ML18005A099: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18005A099
| number = ML18005A099
| issue date = 01/25/2018
| issue date = 01/25/2018
| title = Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 (EPID L-2017-LRM-0051
| title = Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2
| author name = Pulvirenti A L
| author name = Pulvirenti A
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000382
| docket = 05000382
| license number = NPF-038
| license number = NPF-038
| contact person = Pulvirenti A L
| contact person = Pulvirenti A
| case reference number = EPID L-2017-LRM-0051
| case reference number = EPID L-2017-LRM-0051
| document type = Meeting Summary
| document type = Meeting Summary
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter::.V" 1\&#xa3;011<.., l~~c. "o\ UNITED STATES NUCLEAR REGULATORY COMMISSION *
{{#Wiki_filter::.V" 1\&#xa3;011<..,
* o; WASHINGTON, D.C. 20555-0001 < ~* ",s.l') ,!' *it-*il ... January 25, 2018 LICENSEE: Entergy Operations, Inc. FACILITY: Waterford Steam Electric Station, Unit 3  
l~~c."o\                                               UNITED STATES
~                          ~            NUCLEAR REGULATORY COMMISSION
*~
* o;                     WASHINGTON, D.C. 20555-0001
  <",s.l')             ,!'~*
          *it-*il ...                               January 25, 2018 LICENSEE:                     Entergy Operations, Inc.
FACILITY:                     Waterford Steam Electric Station, Unit 3


==SUBJECT:==
==SUBJECT:==
SUMMARY OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051) On November 16, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operation, Inc. (Entergy, the licensee). The purpose of the meeting was to discuss with NRC staff a planned license amendment request (LAR) to revise Technical Specification (TS) 3/4.3.2, Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation [ESFAS] Surveillance Requirements," for Waterford Steam Electric Station, Unit 3 (Waterford 3). The meeting notice and agenda, dated November 2, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17318A139. The licensee provided an initial slide presentation, which is available in ADAMS at Accession No. ML 17318A123. A list of attendees at the meeting is also enclosed to this meeting summary. During its presentation, the licensee stated that the current configurations of the main steam isolation signal (MSIS) and containment spray actuation signal (CSAS) relay circuits represent an adverse condition. Specifically, the circuit incorporates a single-point vulnerability such that if the circuit were to be tested at power, a single failure in the relay circuit may inadvertently actuate a spurious trip of the reactor. To reduce the potential for a spurious trip, the licensee was originally exempted from testing the circuit at power. The licensee indicated that they plan to install a trip-hardening modification of the circuit, to be performed pursuant to Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR), "Changes, tests, and experiments," that would alter the circuit logic from one-out-of-one logic to parallel-two-out-of-two logic. The modification would remove the single-point vulnerability adverse condition and allow the MSIS and CSAS circuits to be tested quarterly, at power, with a reduced probability of actuating a spurious trip during testing. The licensee demonstrated the operation of the planned parallel-two-out-of-two logic and the function of light-emitting-diode (LED) indicator lights to be utilized during testing. The licensee also presented circuit diagrams of the proposed design of both MSIS and CSAS ESFAS systems. The licensee stated that the new configuration will comply with Regulatory Guide 1.22, "Periodic Testing of Protection System Actuation Functions" (ADAMS Accession No. ML083300530). The NRC staff asked how many new relays were to be added for the MSIS valve actuation; the licensee responded that three new relays would be added to the circuitry, for a total of six relays. The staff also inquired whether only one test button would be used to
 
-2-test the function of the LED indicator lights before performing the relay test. The licensee confirmed that one button would be used to test all four indicator lights. The licesee described how the planned LAR will request to revise Note 3 of TS Table 4.3-2 to remove the exemption from testing at power for the affected MSIS and CSAS relays, and provided the planned markup for the affected TS pages. The NRC staff requested that the LAR submittal include the current baseline frequency of the current surveillance for the affected relays. The licensee stated that the planned LAR is scheduled to be submitted by early December 2017. No regulatory decisions were reached at this meeting. No member of the public provided comments to the NRC staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received. Please direct any inquiries to me at 301-415-1390, or at April.Pulvirenti@nrc.gov. Docket No. 50-382  
==SUMMARY==
OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051)
On November 16, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operation, Inc. (Entergy, the licensee). The purpose of the meeting was to discuss with NRC staff a planned license amendment request (LAR) to revise Technical Specification (TS) 3/4.3.2, Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation [ESFAS] Surveillance Requirements," for Waterford Steam Electric Station, Unit 3 (Waterford 3). The meeting notice and agenda, dated November 2, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17318A139. The licensee provided an initial slide presentation, which is available in ADAMS at Accession No. ML17318A123. A list of attendees at the meeting is also enclosed to this meeting summary.
During its presentation, the licensee stated that the current configurations of the main steam isolation signal (MSIS) and containment spray actuation signal (CSAS) relay circuits represent an adverse condition. Specifically, the circuit incorporates a single-point vulnerability such that if the circuit were to be tested at power, a single failure in the relay circuit may inadvertently actuate a spurious trip of the reactor. To reduce the potential for a spurious trip, the licensee was originally exempted from testing the circuit at power.
The licensee indicated that they plan to install a trip-hardening modification of the circuit, to be performed pursuant to Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR),
"Changes, tests, and experiments," that would alter the circuit logic from one-out-of-one logic to parallel-two-out-of-two logic. The modification would remove the single-point vulnerability adverse condition and allow the MSIS and CSAS circuits to be tested quarterly, at power, with a reduced probability of actuating a spurious trip during testing. The licensee demonstrated the operation of the planned parallel-two-out-of-two logic and the function of light-emitting-diode (LED) indicator lights to be utilized during testing.
The licensee also presented circuit diagrams of the proposed design of both MSIS and CSAS ESFAS systems. The licensee stated that the new configuration will comply with Regulatory Guide 1.22, "Periodic Testing of Protection System Actuation Functions" (ADAMS Accession No. ML083300530). The NRC staff asked how many new relays were to be added for the MSIS valve actuation; the licensee responded that three new relays would be added to the circuitry, for a total of six relays. The staff also inquired whether only one test button would be used to
 
test the function of the LED indicator lights before performing the relay test. The licensee confirmed that one button would be used to test all four indicator lights.
The licesee described how the planned LAR will request to revise Note 3 of TS Table 4.3-2 to remove the exemption from testing at power for the affected MSIS and CSAS relays, and provided the planned markup for the affected TS pages. The NRC staff requested that the LAR submittal include the current baseline frequency of the current surveillance for the affected relays.
The licensee stated that the planned LAR is scheduled to be submitted by early December 2017. No regulatory decisions were reached at this meeting. No member of the public provided comments to the NRC staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-1390, or at April.Pulvirenti@nrc.gov.
April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382


==Enclosure:==
==Enclosure:==
List of Attendees cc: Listserv April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF A TIEN DEES November 16. 2017, MEETING WITH ENTERGY OPERATIONS. INC. REGARDING NEUTRON FLUENCE CALCULATION METHOD WATERFORD STEAM ELECTRIC STATION, UNIT 3 Entergy Operations, Inc Miguel Barreto John Jarrell Jason Laque Paul Stanton William Steelman Maria Zamber DP Engineering Robert Finkenaur U.S. Nuclear Regulatory Commission Gursharan Singh Pete Snyder Robert Pascarelli April Pulvirenti Public None Enclosure 
-3 -


==SUBJECT:==
List of Attendees cc: Listserv
SUMMARY OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051 ), DATED JANUARY 25, 2018 DISTRIBUTION: PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsRgn4MailCenter Resource RidsNrrDorllp14 Resource RidsNrrPMWatertord Resource RidsNrrDssStsb Resource RidsNrrOeEicb Resource ADAMS Accession No.: ML1S005A099 OFFICE NRR/D0RULPL4/PM NRR/DORULPL4/LA NAME APuvirenti PBlechman DATE 01/16/18 01/08/18 RidsNrrLAPBlechman Resource GSingh, NRR MWaters, NRR PSnyder, NRR VCusumano, NRR TWertz, NRR JBowen, OEDO NRR/DORULPL4/BC NRR/DORULPL4/PM A Pascarelli APulvirenti 01/18/18 01/25/18 OFFICIAL RECORD COPY 
 
}}
LIST OF ATIEN DEES November 16. 2017, MEETING WITH ENTERGY OPERATIONS. INC.
REGARDING NEUTRON FLUENCE CALCULATION METHOD WATERFORD STEAM ELECTRIC STATION, UNIT 3 Entergy Operations, Inc Miguel Barreto John Jarrell Jason Laque Paul Stanton William Steelman Maria Zamber DP Engineering Robert Finkenaur U.S. Nuclear Regulatory Commission Gursharan Singh Pete Snyder Robert Pascarelli April Pulvirenti Public None Enclosure
 
ML1S005A099 OFFICE   NRR/D0RULPL4/PM     NRR/DORULPL4/LA   NRR/DORULPL4/BC    NRR/DORULPL4/PM NAME     APuvirenti         PBlechman         APascarelli        APulvirenti DATE     01/16/18           01/08/18         01/18/18           01/25/18}}

Latest revision as of 07:01, 22 October 2019

Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2
ML18005A099
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/25/2018
From: April Pulvirenti
Plant Licensing Branch IV
To:
Pulvirenti A
References
EPID L-2017-LRM-0051
Download: ML18005A099 (4)


Text

.V" 1\£011<..,

l~~c."o\ UNITED STATES

~ ~ NUCLEAR REGULATORY COMMISSION

  • ~

<",s.l') ,!'~*

  • it-*il ... January 25, 2018 LICENSEE: Entergy Operations, Inc.

FACILITY: Waterford Steam Electric Station, Unit 3

SUBJECT:

SUMMARY

OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051)

On November 16, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operation, Inc. (Entergy, the licensee). The purpose of the meeting was to discuss with NRC staff a planned license amendment request (LAR) to revise Technical Specification (TS) 3/4.3.2, Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation [ESFAS] Surveillance Requirements," for Waterford Steam Electric Station, Unit 3 (Waterford 3). The meeting notice and agenda, dated November 2, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17318A139. The licensee provided an initial slide presentation, which is available in ADAMS at Accession No. ML17318A123. A list of attendees at the meeting is also enclosed to this meeting summary.

During its presentation, the licensee stated that the current configurations of the main steam isolation signal (MSIS) and containment spray actuation signal (CSAS) relay circuits represent an adverse condition. Specifically, the circuit incorporates a single-point vulnerability such that if the circuit were to be tested at power, a single failure in the relay circuit may inadvertently actuate a spurious trip of the reactor. To reduce the potential for a spurious trip, the licensee was originally exempted from testing the circuit at power.

The licensee indicated that they plan to install a trip-hardening modification of the circuit, to be performed pursuant to Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR),

"Changes, tests, and experiments," that would alter the circuit logic from one-out-of-one logic to parallel-two-out-of-two logic. The modification would remove the single-point vulnerability adverse condition and allow the MSIS and CSAS circuits to be tested quarterly, at power, with a reduced probability of actuating a spurious trip during testing. The licensee demonstrated the operation of the planned parallel-two-out-of-two logic and the function of light-emitting-diode (LED) indicator lights to be utilized during testing.

The licensee also presented circuit diagrams of the proposed design of both MSIS and CSAS ESFAS systems. The licensee stated that the new configuration will comply with Regulatory Guide 1.22, "Periodic Testing of Protection System Actuation Functions" (ADAMS Accession No. ML083300530). The NRC staff asked how many new relays were to be added for the MSIS valve actuation; the licensee responded that three new relays would be added to the circuitry, for a total of six relays. The staff also inquired whether only one test button would be used to

test the function of the LED indicator lights before performing the relay test. The licensee confirmed that one button would be used to test all four indicator lights.

The licesee described how the planned LAR will request to revise Note 3 of TS Table 4.3-2 to remove the exemption from testing at power for the affected MSIS and CSAS relays, and provided the planned markup for the affected TS pages. The NRC staff requested that the LAR submittal include the current baseline frequency of the current surveillance for the affected relays.

The licensee stated that the planned LAR is scheduled to be submitted by early December 2017. No regulatory decisions were reached at this meeting. No member of the public provided comments to the NRC staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received.

Please direct any inquiries to me at 301-415-1390, or at April.Pulvirenti@nrc.gov.

April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

List of Attendees cc: Listserv

LIST OF ATIEN DEES November 16. 2017, MEETING WITH ENTERGY OPERATIONS. INC.

REGARDING NEUTRON FLUENCE CALCULATION METHOD WATERFORD STEAM ELECTRIC STATION, UNIT 3 Entergy Operations, Inc Miguel Barreto John Jarrell Jason Laque Paul Stanton William Steelman Maria Zamber DP Engineering Robert Finkenaur U.S. Nuclear Regulatory Commission Gursharan Singh Pete Snyder Robert Pascarelli April Pulvirenti Public None Enclosure

ML1S005A099 OFFICE NRR/D0RULPL4/PM NRR/DORULPL4/LA NRR/DORULPL4/BC NRR/DORULPL4/PM NAME APuvirenti PBlechman APascarelli APulvirenti DATE 01/16/18 01/08/18 01/18/18 01/25/18