{{#Wiki_filter:UA'l'E(90RY
{{#Wiki_filter:UA'l'E(90RY REGULAT     Y INFORMATION   DISTRIBUTION YSTEM (RIDS)
REGULAT Y INFORMATION
ACCESSION NBR:9607250153            DOC.DATE:    96/07/18    NOTARIZED: NO              DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                      C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                    C 05000251 AUTH NAME            AUTHOR AFFILIATION PLUNKETT,T.F.
DISTRIBUTION
RECIP.NAME Florida   Power !'ight RECIPIENT 'AFFILIATION Co.
YSTEM (RIDS)PLUNKETT,T.F.
Document Control Branch (Document           Control Desk)
Florida Power!'ight Co.RECIP.NAME
 
RECIPIENT'AFFILIATION
==SUBJECT:==
Document Control Branch (Document Control Desk)SUBJECT: Forwards response to NRC ltr re violations
Forwards       response   to       ltr re violations noted in insp l
noted in insp repts 50-250/96-06
NRC repts 50-250/96-06       6 50-251/96-06 on 960505-0615.
6 50-251/96-06
DISTRZBDTZON CODE: ZE01D           COPIES RECEIVED:LTR TITLE: General (50 Dkt)-Insp Rept/Notice of ENCL Violation i  SIZE:
on 960505-0615.
 
DISTRZBDTZON
===Response===
CODE: ZE01D COPIES RECEIVED:LTR
NOTES:
l ENCL i SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
RECIPIENT            COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME         LTTR ENCL PD2-3 PD                 1    1      CROTEAUPR                  1      1            0 INTERNAL: AEOD/SPD/RAB                 1     1             TTC                1     1 DEDRO                    1     1         IL    NTE              1     1 NRR/DISP/PIPB            1     1                     FB          1     1 NRR/DRPM/PECB            1     1       NRR/DRPM/PERB             1     1 NUDOCS-ABSTRACT          1     1       OE DIR                    1     1 OGC/HDS3                  1     1       RGN2    FILE    01      1     1 EXTERNAL: LITCO BRYCE,J H              1     1       NOAC                      1   ~ 1 NRC PDR                  1     1 D
of Violation Response NOTES: ACCESSION NBR:9607250153
0 U
DOC.DATE: 96/07/18 NOTARIZED:
N NOTE TO,ALL "RIDS" RECIPIENTS:
NO DOCKET FACIL:50-250
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN   SD"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH NAME AUTHOR AFFILIATION
TOTAL NUMBER OF COPIES REQUIRED: LTTR               17   ENCL     17
RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RAB
 
DEDRO NRR/DISP/PIPB
Florida Power 5 Light Company, P.O. Box 14000, Juno Beach, FL 33408.0420 FPL JUL     3 8 $ 996 L-96-185 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn:       Document Control Desk Washington, D. C. 20555 Gentlemen:
NRR/DRPM/PECB
Re:     Turkey Point Units 3 & 4 Docket Nos. 50-250/251 Reply to Notice of Violation NRC   Ins ection   Re ort 96-06 Florida Power 8 Light Company has reviewed the subject inspection report and, pursuant to 10 CFR 2.201, the required response is attached.
NUDOCS-ABSTRACT
If there       are any questions,     please contact us.
OGC/HDS3 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAUPR TTC IL NTE FB NRR/DRPM/PERB
Very     truly yours,
OE DIR RGN2 FILE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1~1 0 D 0 U N NOTE TO,ALL"RIDS" RECIPIENTS:
  .g+
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
T. F. Plunkett President Nuclear Division Attachment cc:     Stewart       D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson,       Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9607250l53 960718 PDR     ADQCK 05000250
LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17  
~   8                     PDR an FPL Group company
 
Florida Power 5 Light Company, P.O.Box 14000, Juno Beach, FL 33408.0420
Cr+,.
FPL JUL 3 8$996 L-96-185 10 CFR 2.201 U.S.Nuclear Regulatory
Attachment to L 85 Page 1 REPLY TO NOTZCE OF VXOLATXON RE:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Inspection Report 96-06 FINDING "During an NRC inspection conducted on May 5 through June 15, 1996, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600 the violation is listed below:
Commission
Technical Specification 6.8.1 requires that written procedures shall be established in accordance with Appendix A of Regulato-ry Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2, February 1978.
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Appendix A of Regulatory Guide 1.33 section 8.b.(1)(q) states that implementing procedures are required for each surveillance test listed in the technical specifications, including emergen-cy power tests.
Re: Turkey Point Units 3&4 Docket Nos.50-250/251
Technical Specification 4.8.1.1.2.a.4 requires that each emergency diesel generator shall be demonstrated operable by verifying that the diesel starts and accelerates to rated conditions. Once per 184 days, these conditions shall be reached within 15 seconds after the start signal from normal conditions. This requirement was implemented by procedures 3 and 4-0SP-023.1, Diesel Generator Operability Test, sections 7.3 and 7.4, rapid start test.
Reply to Notice of Violation NRC Ins ection Re ort 96-06 Florida Power 8 Light Company has reviewed the subject inspection
Contrary to the above, prior to May 21, 1996, and since initial
report and, pursuant to 10 CFR 2.201, the required response is attached.If there are any questions, please contact us.Very truly yours,.g+T.F.Plunkett President Nuclear Division Attachment
          .plant startup for Unit 3 and since the Dual Unit Outage for Unit 4, the 184 day rapid start test performed by procedures 3 and 4-OSP-023.1 was not performed from normal conditions in that the diesel generator fuel priming pumps were operated prior to initiating the diesel start signal.       As a result, portions   of the automatic start circuitry had not been demon-strated operable. Subsequent testing of all four diesels without operating the fuel priming system was successful.
cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9607250l53
This is a Severity Level IV violation (Supplement 1)."
960718 PDR ADQCK 05000250~8 PDR an FPL Group company  
RESPONSE   TO FINDING
: 1. Florida
Cr+,.Attachment
                  ~
to L-96-85 Page 1 REPLY TO NOTZCE OF VXOLATXON RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 NRC Inspection
Power S Light Company (FPL) concurs with the finding.
Report 96-06 FINDING"During an NRC inspection
: 2. On June 18, 1996, FPL submitted LER 250/96-08,   Inadequate Surveillance Testing for Emergency Diesel Generato rs. Th e
conducted on May 5 through June 15, 1996, a violation of NRC requirements
                    ~
was identified.
issues associated with violation 96-06-02, including corrective actions are contained within LER 250/96-08.}}
In accordance
with the"General Statement of Policy and Procedure for NRC Enforcement
Actions," NUREG-1600
the violation is listed below: Technical Specification
6.8.1 requires that written procedures
shall be established
in accordance
with Appendix A of Regulato-ry Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2, February 1978.Appendix A of Regulatory
Guide 1.33 section 8.b.(1)(q)
states that implementing
procedures
are required for each surveillance
test listed in the technical specifications, including emergen-cy power tests.Technical Specification
4.8.1.1.2.a.4
requires that each emergency diesel generator shall be demonstrated
operable by verifying that the diesel starts and accelerates
to rated conditions.
Once per 184 days, these conditions
shall be reached within 15 seconds after the start signal from normal conditions.
This requirement
was implemented
by procedures
3 and 4-0SP-023.1, Diesel Generator Operability
Test, sections 7.3 and 7.4, rapid start test.Contrary to the above, prior to May 21, 1996, and since initial.plant startup for Unit 3 and since the Dual Unit Outage for Unit 4, the 184 day rapid start test performed by procedures
3 and 4-OSP-023.1
was not performed from normal conditions
in that the diesel generator fuel priming pumps were operated prior to initiating
the diesel start signal.As a result, portions of the automatic start circuitry had not been demon-strated operable.Subsequent
testing of all four diesels without operating the fuel priming system was successful.
This is a Severity Level IV violation (Supplement
1)." RESPONSE TO FINDING Surveillance
Testing for Emergency Diesel Generato T e issues associated
with violation 96-06-02, including corrective
actions are contained within LER 250/96-08.
1.Florida Power S Light Company (FPL)concurs with the finding.~~2.On June 18, 1996, FPL submitted LER 250/96-08, Inadequate
rs.h
}}

Latest revision as of 07:18, 22 October 2019

Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-250/96-06 & 50-251/96-06 on 960505-0615
ML17353A819
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/18/1996
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-185, NUDOCS 9607250153
Download: ML17353A819 (5)


Text

UA'l'E(90RY REGULAT Y INFORMATION DISTRIBUTION YSTEM (RIDS)

ACCESSION NBR:9607250153 DOC.DATE: 96/07/18 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH NAME AUTHOR AFFILIATION PLUNKETT,T.F.

RECIP.NAME Florida Power  !'ight RECIPIENT 'AFFILIATION Co.

Document Control Branch (Document Control Desk)

SUBJECT:

Forwards response to ltr re violations noted in insp l

NRC repts 50-250/96-06 6 50-251/96-06 on 960505-0615.

DISTRZBDTZON CODE: ZE01D COPIES RECEIVED:LTR TITLE: General (50 Dkt)-Insp Rept/Notice of ENCL Violation i SIZE:

Response

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAUPR 1 1 0 INTERNAL: AEOD/SPD/RAB 1 1 TTC 1 1 DEDRO 1 1 IL NTE 1 1 NRR/DISP/PIPB 1 1 FB 1 1 NRR/DRPM/PECB 1 1 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 ~ 1 NRC PDR 1 1 D

0 U

N NOTE TO,ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17

Florida Power 5 Light Company, P.O. Box 14000, Juno Beach, FL 33408.0420 FPL JUL 3 8 $ 996 L-96-185 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 & 4 Docket Nos. 50-250/251 Reply to Notice of Violation NRC Ins ection Re ort 96-06 Florida Power 8 Light Company has reviewed the subject inspection report and, pursuant to 10 CFR 2.201, the required response is attached.

If there are any questions, please contact us.

Very truly yours,

.g+

T. F. Plunkett President Nuclear Division Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9607250l53 960718 PDR ADQCK 05000250

~ 8 PDR an FPL Group company

Cr+,.

Attachment to L 85 Page 1 REPLY TO NOTZCE OF VXOLATXON RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Inspection Report 96-06 FINDING "During an NRC inspection conducted on May 5 through June 15, 1996, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600 the violation is listed below:

Technical Specification 6.8.1 requires that written procedures shall be established in accordance with Appendix A of Regulato-ry Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2, February 1978.

Appendix A of Regulatory Guide 1.33 section 8.b.(1)(q) states that implementing procedures are required for each surveillance test listed in the technical specifications, including emergen-cy power tests.

Technical Specification 4.8.1.1.2.a.4 requires that each emergency diesel generator shall be demonstrated operable by verifying that the diesel starts and accelerates to rated conditions. Once per 184 days, these conditions shall be reached within 15 seconds after the start signal from normal conditions. This requirement was implemented by procedures 3 and 4-0SP-023.1, Diesel Generator Operability Test, sections 7.3 and 7.4, rapid start test.

Contrary to the above, prior to May 21, 1996, and since initial

.plant startup for Unit 3 and since the Dual Unit Outage for Unit 4, the 184 day rapid start test performed by procedures 3 and 4-OSP-023.1 was not performed from normal conditions in that the diesel generator fuel priming pumps were operated prior to initiating the diesel start signal. As a result, portions of the automatic start circuitry had not been demon-strated operable. Subsequent testing of all four diesels without operating the fuel priming system was successful.

This is a Severity Level IV violation (Supplement 1)."

RESPONSE TO FINDING

1. Florida

~

Power S Light Company (FPL) concurs with the finding.

2. On June 18, 1996, FPL submitted LER 250/96-08, Inadequate Surveillance Testing for Emergency Diesel Generato rs. Th e

~

issues associated with violation 96-06-02, including corrective actions are contained within LER 250/96-08.