| issue date = 05/12/2006
| issue date = 05/12/2006
| title = IR 05000277-06-010, 05000278-06-010; 05/25/2006 - 05/28/2006; Peach Bottom Atomic Power Station; Emergency Preparedness Exercise; Performance Indicator Verification
| title = IR 05000277-06-010, 05000278-06-010; 05/25/2006 - 05/28/2006; Peach Bottom Atomic Power Station; Emergency Preparedness Exercise; Performance Indicator Verification
| author name = Lorson R K
| author name = Lorson R
| author affiliation = NRC/RGN-I/DRS/PSB1
| author affiliation = NRC/RGN-I/DRS/PSB1
| addressee name = Crane C M
| addressee name = Crane C
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000277, 05000278
| docket = 05000277, 05000278
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:May 12, 2006Mr. Christopher M. CranePresident and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348SUBJECT:PEACH BOTTOM ATOMIC POWER STATION - NRC EVALUATEDEMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT
[[Issue date::May 12, 2006]]
 
Mr. Christopher M. CranePresident and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348
 
SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - NRC EVALUATEDEMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT


05000277/2006010, 05000278/2006010
05000277/2006010, 05000278/2006010
Line 34: Line 29:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) com ponent ofNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) com ponent ofNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/Raymond K. Lorson, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-277; 50-278License Nos.:DPR-44, DPR-56 C. Crane2
Sincerely,
 
/RA/Raymond K. Lorson, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-277; 50-278License Nos.:DPR-44, DPR-56 C. Crane2Enclosure:Inspection Report 05000277/2006010, 05000278/2006010 w/Attachment: Supplemental Informationcc w/encl:Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Nuclear Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA)
===Enclosure:===
Inspection Report 05000277/2006010, 05000278/2006010  
 
===w/Attachment:===
Supplemental Informationcc w/encl:Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Nuclear Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA)
R. McLean, Power Plant and Environmental Review Division (MD)
R. McLean, Power Plant and Environmental Review Division (MD)
R. Fletcher, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)
R. Fletcher, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)

Revision as of 19:12, 13 July 2019

IR 05000277-06-010, 05000278-06-010; 05/25/2006 - 05/28/2006; Peach Bottom Atomic Power Station; Emergency Preparedness Exercise; Performance Indicator Verification
ML061350072
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/12/2006
From: Ray Lorson
Plant Support Branch 1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-06-010
Download: ML061350072 (11)


Text

May 12, 2006Mr. Christopher M. CranePresident and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348SUBJECT:PEACH BOTTOM ATOMIC POWER STATION - NRC EVALUATEDEMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT

05000277/2006010, 05000278/2006010

Dear Mr. Crane:

On April 28, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection ofyour full-scale biennial Emergency Preparedness exercise that occurred at your Peach Bottom Atomic Power Station, Units 2 and 3 on April 25, 2006. The enclosed inspection report documents the inspection results, which were discussed with Mr. J. Grimes, Site Plant Manager, and other members of your staff during an exit meeting held on April 28, 2006.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed emergency plan procedures, previous dr ill reports, observed theexercise activities, and interviewed selected emergency preparedness personnel from your staff.Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) com ponent ofNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/Raymond K. Lorson, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-277; 50-278License Nos.:DPR-44, DPR-56 C. Crane2Enclosure:Inspection Report 05000277/2006010, 05000278/2006010 w/Attachment: Supplemental Informationcc w/encl:Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Nuclear Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA)

R. McLean, Power Plant and Environmental Review Division (MD)

R. Fletcher, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)

Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom AllianceTMI - Alert (TMIA)

J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams Vice President, Licensing and Regulatory Affairs Vice President, Operations Mid-Atlantic Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Fewell, Assistant General Counsel D. Hammons, RAC Chair, FEMA Region III