| See also: [[followed by::IR 05000250/1996006]]
| |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UA'l'E(90RY | | {{#Wiki_filter:UA'l'E(90RY REGULAT Y INFORMATION DISTRIBUTION YSTEM (RIDS) |
| REGULAT Y INFORMATION | | ACCESSION NBR:9607250153 DOC.DATE: 96/07/18 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH NAME AUTHOR AFFILIATION PLUNKETT,T.F. |
| DISTRIBUTION | | RECIP.NAME Florida Power !'ight RECIPIENT 'AFFILIATION Co. |
| YSTEM (RIDS)PLUNKETT,T.F. | | Document Control Branch (Document Control Desk) |
| Florida Power!'ight Co.RECIP.NAME | | |
| RECIPIENT'AFFILIATION | | ==SUBJECT:== |
| Document Control Branch (Document Control Desk)SUBJECT: Forwards response to NRC ltr re violations | | Forwards response to ltr re violations noted in insp l |
| noted in insp repts 50-250/96-06 | | NRC repts 50-250/96-06 6 50-251/96-06 on 960505-0615. |
| 6 50-251/96-06 | | DISTRZBDTZON CODE: ZE01D COPIES RECEIVED:LTR TITLE: General (50 Dkt)-Insp Rept/Notice of ENCL Violation i SIZE: |
| on 960505-0615. | | |
| DISTRZBDTZON | | ===Response=== |
| CODE: ZE01D COPIES RECEIVED:LTR | | NOTES: |
| l ENCL i SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
| | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAUPR 1 1 0 INTERNAL: AEOD/SPD/RAB 1 1 TTC 1 1 DEDRO 1 1 IL NTE 1 1 NRR/DISP/PIPB 1 1 FB 1 1 NRR/DRPM/PECB 1 1 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 ~ 1 NRC PDR 1 1 D |
| of Violation Response NOTES: ACCESSION NBR:9607250153 | | 0 U |
| DOC.DATE: 96/07/18 NOTARIZED:
| | N NOTE TO,ALL "RIDS" RECIPIENTS: |
| NO DOCKET FACIL:50-250
| | PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! |
| Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH NAME AUTHOR AFFILIATION
| | TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17 |
| RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RAB
| | |
| DEDRO NRR/DISP/PIPB
| | Florida Power 5 Light Company, P.O. Box 14000, Juno Beach, FL 33408.0420 FPL JUL 3 8 $ 996 L-96-185 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen: |
| NRR/DRPM/PECB
| | Re: Turkey Point Units 3 & 4 Docket Nos. 50-250/251 Reply to Notice of Violation NRC Ins ection Re ort 96-06 Florida Power 8 Light Company has reviewed the subject inspection report and, pursuant to 10 CFR 2.201, the required response is attached. |
| NUDOCS-ABSTRACT
| | If there are any questions, please contact us. |
| OGC/HDS3 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAUPR TTC IL NTE FB NRR/DRPM/PERB
| | Very truly yours, |
| OE DIR RGN2 FILE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1~1 0 D 0 U N NOTE TO,ALL"RIDS" RECIPIENTS:
| | .g+ |
| PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION | | T. F. Plunkett President Nuclear Division Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9607250l53 960718 PDR ADQCK 05000250 |
| LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17 | | ~ 8 PDR an FPL Group company |
|
| | |
| Florida Power 5 Light Company, P.O.Box 14000, Juno Beach, FL 33408.0420 | | Cr+,. |
| FPL JUL 3 8$996 L-96-185 10 CFR 2.201 U.S.Nuclear Regulatory | | Attachment to L 85 Page 1 REPLY TO NOTZCE OF VXOLATXON RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Inspection Report 96-06 FINDING "During an NRC inspection conducted on May 5 through June 15, 1996, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600 the violation is listed below: |
| Commission | | Technical Specification 6.8.1 requires that written procedures shall be established in accordance with Appendix A of Regulato-ry Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2, February 1978. |
| Attn: Document Control Desk Washington, D.C.20555 Gentlemen: | | Appendix A of Regulatory Guide 1.33 section 8.b.(1)(q) states that implementing procedures are required for each surveillance test listed in the technical specifications, including emergen-cy power tests. |
| Re: Turkey Point Units 3&4 Docket Nos.50-250/251 | | Technical Specification 4.8.1.1.2.a.4 requires that each emergency diesel generator shall be demonstrated operable by verifying that the diesel starts and accelerates to rated conditions. Once per 184 days, these conditions shall be reached within 15 seconds after the start signal from normal conditions. This requirement was implemented by procedures 3 and 4-0SP-023.1, Diesel Generator Operability Test, sections 7.3 and 7.4, rapid start test. |
| Reply to Notice of Violation NRC Ins ection Re ort 96-06 Florida Power 8 Light Company has reviewed the subject inspection | | Contrary to the above, prior to May 21, 1996, and since initial |
| report and, pursuant to 10 CFR 2.201, the required response is attached.If there are any questions, please contact us.Very truly yours,.g+T.F.Plunkett President Nuclear Division Attachment | | .plant startup for Unit 3 and since the Dual Unit Outage for Unit 4, the 184 day rapid start test performed by procedures 3 and 4-OSP-023.1 was not performed from normal conditions in that the diesel generator fuel priming pumps were operated prior to initiating the diesel start signal. As a result, portions of the automatic start circuitry had not been demon-strated operable. Subsequent testing of all four diesels without operating the fuel priming system was successful. |
| cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9607250l53 | | This is a Severity Level IV violation (Supplement 1)." |
| 960718 PDR ADQCK 05000250~8 PDR an FPL Group company | | RESPONSE TO FINDING |
|
| | : 1. Florida |
| Cr+,.Attachment | | ~ |
| to L-96-85 Page 1 REPLY TO NOTZCE OF VXOLATXON RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 NRC Inspection | | Power S Light Company (FPL) concurs with the finding. |
| Report 96-06 FINDING"During an NRC inspection | | : 2. On June 18, 1996, FPL submitted LER 250/96-08, Inadequate Surveillance Testing for Emergency Diesel Generato rs. Th e |
| conducted on May 5 through June 15, 1996, a violation of NRC requirements | | ~ |
| was identified. | | issues associated with violation 96-06-02, including corrective actions are contained within LER 250/96-08.}} |
| In accordance | |
| with the"General Statement of Policy and Procedure for NRC Enforcement | |
| Actions," NUREG-1600 | |
| the violation is listed below: Technical Specification | |
| 6.8.1 requires that written procedures | |
| shall be established | |
| in accordance | |
| with Appendix A of Regulato-ry Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2, February 1978.Appendix A of Regulatory | |
| Guide 1.33 section 8.b.(1)(q) | |
| states that implementing | |
| procedures | |
| are required for each surveillance | |
| test listed in the technical specifications, including emergen-cy power tests.Technical Specification | |
| 4.8.1.1.2.a.4 | |
| requires that each emergency diesel generator shall be demonstrated | |
| operable by verifying that the diesel starts and accelerates | |
| to rated conditions. | |
| Once per 184 days, these conditions | |
| shall be reached within 15 seconds after the start signal from normal conditions. | |
| This requirement | |
| was implemented | |
| by procedures | |
| 3 and 4-0SP-023.1, Diesel Generator Operability | |
| Test, sections 7.3 and 7.4, rapid start test.Contrary to the above, prior to May 21, 1996, and since initial.plant startup for Unit 3 and since the Dual Unit Outage for Unit 4, the 184 day rapid start test performed by procedures | |
| 3 and 4-OSP-023.1 | |
| was not performed from normal conditions | |
| in that the diesel generator fuel priming pumps were operated prior to initiating | |
| the diesel start signal.As a result, portions of the automatic start circuitry had not been demon-strated operable.Subsequent | |
| testing of all four diesels without operating the fuel priming system was successful. | |
| This is a Severity Level IV violation (Supplement | |
| 1)." RESPONSE TO FINDING Surveillance | |
| Testing for Emergency Diesel Generato T e issues associated
| |
| with violation 96-06-02, including corrective
| |
| actions are contained within LER 250/96-08.
| |
| 1.Florida Power S Light Company (FPL)concurs with the finding.~~2.On June 18, 1996, FPL submitted LER 250/96-08, Inadequate | |
| rs.h | |
| }} | |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] |
Text
UA'l'E(90RY REGULAT Y INFORMATION DISTRIBUTION YSTEM (RIDS)
ACCESSION NBR:9607250153 DOC.DATE: 96/07/18 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH NAME AUTHOR AFFILIATION PLUNKETT,T.F.
RECIP.NAME Florida Power !'ight RECIPIENT 'AFFILIATION Co.
Document Control Branch (Document Control Desk)
SUBJECT:
Forwards response to ltr re violations noted in insp l
NRC repts 50-250/96-06 6 50-251/96-06 on 960505-0615.
DISTRZBDTZON CODE: ZE01D COPIES RECEIVED:LTR TITLE: General (50 Dkt)-Insp Rept/Notice of ENCL Violation i SIZE:
Response
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAUPR 1 1 0 INTERNAL: AEOD/SPD/RAB 1 1 TTC 1 1 DEDRO 1 1 IL NTE 1 1 NRR/DISP/PIPB 1 1 FB 1 1 NRR/DRPM/PECB 1 1 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 ~ 1 NRC PDR 1 1 D
0 U
N NOTE TO,ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17
Florida Power 5 Light Company, P.O. Box 14000, Juno Beach, FL 33408.0420 FPL JUL 3 8 $ 996 L-96-185 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 & 4 Docket Nos. 50-250/251 Reply to Notice of Violation NRC Ins ection Re ort 96-06 Florida Power 8 Light Company has reviewed the subject inspection report and, pursuant to 10 CFR 2.201, the required response is attached.
If there are any questions, please contact us.
Very truly yours,
.g+
T. F. Plunkett President Nuclear Division Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9607250l53 960718 PDR ADQCK 05000250
~ 8 PDR an FPL Group company
Cr+,.
Attachment to L 85 Page 1 REPLY TO NOTZCE OF VXOLATXON RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Inspection Report 96-06 FINDING "During an NRC inspection conducted on May 5 through June 15, 1996, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600 the violation is listed below:
Technical Specification 6.8.1 requires that written procedures shall be established in accordance with Appendix A of Regulato-ry Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2, February 1978.
Appendix A of Regulatory Guide 1.33 section 8.b.(1)(q) states that implementing procedures are required for each surveillance test listed in the technical specifications, including emergen-cy power tests.
Technical Specification 4.8.1.1.2.a.4 requires that each emergency diesel generator shall be demonstrated operable by verifying that the diesel starts and accelerates to rated conditions. Once per 184 days, these conditions shall be reached within 15 seconds after the start signal from normal conditions. This requirement was implemented by procedures 3 and 4-0SP-023.1, Diesel Generator Operability Test, sections 7.3 and 7.4, rapid start test.
Contrary to the above, prior to May 21, 1996, and since initial
.plant startup for Unit 3 and since the Dual Unit Outage for Unit 4, the 184 day rapid start test performed by procedures 3 and 4-OSP-023.1 was not performed from normal conditions in that the diesel generator fuel priming pumps were operated prior to initiating the diesel start signal. As a result, portions of the automatic start circuitry had not been demon-strated operable. Subsequent testing of all four diesels without operating the fuel priming system was successful.
This is a Severity Level IV violation (Supplement 1)."
RESPONSE TO FINDING
- 1. Florida
~
Power S Light Company (FPL) concurs with the finding.
- 2. On June 18, 1996, FPL submitted LER 250/96-08, Inadequate Surveillance Testing for Emergency Diesel Generato rs. Th e
~
issues associated with violation 96-06-02, including corrective actions are contained within LER 250/96-08.