performed, as required, to assure all quality assurance program requirements are properly implemented in accordance with procurement documents.
Revision 19 December, 1993
Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends.Results of these analyses are provided to management for their regular review.-39-Revision 19 December, 1993 Table 1-1 Quality Assurance Program Procedures Subject Listing ualit Assurance ualit Control Procedures Indoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management Review of the Quality Assurance Program Appendix B Criteria Periodic Review of Quality Assurance/Quality Control Procedures Planning and Reporting Results for QA/QC Subcommittee Meetings Quality Assurance/Quality Control Group Organization and Responsibilities IX Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review and Approval of'Field Change Requests and Review of ECN's~~Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Preparation, Review and Approval of Quality Verification III Specifications Computer Software Product Evaluation IIX Quality Assurance, Review of Computer Software Production Evaluations Master Software Index Requisitioning Quality Assurance/Quality Control Services 5 Quality Review of Rochester Gas and Electric Procurement Documents IV IV Preparation, Review and Approval of Rochester Gas and Electric Q.A.Specifications Revision 19 December, 1993 Cl Table 1-1 (cont'd)ualit Assurance ualit Control Procedures Appendix B Criteria Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval of Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision and Control of the QA Program for Station Operation Review of Departmental Procedures VI Preparation, Review and Approval of Procedure Deviation Requests by Quality Assurance/Quality Control VI Evaluation of Suppliers by Quality Assurance Supplier Surveillance VII VII Control of Supplier Performance Quality Assurance Evaluation of Bids Conducting Commercial Grade Supplier Surveys Evaluation of Commercial Suppliers by Quality Assurance VII VII VII VII Document Deficiency Reports VII Verification Inspection Program Revision 19 December, 1993 Qualification of Inspection Personnel Quality Assurance Nonconformance Processing XV Corrective Action Reports XVI Quality Assurance Commitments and Action Items Review of Ginna Maintenance Work Order Packages Identified Deficiency Reports Records Turnover Plan Qualification of Audit/Survey Personnel Audit Scheduling and Planning Performance of Quality Assurance Audits Reporting and Follow-Up of Audit Findings Conduct of Quality Assurance During and in Follow-Up of NSARB Audits Response to Audits and Surveillance Qualifications of Surveillance Personnel Review of Audit Program Auditing of the Nuclear Emergency Response Plan Performance Based Surveillance Program Availability and Use of INPO and NRC Inspection/
 
Assessment Reports in Audit and QA Surveillance XVI XVI XVI XVII XVIII XVIII XVIII XVIII XVIII XVIII XVIII XVII XVII XVIII XVIII Quality Assurance Planning Guides XV1II-42-Revision 19 December, 1993  
S Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procurement, as required, to evaluate their quality assurance program for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents. During the project or procurement process additional audits are performed, as required, to assure all quality assurance program requirements are properly implemented in accordance with procurement documents.
Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends. Results of these analyses are provided to management for their regular review.
Revision 19 December, 1993
 
Table 1-1 Quality Assurance Program Procedures Subject Listing Appendix  B ualit   Assurance   ualit Control   Procedures         Criteria Indoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Planning and Reporting Results     for QA/QC Subcommittee Meetings Quality Assurance/Quality Control Group Organization                 IX and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review and Approval of 'Field Change Requests and Review of ECN's
                  ~
Quality Assurance Review of Rochester Gas and Electric Engineering Specifications
                            ~
Preparation, Review and Approval of Quality Verification             III Specifications Computer Software Product Evaluation                                 IIX Quality Assurance, Review of Computer Software Production Evaluations Master Software Index Requisitioning Quality Assurance/Quality Control                     IV Services             5 Quality Review of Rochester     Gas and                             IV Electric Procurement     Documents Preparation,   Review and Approval   of Rochester Gas and Electric   Q.A. Specifications Revision 19 December, 1993
 
Cl Table 1-1 (cont'd)
Appendix  B ualit Assurance ualit Control   Procedures         Criteria Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval of Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision and Control of the QA Program for Station Operation Review of Departmental Procedures                               VI Preparation, Review and Approval of Procedure                   VI Deviation Requests by Quality Assurance/Quality Control Evaluation of Suppliers by Quality Assurance                     VII Supplier Surveillance                                           VII Control of Supplier Performance                                 VII Quality Assurance Evaluation of Bids                             VII Conducting Commercial Grade Supplier Surveys                     VII Evaluation of Commercial Suppliers by Quality                   VII Assurance Document Deficiency Reports                                     VII Verification Inspection Program Revision 19 December, 1993
 
Qualification of Inspection Personnel Quality Assurance Nonconformance Processing                   XV Corrective Action Reports                                     XVI Quality Assurance Commitments and Action Items               XVI Review of Ginna Maintenance Work Order Packages               XVI Identified Deficiency Reports                                 XVI Records Turnover Plan                                         XVII Qualification of Audit/Survey Personnel                       XVIII Audit Scheduling and Planning                                 XVIII Performance of Quality Assurance Audits                       XVIII Reporting and Follow-Up of Audit Findings                     XVIII Conduct of Quality Assurance During and in                   XVIII Follow-Up of NSARB Audits Response to Audits and Surveillance                           XVIII Qualifications of Surveillance Personnel                     XVIII Review of Audit Program                                     XVII Auditing of the Nuclear Emergency Response Plan               XVII Performance Based Surveillance Program                       XVIII Availability and Use of INPO and NRC Inspection/             XVIII Assessment Reports in Audit and QA Surveillance Quality Assurance Planning Guides                             XV1II Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Materials  En  ineerin  Ins ection Services          Criteria Indoctrination  and  Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures Quality Materials Engineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material
.Handling Equipment Instructions Preparation, Review and Approval of Materials Engineering Laboratory Test Procedures Control and Distribution of Documents Regulating              VI Safety Related Activities Control of Purchased Materials                                VII Preparation, Review and Approval of Supplier                  VII Evaluation Control of Purchased Services                                  VII Welding Procedure Preparation Review and Approval              IX Welding Procedure  Qualification                              IX Heat Treating Procedures                                      IX Welder  Qualification  and Currency                            IX Nondestructive Examination Procedures                          IX Nondestructive Examination Procedures Manual                  IX Nondestructive Examination Personnel Qualification Revision  19 December,  1993
 
Cl 0
 
Table 1-1 (cont'd)
Appendix    B Materials          En  ineerin      Ins ection Services                      Criteria Qualification of Visual Examination Personnel                                                  IX Erosion/Corrosion Program                                                                      IX General Brazing Procedures                    Preparation and Approval                        IX General Brazing Procedures                    Qualification                                    IX Inservice Inspection Program and Plans ASME Section XI Repair, Replacement and Modification Procedure Incorporating Ginna Modifications into Inservice Inspection Program Duties of the ANII Tests conducted by MEIS Laboratories                                                          XI Rm Pm~swq~cgqcPyggx w+<'~vg. ~++>Pyb~~ex egmyqqoywyxorgyeq~qygyyegP'Pygmy,~z, gyr<qz~~<gg~sgyr~~~
                                        ~
Test Personnel Qualifications                                                                  XI Vendor Tests under MEIS                    Direction                                          XI Calibration          and    Control of Nondestructive                                        XII Examination Instruments Inspection and Maintenance of Material Handling                                                XIII Equipment Overhead and Gantry Cranes                                                                    XIII Inspection and Maintenance                    of Portable Lifting                              XIII and Handling Equipment Underhung Cranes,              Jib Cranes      and Monorail Systems                          XIII Slings and Related Apparatus                                                                  XIII Classification and Training of Material Handling                                              XIII Revision    19 December,      1993
 
Equipment Personnel Table 1-1 (cont'd)
Appendix  B Materials En  ineerin  Ins ection Services          Criteria Mobile Hydraulic Cranes                                        XIII Inspection and Maintenance of Jacks, Hydraulic  Rams          XIII and  Cylinders, Forklift Loading  Forks                                      XIII Inspection of Designated Monorails                            XIII Training and Qualification of Crane Operators                  XIII Lifting Devices in  the Containment Vessel                    XIII Pre-Shipment Inspection of Radioactive Material                XIII Shipping Containers Nonconformance Reports                                        XV Initiating  and Responding  to Corrective Action              XVI Reports Quality Materials Engineering  and  Inspection                XVII Services Records Response  to Audits                                            XVII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                    Criteria Ginna  Quality Assurance Program Implementation Fire Watch Training R.E. Ginna Training Plan Ginna Station Training General Employee Training Temporary Employee Training Hazardous/Mixed Waste Emergency Response Training Operator Training Responsibilities R.E. Ginna Health Physics Orientation Program Fire Brigade Training Radiation Protection Technician Entry Level
'Requirements, Responsibilities, .and Training Chemistry Technician Entry Level Requirements, Responsibilities, and Training Maintenance Training Program Ginna Station Administrative and Engineering Staff Responsibilities  ~
Ginna Station Management Responsibilities Health Physics and Chemistry Section Organization and Responsibilities Support Services Organization and Responsibilities Operations Section Organization and Responsibilities Technical Section Organization and Responsibilities Material and Procurement Section Organization and Respon'sibilities Revision  19 December,  1993
 
S Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                    Criteria Operational Assessment Section Ginna  Station Staff Responsibilities for Fire Prevention Ginna  Modification Project Organization Plant Operations Review Committee Operating Procedure Radiation Emergency Plan Xmplementing Procedure Committee Emergency Procedures    Committee  (EPC)
Ginna Standard Nomenclature                                  XI Preparing and Dispositioning of Technical Staff Request Control of Station Modification Station Modification Classification and Review                IIX Station Modification Planning Control Station Modification Installation and Acceptance Station Modification Completion Preparation, Review 8 Approval of Design Input Documents for Minor Modifications Component  Classification Request/Reanalysis                IXI Evaluation of Parts to Determine Safety Classification Preparation, Review and Approval of Safety Analysis Preparation, Review, Approval and Distribution of Design Output and Design Review Documents for Minor Modifications Technical Evaluation Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                                      Criteria Preparation of Configuration Data Change Forms Computer Software Product Evaluation Control of Procurement Documents Prepared at Ginna  Station Evaluation of Commercial Grade Items for Safety                                IV Related Applications Evaluation of Items for In-Storage Maintenance                                  IV Requirements Plant Procedures Preparation and Classification Plant Procedure Content and.Format Requirements Emergency and Abnormal Operating Procedures Writers'uide Operating Procedures  Writers'uide Health Physics and Chemistry Procedures  Writers.'uide V
Plant Procedure Adherence Requirements Emergency and Abnormal Operating Procedures            Users'uide Procedure Control Procedure Control-New Procedures Procedure Control-Permanent  Changes Procedure Control-Temporary Changes Procedure Control-Periodic Review                                              VI Procedure Control-Index Procedure Control of Emergency and Abnormal Procedures                          VI Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Qinna Procedures                                      Criteria Procedure Control - Amendments to Licensing Documents and Changes  to the Facility Procedure Change Control 10CFR 50.59 Review                      VI Emergency and Abnormal Operating Procedure    Support          VI Documentation Control Procedure  Distribution                                          VI Control of Construction Documents                                VI Vendor Manual Control Program Vendor Manual Information/Discrepancy/Incorporation              VI Request Drawing Change Request                                          VI Conditional Release Program                                      VIX Receipt and Acceptance of Materials/Parts                        VII Control of Purchased Services                                    VII Inventory Control of Material, Parts and Components              VIX at Qinna Station Xdentification and Marking of Accepted Material,                VIII Parts, and Components Bulk Storage of Combustible Materials and Their Use    =
VIIX Trailer Admittance  Requirements                                VIIX Control of Consumable Materials at Ginna Station                VIII Control of Welding                                              IX Nondestructive Examination Control Welding Equipment Performance    Verifications Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix    B Ginna Procedures                                          Criteria Open Flame,  Welding and Grinding Permit (Hot Work Permit)        IX Control of Inservice Inspection Activities ASME  Section XI Repair, Replacement and Modification Procedure  for Ginna  Station Electrical Preventive    Maintenance Program Environmentally Qualified Equipment Maintenance Program Mechanical Preventive Maintenance Program      for Rotating Equipment Equipment Inspection and Lubricant      List                        X Valve Preventive Maintenance Program Condenser  Inservice Inspection Program Preventive Maintenance Program for Plant Security Equipment Performance of Tests                                                XI Qualification  and  Certification of Test  Personnel              XI Test Tag Control Program Calibration, Test, Check and Replacement Surveillance Program for Instrumentation and Equipment Important to Safety                                                          XI Ginna Station Surveillance Schedule                                XI Inservice Testing of Pumps and Valves                              XI Calibration and Control of Test Equipment                          XII Maintenance and Inspection of Material Handling Equipment                                                          XIII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix    B Ginna Procedures                                    Criteria Control of Material Handling and Handling Equipment                                            XIII Storage and Preservation of Materials and Equipment  at Ginna Station                                  XIII Control of Heavy Loads at Ginna Station                        XIII Control of Heavy Loads for the Containment Overhead Crane                                    XIII Control of Heavy Loads for the Auxiliary Building  Overhead Crane                            XIII Control of Heavy Loads for the    7 1/2 Ton Screenhouse  Crane                                            XIII Control of Heavy Loads for Jib Cranes in Containment                                                    XIII Control of Heavy Loads in Safety-Related Areas                XIII Housekeeping 'Control                                          XIII Station Holding Rules                                          XIV Bypass of Safety Function of Jumper Control                    XIV Operational Assessment Program                                XIV Effectiveness Evaluation of the Operational Assessment  Program                                          XIV Installation  and Removal  of Temporary Cables                XIV Control of Temporary Modifications                            XIV Program Pressure Provisions'IV Installation, Removal and Control of Scaffolding Installation and Removal of Temporary Fluid System to Prevent Degradation of Reactor Coolant Boundary XIV XIV Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                        Criteria Independent  Verification                                        XIV Control of Nonconforming Items                                    XV Nonconformance Reports                                            XV Corrective Action Reports                                          XVI Root Cause Analysis                                                XVI Overview of the Ginna Station    Work  Control System            XVI Work Request/Trouble    Report  Initiation                        XVI Work Order  Initiation                                            XVI Work Order Planning                                                XVI Work Order Scheduling                                              XVI Work Order Execution                                              XVI Post Maintenance Testing                                          XVI Work Order Close Out                                              XVI Work Order Processing    After  Hours                              XVI Work  Control System Performance Indicators                        XVI Station Work Authorization Request                                XVI Safety Classification of Maintenance Work Activities              XVI Identified Deficiency Reports                                      XVI Ginna Records                                                      XVII Records Storage  Facilities  and Equipment                      XVII Special Nuclear Material Inventory and Record Requirements                                                      XVII Maintenance History Program                                        XVII Ginna  Station  Response  to Internal Audits                      XVII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Nuclear  En ineerin  Services Procedures                  Criteria Indoctrination  and Training Engineering Department Organization and Responsibilities I
Ginna Modification Project Organization Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses              III Preparation, Review and Approval of Engineering Drawings          III Preparation,  Review and Approval'f Engineering Specifications Preparation,'eview and Approval of Design. Verification Integrated Design Process Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation,  Review and Approval  of Field Change Requests Preparation,  Review and Approval  of Engineering  Change Notices Review  of the Classification of Station Modifications Preparation, Review,and Approval of CAD Piping and Instrumentation Drawings Preparation, Review and Disposition of Drawing Change Requests ALARA/  Radiation Safety Design Review Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Nuclear  En  ineerin Services Procedures                    Criteria Preparation, Review and Approval of Appendix R Conformance Verifications Preparation, Review and Approval of the Electrical Equipment Environmental Qualification Data Summary Form EEQ-1 and XEEE 323-1974 Waiver Authorization Form EEQ-2 Review, Approval and Implementation of Changes to the Safety Assessment System Software Engineering Computer Software Documentation and Control Human  Factors Review of Control Room and. Local                XII Emergency  Control Panel Modifications Preparation, Review and Approval of PAID Database and  Configuration Data Change Forms Erosion/Corrosion Control Monitoring Program y for Carbon Steel Piping Preparation, Review and Approval of Changes to.the Updated Final Safety Analysis Report ASME  Section XI Repair, Replacement and Modification Program Implementation Component  Safety Classification Drawing Review Process Component Safety Classification Component Classification  Form Component  Safety Classification Request/Re-Analysis System, Structure, or Component Safety Classification Criteria Preparation,  Review and Approval of CAD  Electrical          XII Drawings Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Nuclear  En  ineerin Services Procedures                    Criteria Requests  for Nuclear Engineering Services Preparation,  Review and Approval of Procurement  .            IV Documents  for Purchases Covered by the QA Program Evaluation of Commercial Grade Items for Safety                  IV Related Applications Evaluation of Quality Verification Items for Safety              IV Significant Applications Preparation,  Review, and Approval of Engineering Procedures Preparation, Review, and Approval of Engineering Procedure Deviation Request Distribution and Control of Documents by the Control Number Method Distribution and Control of Documents by Project
      ~
VI Correspondence  Procedures Preparation,  Review and Approval
                  ~
of Supplier Evaluations    VII Review and Approval of Vendor Design and'Manufacturing          VII Technical Documents Preparation, Review and Approval of Bid Requests, Bid            VII Evaluations and Recommendations for Award Engineering Review of Nonconforming Materials, Parts or Components Initiating  and Responding  to Corrective Action Reports      XVI Processing Identified Deficiency Reports                        XVI Documenting and Reporting Potential Conditions                  XVI Adverse to Quality Performing "Substantial Safety Hazard" Evaluations              XVI for  10CFR21  Reportability Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix    B Nuclear  En ineerin Services Procedures              Criteria Records                                                  XVII Records Turnover Plan                                    XVII Engineering Response to Internal Audits                  XV1II Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix  B Purchasin  Procedures                              Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department'rganization and Responsibilities Preparation, Review, Approval and Issuance of                IV Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation                          XV Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation                                          VIX Supplier Material Deficiency Processing                      XV Supplier Corrective Action Reporting                          XVI Purchasing Response to Corrective                            XVI Action Reports and Corrective Action Reporting Purchasing Records and Turnover=Pl'an                        XVII Purchasing Response  to Audits                              XVIII Revision  19 December,  1993
 
Table 1-1 (cont'd)
Appendix    B Production Division Trainin Procedures              Criteria Indoctrination and Training Production Division Training Organization and Responsibilities Operations and Technical Training Organization and Responsibilities Training Systems Organization and Responsibilities Maintenance Training Organization and Responsibilities Curriculum Committee Organization and 'Responsibilities Software Quality Assurance. Program Preparation, Review and Approval of Quality Training Procedures Preparation, Review and Approval of Training Procedures, Guidelines, and Policies Preparation, Review and Approval of Nuclear Training Programs Style Guide for Training Procedure Development Nuclear Training Procedure Revision Training Change Request/Notice Control and Distribution of Production Division                VI Training Documents Training Programs for Crane Operators and Riggers              XIII Corrective Action                                              XVI Nuclear Production Division Training                          XVII Records Management Production Division Training Response to  QA Audits          XVIII Revision   19 December,   1993


Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix B Criteria Indoctrination and Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures Quality Materials Engineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material.Handling Equipment Instructions Preparation, Review and Approval of Materials Engineering Laboratory Test Procedures Control and Distribution of Documents Regulating Safety Related Activities Control of Purchased Materials VI VII Preparation, Review and Approval of Supplier Evaluation VII Control of Purchased Services VII Welding Procedure Preparation Review and Approval IX Welding Procedure Qualification Heat Treating Procedures Welder Qualification and Currency Nondestructive Examination Procedures IX IX IX IX Nondestructive Examination Procedures Manual Nondestructive Examination Personnel Qualification IX-43-Revision 19 December, 1993 Cl 0 Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix B Criteria Qualification of Visual Examination Personnel Erosion/Corrosion Program General Brazing Procedures Preparation and Approval General Brazing Procedures Qualification Inservice Inspection Program and Plans IX IX IX IX ASME Section XI Repair, Replacement and Modification Procedure Incorporating Ginna Modifications into Inservice Inspection Program Duties of the ANII T ests conducted by MEIS Laboratories XI Rm Pm~swq~cgqcPyggx w+<'~vg.~++>Pyb~~ex
Table 1-1 (cont'd)
~egmyqqoywyxorgyeq~qygyyegP'Pygmy,~z, gyr<qz~~<gg~sgyr~~~
            ,~wry.pe,agcy; wr,, ~pyrrrrrps yywp. yg "q<yrrrp wywvr ' vgrpymyrrgy.>yv                        v,v yu< q<m .v:~gggp. ',%~errrrr,.}y ~gpss,g Qa'sSpan88, H'::ectr'g'cR'Dg<str'$i                      j'juKiy~6jj%'iDj'.jij<s''jjn@prjjc'e8Q+e 8
Test Personnel Qualifications XI Vendor Tests under MEIS Direction XI Calibration and Control of Nondestructive Examination Instruments XII Inspection and Maintenance of Material Handling Equipment XIII Overhead and Gantry Cranes Inspection and Maintenance of Portable Lifting and Handling Equipment XIII XIII Underhung Cranes, Jib Cranes and Monorail Systems Slings and Related Apparatus Classification and Training of Material Handling XIII XIII XIII Revision 19 December, 1993  
                                                                                                          >
VhWhWh AVP  'hY WW WSA 1WRY            'h N~VhW lV('' '+YhY h                            *VS  VhYh W  Y Wh& '''4YAAWhWh4 V                    'wC
              '                                        YY Appendix B Criteria Quality v
Assurance "yi~:
  .'wx".m@y'~.;.<~m""'~<<,.~~'rmsep" Program   .y Implementation for y;~~g'cyx coax~"">~gq>+~zga~c+r~oww~ox,>,
Gas,:l'j8TiCt!)/ZAN!O'Qp'Xs3.C; ";,'V3',BpX';L'GuC'9;:OD$              ,.';:p3'i''83iOQ4~VGQRrC168XKC'D@8
                                                                                                                                  ~~                         I k&SStlt %5A';:!93!'ll!g'8X0A.;;i!P8'4'80hfY81'.
Design/Modification Activities Control. at Ginna Station Design/Modification Activities Control at Station 13A and on          Circuit        751, Equipment and Line Control of Procurement Documents for Purchased Parts, Components and Services Preparation, Review and Approval of Electric Transmission and Distribution Procedures Preparation              and Approval                      of Laboratory Test Procedures Preparation              and Approval of Electric Meter and                                                                                                   V Laboratory            Calibration Schedules Preparation              and Approval of Electric Substation'Department                                                                                        V Relay Test Schedules Preparation and Approval of Electric Transmission and Distribution Deviation Requests Procedures Control and Distribution of Electric Meter and Laboratory                                                                                                      VI Department and Laboratory Test Procedures Revision       19 December,       1993


Equipment Personnel Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix B Criteria Mobile Hydraulic Cranes XIII Inspection and Maintenance of Jacks, Hydraulic Rams and Cylinders, XIII Forklift Loading Forks Inspection of Designated Monorails Training and Qualification of Crane Operators Lifting Devices in the Containment Vessel XIII XIII XIII XIII Pre-Shipment Inspection of Radioactive Material Shipping Containers XIII Nonconformance Reports XV Initiating and Responding to Corrective Action Reports Quality Materials Engineering and Inspection Services Records XVI XVII Response to Audits XVII Revision 19 December, 1993  
Table 1-1 (cont'd)
:0, <?,? y4%$ <???;yj,,
Gas:::.?'.:a    '0'-;:'.
j
                                  'ikctia
                                  'pqg@c<?..<<jp,?<,'p<;      e?'h,.p%yy;.
e"'"::u'x45i''xou'ix'on'.'PN'a    jq'</~~33.<?...vie/              ?,'? .,<?:y(pg' .""<?<?
v.: ':s':o:.':::::qp "
                                                                                                                                                    ? ."<???.<??<,.< <<? y<, <?.,<?.",~/+4@
oeeau'::es.':,::happ?evaj,x<,
                                                                                                                                                                                            @N@:<<.v"?<<<<'+g')/.
:<.
Criteria Control of Electric Meter and Laboratory Department Calibration Services Control of Electric Substations Department Relay                                                                                                                                                    VI Test Schedule
                            ?
Supplier Technical Evaluation                                                                                                                                                                        VII Receipt and Acceptance of Instrumentation and                                                                                                                                                        VII Standards              Equipment Control of Purchased Services for Electric Meter and Lab                                                                                                                                            VII Identification and Control of Materials, Parts and                                                                                                                                                   VIII Components
  @etc~'? <j jM~P'A0PN~ .. Ph<Q~x@<?w<:<o<<?w 'ops?< gj~+?~                                                          j~+'~~...                '<'g~ jw ~D'.??0<)<?<QP?PPY
            ''O'QCiBg.:'R'tg~ 'Y<'? a',"~",'R'0 @ 'eC, "X'3 Q~~" ',X'8.;,X'4't3.'OD>,. '3"V3;B3'oD.,'-':;,'<''.":,,
            .                                                                .        .
pQX(VBX"                                                                                                                                                                                              '.
Division Performance                    of Tests at Ginna Station                                                                                                                                              XI Performance of Tests at the Electrical Laboratory                                                                                                                                                    XI Qualification of Test Personnel                                                                                                                                                                      XI Calibration and Control of Test Instruments                                                                                                                                                          XII Nonconforming Parts and Components                                                                                                                                                                    XV Initiating                 and Processing                                        of Corrective Action Reports                                                                                         XVI Control of Quality Assurance Records                                                                                                                                                                 XVII Kai'%EKE%<iii?;:<i&#xc3;t&#xc3;Nii                              ib~i?.~e':re'v'iVi4~:%<?<<yo??8'N%%W!~eiir5'i~??::"'~"HNUFx'60-Revision                   19 December,                     1993


Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Ginna Quality Assurance Program Implementation Fire Watch Training R.E.Ginna Training Plan Ginna Station Training General Employee Training Temporary Employee Training Hazardous/Mixed Waste Emergency Response Training Operator Training Responsibilities R.E.Ginna Health Physics Orientation Program Fire Brigade Training Radiation Protection Technician Entry Level'Requirements, Responsibilities,.and Training Chemistry Technician Entry Level Requirements, Responsibilities, and Training Maintenance Training Program Ginna Station Administrative and Engineering Staff Responsibilities
TABLE 4-1 Procurement Document Re uirements Items to be considered    for inclusion in  procurement documents include:
~Ginna Station Management Responsibilities Health Physics and Chemistry Section Organization and Responsibilities Support Services Organization and Responsibilities Operations Section Organization and Responsibilities Technical Section Organization and Responsibilities Material and Procurement Section Organization and Respon'sibilities Revision 19 December, 1993 S
: 1. Sco e  of Work    Detailed statement of the work to  be performed.
Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Operational Assessment Section Ginna Station Staff Responsibilities for Fire Prevention Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Radiation Emergency Plan Xmplementing Procedure Committee Emergency Procedures Committee (EPC)Ginna Standard Nomenclature XI Preparing and Dispositioning of Technical Staff Request Control of Station Modification Station Modification Classification and Review Station Modification Planning Control Station Modification Installation and Acceptance IIX Station Modification Completion Preparation, Review 8 Approval of Design Input Documents for Minor Modifications Component Classification Request/Reanalysis IXI Evaluation of Parts to Determine Safety Classification Preparation, Review and Approval of Safety Analysis Preparation, Review, Approval and Distribution of Design Output and Design Review Documents for Minor Modifications Technical Evaluation Revision 19 December, 1993 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Preparation of Configuration Data Change Forms Computer Software Product Evaluation Control of Procurement Documents Prepared at Ginna Station Evaluation of Commercial Grade Items for Safety Related Applications IV Evaluation of Items for In-Storage Maintenance Requirements IV Plant Procedures Preparation and Classification Plant Procedure Content and.Format Requirements Emergency and Abnormal Operating Procedures Writers'uide Operating Procedures Writers'uide Health Physics and Chemistry Procedures Writers.'uide Plant Procedure Adherence Requirements V Emergency and Abnormal Operating Procedures Users'uide Procedure Control Procedure Control-New Procedures Procedure Control-Permanent Changes Procedure Control-Temporary Changes Procedure Control-Periodic Review Procedure Control-Index Procedure Control of Emergency and Abnormal Procedures VI VI Revision 19 December, 1993 Qinna Procedures Table 1-1 (cont'd)Appendix B Criteria Procedure Control-Amendments to Licensing Documents and Changes to the Facility Procedure Change Control 10CFR 50.59 Review VI Emergency and Abnormal Operating Procedure Support Documentation Control VI Procedure Distribution Control of Construction Documents Vendor Manual Control Program Vendor Manual Information/Discrepancy/Incorporation Request Drawing Change Request Conditional Release Program Receipt and Acceptance of Materials/Parts VI VI VI VI VIX VII Control of Purchased Services VII Inventory Control of Material, Parts and Components at Qinna Station VIX Xdentification and Marking of Accepted Material, Parts, and Components Bulk Storage of Combustible Materials and Their Use=Trailer Admittance Requirements Control of Consumable Materials at Ginna Station Control of Welding Nondestructive Examination Control Welding Equipment Performance Verifications VIII VIIX VIIX VIII IX Revision 19 December, 1993  
: 2. Technical  Re  uirements - by reference to specific drawings, specifications, codes, regulations, procedures or instructions, including revisions, that describe the items or services to be furnished. Also identified shall be test, inspection and acceptance requirements, and any special requirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage and shelf life.
*3    ualit Assurance Pro ram Re irements  which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements in subtier procurement documents.
*4. Ri ht of Access  to include the facilities and records of the supplier for source inspection and audit by the Purchaser or parties designated by the purchaser. Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.
  *5. Documentation Re uirements  Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.
*6. Nonconformance  Requirements for reporting and disposition of nonconformance to procurement requirements.
* - Items reviewed by Quality Assurance or Quality Control.
                                  -'61-Revision 19 December, 1993


Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Open Flame, Welding and Grinding Permit (Hot Work Permit)IX Control of Inservice Inspection Activities ASME Section XI Repair, Replacement and Modification Procedure for Ginna Station Electrical Preventive Maintenance Program Environmentally Qualified Equipment Maintenance Program Mechanical Preventive Maintenance Program for Rotating Equipment Equipment Inspection and Lubricant List Valve Preventive Maintenance Program Condenser Inservice Inspection Program X Preventive Maintenance Program for Plant Security Equipment Performance of Tests XI Qualification and Certification of Test Personnel Test Tag Control Program XI Calibration, Test, Check and Replacement Surveillance Program for Instrumentation and Equipment Important to Safety XI Ginna Station Surveillance Schedule Inservice Testing of Pumps and Valves Calibration and Control of Test Equipment Maintenance and Inspection of Material Handling Equipment XI XI XII XIII-50-Revision 19 December, 1993 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Control of Material Handling and Handling Equipment XIII Storage and Preservation of Materials and Equipment at Ginna Station XIII Control of Heavy Loads at Ginna Station XIII Control of Heavy Loads for the Containment Overhead Crane XIII Control of Heavy Loads for the Auxiliary Building Overhead Crane XIII Control of Heavy Loads for the 7 1/2 Ton Screenhouse Crane XIII Control of Heavy Loads for Jib Cranes in Containment XIII Control of Heavy Loads in Safety-Related Areas XIII Housekeeping
Table 18-1 Audit List Audit  i i Title Corrective Action Audit To ic Areas Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods of operation.
'Control Station Holding Rules XIII XIV Bypass of Safety Function of Jumper Control Operational Assessment Program XIV XIV Effectiveness Evaluation of the Operational Assessment Program XIV Installation and Removal of Temporary Cables Control of Temporary Modifications Installation, Removal and Control of Scaffolding XIV XIV XIV Installation and Removal of Temporary Fluid System Provisions'IV Program to Prevent Degradation of Reactor Coolant Pressure Boundary XIV Revision 19 December, 1993  
Operational Assessment Nonconformance Control
*Outage  Activities                 Refueling and Special Nuclear Material ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA
*Health Physics, Chemistry and      Radwaste Shipping and Process Radwaste                          Control Program and implementing procedures Radioactive Effluents and Offsite  Dose  Calculation Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program
*Fire  and Safety                     Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program Revision 19 December, 1993


Table 1-1 (cont'd)Ginna Procedures Independent Verification Appendix B Criteria XIV Control of Nonconforming Items Nonconformance Reports Corrective Action Reports Root Cause Analysis Overview of the Ginna Station Work Control System Work Request/Trouble Report Initiation Work Order Initiation Work Order Planning Work Order Scheduling Work Order Execution XV XV XVI XVI XVI XVI XVI XVI XVI XVI Post Maintenance Testing Work Order Close Out Work Order Processing After Hours XVI XVI XVI Work Control System Performance Indicators Station Work Authorization Request Safety Classification of Maintenance Work Activities Identified Deficiency Reports Ginna Records Records Storage Facilities and Equipment XVI XVI XVI XVI XVII XVII Special Nuclear Material Inventory and Record Requirements XVII Maintenance History Program Ginna Station Response to Internal Audits XVII XVII-52-Revision 19 December, 1993  
Table 18-1   (con')
Audit List i
Audit  i Title                            Audit  To  ic  Areas Independent  Inspections and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety P'rogram Housekeeping Instructions, Procedures,                Drawing Control Document Control 'nd-Vendor Manual Control Procedure Control Records Control Security                                Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program
*Operations                              Limiting Conditions for Operation Surveillance Testing Operator Performance Operations Administration PORC  Activities NSARB  Activities Materials Engineering and                ISI Program Inspection Services                NDE  Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls
*Maintenance and Testing                Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment  History Control of Measuring and Test Equipment Revision 19 December, 1993


Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Indoctrination and Training Engineering Department Organization and Responsibilities I Ginna Modification Project Organization Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses III Preparation, Review and Approval of Engineering Drawings III Preparation, Review and Approval'f Engineering Specifications Preparation,'eview and Approval of Design.Verification Integrated Design Process Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Preparation, Review and Approval of Engineering Change Notices Review of the Classification of Station Modifications Preparation, Review,and Approval of CAD Piping and Instrumentation Drawings Preparation, Review and Disposition of Drawing Change Requests ALARA/Radiation Safety Design Review-53-Revision 19 December, 1993 Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Preparation, Review and Approval of Appendix R Conformance Verifications Preparation, Review and Approval of the Electrical Equipment Environmental Qualification Data Summary Form EEQ-1 and XEEE 323-1974 Waiver Authorization Form EEQ-2 Review, Approval and Implementation of Changes to the Safety Assessment System Software Engineering Computer Software Documentation and Control Human Factors Review of Control Room and.Local Emergency Control Panel Modifications XII Preparation, Review and Approval of PAID Database and Configuration Data Change Forms Erosion/Corrosion Control Monitoring Program y for Carbon Steel Piping Preparation, Review and Approval of Changes to.the Updated Final Safety Analysis Report ASME Section XI Repair, Replacement and Modification Program Implementation Component Safety Classification Drawing Review Process Component Safety Classification Component Classification Form Component Safety Classification Request/Re-Analysis System, Structure, or Component Safety Classification Criteria Preparation, Review and Approval of CAD Electrical Drawings XII Revision 19 December, 1993 Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Requests for Nuclear Engineering Services Preparation, Review and Approval of Procurement
Table 18-1 (con')
.Documents for Purchases Covered by the QA Program IV Evaluation of Commercial Grade Items for Safety Related Applications IV Evaluation of Quality Verification Items for Safety Significant Applications IV Preparation, Review, and Approval of Engineering Procedures Preparation, Review, and Approval of Engineering Procedure Deviation Request Distribution and Control of Documents by the Control Number Method Distribution and Control of Documents by Project VI~~Correspondence Procedures Preparation, Review and Approval of Supplier Evaluations VII Review and Approval of Vendor Design and'Manufacturing Technical Documents VII Preparation, Review and Approval of Bid Requests, Bid Evaluations and Recommendations for Award VII Engineering Review of Nonconforming Materials, Parts or Components Initiating and Responding to Corrective Action Reports Processing Identified Deficiency Reports Documenting and Reporting Potential Conditions Adverse to Quality XVI XVI XVI Performing"Substantial Safety Hazard" Evaluations for 10CFR21 Reportability XVIRevision 19 December, 1993  
Audit List 1
i Audit  i Title                          Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response  Plan      Nuclear Emergency Response Plan and Procedures Offsite  Agency  Interface Response Personnel Training Emergency Information Plan Training/performance and             Licensed Operator qualifications of the                 Auxiliary Operator operating and technical staff        Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General Employee Training Procurement                          Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Program Configuration Control                 Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision  19 December, 1993


Table 1-1 (cont'd)Nuclear En ineerin Services Procedures Appendix B Criteria Records Records Turnover Plan Engineering Response to Internal Audits XVII XVII XV1II-56-Revision 19 December, 1993
e R.E. GINNA NUCLEAR POWER PLANT MANAGEMENTORGANIZATION CHART UNES OF COMMUMCATIOM CHAIRMANOF THE 8OARD, PRESDENTAND UNES OF SVPERVISON ANDADMINISTRATCH                            CHIEF EXECVAVEOFFCER SEMOR                                                      SEMOR VCE                                            SENOR VCE VICE PRESDENT                                                    PRESDEMl;                                            PRES DENT, OAS 4 ELECTRC                                                                                                  Og PRODUCTION AND                                          CONTROLLER DtSTRI8VAON                                                    ENDWEERINQ                                              4 CHtEF AND CVSTOMER                                                                                                          INANCIAL
                                                                                                                                          ~
SERVCE8                                                                                                        ~
OFFCER VCE PRESDENT                                                                                                        VICE PRESDENT L~  MSARS EMPLOYEE                                                                                                          OINNA NUCLEAR RBATIONS,                                                                                                          PRODVCAOM PU8UC AFFAIRS DEPARTMEMT AND MATERIAL                                                    MANAGER          MANAGER        MANAGER                    DEPARTMENT MANAGEMENT                                                        OUAUlY          DIVNIONAL  PRODUCAON                        MANAGER PERFORMANCE        8BlVCES        AND                        PRODVCAOH DIVISON                        DIVISON                                      ENQWEERINO                        DIVISON MANAGER                        MANAGER SYSTEMS                        TRAINWG IIANAQER SYSTEM                      ROCHESTER        OUALAY ENGWEERWO                    CONSTRUCTION    ASSURANCE                      RECORDS            HEALTH AND DESGM                        AND                                      MANAGEMENT,    PHYSCS AND MAINTENANCE                                  TECHMCAL          NUCLEAR OUAUTY                          WFORMATION      EMERGENCY ASSURANCE                        CENTER,CMIS,      PIANNWO PROCVREMEMT,                    WFORMATIOM DEPARTMENT    DEPARlllENT    DEPARTMENT    ENOWEERWO, MANAGER      MANAGER        MANAGER 8ERVCES 4      DEPARTMENT          PLANT AUDIT4                            DMSOM SYSTEM      DISTRISVAVE      METER AND                                                      MANAGER          LIAMAQER SURVEILLANCE                    SYSTEMS          NVCLEAR          OWNA oooo' DESGM      IMFORMAllON        IAS      SERVCES ENQWEERINO      SYSTEMS      OPERATIONS                                                    ENOWEKRWQ          STATION SUPPORT                                                                      8ERVCES MANAGER        FIELD 4 SHOP  ENNRONMENTAL RELAY                        ELECTRX:          NUCLEAR        FASRCAllON    SCIENCE, COMMUNKAllONS                    ASSVRANCK        SERVCES      IASORATORY      SQN,          STATION ENGINE ERWQ                  METER CHEMISTRY    COMSTRVCAOM. OPERAllONS, OPERATES SERVCES AND  UCBtSNQ,        MAtNTKNINCE, OUALIIY                        RESEARCH 4    FUEL            HP 4 LASORATORY      CONTROL AND                    DEVELOPMENT  MANAGEMENT 4    CHEMISTRY EMPLOYEE                                        SERVICES      OVALAY                                        TECHNCAL        COMTROI RBAllONS                                                      ENGINEERWO                                    SUPPORT          TKCHNCAL DEPARTMENT    SERVCES                                      SERVCES          SUPPORT, MANAGER                                                                    TESTWQ, OVERHEAD        MANAGER                                                    MATKRLAL CONSTRV CADM      MATERIALS                                                  OOHTROL, AND        ENQWEKRWG                                                    PROCUREMEMT, MAIMIKNANCE          AND                                                      FIRE EAST        INSPECTION                                                  PROTECAON, SERVCES                                                    SAFETY, LIODIFCATXOM, CONSTRUCAON OPERATWO RBAYTEST        MATERIALS                                                      EXPERIENCE 4 ENQWEERINQ,                                                    COMPVIKR SYSTKMS MHE ISNP.
SKRVICES        FIGURE 2-1


Table 1-1 (cont'd)Purchasin Procedures Appendix B Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department'rganization and Responsibilities Preparation, Review, Approval and Issuance of Purchase Orders and Changes to Purchase Orders IV Requests for Bids and Bid Evaluation XV Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation VIXSupplier Material Deficiency Processing Supplier Corrective Action Reporting XV XVI Purchasing Response to Corrective Action Reports and Corrective Action Reporting XVI Purchasing Records and Turnover=Pl'an Purchasing Response to Audits XVII XVIII-57-Revision 19 December, 1993 Table 1-1 (cont'd)Production Division Trainin Procedures Appendix B Criteria Indoctrination and Training Production Division Training Organization and Responsibilities Operations and Technical Training Organization and Responsibilities Training Systems Organization and Responsibilities Maintenance Training Organization and Responsibilities Curriculum Committee Organization and'Responsibilities Software Quality Assurance.
QUALITYPERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE MANAGER        MANAGER              MANAGER      QUALITY QUALITY        NUCLEAR            MATERIALS  PERFORMANCE ASSURANCE      ASSURANCE          ENGINEERING    SENIOR
Program Preparation, Review and Approval of Quality Training Procedures Preparation, Review and Approval of Training Procedures, Guidelines, and Policies Preparation, Review and Approval of Nuclear Training Programs Style Guide for Training Procedure Development Nuclear Training Procedure Revision Training Change Request/Notice Control and Distribution of Production Division Training Documents VI Training Programs for Crane Operators and Riggers Corrective Action XIII XVI Nuclear Production Division Training Records Management XVII Production Division Training Response to QA Audits XVIII Revision 19 December, 1993 Table 1-1 (cont'd),~wry.pe,agcy; wr,,~pyrrrrrps yywp.yg"q<yrrrp wywvr'vgrpymyrrgy.>yv
                                  & INSPECTION    ANALYST SERVICES QUALITY  QUALITY    QUALITY      MATERIAL8      STAFF ASSURANCE  CONTROL    CONTROL        MATERIAL ENGINEERS  ENGINEERS  FOREMAN        HANDLING ENGINEERS 8 FOREMEN STAFF            TECHNICIANS INSPECTORS FIGURE 2-2
>v,v yu<q<m.v:~gggp.',%~errrrr,.}y
~gpss,g Qa'sSpan88, H'::ectr'g'cR'Dg<str'$i j'juKiy~6 jj%'iD j'.ji j<s''jjn@prjjc'e8Q+e 8'VhWhWh AVP'hY WW WSA 1WRY Y Y'h N~VhW lV('''+YhY h*VS VhYh W Y Wh&V'''4YAAWhWh4
'wC Appendix B Criteria Quality Assurance Program Implementation for I v.'wx".m@y'~.;.<~m""'~<<,.~~'rmsep"-"yi~:.y y;~~g'cyx coax~"">~gq>+~zga~c+r~oww~ox,>,~~Gas,:l'j8TiCt!)/ZAN!O'Qp'Xs3.C;
";,'V3',BpX';L'GuC'9;:OD$
,.';:p3'i''83iOQ4~VGQRrC168XKC'D@8 k&SStlt%5A';:!93!'ll!g'8X0A.;;i!P8'4'80hfY8 1'.Design/Modification Activities Control.at Ginna Station Design/Modification Activities Control at Station 13A and on Circuit 751, Equipment and Line Control of Procurement Documents for Purchased Parts, Components and Services Preparation, Review and Approval of Electric Transmission and Distribution Procedures Preparation and Approval of Laboratory Test Procedures Preparation and Approval of Electric Meter and Laboratory Calibration Schedules V Preparation and Approval of Electric Substation'Department V Relay Test Schedules Preparation and Approval of Electric Transmission and Distribution Deviation Requests Procedures Control and Distribution of Electric Meter and Laboratory VI Department and Laboratory Test Procedures Revision 19 December, 1993 Table 1-1 (cont'd):0,<?,?y4%$<???;yj,, j'pqg@c<?..<<jp,?<,'p<;
e?'h,.p%yy;.
jq'</~~33.<?...vie/
?,'?.,<?:y(pg'
.""<?<?qp"?."<???.<??<,.<
<<?y<,<?.,<?.",~/+4@
@N@:<<.v"?<<<<'+g')/.
Gas:::.?'.:a
'0'-;:'.'ikctia e"'"::u'x45i''xou'ix'on'.'PN'a v.: ':s':o:.':::::
oeeau'::es.':,::happ?evaj,x<,:<.Criteria Control of Electric Meter and Laboratory Department Calibration Services Control of Electric Substations Department Relay Test Schedule?Supplier Technical Evaluation VI VII Receipt and Acceptance of Instrumentation and Standards Equipment VII Control of Purchased Services for Electric Meter and Lab VII VIII Identification and Control of Materials, Parts and Components pQX(VBX"''O'QCiBg.:'R'tg~
'Y<'?a',"~",'R'0
@'eC,"X'3 Q~~"',X'8.;,X'4't3.'OD>,.
'3"V3;B3'oD.,'-':;,'<''.":,,'.@etc~'?<j.jM~P'A0PN~
..Ph<Q~x@<?w<:<o<<?w
.'ops?<.gj~+?~j~+'~~...'<'g~jw~D'.??0<)<?<QP?PPY DivisionPerformance of Tests at Ginna Station XI Performance of Tests at the Electrical Laboratory Qualification of Test Personnel Calibration and Control of Test Instruments Nonconforming Parts and Components XI XI XII XV Initiating and Processing of Corrective Action Reports XVI Control of Quality Assurance Records XVII Kai'%EKE%<iii?;:<i&#xc3;t&#xc3;Nii ib~i?.~e':re'v'iVi4~:%<?<<yo??8'N%%W!~eiir5'i~??::"'~"HNUFx'60-Revision 19 December, 1993 TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents include: 1.Sco e of Work-Detailed statement of the work to be performed.
2.Technical Re uirements-by reference to specificdrawings, specifications, codes, regulations, procedures or instructions, including revisions, that describe the items or services to be furnished.
Also identified shall be test, inspection and acceptance requirements, and any special requirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage and shelf life.*3 ualit Assurance Pro ram Re irements-which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards.
Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements in subtier procurement documents.
*4.Ri ht of Access-to include the facilities and records of the supplier for source inspection and audit by the Purchaser or parties designated by the purchaser.
Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.*5.Documentation Re uirements-Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.*6.Nonconformance
-Requirements for reporting and disposition of nonconformance to procurement requirements.
*-Items reviewed by Quality Assurance or Quality Control.-'61-Revision 19 December, 1993


Table 18-1 Audit List Audit Title i i Corrective Action Audit To ic Areas Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods of operation.
GINNA NUCLEAR PRODUCTION ORGANIZATION VCK PRE SCENT 0WNA NUCLEAR PROOUCTCW PLIHT MAHAOBt OWNA STATCW WAlALLCEHSKD OPBtATOR OPERATOlt ItKOVAL OPERATWO              PLAHNWO A        AUXOPBIATOR BIPERIEHCE            SCHKOUUHO STA WTIIAL MATKltlALS            MNNTBINCE PROCUREMENT          SYSTEMS          STA REOUAL SAFETY                MNNTKNAICKItULE  CHKNSTRV TECH PltOIKCT ltAD PltOTKCllOH ELKCTRCALAHD IAC TECH MNNTBIANCK CONIIIACTltAD MKCHAHCAL        ~ ROTECTCH TKCH MNNTEHAHCE KLECTltCAL MAlNTB4AHCK MKCHAHCAL MNNTENAHCE QC TKCHIlCIAH RAT TKCIPICW<
Operational Assessment Nonconformance Control*Outage Activities Refueling and Special Nuclear Material ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA*Health Physics, Chemistry and Radwaste Radwaste Shipping and Process Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program*Fire and Safety Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program-62-Revision 19 December, 1993
FlGURE 2-3


Table 18-1 (con')Audit List Audit Title i i Audit To ic Areas Instructions, Procedures,'nd-Document Control Independent Inspections and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety P'rogram Housekeeping Drawing Control Vendor Manual Control Procedure Control Records Control Security Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program*Operations Limiting Conditions for Operation Surveillance Testing Operator Performance Operations Administration PORC Activities NSARB Activities Materials Engineering and Inspection Services ISI Program NDE Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls*Maintenance and Testing Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment-63-Revision 19 December, 1993 Audit Title i i Table 18-1 (con')Audit List 1 Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Training/performance and qualifications of the operating and technical staff Licensed Operator Auxiliary Operator Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General Employee Training Procurement Configuration Control Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Program Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 19 December, 1993
I GAS AND ELECTRIC DISTRIBUTION DIVISION SENIOR VICE PRESIDENT GAS ANO ELECTRIC DISTRIBUTION ANO CUSTOMER SERVICES DMSION MANAGER                                                                            OMSION MANAGER SYSTEM ENGINEERING                                                                              ROCHESTER
                                                                            ~ 0 ~ OOOJOOOtSOS ~
AND DESIGN                                                                              CONSTRUCllON AND MAINTENANCE DEPARTMENT MANAGER                    DEPARTMENT MANAGER          QUALITY            DEPARTMENT MANAGER          DEPARTMENT MANAGER SYSTEM DESIGN                          DISTRIBUTIVE          SERVICES                METER AND LAB              OVERHEAD ENGINEERING                          INFORMATION          COORDINATOR                OPERATIONS            CONSTRUCllON ANO SYSTEMS SUPPORT                                                            MAINTENANCE EAST SUBSTATIONS              RELAY ENGINEERING          ENGINEERING              COMMUNICATIONS                            ELECTRIC        LABORATORY      CONSTRUCTION METER            SERVICES        RELAYTEST OPERATIONS NOTE: Chart la abbreviated to ahow only key OoaNona InvohRed In Implementing the QA program and therefore, doea not ahow aa poaltkea In th UN ES OF AVTNORllY USES OF COMMUNICATION FIGURE 2Q


e R.E.GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART UNES OF COMMUMCATIOM UNES OF SVPERVISON AND ADMI NISTRATCH CHAIRMAN OF THE 8OARD, PRESDENTAND CHIEF EXECVAVE OFFCER SEMOR VICE PRESDENT OAS 4 ELECTRC DtSTRI8VAON AND CVSTOMER SERVCE8 SEMOR VCE PRESDEMl;PRODUCTION AND END WEERINQ Og~~SENOR VCE PRES DENT, CONTROLLER 4 CHtEF INANCIAL OFFCER VCE PRESDENT EMPLOYEE RBATIONS, PU8UC AFFAIRS AND MATERIAL MANAGEMENT EMPLOYEE RBAllONS DIVISON MANAGER SYSTEM ENGWEERWO AND DESGM DEPARTMENT MANAGER SYSTEM DESGM ENQWEERINO RELAY ENGINE ERWQ DEPARlllENT MANAGER DISTRISVAVE IMFORMAllON SYSTEMS SUPPORT COMMUNKAllONS DIVISON MANAGER ROCHESTER CONSTRUCTION AND MAINTENANCE DEPARTMENT MANAGER METER AND IAS OPERATIONS ELECTRX: METER OPERATES LASORATORY SERVICES DEPARTMENT MANAGER OVERHEAD CONSTRV CAD M AND MAIMIKNANCE EAST CONSTRUCAON RBAY TEST DEPARTMEMT MANAGER OUAUlY PERFORMANCE IIANAQER OUALAY ASSURANCE OUAUTY ASSURANCE PROCVREMEMT, ENOWEERWO, AUDIT 4 SURVEILLANCE SERVCES MANAGER NUCLEAR ASSVRANCK OUALIIY CONTROL AND OVALAY ENGINEERWO SERVCES MANAGER MATERIALS ENQWEKRWG AND INSPECTION SERVCES MATERIALS ENQWEERINQ, MHE ISNP.SKRVICES MANAGER DIVNIONAL 8BlVCES MANAGER PRODUCAON AND ENQWEERINO SYSTEMS RECORDS MANAGEMENT, TECHMCAL W FORMATION CENTER,CMIS, WFORMATIOM 8ERVCES 4 DMSOM SYSTEMS FIELD 4 SHOP FASRCAllON SERVCES ENNRONMENTAL SCIENCE, IASORATORY CHEMISTRY SERVCES AND RESEARCH 4 DEVELOPMENT FIGURE 2-1 L~MSARS DEPARTMENT MANAGER PRODVCAOH DIVISON TRAINWG HEALTH PHYSCS AND NUCLEAR EMERGENCY PIANNWO DEPARTMENT MANAGER NVCLEAR ENOWEKRWQ 8ERVCES PLANT LIAMAQER OWNA STATION oooo'SQN, COMSTRVCAOM.
TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MANAGER TECHNICAL SERVICES AND CHIEF ENGINEER MANAGER                      DEPARTMENT  MALINGER PRODUCTION                     MANAGER     DIVISIONAL AND                         GENERAL    SERVICES ENGINEERING                    ENGINEERING SYSTEMS                      SERVICES MANAGER           DIVISION          MANAGER       FOSSIL    PROJECT SHOP            SYSTEMS       ENVIRONMENTAL ENGINEERING MANAGEMENT OPERATIONS                           SCIENCE                SERVICES RECORDS                          HYDRO MANAGER         MANAGEMENT        MANAGER     ENGINEERING FIELD                          CHEMISTRY SERVICE        FOSSIUHYDRO      SERVICES        FACILITY OPERATION          SYSTEMS                      ENGINEERING SUPERVISOR MANAGER       TECHNICAL      ENVIRONMENTAL REAL ESTATE ADMINISTRATIVE  INFORMATION        LABORATORY  MANAGEMENT SERVICES AND       CENTER PROJECT                            SENIOR PLANNING                      ENVIRONMENTAL ANALYST MANAGER                         RESEARCH 8c INSPECTION/LAND                    DEVELOPMENT SURVEY AND                         PROGRAM BUILDING SERVICES FIGURE 2-5
UCBtSNQ, FUEL MANAGEMENT 4 TECHNCAL SUPPORT SERVCES STATION OPERAllONS, MAtNTKNINCE, HP 4 CHEMISTRY COMTROITKCHNCAL SUPPORT, TESTWQ, MATKRLAL OOHTROL, PROCUREMEMT, FIRE PROTECAON, SAFETY, LIODIFCATXOM, OPERATWO EXPERIENCE 4 COMPVIKR SYSTKMS VICE PRESDENT OINNA NUCLEAR PRODVCAOM


QUALITY PERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE MANAGER QUALITY ASSURANCE MANAGER NUCLEAR ASSURANCE MANAGER MATERIALS ENGINEERING
Ill 1I
&INSPECTION SERVICES QUALITY PERFORMANCE SENIOR ANALYST QUALITY ASSURANCE ENGINEERS STAFF QUALITY CONTROL ENGINEERS QUALITY CONTROL FOREMAN TECHNICIANS INSPECTORS MATERIAL 8 MATERIAL HANDLING ENGINEERS 8 FOREMEN STAFF FIGURE 2-2


GINNA NUCLEAR PRODUCTION ORGANIZATION VCK PRE SCENT 0WNA NUCLEAR PROOUCTCW PLIHT MAHAOBt OWNA STATCW OPERATWO BIPERIEHCE MATKltlALS PROCUREMENT SAFETY PLAHNWO A SCHKOUUHO MNNTBINCE SYSTEMS MNNTKNAICK ItULE PltOIKCT ELKCTRCAL AHD IAC MNNTBIANCK MKCHAHCAL MNNTEHAHCE WAlAL LCEHSKD OPBtATOR OPERATOlt ItKOVAL AUX OPBIATOR STA WTIIAL STA REOUAL CHKNSTRV TECH ltAD PltOTKCllOH TECH CONIIIACT ltAD~ROTECTCH TKCH KLECTltCAL MAlNTB4AHCK MKCHAHCAL MNNTENAHCE QC TKCHIlCIAH RAT TKCIPICW<FlGURE 2-3 I
GINNA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY      PORC PERFORMANCE TECHNICAL    MATERIALS    GAS AND     PURCHASING  GENERAL    NUCLEAR  GINNA STATION SERVICES ENGINEERING   ELECTRIC              MAINTENANCE ENGINEERING DIVISION    AND      DISTRIBUTION                          SERVICES INSPECTION    DIVISION SERVICES REVIEW AUDITS FIGURE 2
GAS AND ELECTRIC DISTRIBUTION DIVISION SENIOR VICE PRESIDENT GAS ANO ELECTRIC DISTRIBUTION ANO CUSTOMER SERVICES DMSION MANAGER SYSTEM ENGINEERING AND DESIGN~0~OOOJOOOtSOS
~OMSION MANAGER ROCHESTER CONSTRUCllON AND MAINTENANCE DEPARTMENT MANAGER SYSTEM DESIGN ENGINEERING DEPARTMENT MANAGER DISTRIBUTIVE INFORMATION SYSTEMS SUPPORT QUALITY SERVICES COORDINATOR DEPARTMENT MANAGER METER AND LAB OPERATIONS DEPARTMENT MANAGER OVERHEAD CONSTRUCllON ANO MAINTENANCE EAST SUBSTATIONS RELAY ENGINEERING ENGINEERING NOTE: Chart la abbreviated to ahow only key OoaNona InvohRed In Implementing the QA program and therefore, doea not ahow aa poaltkea In th COMMUNICATIONS ELECTRIC METER OPERATIONS LABORATORY SERVICES CONSTRUCTION RELAY TEST UN ES OF AVTNO RllY USES OF COMMUNICATION FIGURE 2Q


TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MANAGER TECHNICAL SERVICES AND CHIEF ENGINEER MANAGER PRODUCTION AND ENGINEERING SYSTEMS DEPARTMENT MANAGER GENERAL ENGINEERING SERVICES MALINGER DIVISIONAL SERVICES MANAGER SHOP OPERATIONS MANAGER FIELD SERVICE OPERATION MANAGER ADMINISTRATIVE SERVICES AND PROJECT PLANNING MANAGER INSPECTION/LAND SURVEY AND BUILDING SERVICES DIVISION SYSTEMS RECORDS MANAGEMENT FOSSIUHYDRO SYSTEMS TECHNICAL INFORMATION CENTER MANAGER ENVIRONMENTAL SCIENCE MANAGER CHEMISTRY SERVICES SUPERVISOR ENVIRONMENTAL LABORATORY SENIOR ENVIRONMENTAL ANALYST RESEARCH 8c DEVELOPMENT PROGRAM FOSSIL ENGINEERING HYDRO ENGINEERING FACILITY ENGINEERING REAL ESTATE MANAGEMENT PROJECT MANAGEMENT SERVICES FIGURE 2-5 Ill 1I GINNA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY PERFORMANCE PORC TECHNICAL SERVICES DIVISION MATERIALS GAS AND ENGINEERING ELECTRIC AND DISTRIBUTION INSPECTION DIVISION SERVICES PURCHASING GENERAL NUCLEAR GINNA STATION MAINTENANCE ENGINEERING SERVICES REVIEW AUDITS FIGURE 2 I e~~~4 1~I'}}
I e
~ ~
    ~4~
            '
I1}}

Revision as of 09:46, 29 October 2019

Rev 19 to QA Program for Station Operation.
ML17309A535
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1993
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17309A534 List:
References
NUDOCS 9401110034
Download: ML17309A535 (232)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION R.E. GINNA NUCLEAR POWER PLANT Revision 19 to:

Quality Assurance Program for Station Operation DOCKET NO. 50-244 December, 1993 p 10034 R nDaCK'OSO0OZOO PDR'

TABLE OF CONTENTS Section Title Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program I

2. Organization
3. Design Control 10 Procurement Document Control 13
5. Instructions, Procedures .and Drawings . 14
6. Document Control 16
7. Control of Purchased Material, Equipment 18 and Services Identification and Control of Materials, 22 Parts and Components Control of Special Processes 23 Inspection Test Control 25
12. Control of Measuring and Test Equipment 27.
13. Handling, Storage and Shipping 28
14. Inspection, Test and Operating Status 29
15. Nonconforming Materials, Parts and Components 30
16. Corrective Action 31
17. Quality Assurance Records 33
18. Audits Revision 19 December 1993

LIST OF TABLES Table Number Title Pacae Quality Assurance Program 37 Procedures Subject Listing 4-1 Procurement Document Requirements 58 Audit List 59 LIST OF FIGURES Fi ure Number Title Pacae Management Organization 63 2-2 Quality Performance Organization Nuclear Production Division 65 Organization i.- Gas and Electric Distribution Division Organization 66 Technical Services Division 67 Organization Ginna Station Review and Audits 68 Functions Revision 19 December 1993

0 0

UALITY ASSURANCE PROGRAM FOR STATION OPERATION

l. ualit Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation. of the R. E. Ginna Nuclear Power Plant.

This program applies to all activities affecting the safety related functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modif ication, test and inspection. In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with lOCFR Part 71 excluding fabrication and .design of shipping casks.

The basic Rochester Gas and Electric Corporation quality assurance policy is established by the Chairman of the Board, President and Chief Executive Officer. This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering through the:

Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station; Division Manager-Technical Services and Chief Engineer; and heads of other supporting departments.

The program is governed by a Ginna Station Quality Assurance Manual whi'ch contains the requirements and assignment of responsibilities for implementation .of the program. The manual is prepared, reviewed,- and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.

The program is implemented through Quality Assurance/Quality Control, Ginna Station,'uclear Engineering Services, Production Division Tx'aining, Materials Engineering and Inspection Services, Gas and Electric Distribution Division, and Purchasing procedures. These procedures are prepared, approved and maintained by the responsible organization and reviewed by Quality Performance. In addition to its procedure review, Quality Performance assures procedure adequacy through audits and surveillances of a sample of procedures in use. These procedures are reviewed for adequacy at least once every two years by the responsible organization. Table 1-1 provides a listing of the subjects Revision 19 December, 1993

0 0

and a short. description of the subject matter which is contained in each procedure.

Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.

The Quality Assurance Program covers all existing Seismic Category I and Class 1E structures, systems, and components, including their foundations and supports. Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance. A detailed listing of the structures, systems and components covered by the Quality Assurance Program and based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in a controlled database. The criteria for determining if the quality assurance program applies are reviewed by Quality. Performance.

Details of the water-and-steam-containing system boundaries are contained on system flow drawings; Modifications or additions to existing structures, systems, and components are designated the, same seismic classification as the existing system. New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.

Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to 'assure they understand'hat these are mandatory requirements which must be implemented and enforced. Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements, purpose, scope, and implementation of applicable quality related program manuals and procedures. Refresher sessions are held periodically.

Retraining may be required whenever a new procedure is issued or a major revision is made to an existing procedure.

Training of personnel not in the Quality Performance organization is the responsibility of, each. department performing an activity affecting quality. Quality Performance assists in establishing training requirements and assures that personnel are trained by auditing training.

Xn addition to training in quality assurance, each department conducts training, including on-the-job training, to the extent necessary to assure that personnel are Revision 19 December, 1993

qualified for their primary work assignments.

The Vice President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of operators, as necessary. As appropriate, personnel granted unescorted access to Ginna Station are trained in radiation protection, plant safety and security.

The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B. This review consists of audits or a review equivalent to an audit performed by company personnel or outside organizations.

The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:

a. NRC Regulatory Guide 1.8, Revision 1, "Personnel Selection and Training".
b. NRC Regulatory Guide 1.28, Revision 2, "Quality Assurance Program Requirements (Design and Construction) ".

C. AEC Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment".

d. AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", Revision 0 dated October 1973 (Orange Book Revision -0)
e. AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants".
f. NRC Regulatory Guide 1.38, Revision 2, "Quality Revision 19 December, 1993

0 Assurance Requirements for, Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants".

g ~ NRC Regulatory Guide l.39, Revision 2, "Housekeeping Requirements for Water-Cooled Nuclear Power Plants".

NRC Regulatory Guide 1.58, Revision 1, "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel".

NRC Regulatory Guide l.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants NRC Regulatory Guide 1.74, Revision 0, "Quality Assurance Terms and Definitions".

k. NRC Regulatory Guide 1.88, Revision 2, "Collection, Storage and Maintenance of Nuclear Power Plant Records".

NRC Regulatory Guide l.ll6, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems".

NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants".

n. NRC Regulatory Guide 1.144, Revision 1, "Auditing of Quality Assurance Programs for Nuclear Power Plants" except that supplier audit frequencies and performance evaluations are as described in the Quality Assurance Manual.

NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants".

anization The major organizations participating in the Quality Assurance Program are Purchasing, Technical Services, Ginna Nuclear Production, Gas and Electric Distribution Division, Quality Performance, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board. Figure 2-l is an organizational chart showing these organizations and Revision 19 December, 1993

0 their relationship to the corporate organization.

Positions responsible for the principal elements of the quality assurance program are:

Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna Nuclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services Department Manager, Quality Performance Manager, Quality Assurance Manager, Production and Engineering Systems Department Manager and Purchasing Agent, Materials Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Manager, Nuclear Assurance Division Manager, Systems Engineering and Design Division Manager, Rochester Construction and Maintenance Department Manager, Distributive Information Systems Support Manager, Materials Engineering and Inspection Services In addition to the above individuals, two advisory groups are utilized to review and audit plant operations. These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering. The qualifications of members and the responsibilities of these organizations are described in Section 6.0, Technical Specifications, Appendix A to the Full Term Operating License No. DPR-18.

The Chairman of the Board, President and Chief Executive Off'icer of the Rochester Gas and Electric Corporation dir'ected the establishment of the Quality Assurance Program and issued the governing policy statement. He has established the Nuclear Safety Audit and Review Board to review and audit plant operations. The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Chairman of the Board, President and Chief Executive Officer Revision 19 December, 1993

on all activities of the Nuclear Safety Audit and Review Board.

The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements. Xn addition, he has overall responsibility and authority for directing the Quality

. Assurance Program and shall be responsible for the approval of the Quality Assurance Manual. He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing Ginna Nuclear Production activities and those support activities associated with Nuclear Engineering Services; Production Division Training, and Corporate Radiation Protection.

The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the. overall on-site safe operation of Ginna Station. He is responsible for: the performance of all Ginna Station quality affecting activities in accordance with the. requirements of the quality assurance program; providing qualified personnel these activities. in accordance with approved to'erform drawings, specifications, and procedures; those items delineated in Section 6.0, Technical Specifications; and assuring- that significant conditions adverse to quality are identified and corrected.

The Superintendent, Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of plant maintenance and scheduling activities in compliance with the requirements of the Quality Assurance Program.

The Superintendent, Ginna Production reports to the Plant Manager, Ginna Station, and is -responsible for operations, health physics and chemistry, refueling, minor and temporary modifications, fire protection, results and tests, Ginna computer systems, technical engineering and surveillance testing in compliance with the requirements of the quality assurance program.

Revision 19 December, 1993

The Plant Manager, Ginna.Station and Superintendents are assisted by other designated staff members, Figure 2-3, in the implementation of certain Quality Assurance Program requirements at the plant. These staff members are assigned responsibility for testing, procurement,, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, operating experience assessment, maintenance of 'material handling equipment, and control of all activities involving operation; maintenance, repair, refueling and modification.

The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an Institute of Nuclear Power Operations accredited, training program and, in conjunction with Materials Engineering and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related.

activities.

The Department Manager, Nuclear Engineering Services is responsible to the Vice President', Ginna Nuclear Production for designing and 'constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management. As requested by Ginna Station, he is responsible for reviewing unique maintenance and repair procedures for major equipment and providing technical support. He is also responsible for tracking and preparing corrective action report and commitments action tracking report summaries.

The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station. These activities include long range planning for.

low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention,

~

document control, chemistry and environmental requirements support.

The Manager, Production and Engineering Systems is responsible to the Division Manager, Technical Services and .

Chief Engineer for providing records management and document control support services for nuclear related activities.

The -Department Manager, Quality Performance is responsible to the Senior Vice President, Production and Engineering for Revision 19 December, 1993

0 establishing the overall Quality Assurance Program. He is responsible for assuring that all planned and systemati'c actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and fol'lowed. He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.

He has the authority and organizational freedom to assure all necessary quality'ctivities are performed. In addition, he is responsible for special processes and the inservice inspection program. He is responsible for, maintaining a staff, Figure 2-2, for the conduct of staff training and for directing its activities. The staff assists in the preparation and maintenance of the Quality Assurance Manual and applicable corrective action report summaries.

The Manager, Quality Assurance reports to the Department Manager, Quality Performance.. He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation. This

.

includes writing Quality Assurance policies,'ssuring that.

the program satisfies the requirements of 10CFR50, Appendix B, and..for maintaining the total program up to 'date. The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program. The staff is also responsible for auditing and surveillance of aspects of the Qual,ity

.Assurance Program. They are responsible .for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents.

They are responsible for assuring that the suppliers, of safety-related material, equipment and services are properly qualified, maintaining a listing of qualified suppliers and for conducting audits and surveillances at these In addition, the staff assists the Manager, suppliers'acilities.

Quality Assurance, in the preparation of the audit schedule and audit status reports.

The Manager, Quality Assurance is a graduate, engineer with at least six years of responsible experience, of which at least two years are in quality assurance and at least three years in the design or operation of nuclear power plants.

The Manager, Materials Engineering and Inspection Services is responsible to the Department Manager, Quality Revision 19 December, 1993

Performance for the development and qualification of procedures utilized for special processes. He is responsible for providing functi'onal guidance and direction for those methods. He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto. He is also responsible for the routine maintenance of lifting and handling equipment and for the testing and evaluation of Ginna Station materials. He is responsible

'or supporting training and qualification of welders, riggers and crane operators.

The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures. He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance and quality control planning and work monitoring responsibilities to his staff of Quality Control Engineers, Foreman and QC Inspectors. The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing. .Nuclear Assurance is 'responsible for assuring performance of verification inspection activities and assuring that. inspection requirements are included in approved procedures and work packages. This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.

The Nuclear Assurance Quality Control Inspectors also perform compliance oriented surveillance of nuclear:related activities.

The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers,. in accordance with applicable commercial, technical, and quality requirements.

The Division Manager, Rochester Construction and Maintenance is responsible for providing a staff, Figure 2-4, to perform routine maintenance and testing services for Ginna Station meters and relays. He is also responsible for providing laboratory testing of some electrical equipment and devices.

The Division Manager, System Engineering and Design is responsible for providing a staff, Figure 2-4, to perform relay engineering services. He is responsible for design, Revision 19 December, 1993

modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna. He is also responsible for coordinating and for providing support documentation for any design modifications initiated within the Gas and Electric Distribution Division.

The Department Manager, Distributive Information Systems Support is responsible for suporting interdepartmental communications .

Desi n Control Design activities are performed by Rochester Gas and-Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.

Nuclear Engineering Services is responsible for the design.

and control of design activities (including design interfaces) for major modifications of structures, systems

,or components.

Augmenting this effort is the design and technical support

~

provided by, the System Engineering and Design Division for

.the systems and equipment. which Gas and Electric Distribution Division is responsible for. maintaining. In this regard they support Nuclear, Engineering Services for design of safety related modifications.

Ginna Station is responsible for the design and control of design activities for Minor modifications of. structures, systems, or components. Ginna Station is also responsible for classifying station. originated modifications as either" Major or Minor. Nuclear Engineering Services reviews and concurs with modifications being. classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design and are limited to the extent that the change does not impact existing performance requirements, (2) additions within Seismic Category I buildings which perform no safety functions and'hich neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component required for safe shutdown of the plant to an unacceptable level, (3) changes to a safety related system determined not to be major (e.g., vents, drains, alarms, indicating lights, etc.) .

Revision 19 December, 1993

Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution, control, and revision requirements; and corrective action. Design considerations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analyses; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; and quality standards and other quality assurance requirements. Design verification utilizes various methods such as formal design reviews, alternate calculations, or tests; as appropriate, to. assure the adequacy of the design.

I The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested. For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers or consulting.

engineers, as appropriate.

Spare or replacement parts must at least meet the original equipment's technical and quality requirements. For plant modifications, standard, "off-the-shelf", commercial or previously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.

Changes to a modification design are normally reviewed and approved in* accordance with the same procedures as the original modification design. Supplemental procedures are established for the review and approval of field changes.

In general, design changes including field, changes, are reviewed and approved by the. organizations or individuals that performed, reviewed and approved the original"design.

Where this is not practical,'ther responsible design organizations or individuals are designated, provided they have access to pertinent background information and are competent in the specific design area.

Design verification and field change systems are methods utilized to detect, document and correct design process errors and deficiencies. In addition, the corrective action system, described in Section 16, is utilized to control and document corrective action to preclude recurrence of those

-ll-Revision 19 December, 1993

design process errors and deficiencies which are considered to be a significant condition adverse to quality.

Quality Assurance is responsible for assuring that, design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. Design control procedures are reviewed to assure that an independent verification is performed.

Production and Engineering Systems, Nuclear Engineering Services and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions thereto, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded. design information. The measures include the use of document revision levels, document transmit tais, release stamps, field change request forms and distribution lists.

Design documents are collected, stored, and maintained in accordance with Section 6 an'd 17, as appropriate. Design documents include design criteria, analyses, specifications, drawings, design review records, and changes thereto.

Quality Performance, through preparation assistance and/or review, assure the proper inclusion of quality standards in the design of major and minor modifications. Quality Performance is also responsible for assuring that adequate test, examination and inspection requirements are included in specifications. The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.

-Plant modifications are controlled by means of applicable Ginna Station, Nuclear Engineering Services, Gas and Electric Distribution Division, Materials Engineering and Inspection Services, Production Division Training and Quality Assurance/Quality Control procedures. These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures. Plant modifications are reviewed by the Plant Operations Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.

Revision 19 December, 1993

Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.

Such documents may be prepared by Rochester Gas and Electric or by a contractor and include puxchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.

Procurement of materials, 'parts, components, and services is initiated by department staff personnel. .Procurement procedures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.

Procurement documents, including those requesting spare or replacement parts,.initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision. Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Gas and Electric Distribution Division and Quality Assurance/Quality Control are reviewed by ..

Quality Performance and approved by designated departmental supervision.

.Evidence of review -and approval of procurement documents is recorded on the documents and identifies to Purchasing a procurement method which will ensure'hat the selected supplier is capable of providing thd item or service in accordance with the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.

After purchase requisitions, service agreements, contracts, specifications, and drawings have received the required reviews and approvals, a purchase order is issued by Purchasing to the selected .supplier and controlled as described in Section 7. These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.

Under no circumstances are purchasing requirements altered (except for quantity or pricing) during order placement unless review and concurrence is obtained from those who were required to review, concur, with, and approve the Revision 19 December, 1993

original documents as described above. Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.

Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements. Quality Performance review of the above includes checks to verify proper inclusion of the quality standards, quality assurance program requirements, method of procurement and the applicable .acceptance.

criteria. Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, compatibility, and acceptance criteria of the original design. Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.

Instructions Procedures and Drawin s Each Rochester Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing procedures as required to implement the Quality Assurance Program. These procedures cover'ctivities such as document control, training of personnel, and responsibilities and duties of personnel'uality Performance reviews these procedures for inclusion of quality assurance program

~

requirements. Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement. the quality assurance program.'rocurement, documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.

Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modification and testing. This includes instructions and procedures listed in USAEC Regulatory Guide 1. 33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, of f normal, or alarm conditions; response to emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling. Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Revision 19 December, 1993

Rochester Gas and Electric management, or the completion of plant modifications. Ginna Station is also responsible for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.

Gas and Electric Distribution Division is responsible for the preparation and implementation of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible. Gas and Electric Distribution Division also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.

Nuclear Engineering Services is responsible for providing approved specifications and drawings for major modifications and for minor modifications when necessary. These documents require those performing the work to obtain, understand, and

,comply with appropriate procedures, specifications and .

drawings. Engineering has established procedures for revising drawings and specifications.. These procedures cover updating of as-built drawings after .plant modifications and .the revision, 'approval, distribution, and control of all drawings and specifications.

Quality Performance is responsible for: preparing and implementing inspection procedures utilized for detailed inspection activities for Ginna Station; providing and implementing procedures for audit and surveillance related activities; and providing and implementing instructions and procedures associated with special processes, and inspection of cranes and handling equipment routine'aintenance as well as materials testing and inservice inspection.

Persons preparing, reviewing and approving documents are responsible for assuring that specificatio'ns, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.

Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents'n addition, Quality Performance department assessment as described in Section 10 and Section 18 are used to verify that commitments are being addressed and Revision 19 December, 1993

quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.

Document Control Procedures are established to control the issuance of procedures, instructions, drawings, and.specifications.

Standard document control requirements are contained in the Quality Assurance Manual. The Plant Manager, Ginna Station is responsible for the control of all documents issued by Ginna Station personnel. Gas and Electric Distribution Division and Production Division Training are responsible for the control of documents issued by their respective organizations. Production and Engineering Systems controls the distribution of controlled. manuals issued for the other organizations performing activities which implement Assurance Program (Table 1-1). Each organization this'uality controlling documents has a separate procedure to control

documents in accordance with the requirements of the'uality Assurance Manual.

The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and .

approval of documents. Each department, responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to.

assure that they are. adequate, and include appropriate qualitative and quantitative requirements. Nuclear Assurance Quality Control representatives, who are assigned to support departmental maintenance, repair, refueling and modification activities, are respon'sible for reviewing, prior to use; governing procedures to assure quality assurance requirements are included. The Plant Operations Review Committee has the, responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with that activity. Ginna Station, Nuclear Engineering Services, Material. Engineering and Inspection Services, Purchasing, Production Division Training and Gas and Electric Distribution Division quality assurance implementing procedures (Table 1-1) require the review of Quality Performance and the approval of the appropriate department supervisor.

Quality Assurance/Quality Control procedures are approved by Revision 19 December, 1993

the Department Manager, Quality Performance or designee.'he Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. It identifies the difference between controlled and uncontrolled copies of the same document; includes the method for identifying holders of, controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.

Types of documents which are controlled include. Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel. handling, modification, and administrative), specifications and drawings. Suppliers of materials, equipment, and services under an approved 10CFR50 Appendix B supplier quality assurance program are. required in procurement documents to provide for control, of documents, including manufacturing, inspection and testing instructions.

The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when. required; to properly review and approve documents such as procedures, instructions, specifications and drawings to provide the same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents .have access to pertinent information and adequate knowledge of the original document intent; to'ssure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.

Quality Performance is responsible for review and concurrence of procurement documents for all procuring organizations and, therefore, procurement document control

=-requirements.

Quality Performance is responsible for review and assessment of document control systems to assure adequate systems are implemented.

Revision 19 December, 1993

0 Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.

All procurement is conducted in accordance with procurement documents as stated in Section 4. All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality planning by the procuring organizations consists products'rocurement of determining the methods to be used for acceptance of the item or service and the requirements for control of the supplier performance. Source inspection (surveillance),

certificate of conformance, receipt inspection and post installation test are methods which are considered for item acceptance.. Receipt inspection is utilized in the acceptance of all items. In lieu of these methods, acceptance of services is based on either or a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to .the procurement document requirements (i.e. certifications, stress reports etc.) . The extent of the acceptance methods and associated verification activities will vary depending upon the relative importance and complexity of the purchased item or service and the supplier's past performance.

Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and.under what situation the supplier is to report nonconformances.

Results. of. the planning are incorporated in the procurement documents.

Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents. 'The evaluation, which is accomplished during procurement planning, determines the necessity for the supplier selection to be made from the approved suppliers list.

Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program. The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement Revision 19 December, 1993

item, whether the source is to be restricted to the original supplier. For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is made from the approved suppliers lists or one who is in the process of being added to a list, after having its capability evaluated to purchaser satisfaction.

Items or services, which meet industry standards and are typically utilized in applications other than nuclear, may be purchased from suppliers not listed on the approved suppliers list, provided that item acceptance can be based on acceptance of standard commercial quality which is supplemented, as necessary, with source surveillance, pre-or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection. Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed on the approved suppliers list,.

provided that verification of nuclear quality can be accomplished by methods such as source surveillance, pre- or post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance. Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of. the corresponding procurement method. The purchase requisition will also identify the source when replacement parts are to be procured, from the original equipment supplier.

Addition of a supplier 'to the approved suppliers list is based on satisfactory evaluation of the supplier,'s quality assurance program by Quality Assurance.

For engineered items, Nuclear Engineering Services or Ginna Station are responsible for evaluating the overall design or manufacturing capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the, procurement documents.

As part of this review, the supplier'.s design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are .

reviewed.

Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas Revision 19 December, 1993

and Electric Corporation requirements. The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, acceptance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regu1atory or code quality assurance requirements.,

Ginna Station, Quality Performance and Gas and Electric Distribution Division evaluate the suppliers of inspection, test, and calibration services which they intend to use.

The departments responsible for performing supplier evaluations shall document their results in reports which discuss areas investigated, findings, and conclusions..

Measures are established by Nuclear Engineering Services, Ginna Station and Quality Assurance to control supplier performance for engineered items. These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier. In addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance.

With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.

Quality Assurance is responsible-for determining and documenting the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection, testing, and shipping,, and for providing the required surveillance. The objective of.

supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements. For complex engineered items, Quality Assurance and Nuclear Engineering Services are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.

The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which Revision 19 December, 1993

e I

initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance representative has the authority to inform the vendor that a particular item is unacceptable,. to issue a nonconformance report or to stop work, if necessary.

Quality Performance is responsible for surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.

The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.

Department supervision is responsible for receiving and storing items pending their acceptance. Upon receipt, .the department stockkeeper logs the item,, places a "hold" tag on

.the item, and notifies Quality Performance that the item has arrived.

Quality Performance is responsible for receipt inspection at.

Ginna 'Station upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of, conformance is'vailable at the plant prior to installation or use. Documentary evidence sufficient toidentify the codes, standards or specifications met by the .purchased material, equipment, and services is retained. In the event.

a final source inspection, for the acceptance is conducted prior to receipt by RG&E, Quality Performance performs an inspection for shipping damage or lost parts and a document check to assure that the required documentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.

If the item and documentation are adequate, Quality Performance labels the item as "Accepted", files the documentation and receipt inspection results, and releases the item for storage or use. If the item is nonconforming or the documentation is unsatisfactory, Quality Performance Revision 19 December, 1993

initiates controls on the item in accordance with Section l5.

All items issued must bear an acceptance tag or label and have documentation to support the acceptability of the item.

In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.

Identification and Control of Materials Parts and Com onents The identification and control of materials, parts, and components is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication., storage, or installation.

Identification and control requirements are established by either*an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:

traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test. data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials, parts, and components prior to release, for manufacturing, shipping, construction, and installation.

Nuclear Engineering Services, Ginna Station and are responsible for 'assuring that drawings and Quality'erformance specifications contain appropriate requirements for the identification and control of materials, parts, or components, as appropriate. Suppliers are required to assure that all required documentation for an item is properly identified and related to the item.. Each item is required to be physically .identified, either by marking on the item or by tags. Physical identification by purchase order number is used to the maximum. extent possible for relating an item at any time to applicable documentation. to Identification is either. on the item or records traceable the item. Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.

The Plant Manager, Ginna Station is responsible for maintaining identification and control of materials, parts, or components received, stored, installed, and used at the Revision 19 December, 1993

0 1

p

plant in accordance with approved procedures. The responsible supervision of other departments which receive material that is to be stored away from the plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, parts, or components, stored or used in their area of responsibility.

In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 1S.

Control of S ecial Processes Written procedures are established to control special processes, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.

Qualification of personnel and special process procedures comply with the requirements of applicable codes and standards. When special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requirements.

Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.

Quality Performance personnel are responsible for reviewing procurement documents to ensure that .requirements for control of special processes are included.

Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering and Inspection Services. Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.

The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications, and standards.

Within the Quality Performance Department, the Manager, Revision 19 December, 1993

Materials Engineering and Inspection Services is responsible for the qualification of NDE personnel and procedures. The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures.

The Manager, Materials Engineering and Inspection Services along with the Department Manager, Production Division Training are responsible for the training and qualification of welders, riggers and crane operators used for nuclear related activities. Records for personnel and procedures to demonstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.

Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to, assure effective compliance with procedures.

Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifications, codes, standards, or regulatory requirements. For clarification and. to. distinguish from preventive maintenance 'inspections, the following controls are"'associated with the quality assurance'unction inspections and referred to as verification inspections.

Instructions for conducting detailed verification inspections are contained in inspection procedures.. These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection. Inspections and hold points are utilized to verify conformance of materials, parts, appurtenances, components, processes or structures to .

  • predetermined quality. requirements. Inspection procedures include the identification of quality characteristics to,be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the .acceptance and rejection criteria, the requirements for the recording of inspection .

results, and the requirements for providing evidence of completion and certification of the inspection activity.

Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors. Inspectors are Revision 19 December, 1993

k J

sufficiently trained to adequately evaluate the activity they are inspecting.

Quality Performance personnel are responsible for assuring performance of verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and Electric personnel. The adequacy of inspections not directly performed by Quality Performance personnel will be assessed on a sample basis through the QA/QC surveillance program. Inspection equipment is calibrated and controlled in accordance with Section 12. Calibration status is verified by inspection personnel prior to performing an inspection operation.

In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing methods; equipment, and personnel is provided.

Both inspection and process monitoring are required when control is inadequate without both.

Quality Performance is responsible for verifying .adequate inclusion of inspection requirements in specifications.

The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included'in maintenance, repair, refueling, modification and testing instructions and procedures and related fabrication processes. He is also responsible. for the assignment of qualified personnel required for the performance of verification inspections and quality, control surveillances of quality affecting activities.

the exception'of that which pertains to Pump and Valve

'ith Testing, the Manager, Materials Engineering and Inspection Services is responsible for establishing the requirements, for. the Inservice Inspection Program. Nuclear Engineering Services is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.

Test Control Checks or testing performed to verify the adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings. Whenever Revision 19 December, 1993

testing is required to demonstrate that a material, part, component, or system will. perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established'in Technical Specifications, drawings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements. The test program requires the identification, control, and documentation of all tests, and the preparation of written procedures required for satisfactory accomplishment of the testing.

Together the written procedures and checklists for the testing program include: necessary test equipment and calibration requirements; material requirements; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instructions for disposition of deviations; data collection requirements; and test result approval.

The Plant Manager, Ginna Station is responsible for the station test program, which, includes the surveillance. test program required by Section 4.0, Technical Specifications.

Nuclear Engineering Services, is responsible. for preparing

'test procedures and performing testing associated with modifications. I Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved'y the Plant Manager, Ginna Station'. The Plant Manager, Ginna Station .is responsible for the correct and timely performance of the required, tests utilizing written and approved procedures. When contractors are employed for tests, the contractor is required to perform testing in accordance with their approved quality assurance program requirements. All test results are required to be documented, reviewed, and approved by those responsible for performing the test.

When requested by Ginna Station, Gas and Electric Distribution Division performs test activities to determine the cause of protective relay malfunctions. These test activities are performed in accordance with approved procedures by qualified personnel.

Nuclear Engineering Services and Quality Performance are responsible .for assuring that required tests for major Revision 19 December, 1993

0 modifications are included in specifications. Nuclear Engineering Services and Gas and Electric Distx'ibution Division assistance in the preparation of modification-related test procedures may be provided'to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing tqodification-related test results for, acceptability to design requirements. Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requirements.

Control of Measurin and Test' ui ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test. equipment which are to be. used in the measurement, inspection, and.

monitoring of components, systems, and structures.

Calibration procedures include step-by-step methods for .

calibration and requirements for. instrument accuracy.

Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations; experience, and other conditions affecting measurement capability.

Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration. test data, and identification of the next calibration date on the equipment;..a..system providing traceability of shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates; and a system controlling the purchase requirements of new equip-,

ment to be entered into the calibration and control system including requirements for accuracy, stability, and repeatability under normal use conditions. In the event a measuring instrument (i.e. shop or field standard) is found out of calibration,an'investigation is conducted to determine the validity of previous measurements.

Revision 19 December, 1993

Cl 0

The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordancel'.with the above requirements. Instruments specified in Section 4.1, Technical Specifications, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are calibrated and controlled in accordance with station procedures. Measuring, test or inspection equipment used by Nuclear Assurance Quality Control is included in the program.

P The Manager, Materials Engineering and Inspection Services and, Division Manager, Rochester Construction and Maintenance are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.

13. Handlin Stora e and Shi in Ginna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station. Gas and Electric Distribution Division, and Materials Engineering and Inspection Services are responsible for preparing and implementing procedures for the handling, storage, shipping, "

preservation, and cleaning of material and equipment delivered to or located in their "work areas. In addition, the Manager, Materials Engineering and Inspection Services .

is responsible for preparing and implementing procedures for the routine maintenance and .inspection of lifting and handling equipment. Under normal circumstances, manufacturer's specific-written instructions and recommendations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to. environmental requirements. In the

. absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in accordance with department. procedures.

The Department Manager, Nuclear Engineering Services or Plant Manager, Ginna Station are responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for major modifications.

Revision 19 December, 1993

These procedures are prepared by contractors, by the station staff, or by. staff members of Gas and Electric Distribution Division as appropriate. Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.

Xn the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.

Quality Performance, Ginna Station and Nuclear Engineering Services are responsible for review of engineering-specifications to assure that proper handling, storing, and shipping requirements have been specified. Quality Performance is responsible for assessment of handling, storage, and shipping .activities by suppliers, Rochester Gas and Electric personnel, and contractors.

ns ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly"identified by use of tags, control. logs,. and other suitable means to indicate the status in a positive manner.

The identification is sufficient to positively indicate the status .of the particular equipment or system being isolated.

The Plant Manager, Ginna Station is, responsible for indicating the status of operating equipment or systems to be removed from service for maintenance, repair, or modification in accordance with the approved Electric System Operating Rules. The Plant Manager designates personnel who have station holding authority.

Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.

System status is indicated through the use of hold tags, block tags and corresponding control logs.

Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets. Written procedures control .the use of hold tags, test tags, and labels.

Revision 19 December, 1993

0 1

Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.

Fuel handling operations involving, fuel assemblies or other radioactive sources are identified and controlled by the use of tags, stamps, or other suitable means.

Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejection for a particular component, system, or structure.

These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a designated control location to indicate the status and the completion of required inspections and tests.

Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and'ssures that inspection. results are properly documented, Material Engineering and Inspection the procedures for implementing the inspection Services.'stablishes status sheets utilized during inservice inspection.

Nonconformin Materials Parts and Com onents Procedures are. established for the control, evaluation and disposition of deficient material, parts, and components.

Materials, parts, or components which do,not conform to the.

drawing or specification requirements are identify'.ed, controll'ed and reported. RGEE personnel are responsible for initiating nonconformance reports and initiating dispositions. Nuclear Assurance Quality Control personnel are responsible for inspecting and approving closeout- of nonconformance reports. Prior to installation or .use, nonconforming items generally remain in a hold area until an approved disposition has been implemented. Nonconforming items may be released for installation- to meet critical fabrication schedules provided controls are established to prevent inadvertent use prior to implementing the nonconformance disposition. After installation, nonconforming items are identified and controlled until approved disposition has been implemented.

Nonconformances identified .at a supplier's facility and reported- to RGEE, which have supplier recommended dispositions of use-as-is, or repair, are normally processed Revision 19 December, 1993

by the department originating the procurement.

Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.

Items are repaired and reworked in accordance with approved procedures and current drawings. The repair or rework must be verified as acceptable, by an inspection of the affected item or process which is at least equal to the original inspection method.

Items which are accepted "use-as-is" are fully documented

.with the drawing or specification requi'rement and technical justification for acceptances All such items are approved prior to use by the cognizant organization having responsibility for the requirement. In addition, those "use-as-is" nonconformances which also deviate from a Design Criteria requirement, shall require additional approval of the Senior Vice President; Production and Engineering.

Nuclear Assurance Quality Control personnel provide nonconformance status information periodically. Quality Performance and other. organizations analyze nonconformance report data for.'adverse trends and provide periodic reports to management. Adverse trends form a basis for supplier re-

- evaluation or for other corrective action.

Corrective Action Conditions adverse to quality are those conditions which compromise confidence that a structure, system or component at Ginna Station will perform satisfactorily in, service.

Significant conditions adverse to quality are those conditions which, if uncorrected, could affect the health safety of the public, seriously affect the ability to 'nd operate the plant in a safe manner, represent a serious breakdown in activity controls, or will require a major.

effort to restore capability to perform specified. functions.

Conditions adverse to quality shall be promptly identified and reported to supervision. The condition adverse to quality shall be identified, corrected and evaluated to-determine if a significant. condition adverse to quality exists.

When a significant condition adverse to quality at Ginna Station is identified, the Corrective Action Coordinator is Revision 19 December, 1993

responsible for evaluating the effect of continuing the activity. If continuing the activity would obscure or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.

The Manager Nuclear Assurance has authority to stop work on maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies at Ginna Station, as well as other locations.

Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.

The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engineering Services, Materials Engineering and Inspection

. Services, Gas and Electric Distribution Division or cognizant supplier associations.

For significant conditions adverse to quality, affected RGSE management shall review initiated reports to. determine causes and develop corrective action plans to resolve the identified concerns and preclude recurrence'f, the significant condition adverse to quality involves a design deficiency or the recommended corrective action involves a design change, the review of the condition adverse to

'quality includes Nuclear Engineering Services or Ginna Station design personnel, as 'appropriate.

The Corrective Action Coordinator assures root cause determination and corrective action plans. are developed to resolve the identified concern and to preclude recurrence.

Cognizant nuclear supervision reviews each Corrective Action Report initiated. at Ginna Station and may recommend additional corrective action does not result in adequate if the action already taken resolution.

The Plant Operations Review Committee CAR Subcommittee reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective'ction has been taken to preclude repetition.

Corrective action summary reports are submitted to departmental supervision to keep them aware of significant conditions adverse to quality, related causes and corrective Revision 19 December, 1993

action being taken. Senior Management is advised of the causes and actions of the more significant Corrective Action Reports.

Quality Assurance provides additional assurance of the corrective action program effectiveness through semi-annual audits and periodic surveillances.

ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance. Production and Engineering Systems, as directed by the Division Manager,, Technical Services and Chief Engineer, is responsible for,.the retention and maintenance of records. Quality Performance, Purchasing, Nuclear Engineering Services, and Gas and Electric

. Di'stribution Division departments are responsible for forwarding the records they initiate to the appropriate

'Production and Engineering Systems record retention locations. Each organization generating records is responsible for preparation,, review, approval, and implementation of specific quality assurance .record procedures for their areas of responsibility in, accordance with these requirements. The records which fall within quality assurance record requirements include those records

required by Section 6.10 of the Technical Specifications and the Quality Assurance Program. All records associated with

~

the operation, maintenance, repair, inservice inspection,

~

refuel'ing, modification, inspection and testing systems, and components covered by the of'tructures, quality assurance program are included.

Records initiated at Ginna Station include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses; calibration procedures. and reports; and Nonconformance and Corrective Action Reports. Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering Systems record retention location.

Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.

Revision 19 December, 1993

The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate. Requirements and responsibilities for'reparation, inspection, identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents. Records are available to authorized personnel.

Removal of records from storage is documented and accountability is maintained by the responsible record control activity.

Records. are either stored in record storage .facilities"which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept .in two separate storage locations in separate buildings which .are physically isolated from each other.'ecord keeping .procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage. The procedures establish retention- requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records; Production and Engineering Systems is responsible for maintaining plant operating records as. required in Section 6.10, Technical Specifications.

Production and Engineering Systems is also responsible for.

maintaining off-si'te prepared design records, such as specifications, drawings, design review reports, and design control documentation; 'quality assurance records, .such as audit reports and surveillance reports; purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.'udits Compliance with all aspects of the Quality Assurance Program and the effectiveness of the program is determined by audits and surveillances of all organizations performing quality affecting activities. Quality Assurance is responsible for conducting audits of those organizations and. activities involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status. and Revision 19 December, 1993

safety importance of activities being performed, as well as group performance and related management concerns.

Table 18-1 is a list of the audits with activities to be examined for each. Frequencies are based on the level of activity in each area. Audit schedules are established to assure that each of the activities is audited at the frequency specified in Section 6.0. Technical Specifications. Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concexns.

Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names of those .who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations. Audit planning and .

performance utilize performance based techniques that will facilitate effectiveness assessments as well as compliance verification. The audits are performed in accordance 'with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.

Audit results are documented and reported to the supervisor and division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board. Within a specified period of time, the person having supervisory

-

responsibility in the; area audited is required to review the audit results, take necessary action to correct the deficiencies identified by the audit, and document and report the corrective action.

Quality Assurance is responsible for developing audit-plans and audit checklists, designating and training audit personnel,,and conducting audits.

Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.

Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procurement, as required, to evaluate their quality assurance program for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance Revision 19 December, 1993

programs in accordance with procurement documents. During the project or procurement process additional audits are performed, as required, to assure all quality assurance program requirements are properly implemented in accordance with procurement documents.

Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends. Results of these analyses are provided to management for their regular review.

Revision 19 December, 1993

Table 1-1 Quality Assurance Program Procedures Subject Listing Appendix B ualit Assurance ualit Control Procedures Criteria Xndoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Planning and Reporting Results for QA/QC Subcommittee Meetings Quality Assurance/Quality Control Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality .Assurance Review and Approval of Field Change- IXI Reguests and Review of ECN's Quality Assurance Review of Rochester Gas and .IXI Electric Engineering Specifications Preparation, Review and Approval of Quality Verification .III Specifications Computer Software Product Evaluation Quality Assurance, Review of Computer Software Production Evaluations Master Software Index Requisitioning. Quality Assurance/Qual'ity Control Services

'Quality Review of Rochester Gas and Electric Procurement Documents Preparation, Review and Approval of Rochester Gas and Electric Q.A. Specifications Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B ualit Assurance ualit Control Procedures Criteria Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval'f Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision and Control of the QA Program for Station Operation Review of Nuclear Directives Review of Departmental Procedures VI Preparation,'eview and Approval. of Procedure VI Deviation Requests by Quality Assurance/Quality Control Evaluation of Suppliers by Quality Assurance VII Supplier Surveillance Control of Supplier Performance VII Quality Assurance Evaluation of Bids VII Conducting Commercial Grade Supplier Surveys VII Evaluation of Commercial Suppliers by Quality VII Assurance Document Deficiency Reports VII Establishment and Maintenance of Qualified VII Suppliers List Establishment and Maintenance of the Commercial VII Grade Supplier List Verification Inspection Program Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B ualit Assurance ualit Control Procedures Criteria Qualification of Inspection Personnel Quality Assurance Nonconformance Processing XV Corrective Action Reports XVI Quality Assurance Commitments and Action Items XVI Review of Ginna Maintenance Work .Order Packages XVI Identified Deficiency Reports, XVI Records Turnover Plan XVII Qualification of Audit/Survey Personnel ,XVIII Audit Scheduling and Planning XVIII Performance of Quality Assurance Audits XVIII Reporting and Follow-Up of Audit Findings XVIII Conduct of Quality Assurance During and in XVIII Follow-Up of NSARB Audits Response to Audits and Surveillance XVIII Qualifications of Surveillance Personnel XVIII Review of Audit Program XVII Auditing of the Nuclear Emergency Response Plan XVXI Performance Based Surveillance. Program XVIII Availability and Use of INPO and NRC Inspection/ XVIII Assessment Reports in Audit and QA Surveillance Quality Assurance Planning Guides XVIII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Materials En ineerin Ins ection Services Criteria Indoctrination and Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase IV Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures Quality Materials Engineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Preparation, Review and Approval of Materials Engineering Laboratory Test Procedures Control and Distribution of Documents. Regulating VI Safety Related Activities Control of Purchased Materials , VII Preparation, Review and Approval of Supplier VII Evaluation Control of Purchased Services VII Welding Procedure Preparation Review and Approval Welding Procedure Qualification IX Heat Treating Procedures IX Welder Qualification and Currency IX Nondestructive Examination Procedures IX Nondestructive Examination Procedures Manual IX Nondestructive Examination Personnel Qualification IX Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Materials En ineerin Ins ection Services Criteria Qualification of Visual Examination Personnel IX Erosion/Corrosion Program IX General Brazing Procedures Preparation and Approval IX General Brazing Procedures Qualification IX Inservice Inspection Program and Plans ASME Section XI Repair, Replacement and Modification Procedure Incorporating Ginna Modifications into Inservice Inspection Program Duties of the ANII Tests conducted by MEIS Laboratories XI Requesting MEIS Laboratories Services XI Test Personnel Qualifications Vendor. Tests under MEIS Direction . XI.

Calibration and Control of Nondestructive XII Examination Instruments Inspection and Maintenance of Material Handling . XIII.

Equipment Overhead and Gantry Cranes XIII Inspection and Maintenance of Portable Lifting XIII and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems XIII Slings and Related Apparatus XIII Classification and Training of Material Handling XIII Equipment Personnel Revision 19 December, 1993

,

0 0

Table 1-1 (cont'd)

Appendix 8 Materials En ineerin Ins ection Services Criteria Mobile Hydraulic Cranes XIII Inspection and Maintenance of Jacks, Hydraulic Rams XIII and Cylinders Forklift Loading Forks XIII Inspection of Designated Monorails XIII Training and Qualification of Crane Operators XIII Lifting Devices in the Containment Vessel XIII Pre-Shipment Inspection of Radioactive Material XIII Shipping Containers Nonconformance Reports. XV Initiating and Responding to Corrective Action XVI Reports

'uality Materials Engineering and, Inspection XV.II.

Services Records Response to Audits XVII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Ginna Quality Assurance Program Implementation Fire Watch Training R.E. Ginna Training Plan Ginna Station Training General Employee Training Temporary Employee Training Hazardous/Mixed Waste Emergency Response Trainipg Operator Training Responsibilities R.E. Ginna Health Physics Orientation Program Fire Brigade Training Radiation Protection Technician Entry Level Requirements, Responsibilities, and Training

~

Chemistry Technician Entry .Level Requirements, Responsibilities, and Training

~

Maintenance Training Program Ginna Station Administrative and Engineering Staff Responsibilities Ginna Station Management Responsibilities XI Physics and Chemistry Section Organization, 'ealth and Responsibilities Support Services Organization and Responsib'ilities Operations Section Organization and Responsibilities Technical Section Organization and Responsibilities Material and Procurement Section Organization XI and Responsibilities Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Operational Assessment Section Ginna Station Staff Responsibilities for Fire Prevention Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Radiation Emergency Plan Implementing Procedure Committee Emergency Procedures Committee (EPC)

Ginna Standard Nomenclature XI Preparing and Dispositioning of Technical Staff.

Request Control of Station Modification Station Modif'ication Classification and Review Station Modification Planning Control XXI Station Modification Installation and Acceptance Station Modification Completion Preparation, Review &. Approval of Design Input Documents for Minor Modifications Component Classification Request/Reanalysis, XII Evaluation of Parts to Determine 'Safety Classification XXI Preparation, Review and Approval of. Safety Analysis Preparation, Review, Approval and Distribution of Design Output and Design Review Documents for Minor Modifications Technical Evaluation Revision 19 December, 1993

0 Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Preparation of Configuration Data Change Forms Computer Software Product Evaluation Control of Procurement Documents Prepared at IV Ginna Station Evaluation of Commercial Grade Items for Safety IV Related Applications Evaluation of Items for In-Storage Maintenance IV Requirements Plant Procedures Preparation and Classification t

V Plant Procedure Content and Format Requirements V Emergency and Abnormal. Operating Procedures Writers'uide-Operating Procedures Writers'uide "Health Physics and Chemistry Procedures Writers'uide Plant Procedure Adherence Requirements Emergency and Abnormal Operating Procedures Users'.

Guide Procedure Control Procedure Control-New Procedures Procedure Control-Permanent Changes VI Procedure Control-Temporary Changes VI Procedure Control-Periodic Review VI Procedure Control-Index VI Procedure Control of Emergency and Abnormal Procedures Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Procedure Control - Amendments to Licensing VI Documents and Changes to the Facility Procedure Change Control 10CFR 50 '9 Review Emergency and Abnormal Operating Procedure Support Documentation Control Procedure Distribution Vj Control of Construction Documents VI Vendor Manual Control Program Vj Vendor Manual Information/Discrepancy/Incorpor'ation VI Request.

Drawing Change Request VI Conditional Release Program VII Receipt and Acceptance of Materials/Parts Vjj Control of Purchased Services VII Inventory Control of Material, Parts and Components at Ginna Station Identification and Marking of Accepted Material, VIII Parts, and Components

. Bulk Storage of Combustible'Materials and Their Use VIII Trailer Admittance Requirements VIII Control of Consumable Materials at 'Ginna Station VIII Control of Welding Nondestructive Examination Control IX Welding Equipment Performance Verifications Revision 19 December, 1993

0 Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Open Flame,, Welding and Grinding Permit (Hot Work Permit) IX Control of Inservice Inspection Activities ASME Section XI Repair, Replacement and Modification Procedure for Ginna Station Electrical Preventive Maintenance Program Environmentally, Qualified Equipment Maintenance Program Mechanical Preventive Maintenance Program for X Rotating 'Equipment Equipment Inspection and Lubricant List Valve Preventive Maintenance Program X Condenser Inservice Inspection Program Preventive Maintenance Program for Plant Security X Equipment Performance of Tests. XI Qualification and Certification of Test. Personnel=

Test Tag Control Program Calibration, Test, Check and Replacement. Surveillance Program for Instrumentation and Equipment Important to Safety XI Ginna Station Surveillance Schedule XI Inservice Testing of Pumps and Valves Calibration and Control of Test Equipment XII Maintenance and Inspection of Material Handling Equipment XIII Revision 19 December, 1993

0 Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Control of Material Handling and Handling Equipment XIII Storage and Preservation of Materials and Equipment at Ginna Station XIII Control of Heavy Loads at Ginna Station XIII Control of Heavy Loads for the Containment Overhead Crane XIII Control of Heavy Loads for the Auxiliary Building Overhead Crane XIII Control of Heavy Loads for the 7 1/2 Ton Screenhouse Crane XIII Control of Heavy Loads for Jib Cranes in.

Containment XIII Control of Heavy Loads in Safety-Related Areas XIII Housekeeping Control XIII, .

Station Holding Rules XIV Bypass of Safety Function of Jumper Control XIV Operational Assessment .Program -XIV Effectiveness Evaluation of the Operational Assessment Program XIV Installation -and Removal of Temporary Cables XIV.

Control of .Temporary Modifications XIV Installation, Removal and Control of Scaffolding XIV

'Installation and Removal of Temporary Fluid System Provisions XIV

'Program to Prevent Degradation of Reactor Coolant Pressure Boundary XIV Revision 19 December, 1993

0 Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Independent Verification XIV Control of Nonconforming Items XV Nonconformance Reports XV Corrective Action Reports XVI Root Cause Analysis XVI Overview of the Ginna Station Work Control System XVI Work Request/Trouble Report Initiation XVI Work Order Initiation XVI Work Order Planning XVI Work Ord'er Scheduling XVI Work Order Execution XVI Post Maintenance Testing XVI Work Order Close Out XVI Work Order Processing After Hours XVI Work Control System Performance Indicators XVI Station Work Authorization Request XVI Safety Classification of Mainten'ance Work Activities XVI Identified Deficiency Reports XVI Ginna Records XVII Records Storage Facilities and Equipment XVII Special Nuclear Material Inventory and Record

'equirements XVII Maintenance History Program XVII Ginna Station Response to Internal Audits XVII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Indoctrination and Training Engineering Department Organization and Responsibilities Ginna Modification Project Organization Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Preparation; Review and Approval of Engineering Drawings - III Review and Approval of Engineering .. III ',

.'reparation, Specifications Preparation, Review and Approval of Design Verification,:

Integrated Design Process Preparation, Review and Approval of, Safety Analyses Review and Approval of Architect Engineer or ~

III Design Documents 'onsultant Preparation, Review and Approval of Field'hange Requests Preparation, Review and Approval of Engineering Change Notices

'. XII Review. of the Classification of Station Modifications Preparation, Review, and Approval of CAD Piping and IIX Instrumentation Drawings Preparation, Review and Disposition of Drawing Change Requests ALARA/ Radiation Safety Design'Review Revision 19 December, 1993

'k Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Preparation, Review and Approval of Appendix R Conformance Verifications Preparation, Review, and Approval of the Environmental Qualification Data Electrical'quipment Summary Form EEQ-1 and IEEE 323-1974 Waiver .

Authorization Form EEQ-2 Review, Approval and Implementation of Changes to the Safety Assessment System Software Engineering Computer Software Documentation and Control Human. Factors Review of. Control Room and Local I I I,.

Control Panel Modifications 'mergency Preparation, Review and Approval of PAID Database IIX and Configuration Data Change Forms Erosion/Corrosion Control Monitoring Program for Carbon Steel Piping Preparation, Review and Approval .of Changesto the .

Updated Final Safety Analysis Report ASME Section XI Repair, Replacement and Modification Program Implementation

'. Component Safety Classification Drawing Review Process, Component Safety Classification Component IIX Classification Form Component Safety Classification Request/Re-Analysis System, Structure,. or .Component Safety Classification III" Criteria Preparation, Review and Approval of CAD Electrical Drawings Revision 19 December, 1993

i Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Requests for Nuclear Engineering Services Preparation, Review and Approval of Procurement IV Documents for Purchases Covered by the QA. Program Evaluation of Commercial Grade Items for Safety IV Related Applications Evaluation of Quality Verification Items for Safety IV Significant Applications Preparation, Review, and Approval of Engineering Procedures Review, and Approval of Engineering V'reparation, Procedure Deviation Request Distribution and Control of Documents by VI the Control Number Method Distribution and Control of Documents by Project . .. . VI Correspondence Procedures Preparation, Review,and Approval of Supplier Evaluations VII Review and Approval of Vendor Design and Manufacturing .. VII Technical Documents Preparation, Review and'pproval of Bid Requests, Bid, VII Evaluations and Recommendations for Award Engineering Review of Nonconforming Materials, Parts VX or Components Initiating and Responding to Corrective Action Reports XVI Processing Identified Deficiency Reports XVI Documenting and Reporting Potential Conditions XVI Adverse to Quality Performing "Substantial Safety Hazard" Evaluations XVI for 10CFR21 Reportability Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Records XVII Records Turnover Plan XVII Engineering Response to Internal Audits XVIII Revision 19 December, 1993

Table 1-1 (cont',d)

Appendix B Purchasin Procedures Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities Preparation, Review, Approval and Issuance of IV Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation IV Purchasing Procedures Purchasing Procedure Deviation Request V Supplier Evaluation VII Supplier Material Deficiency Processing XV Supplier Corrective Action Reporting XV1 Purchasing Response.to Corrective, XVI Action Reports and Corrective Action Reporting Purchasing Records and Turnover Plan XVII Purchasing Response to Audits XVIII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Production Division Trainin Procedures Criteria Indoctrination and Training Production Division Training Organization and Responsibilities Operations and Technical Training Organization and Responsibilities Training Systems Organization and Responsibilities'aintenance Training Organization and Responsibilities Curriculum Committee Organization and Responsibilities Software Quality Assurance Program Preparation, Review and Approval of Quality Training Procedures Review and'pproval of Training V'reparation, Procedures, Guidelines, and Policies

~ ~

Preparation, Review and Approval of Nuclear V, Training Programs Style Guide for Training Procedure Development Nuclear Training Procedure Revision Training Change Request/Notice Control .and Distribution of Production. Division VI Training Documents Training Programs for Crane Operators and Riggers XIII Corrective Action XVI Nuclear Production Division Training XVII Records Management Production Division Training Response to QA Audits XVIII Revision 19 December, 1993

Table 1-1 (cont'd)

Gas and Electric Distribution Division Procedures Appendix B Criteria Quality Assurance Program Implementation for Gas and Electric Distribution Division Department Indoctrination and Training of Gas and Electric Distribution Division Personnel Gas and Electric Distribution Division Organization Design/Modification Activities Control at Ginna Station Design/Modification Activities Control at Station 13A and on Circuit 751, Equipment and Line Control of Procurement Documents for Purchased IV Parts, Components and Services Preparation, Review and Approval of Electric V Transmission and Distribution Procedures Preparation and Approval of Laboratory Test Procedures Preparation and Approval of Electric Meter and .

Laboratory Calibrate.on Schedules Preparation and Approval of Electric Substation Department V Relay Test Schedules Preparation and Approval of Electric Transmission and V Distribution Deviation Requests Control of Gas and.Electric Distribution Division VI.

Procedures Control and Distribution of Electric Meter and Laboratory VI Department and Laboratory Test Procedures Control of Electric Meter and Laboratory Department-Calibration Services Control of Electric Substations Department Relay VI Test Schedule Revision 19 December, 1993

0 Table 1-1 (cont'd)

, Gas and Electric Distribution Division Procedures Appendix B Criteria Supplier Technical Evaluation VII Receipt and Acceptance of Instrumentation and VII Standards Equipment ..

Control of Purchased. Services for Electric Meter and Lab VII Identification and Control of Materials, Parts and VIII Components Surveillance at the Gas and Electric Distribution Division. X Division Performance of Tests at Ginna Station  : XI Personnel'I Performance of Tests at the Electrical Laboratory Qualification of Test and Control of Test Instruments XII, XI'alibration Nonconforming Parts and:Components and Processing of Corrective Action Reports .XVI 'nitiating Control of Quality Assurance Records .XVII Gas and Electric Distribution Division Response to Audits.'VIII.

Revision 19 December, 1993

TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents include:

1. Sco e of Work - Detailed statement of the work to be performed.
2. Technical Re uirements by reference to specific drawings; specifications, codes, regulations; procedures or instructions, including, revisions, that describe the items or services to be furnished. Also identified shall be test, inspection and acceptance requirements, and any'special .

requirements for such activities as designing, identification, fabrication, cleaning, erecting,. packaging, handling, shipping, extended storage and shelf life.

  • 3 ualit Assurance Pro ram Re uirements - which require. the.

supplier to have a documented quality assurance progiam that ~

implements portions or all of lOCFR50 Appendix B as well as

~

applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements. in subtier procurement documents.

Ri ht of Access - to include the facilities and records of.- - .

the supplier for source inspection .and audit. by the Purchaser or'parties designated by =the purchaser. . Also included shall be provisions for the identification of witness, and hold points and the minimum time of advance .notice'.,

  • 5. Documentation. Re uirements Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.
  • 6. Nonconformance - Requirements-for reporting .and;disposition of nonconformance to procurement requirements' Items reviewed by Quality Assurance or Quality Control.

Revision 19 December, 1993

Table 18-1 Audit List Audit Title Audit To ic Areas Corrective Action Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods of operation.

Operational Assessment Nonconformance Control

  • Outage Activities Refueling and Special Nuclear Material-ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA
  • Health Physics, Chemistry 'and Radwaste Shipping and Process Radwaste Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation" Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program

+Fire and Safety Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program Revision 19 December, 1993

Table 18-1 (con't)

Audit List Audit Title Audit To ic Areas Independent Inspections and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety Program Housekeeping Instructions, Procedures, Drawing Control and Document Control Vendor Manual Control Procedure Control Records Control ~

Security Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program

  • Operations Limiting Conditions for Operation.

Surveillance Testing Operator Performance Operations Administration PORC Activities NSARB Activities Materials Engineering and ISI Program Inspection Services NDE Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls

  • Maintenance and Testing Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment Revision 19 December, 1993

Table 18-1 (con't)

Audit List Audit Title Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Training/performance and Licensed Operator qualifications of the Auxiliary, Operator operating and technical staff Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General, Employee Training Procurement Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Program Configuration Control Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 19 December, 1993

i Table 18-1 (con't)

Audit List Audit Title Audit To ic Areas Gas and Electric Systems Engineering and Distribution Division Design Rochester Construction and Maintenance Distributive Information Systems Support

  • Noted audits will also address relevant activities to .verify conformance of facility operat'ion to all provisions contained in Technical Specifications and 'appl'icable license conditions..

Revision 19 December, 1993

R.E. GINNA NUCLEAR POWER PLANT MANAGEMENTORGANIZATION CHART UNES OF COMMUNCATIQN UNES OF SU~ AND ADMIMSTRATION CHAIRMANOF THE BOARD, PRESDEMT AND CHIEF EXECUTIVE OFFCER SEMR SENIOR VCE SENIOR VCE VICE PRESDENT PRESDENT, PRESIDEMT, GAS & ELECTRIC PRODUCTON AND CONTR OI.LER IXSmlBVTKW ENGWEERWG & CHIEF AND CUSTOMER FINANCIAL SERVICES OFFCER VCE PRESDENT DMSON MANAGERTECHNCAL VCE PRESDENT NSARB VCE EMPLOYEE SERVICES AMO GINNANUCLEAR PRES DENT, RELATIONS. CHIEF ENGINEER PRODUCTION SECRETARY PUBUC AFFAIRS DEPARTMENT AND AND MATERIAL MANAGER MANAGER DIRECTOR DEPARTMENT TREASURER MANAGEMENT PRODVCilON CORPORATE MANAGER QUAUTY PERFORMANCE ANO RADIATION PRODUCTION DEPARTMENT DIVISON DIVISON ENGWEERING PROTECTION DMSON MANAGER MANAGER MANAGER SYSTEMS .-TRAINING PROJECT RSK SYSTEM ROCHESTER MANAGEMENT CORPORATE MANAGEMENT ENGINEERIHG CONSTRUCTION RECORDS HEALTH TRAIMWG AND DESGN AND MANAGEMENT, PHYSCS AND SERVICES MAINTENANCE NUCLEAR IXRECTOR TECH NCAL QUAUTY EMERGENCY OF SECURITY WFORMATlOM ASSURANCE CENTER,CNS, PLANNWG PROCVREMENT, WFORMATKW DEPARTMENT DEPARTMENT DEPARlllEMT SUPERVISOR ENGWEERWG, SERVICES &

MANAGER MANAGER MANAGER DEPARTMENT PLANT NUCLEAR AIXXT& DMSON SYSTEM IXSTRIBIflIVE METER AND MANAGER MANAGER SECURIlY SVRVBLLANCE SYSTEMS DESGN INFORMATION tAB HUCLEAR GWNA SERVICES ENGWEERWG SYSTEMS OPERATIONS ENGWEERING STATION SECURITY SUPPORT SERVCES SERVICES FIELD & SHOP ENVIRONMENTAL c RBAY ELECTRC FABRCAllON SC ENCE, SERVCES LABORATORY DESGM, STATION ENGINEERWG COMMVNCAIIONS METER CHEIIISTRY CONSTR UCTCN, OPERATlONS.

OPERATIONS SERVICES AND MAINTENANCE, QVAUIYc RESEARCH & FUEL KP &

LABORATORY COHTROL AND MANAGEMENT& CHEMISTRY DEVELOPMENT EMIPLOYEE SERVICES QUAUlY TECHNICAL COMmOL, RELATIONS ENGINEERING SUPPORT TECHNICAL DEPARTMENT SERVCES SERVICES SUPPORT, IOWAGER TESTING, OVERHEAD MANAGER MATERIAL CON SIR VCDOM MATERIALS CONTROL, AND ENGWEERWG PROCUREMENT, MAINTENANCE- AMD FIRE EAST INSPECTION PROTECTION, SERVCES SAFETY, MODIFCATIOM, CONSTR UCilON OPERATING RBAYTEST EXPERIENCE &

ENGWEERWG. COMPVTER SYSTEMS MHE ISNP.

SERVCES FIGURE 2-1

QUALITYPERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE MANAGER MANAGER MANAGER QUALITY QUAI ITY NUCLEAR MATERIALS PERFORMANCE ASSURANCE ASSURANCE ENGINEERING SENIOR 8 INSPECTION ANALYST

- SERVICES QUALITY QUALITY QUALITY MATERIAL8 STAFF ASSURANCE CONTROL CONTROL MATERIAL ENGINEERS ENGINEERS FOREMAN HANDLING ENGINEERS 8 FOREMEN STAFF TECHNICIANS 8

INSPECTORS FIGURE 2-2

GINNA NUCLEAR PRODUCTION ORGANIZATION VCE PRESDEMT 0 INNA NUCLEAR PRODUCTION BUDGET AND COST PLANT MANAGER DEPARlMENT DEPARTlIENT OINNASTATION MANAGER MANAGER NUCLEAR PRODVCllON NVISON ENGINEKRINO TRAJNINO SERVCES SV PERINTENDENT NITIALUCENSED DESGM GINNASUPPORT OPERATOR I

SERVCES CONSTRUCTION OPERATOR REOUAL I UCEN SINO OPERAllONS OPERATINO PlhNNINO d AUX OPERATOR CORPORATE HEALTH EXPERIENCE ECHE DVUNO FUEL MANAGEMENT PHYSICS HEALTH PHYSCS d STA INITIAL CHEMISTRY MATERIALS MAINTENANCE TECHNCAL SUPPORT NUCLEAR PROCUREMENT SYSTEMS STA REOVAL SERVCES EMERGENCY TECHNCAL PLANNINO ENGINEERING MAINTENANCERULE CHEMISTRY TECH PROJECT COMPUTER SYSTEMS RAD PROTKCIIOM ELECTRCAL ANO ldC TECH MAINTENANCE CONTRACT RAD MKCHANCAL PROTECTION TECH MAINTENANCE ELECTRCAL MAINTENANCE MECHANCAL MAINTENANCE r0 UI Id C TECHNXXAM RdT TECHNCIAM LO lA FIGURE 2-3

GAS AND ELECTRIC DISTRIBUTION DIVlSION SENIOR VICE PRESIDENT GAS AND ELECTRIC DISTRIBUTION AND CUSTOMER SERVICES DIVISION MANAGER DIVISION MANAGER SYSTEM ENGINEERING ------ ~------------- ~ ~ 0~

ROCHESTER AND DESIGN CONSTRUCTION .

AND MAINTENANCE DEPARTMENTMANAGER DEPARTMENT MANAGER QUALITY DEPARTMENT MANAGER DEPARTMENT MANAGER SYSTEM DESIGN DISTRIBUTIVE SERVICES METER AND LAB OVERHEAD ENGINEERING INFORMATION COORDINATOR OPERATIONS CONSTRUCTION AND SYSTEMS SUPPORT MAINTENANCE- EAST SUBSTATIONS RELAY ENGINEERING ENGINEERING COMMUNICATIONS ELECTRIC LABORATORY CONSTRUCTION METER SERVICES RELAYTEST OPERATIONS NOTE: Chart Is abbreviated to show only key positions involved In Implementing the QA program and therefore, does not show all positions In the division.

LINES OFAUINORllY LINES OF COMMUNICATION FIGURE 2-4

TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MANAGER TECHNICAL SERVICES AND CHIEF ENGINEER MANAGER DEPARTMENT MANAGER PRODUCTION MANAGER DIVISIONAL AND GENERAL SERVICES ENGINEERING ENGINEERING SYSTEMS SERVICES MANAGER DIVISION MANAGER FOSSIL . PROJECT SHOP SYSTEMS ENVIRONMENTAI ENGINEERING MANAGEMENT OPERATIONS SCIENCE SERVICES RECORDS HYDRO MANAGER MANAGEMENT MANAGER ENGINEERING FIELD CHEMISTRY SERVICE FOSSIL/HYDRO SERVICES FACILITY OPERATION SYSTEMS ENGINEERING SUPERVISOR MANAGER TECHNICAL ENVIRONMENTAL REAL ESTATE ADMINISTRATIVE INFORMATION LABORATORY MANAGEMENT SERVICES AND CENTER PROJECT SENIOR PLANNING ENVIRONMENTAL ANALYST MANAGER RESEARCH 8 INSPECTION/LAND DEVELOPMENT SURVEY AND PROGRAM BUILDING SERVICES FIGURE 2-5

G IN NA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY PORC PERFORMANCE T T T TECHNICAL MATERIALS GAS AND PURCHASING GENERAL NUCLEAR GINNA STATION SERVICES ENGINEERING ELECTRIC MAINTENANCE ENGINEERING DIVISION AND DISTRIBUTION SERVICES INSPECTION DIVISION SERVICES REVIEW AUDITS FIGURE 2-6

l ATTACHMENT 2 ROCHESTER GAS AND ELECTRIC CORPORATION R.E. GINNA NUCLEAR POWER PLANT Revision 19 to:

Quality Assurance Program for Station Operation DOCKET NO. 50-244 December, 1993

'

P

TABLE OF CONTENTS Section Title Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program

2. Organization
3. Design Control Procurement Document Control 14
5. Instructions, Procedures and Drawings 16 Document Control
7. Control of Purchased Material, Equipment 20 and Services
8. Identification and Control of Materials, Parts and Components Control of Special Processes 26 Inspection 27 Test Control 28
12. Control of Measuring and Test Equipment 30
13. Handling, Storage and Shipping 31 Inspection, Test and Operating Status 32
15. Nonconforming Materials, Parts and Components 33
16. Corrective Action
17. Quality Assurance Records 36 18., Audits 38 Revision 19 December 1993

UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R. E. Ginna Nuclear Power Plant.

This program applies to all activities affecting the safety related. functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modification, test and inspection. In addition, the Quality Assurance Program applies to the activities associated with the packaging of" licensed radioactive materials to be shipped in accordance with lOCFR Part 71 excluding fabrication and design of shipping casks'he basic Rochester Gas and Electric 'Corporation quality assurance policy is, established by. the Chairman of the Board, President 'and"Chief Executive Officer. This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering through the:

Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station; Division Manager-Technical Services and Chief Engineer; and heads of other supporting departments.

The program is governed by a.Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program. The manual is prepared, reviewed, and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.

The program is implemented through Quality Assurance/Quality Control, Ginna Station, Nuclear Engineering Services, Production Division Training, Materials Engineering and Inspection Services(,:-:,Gas,t',:'and::.':;:lBlectrac.,',";,'Das't'ai'butao'nj!

", 'an'"'pure asrng Diva~ii'~fief procedures. These procedures are prepared, approved and maintained by the responsible organization and reviewed by Quality Performance. In addition to its procedure review, Quality Performance assures procedure adequacy through use.

audits and surveillances of a sample of procedures in

-

These procedures are reviewed for adequacy at least once every two years by the responsible organization.

Revision 19 December, 1993

Table l-l provides a listing of the subjects and a short description of the subject matter which is contained in ~

Ka.ch:-:.'procedures Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.

The Quality Assurance Program covers all existing Seismic Category l and Class 1E structures, systems, and components, including their foundations and supports. Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance. A detailed listing of the structures, systems and components covered by the Quality Assurance Program and,based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in a controlled database. The criteria for determining if the quality assurance program applies are reviewed by Quality Performance.

Details of -the water-and-steam-containing system boundaries are contained on system flow drawings.

Modifications or additions to existing structures,.systems, and components are designated the same seismic classification .as the existing system. New structures, systems,. and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.

Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure .they understand, that these are mandatory requirements which must be implemented and .enforced. Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements, purpose, scope,and implementation of ajj3.'fegb3ygj.,quality related program manuals and procedures. Refre'sher" sessions are held periodically.

Retraining may be required whenever a new procedure is issued or a major revision is made to an existing procedure.

Training of personnel not in the Quality Performance organization is the responsibility of each department performing an activity affecting quality. Quality Performance assists in establishing training requirements and assures that personne3, are trained by auditing training.

Revision 19 December, 1993

In addition to training in quality assurance, each department conducts training, including on-the-job training, to the extent necessary to assure that personnel are qualified for their primary work assignments.

The Vice President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of o erators, as necessar . As ap ro riate, personnel 'g'@Ag't'8'i9':'..,gpiiier548@'iePes'i~tc! $ 8 j;::i trained in radiation protection, plant safety and'"security.

The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B. This review consists of audits or a review equivalent to an audit performed by company personnel or outside organizations.

The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B,,"Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:

a. NRC Regulatory Guide 1.8, Revision 1, "Personnel Selection and Training".
b. NRC Regulatory Guide 1.28, Revision 2, "Quality Assurance Program Requirements (Design and Construction) ".

C. AEC Regulatory Guide 1.=30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment".

d. AEC Regulatory Guide 1;33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in: the document, entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", Revision 0 dated October 1973 (Orange Book - Revision 0)

Revision 19 December, 1993

0 AEC Regulatory Guide 1.37, Revision. 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants".

NRC Regulatory Guide 1.38, Revision 2, "Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants".

NRC Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements for Water-Cooled Nuclear Power Plants".

h. NRC Regulatory Guide 1.58, Revision 1, "Qualification of Nuclear, Power Plant Inspection, Examination and Testing Personnel".

NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants."

j. NRC Regulatory Guide 1.74, Revision 0, "Quality Assurance Terms and Definitions" ~
k. NRC Regulatory Guide 1.88, Revision 2, "Collection, Storage and Maintenance of Nuclear Power Plant Records".

NRC Regulatory Guide 1.116, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment .and Systems".

NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants".

n. NRC Regulatory Guide 1.144, Revision 1, "Auditing of Quality Assurance Programs for Nuclear Power Plants" except that supplier audit frequencies and performance evaluations are as described in the Quality Assurance Manual.

Revision 19 December, 1993

0 0

e

o. NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants".

Or anization The major organizations participating in the Quality Assurance Program are Purchasinq, Technical Services, Ginna production ~ggasj!and":"."::::El'ectrwcl!'S'distr'r'hut'aozj!Xfi!lfi~8xp~A

"," " 'ua "i 'rea OimanCe,

'uclear y

the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board. Figure 2-1 is an organizational chart 'showing these organizations and their relationship to the corporate organization.

Positions responsible for the principal elements of the quality assurance program are:

Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna Nuclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services piphx;:tgjig.j:.:Nieige',i": Quality Pi r ormance Manager, Quality Assurance Production and Engineering Department Manager and, Purchasing Agent, Materials Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Mana er, Nuclear Assurance Piijry',eao 9 zv'i!eron:::;:!Man'ager'~~Ra'ahii'eL e+rLonereuti.,:Li>ai'i~<:::aii'0

,, axnt',"u,,nancer.

~D'e',,ax:tmeiit$~Namage Manager, Materials Engineering and Inspection Services Revision 19 December, 1993

In addition to the above individuals, two advisory groups are utilized to review and audit plant operations. These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering. The qualifications of members and the responsibilities of these organizations are described in Section 6.0, Technical Specifications, Appendix A to the Full Term Operating License No. DPR-18.

The Chairman of the Board, President and Chief Executive Officer of the Rochester Gas and Electric Corporation directed the establishment of the Quality Assurance Program and issued the governing policy statement. He has established the Nuclear Safety Audit and Review Board to review and audit plant operations: The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Chairman of the Board, President.and Chief Executive Officer on all activities of the Nuclear Safety Audit and Review Board.

The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in .accordance with applicable regulatory requirements. In addition, he has overall responsibility and authority for directing the Quality Assurance Program and shall be responsible for the approval of the Quality Assurance Manual. He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing'Ginna Nuclear Production activities and those support activities associated with Nuclear Engineering Services, Production Division Training, and Corporate Radiation Protection.

Revision 19 December, 1993

The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the overall on-site safe operation of Ginna Station. He is responsible for: the performance of all Ginna Station'uality affecting activities in accordance with the requirements of the quality assurance program; providing qualified personnel to perform these activities in accordance with approved drawings, specifications, and procedures; those items delineated in Section 6.0, Technical Specifications; and assuring that significant conditions adverse to quality are identified and corrected.

The Superintendent; Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of The Superintendent, Ginna Production, reports to the Plant Manager, Ginna Station, and is responsible for operations, health physi'cs and. chemistry, refueling, Lf'rrs,."lip'r'oLeptieng!::

results and tests, Ginna computer systems, man0 rj a8n

@e%p'OX!BX4~+C-';l1RG: '3 ','3."CCQ "'3 "QDBjgf vramirf~ q

~

.".,

0;:ephor%:O'A.;.

a nghineex'g'age'an,:,!sary'a'i'<ilia'nceii'teat'ingle'h requirements o'"t "e qutalrtty 'assuran'ce. program The Plant Manager, Ginna Station and Superintendents, are assisted by other designated staff members, Figure 2-3; in the implementation of certain Quality Assurance Program requirements at the plant. These staff members are assigned responsibility for testing, procurement, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, op'ei',:aPiixg~7exper'i'eniaaiaipsm'enba) maintenance of material handTing .equipment, and control of all activities involving operation, maintenance, repair, refueling and modification.

The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an ximrzev~s~Ssa."'"y ""wreais c..em., gsesex~~sc .qxyasaga, ,iaG+i~i

@~A'sc'xtlxtc.".,',:of~;;Mu'cl;;.Bax;:..,,:Pow8x+OpBx:a t&oQB:

Mraa"teiials Eangineering 'and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related activities.

Revision 19 December, 1993

The Department Manager, Nuclear Engineering Services is responsible to the Vice President, Ginna Nuclear Production for designing and constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management. As requested by Ginna Station, he is responsible for reviewing unique maintenance and repair procedures for major equipment and providing technical support. He is also responsible for tracking and preparing corrective action report a udice CLaertilf&A tl:: ac~tictiiigX!~8,: Ckangf summaries .

The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station. These activities include long range planning for low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention, document control, chemistry and environmental requirements support..

Production and Engineering Systems is responsible to the Division Manager, Technical Services and Chief Engineer for providing records management and document control support services for nuclear related activities.

The Department Manager, Quality Performance is responsible to the Senior Vice President, Production and Engineering for establishing the overall Quality Assurance Program. He is responsible for assuring that all planned and systematic actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed. He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.

Revision 19 December, 1993

0 He has the authority and organizational freedom to assure all necessary quality activities are performed. In addition, he is responsible, for special processes and the inservice inspection program. He is responsible for maintaining a staff, Figure 2-2, for the conduct of staff training and.for directing its activities. The staff assists in the preparation and maintenance of .the Quality Assurance Manual and applicable corrective action report summaries.

The Manager, Quality Assurance reports to the Department Manager, Quality Performance. He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation. This includes writing Quality Assurance policies, assuring that the program satisfies the requirements of.lOCFR50, Appendix B, and for maintaining the total program up to date. The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program. The staff is also, responsible for auditing and surveillance of aspects of the Quality Assurance Program. They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents.,

They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified Q!'itig'iA't'i5+xygPi::::!3!9,':::itgBgFo'ggggfiliigke6:::guy@'3!jyiiand at these suppliers'acilities In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule and audit status reports.

The Manager, Quality Assurance is a graduate engineer with at least six years of responsible experience, of which at least two years are in quality assurance and at least three years in the design or operation of nuclear power plants.

The Manager, Materials Engineering and Inspection Services is responsible to the Department Manager, Quality Performance for the development and qualification of procedures utilized for special processes.

Revision 19 December, 1993

He is responsible for providing functional guidance and direction for those methods.'e is responsible for establishing the Xnservice Xnspection Program and for coordinating changes thereto. He is also responsible for the routine maintenance of lifting and handling equipment and for the testing and evaluation of Ginna Station mater'is is I ~sH~e,:',::,:::s~!re8ponsa

.

The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures.gj4He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance andPq'uaX!it@,,control planning and work monitoring responsibilities to his staff of Quality Control Engineers, Foreman and QC Xnspectors. The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing. Nuclear Assurance is responsible for assuring performance of verification inspection i activities and assuring that inspection requirements are included in approved procedures and work packages. This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.

The Nuclear Assurance Quality Control Xnspectors also perform compliance oriented surveillance of nuclear ~elated activities.

The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements.

Revision 19 December, 1993

I He is also responsible for providing laboratory testing of some electrical equipment and devices'hhg:"

"i!i',,'i":::,i!i:,,',iI'i',::i'i!i!s i::, sil II'.i, i'is! 'mi '...'i$

Design is resposns'i.ble for"'providing a s'tsaffs", P'i.gure 2-4, to perf'orm relay engineering services. He is responsible for design, modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna.p::;-:NikTj'is><alppji ejsi'ons'abTpgfc'ig, FOTSDQD~$ <CO'.t.XQ~A's.':x

~ ~

Desi n Control Design activities are performed by Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.

Nuclear Engineering Services is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or components.

Augmenting this effort is the design and technical support provided by the ui ment which

'r Syihge'llChgaiiie'e'i'iiig),"ariWi'",,'-Z)Faxga':',:;Pi87ipi:;:on

'e systems" an' 5as-:

O'AC&1'SCCA'XC+jPX%t!XAVQKxp'6j+9'ivan'i'ca'; is responsible for maintaining. Xn %is regard Grays support Nuclear Engineering Services for design of safety related modifications.

Revision 19 December, 1993

Ginna Station is responsible for the design and control of design activities for Minor modifications of structures, systems, or components. Ginna Station is also responsible for classifying station originated modifications as either Major or Minor. Nuclear Engineering Services reviews and concurs with modifications being classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design. and are limited to the extent that the change does not impact existing performance requirements, (2) additions within Seismic Category I buildings which perform no safety functions and which neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component required for safe, shutdown of the plant to an unacceptable (3) changes to a safety related system determined not 'evel, to be major (e.g., vents, drains, alarms, indicating lights, etc.) .

Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution,'ontrol, and revision requirements; and corrective action. Design considerations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analyses; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; and quality standards and other quality assurance requirements. Design verification utilizes. various methods such as formal design reviews, alternate calculations, or tests, as appropriate, to assure the adequacy of the design.

The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested. For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers'r consulting engineers, as appropriate.

Spare or replacement parts must at least meet the original equipment's technical and quality requirements. For plant modifications, standard, "off-the-shelf", commercial or previously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.

Revision 19 December, 1993

Changes to a modification design are normally reviewed and approved in accordance with the same procedures as the original modification design. Supplemental procedures are established for the review and approval of field changes.

In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed, reviewed and approved the original design.

Where this is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent background information and are competent in the specific design area.

Design verification and field change systems are .methods utilized to detect, document and correct design process errors and deficiencies. In addition, the corrective action system, described in Section 16, is utilized to control and document corrective action to preclude recurrence of those design process errors and deficiencies which are 'considered

, to be a significant condition adverse to quality.

Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. Design, control procedures are reviewed to assure that an independent verification is performed.

Production and Engineering Systems, Nuclear Engineering Services and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions Were~a.:44ex$ 5@, to assure. that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information. The measures. include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.

Design documents are collected, stored, and .maintained in accordance with Section 6 and 17, as appropriate. Design documents include design criteria, analyses, specifications, drawings, design review records, and changes thereto.

Revision 19 December, 1993

~

Quality Performance, through preparation assistance and/or review, assure the proper inclusion of quality standards in

-the design of major and minor modifications. Quality Performance is also responsible for assuring that adequate test, examination and inspection. requirements are included in specifications. The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.

Ginna x.rp Plant modifications are controlled by means of applicable Station, Nuclear Engineering Services,fi8i'Sillery

,s::-,~!-::-::::- -:I-:::::,-::.::::::-::::::':::.:':::::- -:::::":-:::

Production Division Training and Quality Assurance/Quality Control procedures. These procedures provide for, the preparation, review, and approval of design documents,

':::,::

safety analyses, and plant modification procedures. Plant modifications are reviewed by the Plant 'Operations. Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.

Procurement Document Control Procurement document control applies to the control of-procurement documents for materials, parts, components,,and services required to perform quality affecting activities.

Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts.,

specifications, and drawings.

Procurement of materials, parts, components, and services is initiated by department staff personnel. Procurement procedures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.

Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision. Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Gaa":::,,~h'kaid.:':';,:El'gcYi3'4':,"'Da'ptxxbutxori-.::.!P'iy ipibn3(pand Qual ity Performance and approved by designated departmental supervision.

Revision 19 December, 1993

Evidence of review and approval of procurement documents is recorded on the documents and identifies to Purchasing a procurement method which will ensure that the selected supplier is capable of providing the item or service in accordance with the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.

After purchase requisitions, service agreements, contracts, specifications, and drawings have received the required reviews and approvals, a purchase order is issued by Purchasing to the selected supplier and controlled as described in Section 7."'hese documents are maintained by Purchasing, by the originating department, and/or by the.

receiving locations, as appropriate, until procurement is completed.

Under no circumstances are purchasing requirements altered (except for quantity. or pricing) during order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above. Changes or rev'isions to procurement documents are subject to the same review and approval requirements as the original documents.

Originating department technical review of procurement documents includes verification of applicable regulatory,.

code and design requirements. Quality Performance review of the above includes checks to verify proper inclusion of the quality standards, quality assurance p~~gram requirements, method of procurement and the applicable acceptance criteria. Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, compatibility, and acceptance criteria of the original design. Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.

Revision 19 December, 1993

instructions Procedures and Drawin s Each Rochester Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing procedures as required to implement the Quality Assurance Program. These procedures cover activities such as document control, training of personnel, and responsibilities and duties of personnel. Quality Performance reviews these procedures for inclusion of quality assurance program requirements. Table 1-1 prov&des a summary of the subject matter contained in the procedures which are used to implement the quality assurance program. Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.

Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modif ication and testing. This'ncludes instructions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, of f normal, or alarm conditions; response to emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling. Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Rochester Gas and Electric management, or the completion of plant modifications. Ginna Station is also responsible. for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.

GaÃ~j%'riNF48:l"eati:ga,':':'DiSFi'i~b+8i%n!ISi;vi.si':0rB, v: vNM'NQN@k'.jhivNkvNNNRN@vSN%'j'"w'"s~"~SNR 'v'"

Rv>SNWs4':i'%5i'>WC:jv is responsible ior the preparation and implementation. of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible. P$%jYFi)cPjBl'ectii6 P~,e.tj":j:.k,ijg'~ogPjP),,:,;~i'i~oe:.-::

also assists in the preparation of routine relay mai,ntenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.

Revision 19 December, 1993

0 Nuclear Engineering Services is responsible ' for. providing approved specifications and drawings -'.lpga major modifications and for minor modifications when <aiam 4g4$ $ j~. -These documents require those performing the work'"Fo obtain, understand, and comply with appropriate procedures, specifications and drawings. Engineering has established procedures for revising drawings and specifications. These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.

Quality, Performance is responsible for: preparing and implementing inspection procedures utilized for detailed inspection activities for Ginna Station; providing and implementing procedures for audit and surveillance related activities; providing and implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.

Persons preparing, reviewing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.

Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents. In addition, Quality Performance department assessment as described in Section 10 and Section 18 are used to verify that commitments are being addressed and affecting activities are being performed in 'uality accordance with approved instructions, procedures and drawings.

Document Control Procedures are established to control the'ssuance of procedures, instructions, drawings, and specifications.

Revision 19 December, 1993

Standard document control requirements are contained in the Quality Assurance Manual. The Plant Manager, Ginna Station is responsible for the control of all documents issued by Ginna Station ersonnel.

98".8.,'.:'-'.-8gj9,l::;:'.EX$ c,Q:X;x'C::::::,';QMCg',i:. 'g:giegi~iD$ ygkioegand Production Divi:si;on Trai'ning are respons'i.ble 'for the control of documents issued. by their respective organizations.

Production and Engineering Systems controls the distribution of controlled manuals issued for the other organizations performing activities which implement this Quality Assurance Program (Table 1-1) . Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.

The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and approval of documents. Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequate, and include appropriate qualitative and quantitative requirements. Nuclear Assurance Quality Control representatives, who are assigned to support departmental maintenance, repair, refueling and modification activities, are responsible for reviewing, prior to use, governing procedures to assure quality assurance requirements are included. The Plant Operations Review Committee has the responsibility for 'reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical .Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with that activity. Ginna Station, Nuclear Engineering Services, Material Engineering and Xnspection Services, Purchasing, Production Division

'i",ilia"--.'6!i iX"::-,i-::::i!!i'i'i"'":,i::'i'!8!-.'i -,, ',,'*::D -',:-::i'!::-::,-:::-:i~

" ""'" """assurance""'i.mp "emen ing procedures (Table 1-1) require the review of Quality Performance and the approval of the appropriate department supervisor.

Quality Assurance/Quality Control procedures are approved by the Department Manager, Quality Performance or designee.

Revision 19 December,, 1993

The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. It identifies the difference between controlled and.uncontrolled copies of the same document; includes the method for. identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.

Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and

, administrative)., specifications and drawings. Suppliers of materials, equipment, and services under an approved 10CFRSO

. Appendix B supplier 'quality assurance program are required in procurement documents to provide for control of documents, including -manufacturing, inspection and testing instructions.

The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required; to properly review and approve documents such as procedures, instructions, specifications and drawings to provide the same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.

Quality Performance is responsible for review and concurrence of procurement documents for all procuring organizations and, therefore, procurement document control requirements.

Quality Performance is responsible for review and assessment of document control systems to assure adequate systems are implemented.

Revision 19 December, 1993

Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.

All procurement is conducted in accordance with procurement documents as stated in Section 4. All reviews, inspections, 1,'~

surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.

organizations!c'oTI's'i's%'i of determining the methods to be used for acceptance of the'tem or service and the requirements for control of the supplier performance. Source inspection (surveillance), certificate of conformance, receipt inspection and post installation test are '

methods which are considered for item acceptance ge'c8apg either or a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to the p'rocurement document requirements (i.e.

certifications, stress reports etc;). The extent of the acceptance methods and associated verification activities will vary Bep'endtn9'!::::!up'od the relative importance and complexity of the pur~cTVased iHem or service and the supplier's past performance.

Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.

Results of the planning are incorporated in the procurement documents.

Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance evaluation, which is accomplished during planning, determines the necessity for the supplier

~

with the requirements of the procurement documents. The procurement selection to be mi8a from the approved suppliers list.

Revision 19 December, 1993

Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program. The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement item,F-'-,;:viPggh'eg if- the source is to be restricted to the original supplier. For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is i'i'de"from the approved suppliers lists or one who is in" the process of being added to a list, after having its capability evaluated to purchaser satisfaction. Items or services, which meet industry standards and are typically utilized in applications other than nuclear, may be purchased from suppliers not listed on the approved suppliers list((

provided that item acceptance can be based on acceptance of

,standard commercial quality which is supplemented, as necessary, with source surveillance, pre- or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection. Items or services which have nuclear quality requirements whi'ch normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed on the approved suppliers listg provided that verification of nuclear quality can be accomplished by methods such as source surveillance, 'pre- or post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance. Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of the corresponding procurement method. The purchase requisition will also identify the source when replacement parts. are to be procured from the original equipment supplier.

Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's I

'ii(f181'40':,.!!8'880'XP6C8!!igXOg$PN+'5g Q~u$ ':Q~ty+~gPs su'r'an~+

4w4NOk:vÃvW.'4Ni05NNCS@s% 'Nvdvg

~

Revision 19 December, 1993

For engineered items, Nuclear Engineering Services ke o':.

Qiana.::St5gion!.-:,a'x'e responsible for evaluating the or manufacturing capability of the supplier including overall'esign his particular technical ability to produce the design, service, item, or component delineated .in the procurement documents. As part of this review, the supplier's design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are reviewed.

Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of .10CFR50 Appendix B, and Rochester Gas and Electric Corporation requirements. The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance calibration practices, acceptance criteria, .'rocedures, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assurance requirements.

Ginna Station, Quality Performance and~GY8'".':;@ridj)gp!ic'CWg~~p evaluate the suppliers of inspection, test, and calibration services which they intend to use.

The departments responsible for performing supplier evaluations shall document their results, in reports which discuss areas investigated, findings, and conclusions.

Revision 19 December, 1993

These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier. In addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance. ,With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.

Quality Assurance is responsible for determining and documenting the degree of supplier surveillance (including review, inspection,. or audit) required during design; fabrication, inspection, testing, and shipping, and for providing the required surveillance. The objective of supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements. For complex engineered items, Quality

-

Assurance and Nuclear Engineering Services-are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.

The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance representative has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report , or to stop work, if necessary.

Quality- Performance is responsible for surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.

The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.

Revision 19 December, 1993

Department supervision is responsible for receiving and storing items pending their acceptance., Upon receipt, the department stockkeeper logs the item, places a "hold" tag on the item, and notifies Quality Performance that the item has arrived.

Quality Performance is responsible for receipt inspection at Ginna Station upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use. Documentary evidence sufficient to identify the codes, standards or specifications met by the purchased material, equipment, and services is retained. In the event a final source inspection for the acceptance is conducted prior to receipt by RGGE, Quality Performance performs an inspection for shipping damage or lost parts and a document check to assure that the required documentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.

If the item and documentation are adequate, Quality Performance labels the item as "Accepted", files the documentation and receipt inspection results, and.releases the item for storage or use. If the item is nonconforming or the documentation is unsatisfactory, Quality Performance initiates controls on the item in accordance with Section ls.

All items issued must bear an acceptance tag or label and have documentation to support the acceptability of the item.

In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.

Identification and Control of Materials Parts and Com onents The identification and control of materials, parts, and components is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication, storage, or installation.

Revision 19 December, 1993

Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:

traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials, parts, and components prior to release for manufacturing, shipping, construction, and installation.

Nuclear Engineering Services@~8iiii'ai84%b'i'>and Quality Performance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and control of materials, parts, or components, as appropriate. Suppliers are required to assure that all required documentation for an item is properly identified and related to the item. Each item is required to be physically identified, either by marking on the item or by tags. Physical identification by purchase order number is used to the maximum extent. possible for relating an item at any time to applicable documentation.

Identification is either on the item or records traceable to the item. Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.

The Plant Manager, Ginna Station is responsible for maintaining identification and control of materials, parts, or components received, stored, installed, and used at the plant in accordance with approved procedures.FS The responsible supervision of other departments which receive material:;44'y8 which is to be stored away from the. plant are.

responsibl'e "for establishing procedures for identification and control and for maintaining identification and control of material, parts,'r components, stored or used in their area of responsibility.

In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.

Revision 19 December, 1993

Control of S ecial Processes Written procedures are established to control special processes, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.

Qualification of personnel and special process procedures eemykkee Fo'mply',,::".":with the requirements of applicable codes and standaids.'Shen special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the p'ersonnel qualification requirements, the equipment necessary, and the special process qualification requirements.

Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.

Quality Performance personnel're responsible for reviewing procurement documents to ensure that requirements for control of special processes are included.

Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering and Inspection Services. Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.

The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications, and standards.

Within the Quality Performance Department, the Manager, Materials Engineering and Inspection Services is responsible for the qualification of NDE personnel and procedures. The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures ca@

(<<v<<<< .

<<

.9)))Y ~

Q) <<6" O'Ctjiei'0:;188)~Q()

gg4... g<<YAK ~<<<<w <<<<R Records for personnel ana'NAB

<<<<<<<<<<<<<<<<<<&AN)<<h <<<<%<<<<%1%hw<<<<<<A4 ANh<<, '<<Avh<<<<<<Vh+ <<Y%Nk 4<<SM <<<<<<<<<<<<Y$

procedures to dern'onstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.

Revision 19 December, 1993

O It I I~

II

Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure effective compliance with procedures.

Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifications, codes, standards, or regulatory requirements. For clarification and to distinguish from preventive maintenance inspections, the following controls are associated with the quality assurance function inspections and referred to as verification inspections.

Instructions for conducting detailed verification inspections are contained in inspection procedures. These inspection procedures and all supporting specifications and

.drawings are provided to-inspection personnel for-use prior to performing the inspection. Inspections and hold points are. utilized to verify conformance of materials, parts, appurtenances, components, processes or structures to predetermined quality requirements. Inspection'procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.

Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors. Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.

Quality Performance personnel are responsible for assuring performance of verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and 'Electric personnel. The adequacy of inspections not directly performed by Quality Performance personnel will be assessed on a sample basis through the QA/QC surveillance program. Inspection equipment is calibrated and controlled in accordance with Section l2. Calibration status is verified by inspection Revision 19 December, 1993

personnel prior to performing an inspection operation.

In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing methods, equipment, and personnel is provided.

Both inspection and process monitoring are required when control is inadequate without both.

Quality Performance is responsible for verifying adequate inclusion of inspection requirements in specifications. I The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing instructions and procedures and related fabrication processes. He is also responsible for the assignment of qualified personnel required for the performance of verification inspections and quality control surveillances of quality affecting activities.

With the exception of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible'for establishing the requirements for the Inservice Inspection Program. Nuclear is responsible for establishing the requirements Engineering'ervices for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant i system and other safety related systems is contained in Section 4.2, Technical Specifications.

11. Test Control Checks or testing performed to verify the adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings. Whenever testing is required to demonstrate that a material, pa'rt, component, or system will perform satisfactorily in service,'

test program is instituted employing written and ap'proved procedures which are in accordance with basic requirements established in Technical Specifications, drawings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements. The test program requires the identification, control, and documentation of all tests, and the preparation of written procedures required for satisfactory accomplishment of the testing.

Together the written procedures and checklists for the testing program include: necessary test equipment'and calibration requirements; material requirements; test Revision 19 December, 1993

personnel requirements; prerequisite plant and equipment conditions;-limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instructions for disposition of deviations; data collection requirements; and test result approvals The Plant Manager, Ginna Station is responsible for the

.station test program, which includes the surveillance test program required by Section 4.0, Technical Specifications

~xc ynr vw>>~ ~q~, i o>>a~.>w~q~...i q>e.~vqpwyeepxcwx~avax v." q:py e, aq~mge~pP<$~@3;:sex

>ug )@i?j;:<?:; v'K~

pip'ii'ed'iijiji:,~!~'ii'8::::-pb'if+'~ini~j:",;ij"i3j~j'ig':,:':8'i~oci'iiib5 Io":ii:::i:ckt vA4%4'I ihrii>>"'%%%'kR%(wACCNAv

ÃRvVN'est procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved by the Plant Manager, Ginna Station. The Plant Manager, Ginna Station is responsible for the correct and timely performance of the required tests

.utilizing written and approved procedures.. When contractors are employed for tests, the contractor is required to perform testing in accordance with Re gh8)PjpP'pV5V88 quality assurance program requirements. "'A'll test results are required to be documented, reviewed, and approved by those responsible for performing the test..

When requested by Ginna Station,

'",.;'Qi'i ;.8;.66<:-'.,

test activities'" "o 'e erm'i'ne'" cause" o"'io" e'c'""ive re ay malfunctions. These test activities are performed in accordance with approved procedures by qualified personnel.

Nuclear Engineering Seivices and Quality Performance are responsible for assuring that required tests for major modifications are included in specifications. Nuclear Engineering Services and I'.:",'.Ga%~ an/~@,":Zl:iat'xiePDji;0'x.xbetjonY":,',Di'mi.a.:ion assistance in the preparatio'n'"of'modification-related test procedures may be provided'to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements. Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requirements.

Revision 19 December, 1993

~

Control of Measurin and Test E ui ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures.

Calibration procedures include step-by-step methods for calibration and requirements for instrument accuracy.

Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other conditions affecting measurement capability.

Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability

'to calibration test data, and identification of the next calibration date on the equipment; a system providing traceability.of shop standards to nationally recognized standards (where national standards do not exist, procedures conta'in instructions to document the basis. for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of 'all items under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates; and a system controlling the purchase requirements of new equip-ment to be entered into the calibration and control system including requirements for accuracy, stability, and repeatability under normal use conditions. In the event a measuring instrument (i.e. shop or field standard) is found out of calibration, an investigation is conducted to determine the validity of previous measurements.

The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordance with the above requirements. Instruments specified in Section 4.l, Technical Specifications, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are calibrated and controlled in accordance with station procedures. Measuring, -test or inspection equipment used by Nuclear Assurance. Quality Control is included in the program.

Revision 19 December, 1993

The Manager, Materials Engineering and Inspection Services pap',"O'Ci045@eiparwe responsible the" preparation of procedures for the control and f'r establishing" a program and calibration of measuring and test equipment used by their respective organizations.

13. Handlin Stora e and Shi in Ginna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.F':.',-:";:,'4Qg$ Bd:;.;$ 3'@CQXiC sAn" '

Services are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located in their work areas. In addition, the Manager, Materials Engineering and Inspection Services is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and handling equipment. Under normal circumstances, manufacturer's specific written instructions and recommendations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to environmental requirements. In the absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in accordance with department procedures.

The Department Manager, Nuclear 'Engineering Services p2 Pj3;:8A'+t:"';::885'Age'X~>'":.;.:,,:,bi@$i':.')8t",,@t4e@~i@wi responsible for speci fying in procurement 8ocuments ance in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for major modifications.

These procedures are prepared by contractors, by the station staff; or by staff members of pes'i ap'cl,:,,:MB'acigkiiciPDiSBYibi~Ea'on,.'ipxya;:s'i:on as appropriate. Rocbeste r Cars and Electric proce urea are reviewed and approved as described in Section 6.

Revision 19 December, 1993

In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.

Quality Performance, Gin%a!,';,SEa'@ion and Nuclear Engineering Services are responsible for review of engineering specifications to assure that proper handling, storing, and shipping requirements have been specified. Quality Performance is responsible for assessment of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.

Ins ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly identified by use of tags; control logs, and other suitable means to indicate the status in a positive manner.

The identification is sufficient to positively indicate. the status of the particular equipment-or system being isolated. ~

The Plant Manager, Ginna Station is responsible for indicating the status of operating equipment or systems to be- removed from service for maintenance, repair, or modification in accordance with the. approved Electric System Operating Rules. The Plant. Manager designates personnel who have station holding authority.

Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.

System status is indicated through the use of hold tags, block tags and corresponding control logs.

Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets. Written procedures control the use of hold tags, test tags, and labels.

Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.

Fuel handling operations involving fuel assemblies or other radioactive sources are identified and controlled by the use of tags, stamps, or other suitable means.

Revision 19 December,, 1993

Maintenance, repair, or modification of components, systems, or structures, utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejection for a particular component, system, or structure.

These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a des'.gnated control location to indicate the status and the completion of required inspections and tests.

Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and assures that inspection results are properly documented.. Material Engineering and Inspection Services establishes the procedures for implementing the inspection status sheets utilized during inservice inspection.

Nonconformin Materials Parts and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.,

Materials, parts, or components which do not conform to the drawing or specification requirements are identified, controlled and reported. RG6E personnel are responsible for initiating nonconformance reports and initiating dispositions'uclear Assurance Quality Control personnel are responsible for inspecting and approving closeout of nonconformance'reports. Prior to installation or use, nonconforming items generally remain in a hold area until an approved disposition has been implemented. Nonconforming items may be released for installation to meet critical fabrication schedules provided controls are established to prevent inadvertent use prior to implementing the nonconformance disposition. After installation,.

nonconforming items are identified and controlled until approved disposition has been implemented.

Nonconformances identified at a supplier's facility and reported to RG&E, which have'upplier recommended dispositions of use-as-is, or repair, are normally processed by the department originating the procurement.

Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.

Items are repaired and reworked in accordance with approved procedures and current drawings. The repair or rework must Revision 19 December, 1993

be verified as acceptable. by an inspection of the affected item or process which is at least equal to the original inspection method.

Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance. All such items are approved prior to use by the cognizant organization having responsibility for the requirement. In addition, those "use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Senior Vice President, Production and Engineering.

Nuclear Assurance Quality Control personnel provide nonconformance status information periodically. Quality Performance and other organizations analyze nonconformance report data for adverse trends and geeeeee @gpssj5g periodic reports to management. Adverse trends form' basis for supplier re-evaluation or for other corrective action.

Corrective Action Conditions adverse to quality are those conditions which compromise confidence that a structure, system or component at Ginna Station will perform satisfactorily in service.,

Significant conditions adverse to quality are those conditions which, if uncorrected, could affect the health and safety of the public, seriously affect the ability to serious breakdown in activity controls, or will require a major effort to restore capability to perform specified functions.

'Conditions adverse to quality shall be promptly identified and reported to supervision. The condition adverse to quality shall be identified, corrected and evaluated to determine if a significant condition adverse to quality exists.

When a significant condition adverse to quality at Ginna Station is identified, the Corrective Action Coordinator is responsible for evaluating the effect of continuing the activity. If continuing the activity would obscure or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.

Revision 19 December, 1993

%~48.';:-',; Wan'asg8x'.",!!Sip o'l!8<<tK hssuranc'es has authority to stop work: on mai.ntenance, repair, i'nservice inspection, refueling, modify'.cation,,testing or inspection deficiencies at Ginna Station, as well as other locations.

Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.

The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engineering Services, Materials Engineering and Inspection Services, ."',':.6.'8'8)<p6.:

B3:,e~atVi~e':,'!Di~a,:ri~biti:ae!,:Sgv'iii.""oD or cognizant supplier'"

ions. ""'ssocia For significant conditions adverse to quality,gjVgeet'i':::,R'96'8

'",,-;-,:...E,,:,;:;:h, Pl:,:::,::,,:,::,,:;::::,-...,,,:

  • ,,-...,...,,

caQ888 8@6-48%83 og "cd'x@cK+ve" Ac540Ãgg 3;468

'::':,0l,::,::,"di'll's%i'.".i'*"(-":i:!i!iiiitei-,"'iiil'iiIi'l:""',"!"*'ll,:.i,:"-"-"--:""::i~

'o"x88@+v& - tee If the significant condition adverse to quality involves a design deficiency or the recommended corrective action involves a design change, the review of the condition adverse to quality includes Nuclear Engineering Services. or Ginna Station design personnel, as appropriate.

The Corrective Action Coordinator assures root cause determination and corrective action plans are developed to resolve the identified concern and to preclude recurrence.

s'ugix'hei'op reviews eked eac8 Corrective "Action 'Report'""

initi~ated at Ginna Station and may recommend additional corrective action result in adequate if the action already taken does not resolution.

The Plant Operations Review Committee CAR Subcommittee reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repetition.

Revision 19 December, 1993

Corrective action summary reports are submitted to departmental supervision to keep them aware of significant conditions adverse to quality, related causes and corrective action being taken. Senior Management is advised of the

. causes and actions of the more significant Corrective Action Reports.

Quality Assurance provides additional assurance of the corrective action program effectiveness through semi-annual audits and periodic surveillances.

ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance. Production and Engineering Systems, as directed by the Division Manager, Technical Services and Chief Engineer, is responsible for the retention and maintenance of records. Quality Performance, Purchasing, Nuclear Engineering Services,

't and Ga Illan'd':;:!gee'ctrl!OEDi'81'xi'Qllt@otl';':;D'r'v+8!3~on departments are responsible t iotorw a rda'rng hect" re8cords they initiate to the appropriate Production and Engineering Systems record retention locations'ach organization generating records is responsible for preparation, review, approval, and implementation of specific quality assurance record procedures for their areas of responsibility in accordance with these requirements. The records which fall within quality assurance record requirements include those records, required by Section 6.10 of the Technical Specifications and the Quality Assurance Program. All records associated with the operation, maintenance, repair, inservice inspection, refueling, modification, inspection and testing of structures, systems, and components covered by the quality assurance program are included.

Records initiated at Ginna Station include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses; calibration procedures and reports; and Nonconformance and Corrective Action Reports. Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering Systems record retention location.

Revision 19 December, 1993

Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results,, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.

The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate. Requirements and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents. Records are available to authorized personnel.

Removal of records from storage is documented and accountability. is maintained by the responsible record control activity.

Records are either stored in record storage facilities which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are- kept in two separate storage locations in separate buildings which are physically isolated from each other.

Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage. The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.

Production and Engineering Systems is responsible for maintaining plant operating records as required in Section 6.10, Technical Specifications.

Production and Engineering Systems is also responsible for maintaining off-site prepared design records, such as specifications, drawings, design review reports, and design control documentation; quality assurance records, such as audit 'reports and surveillance reports; purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.

Revision 19 December, 1993

Audits Compliance with all aspects of the Quality Assurance Program and the effectiveness of the program is determined by audits and surveillances of all organizations performing quality affecting activities. Quality Assurance is responsible for conducting audits of those organizations and activities involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status and safety importance of activities being performed, as well as group performance and related management concerns.

Table 18-1 is a list of the ((4~~te~:;-%X$'g activities to be on the level of activity in each area. Audit schedules are established to assure that each of the activities are i'i-:

audited at the frequency specified in Section 6 Technical Specifications. Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concerns.

Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names of those who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations. Audit planning and performance utilize performance based techniques that will facilitate effectiveness assessments as well as compliance verification. The audits are performed in accordance with written procedures or checklists by appropriately, trained personnel not having direct responsibilities in the areas being audited..

Audit results are documented and reported to the supervisor and division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board. Within a specified period of time, the .person having supervisory responsibility in the area audited is required to review the audit results, take necessary action to correct the deficiencies identified by the audit, and document and report the corrective action.

Quality Assurance is responsible for developing audit plans and audit checklists, designating an'd training audit personnel, and conducting audits.

Revision 19 December, 1993

S Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.

Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procurement, as required, to evaluate their quality assurance program for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents. During the project or procurement process additional audits are performed, as required, to assure all quality assurance program requirements are properly implemented in accordance with procurement documents.

Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends. Results of these analyses are provided to management for their regular review.

Revision 19 December, 1993

Table 1-1 Quality Assurance Program Procedures Subject Listing Appendix B ualit Assurance ualit Control Procedures Criteria Indoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Planning and Reporting Results for QA/QC Subcommittee Meetings Quality Assurance/Quality Control Group Organization IX and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review and Approval of 'Field Change Requests and Review of ECN's

~

Quality Assurance Review of Rochester Gas and Electric Engineering Specifications

~

Preparation, Review and Approval of Quality Verification III Specifications Computer Software Product Evaluation IIX Quality Assurance, Review of Computer Software Production Evaluations Master Software Index Requisitioning Quality Assurance/Quality Control IV Services 5 Quality Review of Rochester Gas and IV Electric Procurement Documents Preparation, Review and Approval of Rochester Gas and Electric Q.A. Specifications Revision 19 December, 1993

Cl Table 1-1 (cont'd)

Appendix B ualit Assurance ualit Control Procedures Criteria Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval of Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision and Control of the QA Program for Station Operation Review of Departmental Procedures VI Preparation, Review and Approval of Procedure VI Deviation Requests by Quality Assurance/Quality Control Evaluation of Suppliers by Quality Assurance VII Supplier Surveillance VII Control of Supplier Performance VII Quality Assurance Evaluation of Bids VII Conducting Commercial Grade Supplier Surveys VII Evaluation of Commercial Suppliers by Quality VII Assurance Document Deficiency Reports VII Verification Inspection Program Revision 19 December, 1993

Qualification of Inspection Personnel Quality Assurance Nonconformance Processing XV Corrective Action Reports XVI Quality Assurance Commitments and Action Items XVI Review of Ginna Maintenance Work Order Packages XVI Identified Deficiency Reports XVI Records Turnover Plan XVII Qualification of Audit/Survey Personnel XVIII Audit Scheduling and Planning XVIII Performance of Quality Assurance Audits XVIII Reporting and Follow-Up of Audit Findings XVIII Conduct of Quality Assurance During and in XVIII Follow-Up of NSARB Audits Response to Audits and Surveillance XVIII Qualifications of Surveillance Personnel XVIII Review of Audit Program XVII Auditing of the Nuclear Emergency Response Plan XVII Performance Based Surveillance Program XVIII Availability and Use of INPO and NRC Inspection/ XVIII Assessment Reports in Audit and QA Surveillance Quality Assurance Planning Guides XV1II Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Materials En ineerin Ins ection Services Criteria Indoctrination and Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures Quality Materials Engineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material

.Handling Equipment Instructions Preparation, Review and Approval of Materials Engineering Laboratory Test Procedures Control and Distribution of Documents Regulating VI Safety Related Activities Control of Purchased Materials VII Preparation, Review and Approval of Supplier VII Evaluation Control of Purchased Services VII Welding Procedure Preparation Review and Approval IX Welding Procedure Qualification IX Heat Treating Procedures IX Welder Qualification and Currency IX Nondestructive Examination Procedures IX Nondestructive Examination Procedures Manual IX Nondestructive Examination Personnel Qualification Revision 19 December, 1993

Cl 0

Table 1-1 (cont'd)

Appendix B Materials En ineerin Ins ection Services Criteria Qualification of Visual Examination Personnel IX Erosion/Corrosion Program IX General Brazing Procedures Preparation and Approval IX General Brazing Procedures Qualification IX Inservice Inspection Program and Plans ASME Section XI Repair, Replacement and Modification Procedure Incorporating Ginna Modifications into Inservice Inspection Program Duties of the ANII Tests conducted by MEIS Laboratories XI Rm Pm~swq~cgqcPyggx w+<'~vg. ~++>Pyb~~ex egmyqqoywyxorgyeq~qygyyegP'Pygmy,~z, gyr<qz~~<gg~sgyr~~~

~

Test Personnel Qualifications XI Vendor Tests under MEIS Direction XI Calibration and Control of Nondestructive XII Examination Instruments Inspection and Maintenance of Material Handling XIII Equipment Overhead and Gantry Cranes XIII Inspection and Maintenance of Portable Lifting XIII and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems XIII Slings and Related Apparatus XIII Classification and Training of Material Handling XIII Revision 19 December, 1993

Equipment Personnel Table 1-1 (cont'd)

Appendix B Materials En ineerin Ins ection Services Criteria Mobile Hydraulic Cranes XIII Inspection and Maintenance of Jacks, Hydraulic Rams XIII and Cylinders, Forklift Loading Forks XIII Inspection of Designated Monorails XIII Training and Qualification of Crane Operators XIII Lifting Devices in the Containment Vessel XIII Pre-Shipment Inspection of Radioactive Material XIII Shipping Containers Nonconformance Reports XV Initiating and Responding to Corrective Action XVI Reports Quality Materials Engineering and Inspection XVII Services Records Response to Audits XVII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Ginna Quality Assurance Program Implementation Fire Watch Training R.E. Ginna Training Plan Ginna Station Training General Employee Training Temporary Employee Training Hazardous/Mixed Waste Emergency Response Training Operator Training Responsibilities R.E. Ginna Health Physics Orientation Program Fire Brigade Training Radiation Protection Technician Entry Level

'Requirements, Responsibilities, .and Training Chemistry Technician Entry Level Requirements, Responsibilities, and Training Maintenance Training Program Ginna Station Administrative and Engineering Staff Responsibilities ~

Ginna Station Management Responsibilities Health Physics and Chemistry Section Organization and Responsibilities Support Services Organization and Responsibilities Operations Section Organization and Responsibilities Technical Section Organization and Responsibilities Material and Procurement Section Organization and Respon'sibilities Revision 19 December, 1993

S Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Operational Assessment Section Ginna Station Staff Responsibilities for Fire Prevention Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Radiation Emergency Plan Xmplementing Procedure Committee Emergency Procedures Committee (EPC)

Ginna Standard Nomenclature XI Preparing and Dispositioning of Technical Staff Request Control of Station Modification Station Modification Classification and Review IIX Station Modification Planning Control Station Modification Installation and Acceptance Station Modification Completion Preparation, Review 8 Approval of Design Input Documents for Minor Modifications Component Classification Request/Reanalysis IXI Evaluation of Parts to Determine Safety Classification Preparation, Review and Approval of Safety Analysis Preparation, Review, Approval and Distribution of Design Output and Design Review Documents for Minor Modifications Technical Evaluation Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Preparation of Configuration Data Change Forms Computer Software Product Evaluation Control of Procurement Documents Prepared at Ginna Station Evaluation of Commercial Grade Items for Safety IV Related Applications Evaluation of Items for In-Storage Maintenance IV Requirements Plant Procedures Preparation and Classification Plant Procedure Content and.Format Requirements Emergency and Abnormal Operating Procedures Writers'uide Operating Procedures Writers'uide Health Physics and Chemistry Procedures Writers.'uide V

Plant Procedure Adherence Requirements Emergency and Abnormal Operating Procedures Users'uide Procedure Control Procedure Control-New Procedures Procedure Control-Permanent Changes Procedure Control-Temporary Changes Procedure Control-Periodic Review VI Procedure Control-Index Procedure Control of Emergency and Abnormal Procedures VI Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Qinna Procedures Criteria Procedure Control - Amendments to Licensing Documents and Changes to the Facility Procedure Change Control 10CFR 50.59 Review VI Emergency and Abnormal Operating Procedure Support VI Documentation Control Procedure Distribution VI Control of Construction Documents VI Vendor Manual Control Program Vendor Manual Information/Discrepancy/Incorporation VI Request Drawing Change Request VI Conditional Release Program VIX Receipt and Acceptance of Materials/Parts VII Control of Purchased Services VII Inventory Control of Material, Parts and Components VIX at Qinna Station Xdentification and Marking of Accepted Material, VIII Parts, and Components Bulk Storage of Combustible Materials and Their Use =

VIIX Trailer Admittance Requirements VIIX Control of Consumable Materials at Ginna Station VIII Control of Welding IX Nondestructive Examination Control Welding Equipment Performance Verifications Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Open Flame, Welding and Grinding Permit (Hot Work Permit) IX Control of Inservice Inspection Activities ASME Section XI Repair, Replacement and Modification Procedure for Ginna Station Electrical Preventive Maintenance Program Environmentally Qualified Equipment Maintenance Program Mechanical Preventive Maintenance Program for Rotating Equipment Equipment Inspection and Lubricant List X Valve Preventive Maintenance Program Condenser Inservice Inspection Program Preventive Maintenance Program for Plant Security Equipment Performance of Tests XI Qualification and Certification of Test Personnel XI Test Tag Control Program Calibration, Test, Check and Replacement Surveillance Program for Instrumentation and Equipment Important to Safety XI Ginna Station Surveillance Schedule XI Inservice Testing of Pumps and Valves XI Calibration and Control of Test Equipment XII Maintenance and Inspection of Material Handling Equipment XIII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Control of Material Handling and Handling Equipment XIII Storage and Preservation of Materials and Equipment at Ginna Station XIII Control of Heavy Loads at Ginna Station XIII Control of Heavy Loads for the Containment Overhead Crane XIII Control of Heavy Loads for the Auxiliary Building Overhead Crane XIII Control of Heavy Loads for the 7 1/2 Ton Screenhouse Crane XIII Control of Heavy Loads for Jib Cranes in Containment XIII Control of Heavy Loads in Safety-Related Areas XIII Housekeeping 'Control XIII Station Holding Rules XIV Bypass of Safety Function of Jumper Control XIV Operational Assessment Program XIV Effectiveness Evaluation of the Operational Assessment Program XIV Installation and Removal of Temporary Cables XIV Control of Temporary Modifications XIV Program Pressure Provisions'IV Installation, Removal and Control of Scaffolding Installation and Removal of Temporary Fluid System to Prevent Degradation of Reactor Coolant Boundary XIV XIV Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Independent Verification XIV Control of Nonconforming Items XV Nonconformance Reports XV Corrective Action Reports XVI Root Cause Analysis XVI Overview of the Ginna Station Work Control System XVI Work Request/Trouble Report Initiation XVI Work Order Initiation XVI Work Order Planning XVI Work Order Scheduling XVI Work Order Execution XVI Post Maintenance Testing XVI Work Order Close Out XVI Work Order Processing After Hours XVI Work Control System Performance Indicators XVI Station Work Authorization Request XVI Safety Classification of Maintenance Work Activities XVI Identified Deficiency Reports XVI Ginna Records XVII Records Storage Facilities and Equipment XVII Special Nuclear Material Inventory and Record Requirements XVII Maintenance History Program XVII Ginna Station Response to Internal Audits XVII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Indoctrination and Training Engineering Department Organization and Responsibilities I

Ginna Modification Project Organization Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses III Preparation, Review and Approval of Engineering Drawings III Preparation, Review and Approval'f Engineering Specifications Preparation,'eview and Approval of Design. Verification Integrated Design Process Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Preparation, Review and Approval of Engineering Change Notices Review of the Classification of Station Modifications Preparation, Review,and Approval of CAD Piping and Instrumentation Drawings Preparation, Review and Disposition of Drawing Change Requests ALARA/ Radiation Safety Design Review Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Preparation, Review and Approval of Appendix R Conformance Verifications Preparation, Review and Approval of the Electrical Equipment Environmental Qualification Data Summary Form EEQ-1 and XEEE 323-1974 Waiver Authorization Form EEQ-2 Review, Approval and Implementation of Changes to the Safety Assessment System Software Engineering Computer Software Documentation and Control Human Factors Review of Control Room and. Local XII Emergency Control Panel Modifications Preparation, Review and Approval of PAID Database and Configuration Data Change Forms Erosion/Corrosion Control Monitoring Program y for Carbon Steel Piping Preparation, Review and Approval of Changes to.the Updated Final Safety Analysis Report ASME Section XI Repair, Replacement and Modification Program Implementation Component Safety Classification Drawing Review Process Component Safety Classification Component Classification Form Component Safety Classification Request/Re-Analysis System, Structure, or Component Safety Classification Criteria Preparation, Review and Approval of CAD Electrical XII Drawings Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Requests for Nuclear Engineering Services Preparation, Review and Approval of Procurement . IV Documents for Purchases Covered by the QA Program Evaluation of Commercial Grade Items for Safety IV Related Applications Evaluation of Quality Verification Items for Safety IV Significant Applications Preparation, Review, and Approval of Engineering Procedures Preparation, Review, and Approval of Engineering Procedure Deviation Request Distribution and Control of Documents by the Control Number Method Distribution and Control of Documents by Project

~

VI Correspondence Procedures Preparation, Review and Approval

~

of Supplier Evaluations VII Review and Approval of Vendor Design and'Manufacturing VII Technical Documents Preparation, Review and Approval of Bid Requests, Bid VII Evaluations and Recommendations for Award Engineering Review of Nonconforming Materials, Parts or Components Initiating and Responding to Corrective Action Reports XVI Processing Identified Deficiency Reports XVI Documenting and Reporting Potential Conditions XVI Adverse to Quality Performing "Substantial Safety Hazard" Evaluations XVI for 10CFR21 Reportability Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Nuclear En ineerin Services Procedures Criteria Records XVII Records Turnover Plan XVII Engineering Response to Internal Audits XV1II Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Purchasin Procedures Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department'rganization and Responsibilities Preparation, Review, Approval and Issuance of IV Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation XV Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation VIX Supplier Material Deficiency Processing XV Supplier Corrective Action Reporting XVI Purchasing Response to Corrective XVI Action Reports and Corrective Action Reporting Purchasing Records and Turnover=Pl'an XVII Purchasing Response to Audits XVIII Revision 19 December, 1993

Table 1-1 (cont'd)

Appendix B Production Division Trainin Procedures Criteria Indoctrination and Training Production Division Training Organization and Responsibilities Operations and Technical Training Organization and Responsibilities Training Systems Organization and Responsibilities Maintenance Training Organization and Responsibilities Curriculum Committee Organization and 'Responsibilities Software Quality Assurance. Program Preparation, Review and Approval of Quality Training Procedures Preparation, Review and Approval of Training Procedures, Guidelines, and Policies Preparation, Review and Approval of Nuclear Training Programs Style Guide for Training Procedure Development Nuclear Training Procedure Revision Training Change Request/Notice Control and Distribution of Production Division VI Training Documents Training Programs for Crane Operators and Riggers XIII Corrective Action XVI Nuclear Production Division Training XVII Records Management Production Division Training Response to QA Audits XVIII Revision 19 December, 1993

Table 1-1 (cont'd)

,~wry.pe,agcy; wr,, ~pyrrrrrps yywp. yg "q<yrrrp wywvr ' vgrpymyrrgy.>yv v,v yu< q<m .v:~gggp. ',%~errrrr,.}y ~gpss,g Qa'sSpan88, H'::ectr'g'cR'Dg<str'$i j'juKiy~6jj%'iDj'.jij<sjjn@prjjc'e8Q+e 8

>

VhWhWh AVP 'hY WW WSA 1WRY 'h N~VhW lV( '+YhY h *VS VhYh W Y Wh& '4YAAWhWh4 V 'wC

' YY Appendix B Criteria Quality v

Assurance "yi~:

.'wx".m@y'~.;.<~m""'~<<,.~~'rmsep" Program .y Implementation for y;~~g'cyx coax~"">~gq>+~zga~c+r~oww~ox,>,

Gas,:l'j8TiCt!)/ZAN!O'Qp'Xs3.C; ";,'V3',BpX';L'GuC'9;:OD$ ,.';:p3'i83iOQ4~VGQRrC168XKC'D@8

~~ I k&SStlt %5A';:!93!'ll!g'8X0A.;;i!P8'4'80hfY81'.

Design/Modification Activities Control. at Ginna Station Design/Modification Activities Control at Station 13A and on Circuit 751, Equipment and Line Control of Procurement Documents for Purchased Parts, Components and Services Preparation, Review and Approval of Electric Transmission and Distribution Procedures Preparation and Approval of Laboratory Test Procedures Preparation and Approval of Electric Meter and V Laboratory Calibration Schedules Preparation and Approval of Electric Substation'Department V Relay Test Schedules Preparation and Approval of Electric Transmission and Distribution Deviation Requests Procedures Control and Distribution of Electric Meter and Laboratory VI Department and Laboratory Test Procedures Revision 19 December, 1993

Table 1-1 (cont'd)

0, <?,? y4%$ <???;yj,,

Gas:::.?'.:a '0'-;:'.

j

'ikctia

'pqg@c<?..<<jp,?<,'p<; e?'h,.p%yy;.

e"'"::u'x45ixou'ix'on'.'PN'a jq'</~~33.<?...vie/  ?,'? .,<?:y(pg' .""<?<?

v.: ':s':o:.':::::qp "

? ."<???.<??<,.< <<? y<, <?.,<?.",~/+4@

oeeau'::es.':,::happ?evaj,x<,

@N@:<<.v"?<<<<'+g')/.

<.

Criteria Control of Electric Meter and Laboratory Department Calibration Services Control of Electric Substations Department Relay VI Test Schedule

?

Supplier Technical Evaluation VII Receipt and Acceptance of Instrumentation and VII Standards Equipment Control of Purchased Services for Electric Meter and Lab VII Identification and Control of Materials, Parts and VIII Components

@etc~'? <j jM~P'A0PN~ .. Ph<Q~x@<?w<:<o<<?w 'ops?< gj~+?~ j~+'~~... '<'g~ jw ~D'.??0<)<?<QP?PPY

O'QCiBg.:'R'tg~ 'Y<'? a',"~",'R'0 @ 'eC, "X'3 Q~~" ',X'8.;,X'4't3.'OD>,. '3"V3;B3'oD.,'-':;,'<.":,,

. . .

pQX(VBX" '.

Division Performance of Tests at Ginna Station XI Performance of Tests at the Electrical Laboratory XI Qualification of Test Personnel XI Calibration and Control of Test Instruments XII Nonconforming Parts and Components XV Initiating and Processing of Corrective Action Reports XVI Control of Quality Assurance Records XVII Kai'%EKE%<iii?;:<iÃtÃNii ib~i?.~e':re'v'iVi4~:%<?<<yo??8'N%%W!~eiir5'i~??::"'~"HNUFx'60-Revision 19 December, 1993

TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents include:

1. Sco e of Work Detailed statement of the work to be performed.
2. Technical Re uirements - by reference to specific drawings, specifications, codes, regulations, procedures or instructions, including revisions, that describe the items or services to be furnished. Also identified shall be test, inspection and acceptance requirements, and any special requirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage and shelf life.
  • 3 ualit Assurance Pro ram Re irements which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements in subtier procurement documents.
  • 4. Ri ht of Access to include the facilities and records of the supplier for source inspection and audit by the Purchaser or parties designated by the purchaser. Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.
  • 5. Documentation Re uirements Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.
  • 6. Nonconformance Requirements for reporting and disposition of nonconformance to procurement requirements.
  • - Items reviewed by Quality Assurance or Quality Control.

-'61-Revision 19 December, 1993

Table 18-1 Audit List Audit i i Title Corrective Action Audit To ic Areas Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods of operation.

Operational Assessment Nonconformance Control

  • Outage Activities Refueling and Special Nuclear Material ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA
  • Health Physics, Chemistry and Radwaste Shipping and Process Radwaste Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program
  • Fire and Safety Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program Revision 19 December, 1993

Table 18-1 (con')

Audit List i

Audit i Title Audit To ic Areas Independent Inspections and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety P'rogram Housekeeping Instructions, Procedures, Drawing Control Document Control 'nd-Vendor Manual Control Procedure Control Records Control Security Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program

  • Operations Limiting Conditions for Operation Surveillance Testing Operator Performance Operations Administration PORC Activities NSARB Activities Materials Engineering and ISI Program Inspection Services NDE Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls
  • Maintenance and Testing Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment Revision 19 December, 1993

Table 18-1 (con')

Audit List 1

i Audit i Title Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Training/performance and Licensed Operator qualifications of the Auxiliary Operator operating and technical staff Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General Employee Training Procurement Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Program Configuration Control Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 19 December, 1993

e R.E. GINNA NUCLEAR POWER PLANT MANAGEMENTORGANIZATION CHART UNES OF COMMUMCATIOM CHAIRMANOF THE 8OARD, PRESDENTAND UNES OF SVPERVISON ANDADMINISTRATCH CHIEF EXECVAVEOFFCER SEMOR SEMOR VCE SENOR VCE VICE PRESDENT PRESDEMl; PRES DENT, OAS 4 ELECTRC Og PRODUCTION AND CONTROLLER DtSTRI8VAON ENDWEERINQ 4 CHtEF AND CVSTOMER INANCIAL

~

SERVCE8 ~

OFFCER VCE PRESDENT VICE PRESDENT L~ MSARS EMPLOYEE OINNA NUCLEAR RBATIONS, PRODVCAOM PU8UC AFFAIRS DEPARTMEMT AND MATERIAL MANAGER MANAGER MANAGER DEPARTMENT MANAGEMENT OUAUlY DIVNIONAL PRODUCAON MANAGER PERFORMANCE 8BlVCES AND PRODVCAOH DIVISON DIVISON ENQWEERINO DIVISON MANAGER MANAGER SYSTEMS TRAINWG IIANAQER SYSTEM ROCHESTER OUALAY ENGWEERWO CONSTRUCTION ASSURANCE RECORDS HEALTH AND DESGM AND MANAGEMENT, PHYSCS AND MAINTENANCE TECHMCAL NUCLEAR OUAUTY WFORMATION EMERGENCY ASSURANCE CENTER,CMIS, PIANNWO PROCVREMEMT, WFORMATIOM DEPARTMENT DEPARlllENT DEPARTMENT ENOWEERWO, MANAGER MANAGER MANAGER 8ERVCES 4 DEPARTMENT PLANT AUDIT4 DMSOM SYSTEM DISTRISVAVE METER AND MANAGER LIAMAQER SURVEILLANCE SYSTEMS NVCLEAR OWNA oooo' DESGM IMFORMAllON IAS SERVCES ENQWEERINO SYSTEMS OPERATIONS ENOWEKRWQ STATION SUPPORT 8ERVCES MANAGER FIELD 4 SHOP ENNRONMENTAL RELAY ELECTRX: NUCLEAR FASRCAllON SCIENCE, COMMUNKAllONS ASSVRANCK SERVCES IASORATORY SQN, STATION ENGINE ERWQ METER CHEMISTRY COMSTRVCAOM. OPERAllONS, OPERATES SERVCES AND UCBtSNQ, MAtNTKNINCE, OUALIIY RESEARCH 4 FUEL HP 4 LASORATORY CONTROL AND DEVELOPMENT MANAGEMENT 4 CHEMISTRY EMPLOYEE SERVICES OVALAY TECHNCAL COMTROI RBAllONS ENGINEERWO SUPPORT TKCHNCAL DEPARTMENT SERVCES SERVCES SUPPORT, MANAGER TESTWQ, OVERHEAD MANAGER MATKRLAL CONSTRV CADM MATERIALS OOHTROL, AND ENQWEKRWG PROCUREMEMT, MAIMIKNANCE AND FIRE EAST INSPECTION PROTECAON, SERVCES SAFETY, LIODIFCATXOM, CONSTRUCAON OPERATWO RBAYTEST MATERIALS EXPERIENCE 4 ENQWEERINQ, COMPVIKR SYSTKMS MHE ISNP.

SKRVICES FIGURE 2-1

QUALITYPERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE MANAGER MANAGER MANAGER QUALITY QUALITY NUCLEAR MATERIALS PERFORMANCE ASSURANCE ASSURANCE ENGINEERING SENIOR

& INSPECTION ANALYST SERVICES QUALITY QUALITY QUALITY MATERIAL8 STAFF ASSURANCE CONTROL CONTROL MATERIAL ENGINEERS ENGINEERS FOREMAN HANDLING ENGINEERS 8 FOREMEN STAFF TECHNICIANS INSPECTORS FIGURE 2-2

GINNA NUCLEAR PRODUCTION ORGANIZATION VCK PRE SCENT 0WNA NUCLEAR PROOUCTCW PLIHT MAHAOBt OWNA STATCW WAlALLCEHSKD OPBtATOR OPERATOlt ItKOVAL OPERATWO PLAHNWO A AUXOPBIATOR BIPERIEHCE SCHKOUUHO STA WTIIAL MATKltlALS MNNTBINCE PROCUREMENT SYSTEMS STA REOUAL SAFETY MNNTKNAICKItULE CHKNSTRV TECH PltOIKCT ltAD PltOTKCllOH ELKCTRCALAHD IAC TECH MNNTBIANCK CONIIIACTltAD MKCHAHCAL ~ ROTECTCH TKCH MNNTEHAHCE KLECTltCAL MAlNTB4AHCK MKCHAHCAL MNNTENAHCE QC TKCHIlCIAH RAT TKCIPICW<

FlGURE 2-3

I GAS AND ELECTRIC DISTRIBUTION DIVISION SENIOR VICE PRESIDENT GAS ANO ELECTRIC DISTRIBUTION ANO CUSTOMER SERVICES DMSION MANAGER OMSION MANAGER SYSTEM ENGINEERING ROCHESTER

~ 0 ~ OOOJOOOtSOS ~

AND DESIGN CONSTRUCllON AND MAINTENANCE DEPARTMENT MANAGER DEPARTMENT MANAGER QUALITY DEPARTMENT MANAGER DEPARTMENT MANAGER SYSTEM DESIGN DISTRIBUTIVE SERVICES METER AND LAB OVERHEAD ENGINEERING INFORMATION COORDINATOR OPERATIONS CONSTRUCllON ANO SYSTEMS SUPPORT MAINTENANCE EAST SUBSTATIONS RELAY ENGINEERING ENGINEERING COMMUNICATIONS ELECTRIC LABORATORY CONSTRUCTION METER SERVICES RELAYTEST OPERATIONS NOTE: Chart la abbreviated to ahow only key OoaNona InvohRed In Implementing the QA program and therefore, doea not ahow aa poaltkea In th UN ES OF AVTNORllY USES OF COMMUNICATION FIGURE 2Q

TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MANAGER TECHNICAL SERVICES AND CHIEF ENGINEER MANAGER DEPARTMENT MALINGER PRODUCTION MANAGER DIVISIONAL AND GENERAL SERVICES ENGINEERING ENGINEERING SYSTEMS SERVICES MANAGER DIVISION MANAGER FOSSIL PROJECT SHOP SYSTEMS ENVIRONMENTAL ENGINEERING MANAGEMENT OPERATIONS SCIENCE SERVICES RECORDS HYDRO MANAGER MANAGEMENT MANAGER ENGINEERING FIELD CHEMISTRY SERVICE FOSSIUHYDRO SERVICES FACILITY OPERATION SYSTEMS ENGINEERING SUPERVISOR MANAGER TECHNICAL ENVIRONMENTAL REAL ESTATE ADMINISTRATIVE INFORMATION LABORATORY MANAGEMENT SERVICES AND CENTER PROJECT SENIOR PLANNING ENVIRONMENTAL ANALYST MANAGER RESEARCH 8c INSPECTION/LAND DEVELOPMENT SURVEY AND PROGRAM BUILDING SERVICES FIGURE 2-5

Ill 1I

GINNA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY PORC PERFORMANCE TECHNICAL MATERIALS GAS AND PURCHASING GENERAL NUCLEAR GINNA STATION SERVICES ENGINEERING ELECTRIC MAINTENANCE ENGINEERING DIVISION AND DISTRIBUTION SERVICES INSPECTION DIVISION SERVICES REVIEW AUDITS FIGURE 2

I e

~ ~

~4~

'

I1