ML18044A195: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I* TESTS *AND TEST CRITERIA ...... A. LOW PCMER TESTS Measured Parameter ARO HZP Critical Boron ' Concentration
{{#Wiki_filter:{.*
* Regulating Rod Bank Worths, No Overlap Regula ting Rod Bank Worths In Overlap Sequence Central Rod Integral Worth bro. tion * ' . Symmetric Rod Worths Moderator Temperature Coefficient ARO and Regulating Banks In Reciprocal Soluble Boron.Worth CYCLE 4 START-UP PHYSICS TEST PROGRAM Palisades Plant Review Criterion.
CYCLE 4 START-UP PHYSICS TEST PROGRAM                                            .
Within 70 ppm of Prediction Individual Rods Banks Within l5'fo. or o.15'fo of Predicted Value, Whichever is Greater None None Each Individual Rod Within 101> of the Symmetric Group Average Within 5 x 10-5 1J.f'/°F of the Predicted Value Within 15 ppm/'foM of the dicted Value Acceptance Criterion None (no associated safety limit) Sum of Regulating Banks Within of Prediction Sum of Regulating Banks Within 101> of Prediction None Each Individual Rod Within 201> of the Symmetric Group Average {.* J I .. Value  
I Palisades Plant                                                  J I* TESTS *AND TEST CRITERIA A. LOW PCMER TESTS Measured Parameter                     Review Criterion.                  Acceptance Criterion ARO HZP Critical Boron                 Within 70 ppm of Prediction        None (no associated safety    limit)
+ 5 and -35 x *10-ae /°F' When Extrapolated A. to Full Power Less than 125 ppm/'fo!lp  
Concentration      '*
..
Regulating Rod Bank Worths,             Individual Rods Banks Within l5'fo. Sum of Regulating Banks Within No Overlap                             or o.15'fo of Predicted Value,      l~ of Prediction Whichever is Greater Regula ting Rod Bank Worths In         None                                Sum of Regulating Banks Within Overlap Sequence                                                           101> of Prediction Central Rod Integral Worth Cali-        None                                None bro. tion         * '           .
CYCLE 4 START-UP PHYSICS TEST PROGRAM Palisades Plant I.. TESTS AND TEST CRITERIA {Continued)
Symmetric Rod Worths                   Each Individual Rod Within 101>    Each Individual Rod Within 201> of of the Symmetric Group Average      the Symmetric Group Average Moderator Temperature Coefficient      Within 5 x 10- 51J.f'/°F of the     Value Bet~een + 5 ~ l0- 5D~/°F and ARO and Regulating Banks In            Predicted Value                     -35 x *10- ae /°F' When Extrapolated A.
B. POWER ESCAIATION TESTS Measured Parameter Moderator tempe:rature Coefficient Power Coefficient Power Distribution Quadrant Tilt Assembly Power Assembly Power PJ1S
to Full Power                       ~
* Deviation* . ; Review Criterion Within + 5 x 10-5 !::. (' /°F From the Predicted Value Within + 3 x 10-5 /% Power of the Prediction 3°/o at Full Power *+ lc:Jf, of Prediction if Assembly Power >.9 + 15% of Prediction if Assembly
......
.9 I Acceptance Criterion Value Between + 5 x fl /°F and -35 x 10-51>.P/°F when polated to Full Power " ' I -[.
Reciprocal Soluble Boron.Worth          Within 15 ppm/'foM of the Pre-      Less than 125 ppm/'fo!lp dicted Value
* With:\,n + 6 x 10-5 . /'fo Power of Pred:i'ction  
                                                                                                                            ..
*
 
* Power Distribution Technical Specifications are Met
                                                                                                                              "
* I\)
                                                                                                                            ' I CYCLE 4   START-UP PHYSICS TEST PROGRAM Palisades Plant I                -[.
-----II. REMEDIAL ACTION A. REVIEW CRITERIA
* I.. TESTS AND TEST CRITERIA   {Continued)
* CYCLE 4 START-UP PHYSICS TEST PROGRAM Palisades Plant 3 Failure to meet a test result review criterion is an indication that there
B. POWER ESCAIATION TESTS Measured Parameter                             Review Criterion                    Acceptance Criterion Moderator tempe:rature                   Within + 5 x 10-5 !::. (' /°F From   Value Between + 5 x 10-~ fl /°F Coefficient                                the Predicted Value                and -35 x 10-51>.P/°F when Extra-polated to Full Power Power Coefficient                        Within + 3 10- 5 x      /%  Power    With:\,n + 6 x 10-5 . /'fo Power of the:e-of the Prediction                    Pred:i'ction
* may be some deficiency in the test, prediction or core loading. If a test result falls outside the review criterion, an engineering review will.be conducted to determine the reason for the deviation and its impact.on reactor safety. . Such a review may consist of, but not be limited to, a review of the test and equipment, a repeat of measurement, a review of the predictive calculation, a correlation with the results of other tests
* Power Distribution
* and/or a review of the results of testing from prev.ious cycles. B. ACCEPTANCE CRITERIA Failure to meet an acceptance criterion indicates that a deficiency exists which may result in a violation of technical specification limits. In such a case, further operation shall be appropriately restricted to main-tain margins of safety. An engineering review as described above shall be conducted to determine the cause of the deviation and appropriate' corrective action. In the case of rod worths, the worth of an additional rod bank will be measured.
* Power Distribution Technical Specifications are Met Quadrant Tilt                        3°/o at Full Power Assembly Power                      *+ lc:Jf, of Prediction if Assembly Power >.9
The Plant Review Committee will review the 'I action taken and disposition of the deviation before commencement of normal operation.}}
                                              + 15% of Prediction if Assembly Power~ .9 Assembly Power PJ1S
* Deviation*
* I\)
                    . ;
 
CYCLE 4 START-UP PHYSICS TEST PROGRAM Palisades Plant
* 3
-----II. REMEDIAL ACTION A. REVIEW CRITERIA Failure to meet a test result review criterion is an indication that there
* may be some deficiency in the test, prediction or core loading. If a test result falls outside the review criterion, an engineering review will.be conducted to determine the reason for the deviation and its impact.on reactor safety. . Such a review may consist of, but not be limited to, a review of the test and equipment, a repeat of   th~ measurement, a review of the predictive calculation, a correlation with the results of other tests
* and/or a review of the results of testing from prev.ious cycles.
B. ACCEPTANCE CRITERIA Failure to meet an acceptance criterion indicates that a deficiency exists which may result in a violation of technical specification limits. In such a case, further operation shall be appropriately restricted to main-tain margins of safety. An engineering review as described above shall be conducted to determine the cause of the deviation and appropriate' corrective action. In the case of rod worths, the worth of an additional rod bank will be measured.
                                      'I The Plant Review Committee will review the action taken and disposition of the deviation before commencement of normal operation.}}

Revision as of 22:12, 21 October 2019

Cycle 4,Startup Physics Test Program.
ML18044A195
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1979
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18044A193 List:
References
PROC-791031, NUDOCS 7911060444
Download: ML18044A195 (3)


Text

{.*

CYCLE 4 START-UP PHYSICS TEST PROGRAM .

I Palisades Plant J I* TESTS *AND TEST CRITERIA A. LOW PCMER TESTS Measured Parameter Review Criterion. Acceptance Criterion ARO HZP Critical Boron Within 70 ppm of Prediction None (no associated safety limit)

Concentration '*

Regulating Rod Bank Worths, Individual Rods Banks Within l5'fo. Sum of Regulating Banks Within No Overlap or o.15'fo of Predicted Value, l~ of Prediction Whichever is Greater Regula ting Rod Bank Worths In None Sum of Regulating Banks Within Overlap Sequence 101> of Prediction Central Rod Integral Worth Cali- None None bro. tion * ' .

Symmetric Rod Worths Each Individual Rod Within 101> Each Individual Rod Within 201> of of the Symmetric Group Average the Symmetric Group Average Moderator Temperature Coefficient Within 5 x 10- 51J.f'/°F of the Value Bet~een + 5 ~ l0- 5D~/°F and ARO and Regulating Banks In Predicted Value -35 x *10- ae /°F' When Extrapolated A.

to Full Power ~

......

Reciprocal Soluble Boron.Worth Within 15 ppm/'foM of the Pre- Less than 125 ppm/'fo!lp dicted Value

..

"

' I CYCLE 4 START-UP PHYSICS TEST PROGRAM Palisades Plant I -[.

  • I.. TESTS AND TEST CRITERIA {Continued)

B. POWER ESCAIATION TESTS Measured Parameter Review Criterion Acceptance Criterion Moderator tempe:rature Within + 5 x 10-5 !::. (' /°F From Value Between + 5 x 10-~ fl /°F Coefficient the Predicted Value and -35 x 10-51>.P/°F when Extra-polated to Full Power Power Coefficient Within + 3 10- 5 x /% Power With:\,n + 6 x 10-5 . /'fo Power of the:e-of the Prediction Pred:i'ction

  • Power Distribution
  • Power Distribution Technical Specifications are Met Quadrant Tilt 3°/o at Full Power Assembly Power *+ lc:Jf, of Prediction if Assembly Power >.9

+ 15% of Prediction if Assembly Power~ .9 Assembly Power PJ1S

  • Deviation*
  • I\)

. ;

CYCLE 4 START-UP PHYSICS TEST PROGRAM Palisades Plant

  • 3

II. REMEDIAL ACTION A. REVIEW CRITERIA Failure to meet a test result review criterion is an indication that there

  • may be some deficiency in the test, prediction or core loading. If a test result falls outside the review criterion, an engineering review will.be conducted to determine the reason for the deviation and its impact.on reactor safety. . Such a review may consist of, but not be limited to, a review of the test and equipment, a repeat of th~ measurement, a review of the predictive calculation, a correlation with the results of other tests
  • and/or a review of the results of testing from prev.ious cycles.

B. ACCEPTANCE CRITERIA Failure to meet an acceptance criterion indicates that a deficiency exists which may result in a violation of technical specification limits. In such a case, further operation shall be appropriately restricted to main-tain margins of safety. An engineering review as described above shall be conducted to determine the cause of the deviation and appropriate' corrective action. In the case of rod worths, the worth of an additional rod bank will be measured.

'I The Plant Review Committee will review the action taken and disposition of the deviation before commencement of normal operation.