{{#Wiki_filter:. ***~ . * ... e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 . ' August 7, 1998 United States Nuclear Regulatory Commission . Attention:. | {{#Wiki_filter:. ***~ . *... | ||
Document Control Desk Washington, D.C. 20555 | e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 | ||
.' August 7, 1998 United States Nuclear Regulatory Commission Serial No. 98-456 | |||
* E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W. Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station ,,.----~~iaru~~~=-=-- | . Attention:. Document Control Desk SPS Lie/JCS RO Washington, D.C. 20555 Docket Nos. 50-280 50-281 License Nos .. DPR-32 DPR-37 Gentlemen: | ||
: ,~~8180363 980731 ---,-__ | VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of July 1998, is provided in the attachment. | ||
uo~ | . If you have any questions or require additional information, please contact us. | ||
Very truly yours, R.Q~ | |||
3 Operating Data Report -Unit No. 2 ........................................................................................................................... | ~ | ||
.4 Unit Shutdowns and Power Reductions | * E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W. | ||
-Unit No. 1 .................................................................................................. | Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station | ||
5 Unit Shutdowns*and Power Reductions | ,,.----~~iaru~~~=-=-- | ||
-Unit No. 2 .................................................................................................. | : ,~~8180363 980731 ---,-_ __ | ||
6 Average Daily Unit Power Level -Unit No. 1 .............................................................................................................. | R ADOCK 05000280 | ||
7 Average Daily Unit Power Level -Unit No. 2 ............................................................................................................... | , PDR | ||
8 Summary of Operating Experience | |||
-Unit Nos. 1 and 2 ............................................................................................. | . \ | ||
9 Facility Changes That Did Not Require NRG Approval ............................................................................................ | VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 98-07 Approved: uo~ | ||
10 Procedure or Method of Operation Changes That Did Not Require NRG Approval ................................................. | |||
11 Tests and Experiments That Did Not Require NRG Approval .................................................................................. | \ | ||
12 Chemistry Report ..................................................................................................................................................... | \ | ||
13 Fuel Handling -Unit Nos. 1 and 2 ............................................................................................................................ | 9urry Monthly Operating Report No. 98-07 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns*and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1 .............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 ............................................................................................................... 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................................................. 9 Facility Changes That Did Not Require NRG Approval ............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRG Approval ................................................. 11 Tests and Experiments That Did Not Require NRG Approval .................................................................................. 12 Chemistry Report ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 15 | ||
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications | |||
....................................................................................................................... | tlurry Monthly Operating Report No. 98-07 Page 3 9f 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 08/01/98 Completed By: D. L. Slade Telephone: (757) 365-2246 | ||
15 | : 1. Unit Name: ........................................................... . Surry Unit 1 | ||
: 2. Reporting Period: ................................................. . July, 1998 | |||
: 3. Licensed Thermal Power (MWt): ......................... . 2546 | |||
: 4. Nameplate Rating (Gross MWe): ......................... . 847.5 | |||
: 17. Gross Electrical Energy Generated (MWH) 618930.0 3697616.0 120513370.0 | : 5. Design Electrical Rating (Net MWe): ................... . 788 | ||
: 18. Net Electrical Energy Generated (MWH) 596814.0 3572533.0 114806754.0 | : 6. Maximum Dependable Capacity (Gross MWe): ... . 840 | ||
: 19. Unit Service Factor 100.0% 86.2% 69.5% 20. Unit Availability Factor 100.0% 86.2% 71.2% 21. Unit Capacity Factor (Using MDC Net) 100.1% 87.7% 65.7% 22. Unit Capacity Factor (Using DER Net) 101.8% 89.1% 64.9% 23. Unit Forced Outage Rate 0.0% 9.1% 14.6% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling, October 19, 1998, 35 Days 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | : 7. Maximum Dependable Capacity (Net MWe): ....... . 801 | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted, If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Year-To-Date Cumulative | |||
: 11. Hours in Reporting Period 744.0 5087.0 224471.0 | |||
: 12. Hours Reactor Was Critical 744.0 4416.6 158442.4 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 | |||
: 14. Hours Generator On-Line 744.0 4383.9 155983.4 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2 | |||
: 16. Gross Thermal Energy Generated (MWH) 1878192.5 11101116.3 367346131.9 | |||
: 17. Gross Electrical Energy Generated (MWH) 618930.0 3697616.0 120513370.0 | |||
: 18. Net Electrical Energy Generated (MWH) 596814.0 3572533.0 114806754.0 | |||
: 19. Unit Service Factor 100.0% 86.2% 69.5% | |||
: 20. Unit Availability Factor 100.0% 86.2% 71.2% | |||
: 21. Unit Capacity Factor (Using MDC Net) 100.1% 87.7% 65.7% | |||
: 22. Unit Capacity Factor (Using DER Net) 101.8% 89.1% 64.9% | |||
: 23. Unit Forced Outage Rate 0.0% 9.1% 14.6% | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
Refueling, October 19, 1998, 35 Days | |||
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | |||
: 26. Unit In Test Status (Prior to Commercial Operation): | : 26. Unit In Test Status (Prior to Commercial Operation): | ||
FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | ||
e 4lurry Monthly Operating Report No. 98-07 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 08/02/98 Completed By: D. L. Slade Telephone: (757) 365-2246 | |||
: 11. Hours in Reporting Period 744.0 5087.0 12. Hours Reactor Was Critical 744.0 5087.0 13. Reactor Reserve Shutdown Hours 0.0 0.0 14. Hours Generator On-Line 744.0 5087.0 15. Unit Reserve Shutdown Hours 0.0 0.0 16. Gross Thermal Energy Generated (MWH) 1891535.4 12933170.9 | : 1. Unit Name: ........................................................... . Surry Unit 2 | ||
: 17. Gross Electrical Energy Generated (MWH) 622370.0 4313935.0 | : 2. Reporting Period: ................................................. . July, 1998 | ||
: 18. Net Electrical Energy Generated (MWH) 600929.0 4170729.0 | : 3. Licensed Thermal Power (MWt): ......................... . 2546 | ||
: 19. Unit Service Factor 100.0% 100.0% 20. Unit Availability Factor 100.0% 100.0% 21. Unit Capacity Factor (Using MDC Net) 100.8% 102.4% 22. Unit Capacity Factor (Using DER Net) 102.5% 104.0% 23. Unit Forced Outage Rate 0.0% 0.0% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | : 4. Nameplate Rating (Gross MWe): ......................... . 847.5 | ||
: 5. Design Electrical Rating (Net MWe): ................... . 788 | |||
: 6. Maximum Dependable Capacity (Gross MWe): ... . 840 | |||
: 7. Maximum Dependable Capacity (Net MWe): ....... . 801 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted, If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Year-To-Date Cumulative | |||
: 11. Hours in Reporting Period 744.0 5087.0 221352.0 | |||
: 12. Hours Reactor Was Critical 744.0 5087.0 156237.3 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1 | |||
: 14. Hours Generator On-Line 744.0 5087.0 154220.5 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 16. Gross Thermal Energy Generated (MWH) 1891535.4 12933170.9 364466738.2 | |||
: 17. Gross Electrical Energy Generated (MWH) 622370.0 4313935.0 119439543.0 | |||
: 18. Net Electrical Energy Generated (MWH) 600929.0 4170729.0 113813880.0 | |||
: 19. Unit Service Factor 100.0% 100.0% 69.7% | |||
: 20. Unit Availability Factor 100.0% 100.0% 69.7% | |||
: 21. Unit Capacity Factor (Using MDC Net) 100.8% 102.4% 65.7% | |||
: 22. Unit Capacity Factor (Using DER Net) 102.5% 104.0% 65.3% | |||
: 23. Unit Forced Outage Rate 0.0% 0.0% 11.6% | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
None | |||
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | |||
: 26. Unit In Test Status (Prior to Commercial Operation): | : 26. Unit In Test Status (Prior to Commercial Operation): | ||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | ||
(757) 365-2863 (5) Duration of LER No. System Component Cause & Corrective Action Hours Reason Shutting Down Rx 17H35M A N/A N/A | .urry Monthly Operatin:eport No. 98-07 | ||
~ | |||
Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%) | |||
(5) Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161) | REPORT MONTH: July, 1998 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 08/03/98 Completed by: J. R. Pincus Telephone: (757) 365-2863 (1) (2) (3) (4) (5) | ||
(757) 365-2863 (3) (4) (5) Method Duration of LER No. System Component Cause & Corrective Action Hours Reason Shutting Code Down Rx None During The Reporting Period (2) REASON: A -Equipment Failure (Explain) | Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx 07/18/98 F 17H35M A N/A N/A AB MO Low Oil RCP Motor "A", | ||
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain) | Added Oil and Installed Remote Oil Addition Modification (1) (2) (3) | ||
F: Forced REASON: METHOD: | |||
(5) Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161) | S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain) | ||
(757) 365-2837 Average Daily Power Level (Mwe -Net) 810 624 791 804 805 804 804 807 807 810 809 806 804 801 806 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt. | E Operator Training & Licensing Examination F Administrative G Operational Error (Explain) | ||
(4) (5) | |||
&urry Monthly Operating Report No. 98-07 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL | Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) | ||
(757) 365-2837 Average Daily Power Level (MWe-Net) 810 803 808 807 810 810 807 810 808 803 813 812 810 806 811 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
e .urry Monthly Operating Report No. 98-07 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%) | |||
REPORT MONTH: July, 1998 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 08/03/98 Completed by: J. R. Pincus Telephone: (757) 365-2863 (1) (2) (3) (4) (5) | |||
Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx None During The Reporting Period (1) (2) (3) | |||
F: Forced REASON: METHOD: | |||
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - other (Explain) | |||
E Operator Training & Licensing Examination F Administrative G Operational Error (Explain) | |||
(4) (5) | |||
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) | |||
e -Surry Monthly Operating Report No. 98-07 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 08/03/98 Completed by: J C. Steinert Telephone: (757) 365-2837 MONTH: July, 1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (Mwe - Net) 1 815 17 810 2 805 18 624 3 813 19 791 4 815 20 804 5 814 21 805 6 811 22 804 7 811 23 804 8 812 24 807 9 810 25 807 10 811 26 810 11 812 27 809 12 812 28 806 13 811 29 804 14 812 30 801 15 801 31 806 16 811 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
&urry Monthly Operating Report No. 98-07 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 08/03/98 Completed by: J. C. Steinert Telephone: (757) 365-2837 MONTH: July, 1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe- Net) 1 810 17 810 2 806 18 803 3 809 19 808 4 811 20 807 5 811 21 810 6 813 22 810 7 813 23 807 8 814 24 810 9 808 25 808 10 809 26 803 11 762 27 813 12 800 28 812 13 813 29 810 14 813 30 806 15 809 31 811 16 810 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
41tsurry Monthly Operating Report No. 98-07 Page 9 of 15 | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE MONTH/YEAR: | OF OPERATING EXPERIENCE MONTH/YEAR: July, 1998 The following chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents. | ||
July, 1998 | UNIT ONE: | ||
UNIT ONE: 07/01/98 0000 07/18/98 0944 | 07/01/98 0000 Unit operating at 100% power, 845 MWe. | ||
07/18/98 0944 Commenced ramp down to 55% Due to "A" RCP Motor Low Oil 07/18/98 1308 Stopped ramp, Unit at 59% power, 475 Mwe 07/18/98 2225 Commenced ramp up, Unit at 58%, 470 Mwe 07/19/98 0319 Unit at 100%, 843 MWe 07/31/98 2400 Unit operating at 100% power, 845 MWe. | |||
UNIT Two: | |||
07/01/98 0000 Unit operating at 100% power, 845 MWe. | |||
07/11/98 0507 Commenced ramp down, Unit at 100% power, 840 Mwe. | |||
07/11/98 0551 Removed water box "A" from service, Unit at 93.5% power, 770 Mwe. | |||
07/11/98 1740 Commenced ramp down to maintain condenser vacuum, Unit at 94%, 765 MWe 07/11/98 1825 Stopped ramp, Unit at 91% power, 740 MWe. | |||
07/11/98 1925 Commenced ramp, Unit at 91% power, 740 MWe. | |||
07/11/98 2040 Unit at 100%, 840 MWe 07/31/98 2400 Unit operating at 100% power, 845 MWe. | |||
L | |||
- | |||
e Surry Monthly Operating Report No. 98-07 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: July, 1998 DCP 97-061 Design Change Package 07/13/98 (Safety Evaluation 98-013) | |||
DCP 97-061, "Interim On-Line Chemistry Monitoring System," replaced the existing Westinghouse On-Line Chemistry Monitoring System computer components and software with a new system. The system is used to collect, store, and analyze secondary water chemistry. The interim system will be replaced with a permanent system with a future DCP. | |||
TM S2-98-04 Temporary Modification 07/14/98 (Safety Evaluation 98-073) | |||
Temporary Modification S2-98-04 was used to allow for the like-for-like replacement of a failed relay in the Unit 2 Train "A" reactor protection circuit. All work was performed in train "A" only with train "A" BYPASS breaker closed. | |||
TM S1-98-15 Temporary Modification 07/18/98 (Safety Evaluation 98-074) | |||
July, 1998 None During the Reporting Period}} | Temporary Modification S1-98-15 was used to install a remote gravity feed oil addition system to the upper reservoir of the 1-RC-P-1A motor to allow oil addition while reducing radiation exposure required for this activity. | ||
JCO 97-006, Rev.1 Justification for Continued Operation 07/30/98 (Safety Evaluation 98-076) | |||
Safety Evaluation 98-076 evaluated whether an unreviewed safety question existed regarding changes to JCO 97-006. The JCO implemented compensatory actions for Thermo-Lag 330-1 material used as radiant energy shields in the containments. The changes to the JCO included; (1) additional information and clarification for Resistance Thermometer Detector monitoring, P-250 address points, and conditional compensatory actions; (2) instructional guidance for the adjustment of P-250 containment temperature high alarm limits; (3) added reference to an improved method for measuring P-250 input data if both P-250 computers become inoperable; and (4) revision of an annunciator procedure clarifying a reference to radiant energy shields. | |||
L_ | |||
e e Surry Monthly Operating Report No. 98-07 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: July, 1998 2-0P-TM-005 Operating Procedure 07/09/98 (Safety Evaluation 98-063 Rev. 1) | |||
Operating Procedure 2-0P-TM-005, "Unit Ramping Operations," was changed to provide a method of repair for the Main Turbine #2 Governor Valve that involved power reduction and an alternate method of closing the valve. The revision to the Safety Evaluation was to include a letter from Westinghouse analyzing destructive overspeed criteria. The letter stated that there was no concern if the valve was repaired within six days. | |||
1-ISP-LM-T-001 Electrical Corrective Maintenance Procedure 07/06/98 2-ISP-LM-T-001 (Safety Evaluation 98-072) | |||
Instrument Surveillance Procedures 1-ISP-LM-T-001 and 2-ISP-LM-T-001, "Containment Temperature Monitoring When Both P-250 Computers Are Inoperable," were written to provide temporary power for the P-250 power supplies when both power supplies are inoperative. | |||
O-OSP-EG-001 Operations Surveillance Procedure 07/23/98 1-0SP-EG-001 (Safety Evaluation 98-075) 2-0SP-EG-001 Operations Surveillance Procedures O-OSP-EG-001, 1-0SP-EG-001, and 2-0SP-EG-001, for emergency diesel generators 3,2, and 1 respectively, "Emergency Diesel Generator Local Alarm Panel Functional Test," were developed to perform a functional test of the Emergency Diesel Generator (EDG) local alarm panels. The EDG will be removed from service during testing. | |||
-Surry Monthly Operating Report No. 98-07 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: July, 1998 None During the Reporting Period | |||
411tsurry Monthly Operating Report No. 98-07 Page 13 of 15 CHEMISTRY REPORT MONTHNEAR: July, 1998 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg. | |||
Gross Radioactivity, µCi/ml 4.37E-1 3.36E-1 3.83E-1 1.78E-1 1.29E-1 1.45E-1 Suspended Solids, ppm - - - - - - | |||
Gross Tritium, µCi/ml 1.41 E-1 1.10E-1 1.26E-1 8.14E-1 7.54E-1 7.92E-1 1131, µCi/ml 3.88E-2 3.55E-3 1.34E-2 1.18E-4 3.21 E-5 7.32E-5 113111133 0.86 0.39 0.57 0.17 0.04 0.11 Hydrogen, cc/kg 42.1 35.4 40.0 43.4 40.0 41.4 Lithium, ppm 2.00 1.44 1.72 2.35 2.07 2.20 Boron - 10, ppm* 54.4 37.0 47.1 153.1 135.8 144.7 Oxygen, (DO), ppm s0.005 s0.005 s0.005 s0.005 s0.005 s0.005 Chloride, ppm 0.002 so.001 s0,001 0.004 0.002 0.003 pH at 25 degree Celsius 7.36 7.05 7.24 6.81 6.48 6.64 | |||
* Boron - 10 = Total Boron x 0.196 | |||
,Comments: | |||
None | |||
-Surry Monthly Operating Report No. 98-07 Page 14 of 15 FUEL HANDLING UNITS 1&2 MONTHNEAR: July, 1998 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity None During the Reporting Period | |||
e e Surry Monthly Operating Report No. 98-07 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: July, 1998 None During the Reporting Period}} |
Latest revision as of 23:49, 20 October 2019
ML18153A316 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 07/31/1998 |
From: | Grecheck E, Pincus J, Slade D VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
98-456, NUDOCS 9808180363 | |
Download: ML18153A316 (16) | |
Text
. ***~ . *...
e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261
.' August 7, 1998 United States Nuclear Regulatory Commission Serial No.98-456
. Attention:. Document Control Desk SPS Lie/JCS RO Washington, D.C. 20555 Docket Nos. 50-280 50-281 License Nos .. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of July 1998, is provided in the attachment.
. If you have any questions or require additional information, please contact us.
Very truly yours, R.Q~
~
- E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W.
Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station
,,.----~~iaru~~~=-=--
- ,~~8180363 980731 ---,-_ __
R ADOCK 05000280
, PDR
. \
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 98-07 Approved: uo~
\
\
9urry Monthly Operating Report No. 98-07 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns*and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1 .............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 ............................................................................................................... 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................................................. 9 Facility Changes That Did Not Require NRG Approval ............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRG Approval ................................................. 11 Tests and Experiments That Did Not Require NRG Approval .................................................................................. 12 Chemistry Report ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 15
tlurry Monthly Operating Report No. 98-07 Page 3 9f 15 OPERATING DATA REPORT Docket No.: 50-280 Date: 08/01/98 Completed By: D. L. Slade Telephone: (757) 365-2246
- 1. Unit Name: ........................................................... . Surry Unit 1
- 2. Reporting Period: ................................................. . July, 1998
- 3. Licensed Thermal Power (MWt): ......................... . 2546
- 4. Nameplate Rating (Gross MWe): ......................... . 847.5
- 5. Design Electrical Rating (Net MWe): ................... . 788
- 6. Maximum Dependable Capacity (Gross MWe): ... . 840
- 7. Maximum Dependable Capacity (Net MWe): ....... . 801
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 744.0 5087.0 224471.0
- 12. Hours Reactor Was Critical 744.0 4416.6 158442.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
- 14. Hours Generator On-Line 744.0 4383.9 155983.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
- 16. Gross Thermal Energy Generated (MWH) 1878192.5 11101116.3 367346131.9
- 17. Gross Electrical Energy Generated (MWH) 618930.0 3697616.0 120513370.0
- 18. Net Electrical Energy Generated (MWH) 596814.0 3572533.0 114806754.0
- 19. Unit Service Factor 100.0% 86.2% 69.5%
- 20. Unit Availability Factor 100.0% 86.2% 71.2%
- 21. Unit Capacity Factor (Using MDC Net) 100.1% 87.7% 65.7%
- 22. Unit Capacity Factor (Using DER Net) 101.8% 89.1% 64.9%
- 23. Unit Forced Outage Rate 0.0% 9.1% 14.6%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, October 19, 1998, 35 Days
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
e 4lurry Monthly Operating Report No. 98-07 Page 4 of 15 OPERATING DATA REPORT Docket No.: 50-281 Date: 08/02/98 Completed By: D. L. Slade Telephone: (757) 365-2246
- 1. Unit Name: ........................................................... . Surry Unit 2
- 2. Reporting Period: ................................................. . July, 1998
- 3. Licensed Thermal Power (MWt): ......................... . 2546
- 4. Nameplate Rating (Gross MWe): ......................... . 847.5
- 5. Design Electrical Rating (Net MWe): ................... . 788
- 6. Maximum Dependable Capacity (Gross MWe): ... . 840
- 7. Maximum Dependable Capacity (Net MWe): ....... . 801
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 744.0 5087.0 221352.0
- 12. Hours Reactor Was Critical 744.0 5087.0 156237.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
- 14. Hours Generator On-Line 744.0 5087.0 154220.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1891535.4 12933170.9 364466738.2
- 17. Gross Electrical Energy Generated (MWH) 622370.0 4313935.0 119439543.0
- 18. Net Electrical Energy Generated (MWH) 600929.0 4170729.0 113813880.0
- 19. Unit Service Factor 100.0% 100.0% 69.7%
- 20. Unit Availability Factor 100.0% 100.0% 69.7%
- 21. Unit Capacity Factor (Using MDC Net) 100.8% 102.4% 65.7%
- 22. Unit Capacity Factor (Using DER Net) 102.5% 104.0% 65.3%
- 23. Unit Forced Outage Rate 0.0% 0.0% 11.6%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.urry Monthly Operatin:eport No. 98-07
~
Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: July, 1998 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 08/03/98 Completed by: J. R. Pincus Telephone: (757) 365-2863 (1) (2) (3) (4) (5)
Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx 07/18/98 F 17H35M A N/A N/A AB MO Low Oil RCP Motor "A",
Added Oil and Installed Remote Oil Addition Modification (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)
E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
(4) (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
e .urry Monthly Operating Report No. 98-07 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)
REPORT MONTH: July, 1998 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 08/03/98 Completed by: J. R. Pincus Telephone: (757) 365-2863 (1) (2) (3) (4) (5)
Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx None During The Reporting Period (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - other (Explain)
E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
(4) (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
e -Surry Monthly Operating Report No. 98-07 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 08/03/98 Completed by: J C. Steinert Telephone: (757) 365-2837 MONTH: July, 1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (Mwe - Net) 1 815 17 810 2 805 18 624 3 813 19 791 4 815 20 804 5 814 21 805 6 811 22 804 7 811 23 804 8 812 24 807 9 810 25 807 10 811 26 810 11 812 27 809 12 812 28 806 13 811 29 804 14 812 30 801 15 801 31 806 16 811 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
&urry Monthly Operating Report No. 98-07 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 08/03/98 Completed by: J. C. Steinert Telephone: (757) 365-2837 MONTH: July, 1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe- Net) 1 810 17 810 2 806 18 803 3 809 19 808 4 811 20 807 5 811 21 810 6 813 22 810 7 813 23 807 8 814 24 810 9 808 25 808 10 809 26 803 11 762 27 813 12 800 28 812 13 813 29 810 14 813 30 806 15 809 31 811 16 810 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
41tsurry Monthly Operating Report No. 98-07 Page 9 of 15
SUMMARY
OF OPERATING EXPERIENCE MONTH/YEAR: July, 1998 The following chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE:
07/01/98 0000 Unit operating at 100% power, 845 MWe.
07/18/98 0944 Commenced ramp down to 55% Due to "A" RCP Motor Low Oil 07/18/98 1308 Stopped ramp, Unit at 59% power, 475 Mwe 07/18/98 2225 Commenced ramp up, Unit at 58%, 470 Mwe 07/19/98 0319 Unit at 100%, 843 MWe 07/31/98 2400 Unit operating at 100% power, 845 MWe.
UNIT Two:
07/01/98 0000 Unit operating at 100% power, 845 MWe.
07/11/98 0507 Commenced ramp down, Unit at 100% power, 840 Mwe.
07/11/98 0551 Removed water box "A" from service, Unit at 93.5% power, 770 Mwe.
07/11/98 1740 Commenced ramp down to maintain condenser vacuum, Unit at 94%, 765 MWe 07/11/98 1825 Stopped ramp, Unit at 91% power, 740 MWe.
07/11/98 1925 Commenced ramp, Unit at 91% power, 740 MWe.
07/11/98 2040 Unit at 100%, 840 MWe 07/31/98 2400 Unit operating at 100% power, 845 MWe.
L
e Surry Monthly Operating Report No. 98-07 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: July, 1998 DCP 97-061 Design Change Package 07/13/98 (Safety Evaluation 98-013)
DCP 97-061, "Interim On-Line Chemistry Monitoring System," replaced the existing Westinghouse On-Line Chemistry Monitoring System computer components and software with a new system. The system is used to collect, store, and analyze secondary water chemistry. The interim system will be replaced with a permanent system with a future DCP.
TM S2-98-04 Temporary Modification 07/14/98 (Safety Evaluation 98-073)
Temporary Modification S2-98-04 was used to allow for the like-for-like replacement of a failed relay in the Unit 2 Train "A" reactor protection circuit. All work was performed in train "A" only with train "A" BYPASS breaker closed.
TM S1-98-15 Temporary Modification 07/18/98 (Safety Evaluation 98-074)
Temporary Modification S1-98-15 was used to install a remote gravity feed oil addition system to the upper reservoir of the 1-RC-P-1A motor to allow oil addition while reducing radiation exposure required for this activity.
JCO 97-006, Rev.1 Justification for Continued Operation 07/30/98 (Safety Evaluation 98-076)
Safety Evaluation 98-076 evaluated whether an unreviewed safety question existed regarding changes to JCO 97-006. The JCO implemented compensatory actions for Thermo-Lag 330-1 material used as radiant energy shields in the containments. The changes to the JCO included; (1) additional information and clarification for Resistance Thermometer Detector monitoring, P-250 address points, and conditional compensatory actions; (2) instructional guidance for the adjustment of P-250 containment temperature high alarm limits; (3) added reference to an improved method for measuring P-250 input data if both P-250 computers become inoperable; and (4) revision of an annunciator procedure clarifying a reference to radiant energy shields.
L_
e e Surry Monthly Operating Report No. 98-07 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: July, 1998 2-0P-TM-005 Operating Procedure 07/09/98 (Safety Evaluation 98-063 Rev. 1)
Operating Procedure 2-0P-TM-005, "Unit Ramping Operations," was changed to provide a method of repair for the Main Turbine #2 Governor Valve that involved power reduction and an alternate method of closing the valve. The revision to the Safety Evaluation was to include a letter from Westinghouse analyzing destructive overspeed criteria. The letter stated that there was no concern if the valve was repaired within six days.
1-ISP-LM-T-001 Electrical Corrective Maintenance Procedure 07/06/98 2-ISP-LM-T-001 (Safety Evaluation 98-072)
Instrument Surveillance Procedures 1-ISP-LM-T-001 and 2-ISP-LM-T-001, "Containment Temperature Monitoring When Both P-250 Computers Are Inoperable," were written to provide temporary power for the P-250 power supplies when both power supplies are inoperative.
O-OSP-EG-001 Operations Surveillance Procedure 07/23/98 1-0SP-EG-001 (Safety Evaluation 98-075) 2-0SP-EG-001 Operations Surveillance Procedures O-OSP-EG-001, 1-0SP-EG-001, and 2-0SP-EG-001, for emergency diesel generators 3,2, and 1 respectively, "Emergency Diesel Generator Local Alarm Panel Functional Test," were developed to perform a functional test of the Emergency Diesel Generator (EDG) local alarm panels. The EDG will be removed from service during testing.
-Surry Monthly Operating Report No. 98-07 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: July, 1998 None During the Reporting Period
411tsurry Monthly Operating Report No. 98-07 Page 13 of 15 CHEMISTRY REPORT MONTHNEAR: July, 1998 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Avg. Max. Min. Avg.
Gross Radioactivity, µCi/ml 4.37E-1 3.36E-1 3.83E-1 1.78E-1 1.29E-1 1.45E-1 Suspended Solids, ppm - - - - - -
Gross Tritium, µCi/ml 1.41 E-1 1.10E-1 1.26E-1 8.14E-1 7.54E-1 7.92E-1 1131, µCi/ml 3.88E-2 3.55E-3 1.34E-2 1.18E-4 3.21 E-5 7.32E-5 113111133 0.86 0.39 0.57 0.17 0.04 0.11 Hydrogen, cc/kg 42.1 35.4 40.0 43.4 40.0 41.4 Lithium, ppm 2.00 1.44 1.72 2.35 2.07 2.20 Boron - 10, ppm* 54.4 37.0 47.1 153.1 135.8 144.7 Oxygen, (DO), ppm s0.005 s0.005 s0.005 s0.005 s0.005 s0.005 Chloride, ppm 0.002 so.001 s0,001 0.004 0.002 0.003 pH at 25 degree Celsius 7.36 7.05 7.24 6.81 6.48 6.64
,Comments:
None
-Surry Monthly Operating Report No. 98-07 Page 14 of 15 FUEL HANDLING UNITS 1&2 MONTHNEAR: July, 1998 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity None During the Reporting Period
e e Surry Monthly Operating Report No. 98-07 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: July, 1998 None During the Reporting Period