{{#Wiki_filter:REPORT OF TYPE B AND C LEAK RATES D.C.COOK PLANT UNIT 2-1984 MDTRO INNEf M NPY.(8gg0gq0030 8+<0<~PDR*DOCY 050003i6 P, PDR 0
{{#Wiki_filter:REPORT OF TYPE B AND C LEAK RATES D. C. COOK PLANT UNIT 2 1984 MDTRO INNEf M NPY.
j TABLE OF CONTENTS SECTION 1.1 2.0 TITLE
(
8+<0<~
8gg0gq0030 050003i6 PDR *DOCY     PDR P,
 
0 j
TABLE OF CONTENTS SECTION     TITLE                PAGE 1.1    


==SUMMARY==
==SUMMARY==
OF RESULTS TABLES 2.1 TABLE 1 2.2 TABLE 2 2.3 TABLE 3 PAGE 2-3 1..0  
OF RESULTS 2.0    TABLES 2.1 TABLE 1               2-3 2.2 TABLE 2 2.3 TABLE 3
 
1..0


==SUMMARY==
==SUMMARY==
OF RESULTS As indicated in the accommanying ILRT report, Type A leakage test results do not indicate a failure to meet the containment overall leakage acceptance criteria.Guideline Type B&C leakages were exceeded, however, as detailed in the following.
OF RESULTS As indicated in the accommanying ILRT report, Type A leakage test results do not indicate a failure to meet the containment overall leakage acceptance criteria. Guideline Type B&C leakages were exceeded, however, as detailed in the following.
Types B&C Leak Rate Testing (**12 THP'4030 STP.203)was performed on Unit 2 between March 12, 1984 and June 29, 1984.Table Ol shows the valves that exceeded their respective guideline leakages.Table 52 gives a brief summary of the repairs made to leaking valves.Table e3 shows a brief history of these valves as tested during previous surveillances.
Types B & C Leak Rate Testing (**12 THP'4030 STP.203) was performed on Unit 2 between March 12, 1984 and June 29, 1984. Table Ol shows the valves that exceeded their respective guideline leakages. Table 52 gives a brief summary of the repairs made to leaking valves. Table e3 shows a brief history of these valves as tested during previous surveillances.
While testing Zone 4 piping pentrations, several penetrations were found to be leaking.These penetrations were CPN-4, CPN-23, CPN-40,&CPN-44.CPN-4 was repaired by ,welding a hole in the bellows.CPN-23, CPN-40,&CPN-44 also had holes in the bellows but.were not repaired per AEPSC review of the plant FSAR determining that bellows on containment, penetrations are not needed to maintain the leak-tight integrity of containment.
While testing Zone 4 piping pentrations, several penetrations were found to be leaking. These penetrations were CPN-4, CPN-23, CPN-40, & CPN-44. CPN-4 was repaired by
Zone 4 was tested after isolating the above penetrations.
    ,welding a hole in the bellows. CPN-23, CPN-40, & CPN-44 also had holes in the bellows but. were not repaired per AEPSC review of the plant FSAR determining that bellows on containment, penetrations are not needed to maintain the leak-tight integrity of containment. Zone 4 was tested after isolating the above penetrations.
PAGE 1  
PAGE 1
 
TABLE 1 Volume                                            Guideline As Found  As Left Description                      Valve            (sccm)    (sccm)    (sccm)
Upper Vent.
Supply                    VCR-105 8 VCR-205          3600      20019        80 Air Part. Rad.
Mon.                            SM-1                    60        623      109 Nitrogen to          PRT  N-159 8 N-285                45      565        40 Charging to Regen. Hx                      CS<<321                180      23818        744 RCDT  Vent Header                    DCR-203 8 DCR-207          120          297      20 RCT  Vent Header                    N-160 8 DCR-201            120      1639        258 CLVGCUV  Drain Header                  ,.DCR-620 6 DCR-621          120      2407 RHR  Recirc                    ICM-305              1080      5910
            'E'ower Cont.
Monitor                  ECR-33 8 ECR-35              60      2495      1907 Air Particl Rad. Mon                ECR-31 6 ECR-32              120      1300      1243 Boron  Injection              ICM-251                240        703          40 Boron  Injection              ICM-250~                240      1854          51 CPN  Coils 384 CCW                          CCW-243-72                60      3229        120 Glycol Return Expan.                        R-157                    60        7947 J
Post Accident Sample Sup                  ECR-416                  15          250 Post Accident Sample Sup                  ECR-417                  15          299
 
W L
 
Volume                            Guideline As Found As  Left Description          Valve        (sccm)    (sccm)  (sccm)
Control Air To  Cont.          XCR-102&XCR-103      120      532    532 CPN  Coils 285  CCW          CCW-243-'25,>        60      109    109 CPN  Coils 384  CCW          CCW-244-72          60      271    271 CPN  Coils 285  CCW          CCR-440              60      188    188 Plant Air to Cont. check Valves  PA"342              120    3974  3974 Personnel Airlock Cover Flange        N/A                55      121    121 Zone 4  Piping Pene.              N/A              1173    19853    802
 
TABLE 2 During the B&C leak rate testing the following            penetrations"'ere found to have excessive leak rates and required repairs:
Volume  Descri tion              Valve  $j                                    R~eaiea Upper Vent, Supply          VCR-105&VCR-205        VCR-105: Xnspected seal & seat, found no damage VCR-205: Manufacturer replaced seal, repaired seat, replaced dowel                  pin Air Part. Rad. Mon.              SM-1              Replaced Valve Nitrogen to  PRT            N-159&N-285            N-159: Lapped seat, replaced
                                                    .plug, spring,                    & gasket N-285: Replaced wedge & gasket Charging to Regn. Hx            CS"321              Replaced disc                    & gasket RCDT  Vent Header            DCR-203&DCR-207        DCR-203: No repair necessary DCR-207: Replaced diaphragm RCDT  Vent Header          N-160 & DCR-201          N-160: Cleaned valve disc & seat DCR-201: No repair necessary CLV&CUV Drain  Header      DCR-620&CR-621          DCR-620: Cleaned seat DCR-621: Cleaned seat,                    replaced packing 10K  Recirc.  'E'CM-305                              Lapped                  disc.
Lower Cont. Monitor        ECR-33 & ECR-35          ECR-33: Cleaned & lapped seat ECR-35: Machined seats & repacked valve Air Particle  Rad. Mon    ECR-31 & ECR-32          ECR-31: Iapped                    plug & seat, replaced gaskets ECR-32: No repairs req'uired Boron  Injection              ICM-251              Iapped seat Boron  Injection              XCM-250                Lapped Seat CPN  Coils 3&4  CCW        CCW-243-72              Replaced valve Glycol Return Expan.          R-157                  Cleaned seat Post Accident Sample    ..  .ECR-416            a Lapped & machined seat &                      plug, Sup.                                          a    replaced gasket PAGE 4
 
  ~ ~
4
 
TABLE TWO  (con't.)
Volume  Descri tion  Valve 8                  R~eeire Post Accident Sample ECR-417            Lapped seat 6  plug, Sup.                                    replaced gasket Zone 4 Piping        N/A              Welded hole in bellows Penetrations                            of CPN-4. CPN-23, CPN-40 and CPN-44 were isolated from the containment penetration and weld channel pressurization system PAGE 5
 
i''
            ~  =
vi, I,          II
      'C lq
 
TABLE 3
              .Guide-Valve          ~
1 ine    Mar84-Jun84            Nov82- an8          ar sccm    found    eft          found      e    t sccm    SCCm          Scc      sccm    Scc VCR-205&
VCR-205          3600    20019      80                              124      12 SM-I                60      623  109              120    120  2  40    2  40 N-159    &                                '0 N-285                45      565                    501    501 CS-321            180    23818    744          16977        06    61 DCR-203&
DCR-207            120        297    20              50              25 N-160    &
DCR-201                    16      258            I    2 I 10    I    8 120'20 DCR-620&
DCR-621                    2407                                    12 ICM-305          1080      5910                      02      02  I    0  I    0 ECR-33&
EC  R-35            60    24  5 I 07              421    421    40    14  I ECR-31&
ECR-32            120      I 00  124              22 0  I I ICM-25I            240        70      4'0          6    7 ICM-250            240      I    4 CCW-243-72                  60      22    120          I      6    2 R-157                60    794                                  0 ECR-416              15      250 ECR-417              15 XCR-102&
XCR-103            120      532    532              41      419 CCM-243-25                  60      109    109                            1010        0 CCW-244-72                  60'71          271          170 4    4    65  1802 CCR-440              60        188  188          21325          0 PA-342              120      974  3974                      N  A N Airlock Cover Flan.                    121  121            49.6    4    .6          N Zone 4 Pip  ~
Pe  etration    117                802 Page  6


Volume Description Valve TABLE 1 Guideline (sccm)As Found As Left (sccm)(sccm)Upper Vent.Supply Air Part.Rad.Mon.VCR-105 8 VCR-205 SM-1 3600 60 20019 623 80 109 Nitrogen to PRT N-159 8 N-285 45 565 40 Charging to Regen.Hx RCDT Vent Header RCT Vent Header CLVGCUV Drain Header RHR Recirc'E'ower Cont.Monitor Air Particl Rad.Mon Boron Injection Boron Injection CPN Coils 384 CCW Glycol Return Expan.Post Accident Sample Sup Post Accident Sample Sup CS<<321 DCR-203 8 DCR-207 N-160 8 DCR-201 ,.DCR-620 6 DCR-621 ICM-305 ECR-33 8 ECR-35 ECR-31 6 ECR-32 ICM-251 ICM-250~CCW-243-72 R-157 J ECR-416 ECR-417 180 120 120 120 1080 60 120 240 240 60 60 15 15 23818 297 1639 2407 5910 2495 1300 703 1854 3229 7947 250 299 744 20 258 1907 1243 40 51 120 W L Volume Description Valve Guideline (sccm)As Found As Left (sccm)(sccm)Control Air To Cont.CPN Coils 285 CCW CPN Coils 384 CCW CPN Coils 285 CCW Plant Air to Cont.check Valves Personnel Airlock Cover Flange Zone 4 Piping Pene.XCR-102&XCR-103 CCW-243-'25,>
CCW-244-72 CCR-440 PA"342 N/A N/A 120 60 60 60 120 55 1173 532 109 271 188 3974 121 19853 532 109 271 188 3974 121 802 TABLE 2 During the B&C leak rate testing the following penetrations"'ere found to have excessive leak rates and required repairs: Volume Descri tion Upper Vent, Supply Air Part.Rad.Mon.Nitrogen to PRT Charging to Regn.Hx RCDT Vent Header RCDT Vent Header Valve$j VCR-105&VCR-205 SM-1 N-159&N-285 CS"321 DCR-203&DCR-207 N-160&DCR-201 R~eaiea VCR-105: Xnspected seal&seat, found no damage VCR-205: Manufacturer replaced seal, repaired seat, replaced dowel pin Replaced Valve N-159: Lapped seat, replaced.plug, spring,&gasket N-285: Replaced wedge&gasket Replaced disc&gasket DCR-203: No repair necessary DCR-207: Replaced diaphragm N-160: Cleaned valve disc&seat DCR-201: No repair necessary CLV&CUV Drain Header DCR-620&CR-621 DCR-620: Cleaned seat DCR-621: Cleaned seat, replaced packing 10K Recirc.'E'CM-305 Lapped disc.Lower Cont.Monitor ECR-33&ECR-35 Air Particle Rad.Mon ECR-31&ECR-32 ECR-33: Cleaned&lapped seat ECR-35: Machined seats&repacked valve ECR-31: Iapped plug&seat, replaced gaskets ECR-32: No repairs req'uired Boron Injection Boron Injection CPN Coils 3&4 CCW Glycol Return Expan.ICM-251 XCM-250 CCW-243-72 R-157 Iapped seat Lapped Seat Replaced valve Cleaned seat Post Accident Sample...ECR-416 Sup.a a Lapped&machined seat&plug, replaced gasket PAGE 4
~~4 TABLE TWO (con't.)Volume Descri tion Valve 8 R~eeire Post Accident Sample Sup.Zone 4 Piping Penetrations ECR-417 N/A Lapped seat 6 plug, replaced gasket Welded hole in bellows of CPN-4.CPN-23, CPN-40 and CPN-44 were isolated from the containment penetration and weld channel pressurization system PAGE 5 i''~=vi, I, II'C lq TABLE 3 Valve.Guide-~1 ine Mar84-Jun84 Nov82-an8 ar sccm found eft found e t VCR-205&VCR-205 3600 sccm 20019 SCCm 80 Scc sccm Scc 124 12 SM-I N-159&N-285 60 45 623 565 109'0 120 120 501 501 2 40 2 40 CS-321 DCR-203&DCR-207 N-160&DCR-201 DCR-620&DCR-621 180 120 120'20 297 20 16 258 2407 23818 744 16977 06 50 I 2 I 10 61 25 I 8 12 ICM-305 1080 5910 02 02 I 0 I 0 ECR-33&EC R-35 ECR-31&ECR-32 60 120 24 5 I 07 I 00 124 421 421 22 0 I I 40 14 I ICM-25I 240 70 4'0 6 7 ICM-250 CCW-243-72 240 60 I 4 22 120 I 6 2 R-157 60 794 0 ECR-416 15 250 ECR-417 XCR-102&XCR-103 CCM-243-25 15 120 60 532 532 109 109 41 419 1010 0 CCW-244-72 60'71 271 170 4 4 65 1802 CCR-440 PA-342 Airlock Cover Flan.60 120 188 188 974 3974 121 121 21325 0 N A 49.6 4.6 N N Zone 4 Pip~Pe etration 117 802 Page 6
'}}
'}}

Latest revision as of 07:19, 29 October 2019

Summary of Type B & C Leak Rates, for 1984
ML17321A181
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1984
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17321A180 List:
References
NUDOCS 8410290030
Download: ML17321A181 (14)


Text

REPORT OF TYPE B AND C LEAK RATES D. C. COOK PLANT UNIT 2 1984 MDTRO INNEf M NPY.

(

8+<0<~

8gg0gq0030 050003i6 PDR *DOCY PDR P,

0 j

TABLE OF CONTENTS SECTION TITLE PAGE 1.1

SUMMARY

OF RESULTS 2.0 TABLES 2.1 TABLE 1 2-3 2.2 TABLE 2 2.3 TABLE 3

1..0

SUMMARY

OF RESULTS As indicated in the accommanying ILRT report, Type A leakage test results do not indicate a failure to meet the containment overall leakage acceptance criteria. Guideline Type B&C leakages were exceeded, however, as detailed in the following.

Types B & C Leak Rate Testing (**12 THP'4030 STP.203) was performed on Unit 2 between March 12, 1984 and June 29, 1984. Table Ol shows the valves that exceeded their respective guideline leakages. Table 52 gives a brief summary of the repairs made to leaking valves. Table e3 shows a brief history of these valves as tested during previous surveillances.

While testing Zone 4 piping pentrations, several penetrations were found to be leaking. These penetrations were CPN-4, CPN-23, CPN-40, & CPN-44. CPN-4 was repaired by

,welding a hole in the bellows. CPN-23, CPN-40, & CPN-44 also had holes in the bellows but. were not repaired per AEPSC review of the plant FSAR determining that bellows on containment, penetrations are not needed to maintain the leak-tight integrity of containment. Zone 4 was tested after isolating the above penetrations.

PAGE 1

TABLE 1 Volume Guideline As Found As Left Description Valve (sccm) (sccm) (sccm)

Upper Vent.

Supply VCR-105 8 VCR-205 3600 20019 80 Air Part. Rad.

Mon. SM-1 60 623 109 Nitrogen to PRT N-159 8 N-285 45 565 40 Charging to Regen. Hx CS<<321 180 23818 744 RCDT Vent Header DCR-203 8 DCR-207 120 297 20 RCT Vent Header N-160 8 DCR-201 120 1639 258 CLVGCUV Drain Header ,.DCR-620 6 DCR-621 120 2407 RHR Recirc ICM-305 1080 5910

'E'ower Cont.

Monitor ECR-33 8 ECR-35 60 2495 1907 Air Particl Rad. Mon ECR-31 6 ECR-32 120 1300 1243 Boron Injection ICM-251 240 703 40 Boron Injection ICM-250~ 240 1854 51 CPN Coils 384 CCW CCW-243-72 60 3229 120 Glycol Return Expan. R-157 60 7947 J

Post Accident Sample Sup ECR-416 15 250 Post Accident Sample Sup ECR-417 15 299

W L

Volume Guideline As Found As Left Description Valve (sccm) (sccm) (sccm)

Control Air To Cont. XCR-102&XCR-103 120 532 532 CPN Coils 285 CCW CCW-243-'25,> 60 109 109 CPN Coils 384 CCW CCW-244-72 60 271 271 CPN Coils 285 CCW CCR-440 60 188 188 Plant Air to Cont. check Valves PA"342 120 3974 3974 Personnel Airlock Cover Flange N/A 55 121 121 Zone 4 Piping Pene. N/A 1173 19853 802

TABLE 2 During the B&C leak rate testing the following penetrations"'ere found to have excessive leak rates and required repairs:

Volume Descri tion Valve $j R~eaiea Upper Vent, Supply VCR-105&VCR-205 VCR-105: Xnspected seal & seat, found no damage VCR-205: Manufacturer replaced seal, repaired seat, replaced dowel pin Air Part. Rad. Mon. SM-1 Replaced Valve Nitrogen to PRT N-159&N-285 N-159: Lapped seat, replaced

.plug, spring, & gasket N-285: Replaced wedge & gasket Charging to Regn. Hx CS"321 Replaced disc & gasket RCDT Vent Header DCR-203&DCR-207 DCR-203: No repair necessary DCR-207: Replaced diaphragm RCDT Vent Header N-160 & DCR-201 N-160: Cleaned valve disc & seat DCR-201: No repair necessary CLV&CUV Drain Header DCR-620&CR-621 DCR-620: Cleaned seat DCR-621: Cleaned seat, replaced packing 10K Recirc. 'E'CM-305 Lapped disc.

Lower Cont. Monitor ECR-33 & ECR-35 ECR-33: Cleaned & lapped seat ECR-35: Machined seats & repacked valve Air Particle Rad. Mon ECR-31 & ECR-32 ECR-31: Iapped plug & seat, replaced gaskets ECR-32: No repairs req'uired Boron Injection ICM-251 Iapped seat Boron Injection XCM-250 Lapped Seat CPN Coils 3&4 CCW CCW-243-72 Replaced valve Glycol Return Expan. R-157 Cleaned seat Post Accident Sample .. .ECR-416 a Lapped & machined seat & plug, Sup. a replaced gasket PAGE 4

~ ~

4

TABLE TWO (con't.)

Volume Descri tion Valve 8 R~eeire Post Accident Sample ECR-417 Lapped seat 6 plug, Sup. replaced gasket Zone 4 Piping N/A Welded hole in bellows Penetrations of CPN-4. CPN-23, CPN-40 and CPN-44 were isolated from the containment penetration and weld channel pressurization system PAGE 5

i

~ =

vi, I, II

'C lq

TABLE 3

.Guide-Valve ~

1 ine Mar84-Jun84 Nov82- an8 ar sccm found eft found e t sccm SCCm Scc sccm Scc VCR-205&

VCR-205 3600 20019 80 124 12 SM-I 60 623 109 120 120 2 40 2 40 N-159 & '0 N-285 45 565 501 501 CS-321 180 23818 744 16977 06 61 DCR-203&

DCR-207 120 297 20 50 25 N-160 &

DCR-201 16 258 I 2 I 10 I 8 120'20 DCR-620&

DCR-621 2407 12 ICM-305 1080 5910 02 02 I 0 I 0 ECR-33&

EC R-35 60 24 5 I 07 421 421 40 14 I ECR-31&

ECR-32 120 I 00 124 22 0 I I ICM-25I 240 70 4'0 6 7 ICM-250 240 I 4 CCW-243-72 60 22 120 I 6 2 R-157 60 794 0 ECR-416 15 250 ECR-417 15 XCR-102&

XCR-103 120 532 532 41 419 CCM-243-25 60 109 109 1010 0 CCW-244-72 60'71 271 170 4 4 65 1802 CCR-440 60 188 188 21325 0 PA-342 120 974 3974 N A N Airlock Cover Flan. 121 121 49.6 4 .6 N Zone 4 Pip ~

Pe etration 117 802 Page 6

'