{{#Wiki_filter:.._,_...._, * ....,.._._  
{{#Wiki_filter:.._,_...._, * ....,.._._ - *-*~I       I 1,-.0 _., 1 I CONTROL BLOC¥-.           .____._ _   __,__ _ _ _ . _ _l  ~-   ~ ~~                           (PLEASE PRINT OR TYPE AL-QUIRED INFORMATION!
-*-*~I I 1,-.0 _., 1 I CONTROL BLOC¥-. l~ .____._ _ __,__ _ __.__~-~~ (PLEASE PRINT OR TYPE AL-QUIRED INFORMATION!
J IV I Al
J IV I Al s I p I s I 1101 0 o 1-Io lo I o I o I o I -Io Io 101 4 I 1 I 1 l 1 I 1 101 I LICENSE NUMBEFi 2=> 2& LICENS~ TYPE JD 57 CAl 5f , S LICE NSE.E COD[ 14 l:,
,      S sI    p LICE NSE.E COD[
L!JG)lo I s I o Io Io 12 I s I o GI *o I s I 1 l 2 1 s lo l©Ltl.? 12 1 2 1 8 6C 61 DOCKET NUMBER 6o 68 EVENT DATE 74 7::, REPORT DATE I O JG Bt* J i-EVENT DESCRIPTION AND ?ROBABLE CONSEQUENCES@
I s I 1101 14        l:,
J ! Dur~ng Power Escalation the indicated Axial Flux difference deviated from its target J I band for greater than one hour in a twenty four ( 24) hour period.* In accordance with J I TS 3.12.B.4.b, power was reduced to less.than 50%. The power reduction took more J I than thirty (30) minutes which is contrary to T.S. 3.12 .. B.4.b.2 and. is reportable as J per T.S. 6.6.2.a.2.
0     o1- Io lo I o I o I o I - Io Io 101 4 I 1 I 1 l 1 I 1 101 LICENSE NUMBEFi                                 2=>     2&       LICENS~ TYPE       JD   57 CAl 5f I ~~:
The Axial Flux Difference was returned to the band and power was J reduced, therefore the health and safety of the general public were not affected.
J            :~:~~~ L!JG)lo I s I o Io Io                               12     I s I o GI *o I s I 1 l 2                           1s    lo   l©Ltl.? 12 12                18    I O JG Bt*
l 9 SYSTEM CAUSE CAUSE CODE CODE SUBCDDE IR IB-1@ w@_ w@ 9 10 11 D 12 @ . ""''"'~ IE-VENT YEA" SEQUENTIAL REPORT N!) RE~ORTL! Bl Oj L=:J I ol 2 I 6 I NUMBER 2, n 23 :14 26 ACTION FUTURE EFFECT SHUTDOWII; COMPONENT CODE zi zl z I z I z I z I@ 18 OCCURRENCE l/1 Io I 1 I :n 2a 29 COMP. VALVE SUB CODE SUBCODE ~ LU@ lfl 20 REPORT TYPE Lu 30 3; PRIME COMP. i AKEN ACTION ON PLANT METHOD HOURS r:;::;,. ATTACHMENT NPRD-4 FORM SUB. SUPPLIER REVISION ND. [.QJ 3::; COMPONENT MANUFACTURER j 80 LaJ@W@ ~@ LU I o I a I 3 SUBMITTED I O I LxJ@ W LBJ@) z I 9 19 I 9 !@) 33 3~ 3~ 36 37 40 4; 47 43 ,47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @ J ! The deviation was caused bv an unscheduled boron addition which initiated a ranid power reduction causing AFD to go out of the band. Power was reduced to less *than _I ~0;~ as required by T.S. Power reduction took more than thirty (30) minutes because of the desire to prevent challenging safeguards by rapid power reduction with unstable plant conditions present. fl FACILITY Si ATUS % POWER OTHER STATUS METHOD OF 80 ~@ I o I s Io !@)I '= 10 D ~L-, ----------44-'
i-                      6C           61                 DOCKET NUMBER                         6o     68           EVENT DATE               74       7::,     REPORT DATE EVENT DESCRIPTION AND ?ROBABLE CONSEQUENCES@
DISCOVERY DISCOVERY DESCRIPTION
J ! Dur~ng           Power Escalation the indicated Axial Flux difference deviated from its target                                                                                                   j J I band         for greater than one hour in a twenty four ( 24) hour period.*                                                                             In accordance with J I TS         3.12.B.4.b, power was reduced to less.than 50%.                                                             The power reduction took more J I than         thirty (30) minutes which is contrary to T.S. 3.12 .. B.4.b.2 and. is reportable as J per T.S. 6.6.2.a.2. The Axial Flux Difference was returned to the band and power was J         reduced, therefore the health and safety of the general public were not affected.
'23,, ~§LI _..:O..:.p_e_r.:...a_t_o_r_E_v_a_l_u_a_t_i_o_n
80 l   9 SYSTEM                 CAUSE         CAUSE                                                                         COMP.            VALVE CODE                   CODE       SUBCDDE                             COMPONENT CODE                          SUB CODE            SUBCODE IR IB-1@
___________
9          10 w@_
.,...-~ :..CTIVITY CONTENT !ELEASED OF RELEASE AMOUNT OF ACTIVITY@
11 w@
W@) W@~l ___ N.:__/A ____ ____. 9 10 11 80 N/A LOCATION OF RELEASE@ BO PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION@
D                       12 zi zl zI z I z I z I@ ~ LU@
N/A I o I o l o l@LJ@ 11 12 1._3 _________________________________________
18          lfl              20 SEQUENTIAL                                        OCCURRENCE              REPORT                      REVISION
6....,0 9 PERSONNEL INJURIES NUMBFP. DESCRIPTION@
      @ . ""''"'~       IE-VENT YEA"                                     REPORT N!)                                                                 TYPE                          ND.
N/A I 01 o Io I@ 9 11 ,~:1=--------------------------------------------8--(*
RE~ORTL! Bl Oj NUMBER                                  L=:J           I ol 2 I 626I                      l/1                Io    I1 I               Lu              ~            [.QJ 2,         n             23             :14                               :n                 2a         29           30             3;           3::;
LOSS OF OR DAMAGE 70 FACILITY (';:;-\ TYPE DESCRIPTJQ11; u.J@) . 9 10 PUBLICITY
ACTION     FUTURE              EFFECT              SHUTDOWII;                                  r:;::;,. ATTACHMENT               NPRD-4           PRIME COMP.            COMPONENT MANUFACTURER i AKEN      ACTION            ON PLANT                METHOD                          HOURS ~              SUBMITTED            FORM SUB.           SUPPLIER LaJ@W@
(:;\ S5UED 8 DE.SCRIPT10N I NI 44 [ 1~*1 f. i0052t:JOC/£3 N/A N/A I I 68 e9 J .L. Wilson ~c NRC USE ONl Y ! I I l I l I I I I Ee ;; -0 C, r.
33        3~
ATTACHMENT 1 SURRY POWER STATION, UNIT NO. 1 DOCKET NO: 50-280 REPORT NO: 80-026/0lT-0 EVENT DATE: 05-12-80 TITLE OF REPORT: AXIAL FLUX DIFFERENCE DEVIATION
                                      ~@
: 1. Description of Event During an unscheduled power reduction on May 12, 1980, the Axial Flux Difference (AFD) deviated from its target band of +/-5% for greater than one (1) hour in a twenty-four (24) hour period. This is contrary to T.S. 3.12.B.4.b.l.
3~
and is reportable as per T.S. 6.6.2.b.2.
LU 36 I o I a I 3 I O I LxJ@
In accordance with T.S., power was reduced to less than 50% and the high neutron flux setpoin~ was set at 55%. The power reduction took longer than thirty (30) minutes which is contrary to T.S. 3.12.B.4.b.2.
37 W                   LBJ@)         ~
and is reportable as per T.S. 6.6.2.a.2.
z   I 9 19 I 9!@)
40       4;                 47                   43                                 ,47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS                                 @
J   ! The     deviation was caused bv an unscheduled boron addition which initiated a ranid power reduction causing AFD to go out of the band.                                                               Power was reduced to less *than
_I ~0;~ as required by T.S.                               Power reduction took more than thirty (30) minutes because of the desire to prevent challenging safeguards by rapid power reduction with unstable plant conditions present.
fl                                                                                                                                                                                           80 FACILITY                                                                                     METHOD OF                                                                  ~
Si ATUS             % POWER                             OTHER STATUS                       DISCOVERY                                    DISCOVERY DESCRIPTION          '23,,
    ~@ 10I o I s Io D !@)I~L-,- - - - - - - - - - 4 4 - '
    '=
                                                                                                    ~§LI_..:O..:.p_e_r.:...a_t_o_r_E_v_a_l_u_a_t_i_o_n___________.,...-~
80
:..CTIVITY       CONTENT
  !ELEASED     OF RELEASE                     AMOUNT OF ACTIVITY@                                                                          LOCATION OF RELEASE@
W@) W@~l___N.:__/A_ _ _ _____.                                                                                              N/A 9               10           11                                                                                                                                                               BO PERSONNEL EXPOSURES NUMBER             TYPE         DESCRIPTION@
I oI o l o l@LJ@
9 11     12                                                           N/A 1._3_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _6....,0 PERSONNEL INJURIES NUMBFP.           DESCRIPTION@
I 01 9
o Io 11I@, ~ : 1 = - - - - - - - - - - - - -N/A                              -------------------------------8--(*
LOSS OF OR DAMAGE 70 FACILITY (';:;-\
TYPE         DESCRIPTJQ11;                   ~
u.J@)                                     .                                           N/A 9           10                                                                                                                                                                                 ~c PUBLICITY             (:;\
NRC USE ONl Y S5UED       DE.SCRIPT10N ~
I NI
  ~
844 [
1
: f. i0052t:JOC/£3 N/A II !I I l     I   l I I     I   I
                                                                                                                                                                                                        ;;
                                                                                                                                                                                                        ~
1~*                                                                                                                                          68  e9                              Ee - 0 J .L. Wilson                                                                                                                            C, r.
 
ATTACHMENT 1 SURRY POWER STATION, UNIT NO. 1 DOCKET NO:     50-280 REPORT NO:     80-026/0lT-0 EVENT DATE:     05-12-80 TITLE OF REPORT:     AXIAL FLUX DIFFERENCE DEVIATION
: 1. Description of Event During an unscheduled power reduction on May 12, 1980, the Axial Flux Difference (AFD) deviated from its target band of +/-5% for greater than one (1) hour in a twenty-four (24) hour period. This is contrary to T.S.
3.12.B.4.b.l. and is reportable as per T.S. 6.6.2.b.2. In accordance with T.S., power was reduced to less than 50% and the high neutron flux setpoin~
was set at 55%. The power reduction took longer than thirty (30) minutes which is contrary to T.S. 3.12.B.4.b.2. and is reportable as per T.S.
6.6.2.a.2.
The AFD was returned to the band and power was reduced, therefore the health and safety of the general public were not affected.
The AFD was returned to the band and power was reduced, therefore the health and safety of the general public were not affected.
: 2. Probable Consequences and Status of Redundant Systems Surveillance of the Axial Flux Difference assures that the limits of heat flux hot channel factor are not exceeded during normal operation or in the event of Xenon redistribution following power changes. This provided protection against exceeding the DNBR and peak fuel clad temperatures.
: 2. Probable Consequences and Status of Redundant Systems Surveillance of the Axial Flux Difference assures that the limits of heat flux hot channel factor are not exceeded during normal operation or in the event of Xenon redistribution following power changes. This provided protection against exceeding the DNBR and peak fuel clad temperatures.
Provisions are made for possible deviations caused by rapid power reductions by allowing up to one hour outside the target band in a twenty-four hour period. If the AFD cannot be returned to the target band in one hour the power must be reduced to less that 50% to provide additional protection for the hot channel factors. Power was reduced and the AFD returned to its target band thereby eliminating possible violations of hot channel factors. 3. Cause The event was caused by an unscheduled boron addition which initiated a rapid power reduction causing the AFD to go out of the band. The boron addition resulted from the addition of water to the primary that had been flushing a mixed bed deminerilizer.
Provisions are made for possible deviations caused by rapid power reductions by allowing up to one hour outside the target band in a twenty-four hour period. If the AFD cannot be returned to the target band in one hour the power must be reduced to less that 50% to provide additional protection for the hot channel factors. Power was reduced and the AFD returned to its target band thereby eliminating possible violations of hot channel factors.
This makeup water had a boron concentration of 1076 ppm while the RCS was 315 ppm. The boration reduced power from 95% to 80%. While stabilizing plant parameters at 80% power, the AFD deviated from the target band for greater than one hour. A power reduction was begun and the AFD was returned to its target band in two (42) minutes. The reduction in power took longer than thirty (30) minutes because of the unstable plant conditions and the desire to prevent challanging safeguards with another rapid power reduction.
: 3. Cause The event was caused by an unscheduled boron addition which initiated a rapid power reduction causing the AFD to go out of the band. The boron addition resulted from the addition of water to the primary that had been flushing a mixed bed deminerilizer. This makeup water had a boron concentration of 1076 ppm while the RCS was 315 ppm. The boration reduced power from 95% to 80%. While stabilizing plant parameters at 80% power, the AFD deviated from the target band for greater than one hour. A power reduction was begun and the AFD was returned to its target band in forty-two (42) minutes. The reduction in power took longer than thirty (30) minutes because of the unstable plant conditions and the desire to prevent challanging safeguards with another rapid power reduction.
4; .. Immediate Corrective Action The source of borated water to the makeup system was isolated.
4; . Immediate Corrective Action The source of borated water to the makeup system was isolated. A power reduction was begun and continued until the unit was less than 50%
A power reduction was begun and continued until the unit was less than 50% power. The AFD was returned to the target band during the rampdown.
power. The AFD was returned to the target band during the rampdown.
ATTACHMENT 1 page 2 5. Subsequent Corrective Action Operations personnel will be reinstructed/retrained on the proper operation of flushing and returning deminerilizers to service. 6. Actions Taken to Prevent Recurrence Completion of corrective actions will prevent recurrence.
 
ATTACHMENT 1 page 2
: 5. Subsequent Corrective Action Operations personnel will be reinstructed/retrained on the proper operation of flushing and returning deminerilizers to service.
: 6. Actions Taken to Prevent Recurrence Completion of corrective actions will prevent recurrence.
: 7. Generic Implications None}}
: 7. Generic Implications None}}

Revision as of 03:41, 21 October 2019

LER 80-026/01T-0:on 800512,during Power Escalation,Indicated Axial Flux Difference Deviated from Target Band for More than 1-h in 24-h Period.Caused by Unscheduled Boron Addition.Power Reduced to Less than 50%
ML18139A269
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/22/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139A268 List:
References
LER-80-026-01T, LER-80-26-1T, NUDOCS 8005290453
Download: ML18139A269 (3)


Text

.._,_...._, * ....,.._._ - *-*~I I 1,-.0 _., 1 I CONTROL BLOC¥-. .____._ _ __,__ _ _ _ . _ _l ~- ~ ~~ (PLEASE PRINT OR TYPE AL-QUIRED INFORMATION!

J IV I Al

, S sI p LICE NSE.E COD[

I s I 1101 14 l:,

0 o1- Io lo I o I o I o I - Io Io 101 4 I 1 I 1 l 1 I 1 101 LICENSE NUMBEFi 2=> 2& LICENS~ TYPE JD 57 CAl 5f I ~~:

J  :~:~~~ L!JG)lo I s I o Io Io 12 I s I o GI *o I s I 1 l 2 1s lo l©Ltl.? 12 12 18 I O JG Bt*

i- 6C 61 DOCKET NUMBER 6o 68 EVENT DATE 74 7::, REPORT DATE EVENT DESCRIPTION AND ?ROBABLE CONSEQUENCES@

J ! Dur~ng Power Escalation the indicated Axial Flux difference deviated from its target j J I band for greater than one hour in a twenty four ( 24) hour period.* In accordance with J I TS 3.12.B.4.b, power was reduced to less.than 50%. The power reduction took more J I than thirty (30) minutes which is contrary to T.S. 3.12 .. B.4.b.2 and. is reportable as J per T.S. 6.6.2.a.2. The Axial Flux Difference was returned to the band and power was J reduced, therefore the health and safety of the general public were not affected.

80 l 9 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCDDE COMPONENT CODE SUB CODE SUBCODE IR IB-1@

9 10 w@_

11 w@

D 12 zi zl zI z I z I z I@ ~ LU@

18 lfl 20 SEQUENTIAL OCCURRENCE REPORT REVISION

@ . """'~ IE-VENT YEA" REPORT N!) TYPE ND.

RE~ORTL! Bl Oj NUMBER L=:J I ol 2 I 626I l/1 Io I1 I Lu ~ [.QJ 2, n 23 :14 :n 2a 29 30 3; 3::;

ACTION FUTURE EFFECT SHUTDOWII; r:;::;,. ATTACHMENT NPRD-4 PRIME COMP. COMPONENT MANUFACTURER i AKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED FORM SUB. SUPPLIER LaJ@W@

33 3~

~@

3~

LU 36 I o I a I 3 I O I LxJ@

37 W LBJ@) ~

z I 9 19 I 9!@)

40 4; 47 43 ,47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

J  ! The deviation was caused bv an unscheduled boron addition which initiated a ranid power reduction causing AFD to go out of the band. Power was reduced to less *than

_I ~0;~ as required by T.S. Power reduction took more than thirty (30) minutes because of the desire to prevent challenging safeguards by rapid power reduction with unstable plant conditions present.

fl 80 FACILITY METHOD OF ~

Si ATUS  % POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION '23,,

~@ 10I o I s Io D !@)I~L-,- - - - - - - - - - 4 4 - '

'=

~§LI_..:O..:.p_e_r.:...a_t_o_r_E_v_a_l_u_a_t_i_o_n___________.,...-~

80

..CTIVITY CONTENT

!ELEASED OF RELEASE AMOUNT OF ACTIVITY@ LOCATION OF RELEASE@

W@) W@~l___N.:__/A_ _ _ _____. N/A 9 10 11 BO PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION@

I oI o l o l@LJ@

9 11 12 N/A 1._3_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _6....,0 PERSONNEL INJURIES NUMBFP. DESCRIPTION@

I 01 9

o Io 11I@, ~ : 1 = - - - - - - - - - - - - -N/A -------------------------------8--(*

LOSS OF OR DAMAGE 70 FACILITY (';:;-\

TYPE DESCRIPTJQ11; ~

u.J@) . N/A 9 10 ~c PUBLICITY (:;\

NRC USE ONl Y S5UED DE.SCRIPT10N ~

I NI

~

844 [

1

f. i0052t:JOC/£3 N/A II !I I l I l I I I I

~

1~* 68 e9 Ee - 0 J .L. Wilson C, r.

ATTACHMENT 1 SURRY POWER STATION, UNIT NO. 1 DOCKET NO: 50-280 REPORT NO: 80-026/0lT-0 EVENT DATE: 05-12-80 TITLE OF REPORT: AXIAL FLUX DIFFERENCE DEVIATION

1. Description of Event During an unscheduled power reduction on May 12, 1980, the Axial Flux Difference (AFD) deviated from its target band of +/-5% for greater than one (1) hour in a twenty-four (24) hour period. This is contrary to T.S.

3.12.B.4.b.l. and is reportable as per T.S. 6.6.2.b.2. In accordance with T.S., power was reduced to less than 50% and the high neutron flux setpoin~

was set at 55%. The power reduction took longer than thirty (30) minutes which is contrary to T.S. 3.12.B.4.b.2. and is reportable as per T.S.

6.6.2.a.2.

The AFD was returned to the band and power was reduced, therefore the health and safety of the general public were not affected.

2. Probable Consequences and Status of Redundant Systems Surveillance of the Axial Flux Difference assures that the limits of heat flux hot channel factor are not exceeded during normal operation or in the event of Xenon redistribution following power changes. This provided protection against exceeding the DNBR and peak fuel clad temperatures.

Provisions are made for possible deviations caused by rapid power reductions by allowing up to one hour outside the target band in a twenty-four hour period. If the AFD cannot be returned to the target band in one hour the power must be reduced to less that 50% to provide additional protection for the hot channel factors. Power was reduced and the AFD returned to its target band thereby eliminating possible violations of hot channel factors.

3. Cause The event was caused by an unscheduled boron addition which initiated a rapid power reduction causing the AFD to go out of the band. The boron addition resulted from the addition of water to the primary that had been flushing a mixed bed deminerilizer. This makeup water had a boron concentration of 1076 ppm while the RCS was 315 ppm. The boration reduced power from 95% to 80%. While stabilizing plant parameters at 80% power, the AFD deviated from the target band for greater than one hour. A power reduction was begun and the AFD was returned to its target band in forty-two (42) minutes. The reduction in power took longer than thirty (30) minutes because of the unstable plant conditions and the desire to prevent challanging safeguards with another rapid power reduction.

4; . Immediate Corrective Action The source of borated water to the makeup system was isolated. A power reduction was begun and continued until the unit was less than 50%

power. The AFD was returned to the target band during the rampdown.

ATTACHMENT 1 page 2

5. Subsequent Corrective Action Operations personnel will be reinstructed/retrained on the proper operation of flushing and returning deminerilizers to service.
6. Actions Taken to Prevent Recurrence Completion of corrective actions will prevent recurrence.
7. Generic Implications None