Line 3: |
Line 3: |
| | issue date = 09/20/2007 | | | issue date = 09/20/2007 |
| | title = IR 05000315-07-502 and IR 05000316-07-502; on 08/13/2007 - 08/17/2007, D. C. Cook Nuclear Power Plant, Units 1 and 2, Biennial Emergency Preparedness Exercise Baseline Inspection | | | title = IR 05000315-07-502 and IR 05000316-07-502; on 08/13/2007 - 08/17/2007, D. C. Cook Nuclear Power Plant, Units 1 and 2, Biennial Emergency Preparedness Exercise Baseline Inspection |
| | author name = Duncan E R | | | author name = Duncan E |
| | author affiliation = NRC/RGN-III/DRS/PSB | | | author affiliation = NRC/RGN-III/DRS/PSB |
| | addressee name = Nazar M K | | | addressee name = Nazar M |
| | addressee affiliation = Indiana Michigan Power Co | | | addressee affiliation = Indiana Michigan Power Co |
| | docket = 05000315, 05000316 | | | docket = 05000315, 05000316 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:September 20, 2007Mr. Mano K. NazarSenior Vice President andChief Nuclear OfficerIndiana Michigan Power CompanyNuclear Generation GroupOne Cook PlaceBridgman, MI 49106SUBJECT:D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2BIENNIAL EMERGENCY PREPAREDNESS EXERCISE BASELINEINSPECTION REPORT 05000315/2007502(DRS);05000316/2007502(DRS) |
| [[Issue date::September 20, 2007]]
| |
| | |
| Mr. Mano K. NazarSenior Vice President andChief Nuclear OfficerIndiana Michigan Power CompanyNuclear Generation GroupOne Cook PlaceBridgman, MI 49106
| |
| | |
| SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2BIENNIAL EMERGENCY PREPAREDNESS EXERCISE BASELINEINSPECTION REPORT 05000315/2007502(DRS);05000316/2007502(DRS)
| |
|
| |
|
| ==Dear Mr. Nazar:== | | ==Dear Mr. Nazar:== |
Line 30: |
Line 25: |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for pub lic inspection in t he NRC Public DocumentRoom or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for pub lic inspection in t he NRC Public DocumentRoom or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Sincerely,/RA/Eric Duncan, ChiefPlant Support BranchDivision of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74 | | Sincerely, |
| | | /RA/Eric Duncan, ChiefPlant Support BranchDivision of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74Enclosure:Biennial Emergency Preparedness Exercise Baseline Inspection Report 05000315/2007502(DRS); 05000316/2007502(DRS); w/Attachment: Supplemental Informationcc w/encl:J. Jensen, Site Vice PresidentL. Weber, Plant ManagerG. White, Michigan Public Service CommissionL. Brandon, Michigan Department of Environmental Quality - Waste and Hazardous Materials DivisionEmergency Management Division MI Department of State PoliceState Liaison Officer, State of MichiganW. King, FEMA, Region V |
| ===Enclosure:===
| |
| Biennial Emergency Preparedness Exercise Baseline Inspection Report 05000315/2007502(DRS); 05000316/2007502(DRS); | |
| | |
| ===w/Attachment:===
| |
| Supplemental Informationcc w/encl:J. Jensen, Site Vice PresidentL. Weber, Plant ManagerG. White, Michigan Public Service CommissionL. Brandon, Michigan Department of Environmental Quality - Waste and Hazardous Materials DivisionEmergency Management Division MI Department of State PoliceState Liaison Officer, State of MichiganW. King, FEMA, Region V | |
|
| |
|
| =SUMMARY OF FINDINGS= | | =SUMMARY OF FINDINGS= |
Line 53: |
Line 43: |
| ==REACTOR SAFETY== | | ==REACTOR SAFETY== |
|
| |
|
| ===Cornerstone:=== | | ===Cornerstone: Emergency Preparedness1EP1Exercise Evaluation (71114.01) |
| Emergency Preparedness1EP1Exercise Evaluation (71114.01) | |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors reviewed the August 14, 2007, biennial emergency preparednessexercise's objectives and scenario to ensure that the exercise would acceptablytest major elements of the licensee's emergency plan and to verify that theexercise's simulated problems provided an acceptable framework to supportdemonstration of the licensee's capability to implement its plan. The inspectorsalso reviewed records of other drills and exercises conduc ted in 2005, 2006, and2007, to verify that those drills' scenarios were sufficiently different from the scenarioused in the August 14, 2007 exercise.The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective actiondecision making, as well as implementation of accident mitigation strategies in thefollowing emergency response facilities:Control Room Simulator (CRS);Technical Support Center (TSC); andEmergency Operations Facility (EOF).The inspectors also assessed the licensee's recognition of abnormal plant conditions,transfer of responsibilities between facilities, internal co mmunications, interfaces withoffsite officials, readiness of emergency facilities and related equipment, and overallimplementation of the licensee's emergency plan.The inspectors attended post-exercise critiques in the CRS, TSC, and EOFto evaluate the licensee's initial self-assessment of its exercise performance. Theinspectors later met with the licensee's lead exercise evaluators and managers toobtain the licensee's findings and assessments of its exercise participants'performances. These self-assessments were then compared with the inspectors'independent observa tions and assessments to assess the licensee's ability toadequately critique its exercise performance.These activities completed one of one inspection sample. | | The inspectors reviewed the August 14, 2007, biennial emergency preparednessexercise's objectives and scenario to ensure that the exercise would acceptablytest major elements of the licensee's emergency plan and to verify that theexercise's simulated problems provided an acceptable framework to supportdemonstration of the licensee's capability to implement its plan. The inspectorsalso reviewed records of other drills and exercises conduc=== |
| | |
| | ted in 2005, 2006, and2007, to verify that those drills' scenarios were sufficiently different from the scenarioused in the August 14, 2007 exercise.The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective actiondecision making, as well as implementation of accident mitigation strategies in thefollowing emergency response facilities:Control Room Simulator (CRS);Technical Support Center (TSC); andEmergency Operations Facility (EOF).The inspectors also assessed the licensee's recognition of abnormal plant conditions,transfer of responsibilities between facilities, internal co mmunications, interfaces withoffsite officials, readiness of emergency facilities and related equipment, and overallimplementation of the licensee's emergency plan.The inspectors attended post-exercise critiques in the CRS, TSC, and EOFto evaluate the licensee's initial self-assessment of its exercise performance. Theinspectors later met with the licensee's lead exercise evaluators and managers toobtain the licensee's findings and assessments of its exercise participants'performances. These self-assessments were then compared with the inspectors'independent observa tions and assessments to assess the licensee's ability toadequately critique its exercise performance.These activities completed one of one inspection sample. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
Line 110: |
Line 101: |
| : Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather thatselected sections of portions of the documents were evaluated as part of the overallinspection effort. | | : Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather thatselected sections of portions of the documents were evaluated as part of the overallinspection effort. |
| : Inclusion of a document on this list does not imply NRC acceptance of thedocument or any part of it, unless this is stated in the body of the inspection report. | | : Inclusion of a document on this list does not imply NRC acceptance of thedocument or any part of it, unless this is stated in the body of the inspection report. |
|
| |
| ==1EP1 Exercise EvaluationDonald C. Cook Nuclear Plant Emergency Plan; Sections B, D, E, H, I, J, and K;Revision 24PMP-2080-EPP-100; Emergency Response; Revision 9==
| |
| : RMT-2080-EOF-001; Activation and Operation of the EOF; Revision 11
| |
| : RMT-2080-OSC-001; Activation and Operation of the OSC; Revision 6
| |
| : RMT-2080-TSC-001; Activation and Operation of the TSC; Revision 8
| |
| : Drill and Exercise Scenarios; dated November 2005 through July 2007AR-07228078; Reevaluate the Sample Analysis Methods for Radioiodine for OffsiteSurveys; dated August 16, 2007AR-07228031; 2007 NRC Evaluated Exercise Item - Error on Protective ActionRecommendation #2 Notification; dated August 16, 2007AR-07228009; 2007 Exercise Fire Brigaded Failed To Include Required OperationsTechnical Assistance; dated August 14, 2007AR-07227063; 2007 Evaluated Exercise Incorrect Protective Action Recommendation;dated August 15, 2007AR-07227058; Several OSC Response Teams Dispatch Were Delayed Due to FailedElectronic Dosimeter Reader; dated August 15, 2007AR-07227032; Training for Emergency Exposure Authorization Requested by the SiteEmergency Director; dated August 15, 2007
| |
| : 4OA1Performance Indicator VerificationERO Member Drill Partici pation PI Data Sheets; dated Apr il 2006 through June 2007Drill/Exercise Perform ance Data Sheets; dated April 2006 through June
| |
| : 20072006 Siren Statistics for Early Warning Siren System; dated April 2006 through June 2007
| |
| : 3Berrien County Monthly EWS Test Reports; dated April 2006 through June 2007Monthly Siren Test Computer Printout Data; dated April 2006 through June 2007
| |
| : AR-07037040; Eight ANS Siren Failures During the February 3, 2007 Test; datedFebruary 6, 2007AR-00813287; Apparent Cause Evaluation for the Alert and Notification System SirensDelayed Activation during the May 5, 2007, Monthly Test; dated May 7, 2007AR-00817132; Contrary to
| |
| : PMP-7110-PIP-001, Alert and Notification SystemReliability Data Was Sent to the NRC on July 25, 2007 with 141 of 210 SuccessfulSiren Tests Instead of 140 of 209 Successful Tests; dated August 10, 2007
| |
|
| |
| ==4OA5 OtherAR-00801675; Apparent Cause Evaluation of==
| |
| : NRC Violation
| |
| : EA-06-177, Failure toMaintain a Standard Emergency Action Level Scheme; dated August 17, 2006
| |
| ==LIST OF ACRONYMS==
| |
| USEDADAMSAgencywide Documents Access and Management System ANSAlert and Notification SystemCFRCode of Federal RegulationsCRSControl Room SimulatorDEPDrill and Exercise PerformanceDRSDivision of Reactor SafetyEOFEmergency Oper
| |
| ations FacilityEPEmergency PreparednessEROEmergency Response OrganizationEWSEarly Warning SirensNARSNuclear Accident Reporting SystemNRCU.
| |
| : [[S.]] [[Nuclear Regulatory Commission]]
| |
| : [[OSCO]] [[perations Support CenterPARSPublicly Available RecordsPIPerformance IndicatorTSCTechnical Support Center]]
| |
| }} | | }} |
Similar Documents at Cook |
---|
Category:Inspection Report
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20230062024-02-28028 February 2024 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023006 and 05000316/2023006) IR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 IR 05000315/20230052023-08-24024 August 2023 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023005 and 05000316/2023005) IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 IR 05000315/20234012023-03-16016 March 2023 – Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 IR 05000315/20224202022-10-19019 October 2022 Cover Letter - Donald C. Cook Nuclear Plant Units 1 and 2 - Security Baseline Inspection Report 05000315/2022420 and 05000316/2022420 IR 05000315/20224012022-09-21021 September 2022 Security Baseline Inspection Report 05000315 2022401 05000316 2022401 Independent Spent Fuel Storage Security Inspection Report 07200072 2022401 IR 05000315/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000315/2022301; 05000316/2022301 IR 05000315/20220052022-08-24024 August 2022 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022005 and 05000316/2022005) IR 05000315/20220022022-08-0808 August 2022 Integrated Inspection Report 05000315/2022002 and 05000316/2022002 IR 05000315/20224022022-07-0505 July 2022 Material Control and Accounting Program Inspection Report 05000315/2022402 and 05000316/2022402 ML22165A2012022-06-14014 June 2022 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220012022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220102022-04-0505 April 2022 Triennial Fire Protection Inspection Report 05000315/2022010 and 05000316/2022010 ML22084A5812022-03-25025 March 2022 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000315/2022011 05000316/2022011 IR 05000315/20210062022-03-0202 March 2022 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021006 and 05000316/2021006) IR 05000315/20210042022-02-0707 February 2022 Integrated Inspection Report 05000315/2021004 and 05000316/2021004 and Exercise of Enforcement Discretion IR 05000315/20210132021-12-0606 December 2021 Inspection Report 05000315/2021013 and 05000316/2021013 IR 05000315/20214032021-11-17017 November 2021 Security Baseline Inspection Report 05000315/2021403 and 05000316/2021403 IR 05000315/20210112021-11-15015 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000315/2021011 and 05000316/2021011 IR 05000315/20210032021-10-26026 October 2021 Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001 IR 05000315/20214012021-10-21021 October 2021 Cyber Security Inspection Report 05000315/2021401 and 05000316/2021401 IR 05000315/20215012021-10-0606 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2021501 and 05000316/2021501 IR 05000315/20210102021-09-0707 September 2021 Biennial Problem Identification and Resolution Inspection Report 05000315/2021010 and 05000316/2021010 IR 05000315/20210052021-09-0101 September 2021 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021005 and 05000316/2021005) IR 05000315/20210122021-08-0202 August 2021 Donald Cook Nuclear Plant - NRC Inspection Report 05000315/2021012 and 05000316/2021012 IR 05000315/20210022021-07-22022 July 2021 Integrated Inspection Report 05000315/2021002 and 05000316/2021002 IR 05000315/20214022021-06-0909 June 2021 Donald D. C. Cook Nuclear Plant - Security Baseline Inspection Report 05000315/2021402 and 05000316/2021402 ML21158A1732021-06-0909 June 2021 Review of the Fall 2017 Steam Generator Tube Inspections Report IR 05000315/20210012021-04-28028 April 2021 Integrated Inspection Report 05000315/2021001 and 05000316/2021001 2024-09-05
[Table view] Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] |
Text
September 20, 2007Mr. Mano K. NazarSenior Vice President andChief Nuclear OfficerIndiana Michigan Power CompanyNuclear Generation GroupOne Cook PlaceBridgman, MI 49106SUBJECT:D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2BIENNIAL EMERGENCY PREPAREDNESS EXERCISE BASELINEINSPECTION REPORT 05000315/2007502(DRS);05000316/2007502(DRS)
Dear Mr. Nazar:
On August 17, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed an inspectionat your D. C. Cook Nuclear Power Plant, Units 1 and 2. The enclosed report documents theinspection findings, which were discussed on August 17, 2007, with Mr. M. Peifer and othermembers of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewedpersonnel. Specifically, this inspection focused on emergency preparedness, including yourstaff's determinations of performance indicators for the Emergency Preparedness Cornerstone.On the basis of the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for pub lic inspection in t he NRC Public DocumentRoom or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/Eric Duncan, ChiefPlant Support BranchDivision of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74Enclosure:Biennial Emergency Preparedness Exercise Baseline Inspection Report 05000315/2007502(DRS); 05000316/2007502(DRS); w/Attachment: Supplemental Informationcc w/encl:J. Jensen, Site Vice PresidentL. Weber, Plant ManagerG. White, Michigan Public Service CommissionL. Brandon, Michigan Department of Environmental Quality - Waste and Hazardous Materials DivisionEmergency Management Division MI Department of State PoliceState Liaison Officer, State of MichiganW. King, FEMA, Region V
SUMMARY OF FINDINGS
IR 05000315/2007502; 05000316/2007502; on 08/13/2007-08/17/2007; D. C. Cook NuclearPower Plant, Units 1 and 2, Biennial Emergency Preparedness Exercise Baseline Inspection.The report covers a 1 week baseline inspection by one regional emergency preparednessinspector, a resident inspector, and a reactor engineer. The inspection focused on theEmergency Preparedness Cornerstone in the Reactor Safety strategic performance area duringthe biennial emergency preparedness exercise. This inspection also included a review ofrecords related to the three emergency preparedness performance indicators for the periodApril 1, 2006 through June 30, 2007.The NRC's program for overseeing the safe operation of commercial nuclear power reactors isdescribed in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.A.Inspector-Identified and Self-Revealed Findings
None.
B.Licensee-Identified Violations
None.
2
REPORT DETAILS
REACTOR SAFETY
===Cornerstone: Emergency Preparedness1EP1Exercise Evaluation (71114.01)
a. Inspection Scope
The inspectors reviewed the August 14, 2007, biennial emergency preparednessexercise's objectives and scenario to ensure that the exercise would acceptablytest major elements of the licensee's emergency plan and to verify that theexercise's simulated problems provided an acceptable framework to supportdemonstration of the licensee's capability to implement its plan. The inspectorsalso reviewed records of other drills and exercises conduc===
ted in 2005, 2006, and2007, to verify that those drills' scenarios were sufficiently different from the scenarioused in the August 14, 2007 exercise.The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective actiondecision making, as well as implementation of accident mitigation strategies in thefollowing emergency response facilities:Control Room Simulator (CRS);Technical Support Center (TSC); andEmergency Operations Facility (EOF).The inspectors also assessed the licensee's recognition of abnormal plant conditions,transfer of responsibilities between facilities, internal co mmunications, interfaces withoffsite officials, readiness of emergency facilities and related equipment, and overallimplementation of the licensee's emergency plan.The inspectors attended post-exercise critiques in the CRS, TSC, and EOFto evaluate the licensee's initial self-assessment of its exercise performance. Theinspectors later met with the licensee's lead exercise evaluators and managers toobtain the licensee's findings and assessments of its exercise participants'performances. These self-assessments were then compared with the inspectors'independent observa tions and assessments to assess the licensee's ability toadequately critique its exercise performance.These activities completed one of one inspection sample.
b. Findings
No findings of significance were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
Cornerstone: Emergency Preparedness.1Reactor Safety Strategic Area
a. Inspection Scope
The inspectors reviewed the licensee's records associated with each of the threeemergency preparedness PIs to verify that the licensee's program was implementedconsistent with the industry guidelines in the applicable revision of Nuclear EnergyInstitute Publication No. 99-02, "Regulatory Assessment Performance IndicatorGuideline," and related licensee procedures. Specifically, licensee records related tothe performance of the Alert and Notification System (ANS), key EmergencyResponse Organization (ERO)members' drill par ticipation, and Drill and ExercisePerformance (DEP) were reviewed to verify the accuracy and completeness of the PIdata submitted to NRC for the period from April 1, 2006, through June 30, 2007. Thefollowing three PIs were reviewed:
Common*ANS;*ERO Drill Participation; and*DEP.These activities completed three of three PI samples.b. FindingsNo findings of significance were identified.
The inspectors noted that the licensee's submittal for the Alert and Notification SystemReliability Performance Indicator was in error because the fourth quarter 2007 datasubmittal indicated 141 sirens of 210 sirens were tested successfully instead of 140 of209 sirens tested successfully. The regularly scheduled test for May 5, 2007, had only69 sirens tested because one siren was not tested because of a local parade. Thesiren taken out-of-service for the regularly scheduled monthly siren test was tested onMay 4, 2007, however, this siren test has to be counted for the NRC's ANSPerformance Indicator as a non-opportunity per the guidance in NEI 99-02, Revision 5,"Regularly scheduled tests missed for reasons other than siren unavailability (e.g.,out-of-service for planned maintenance or repair) should be considerednon-opportunities." This error was entered into the licensee's corrective action systemas AR-00817132, "PI Data Submitted Late to the NRC."
44OA5Other.1(Closed) Severity Lev el III Violat ion 05000315/
316/2006502-01: A Severity Level IIIViolation was identified for the licensee's failure to maintain a standard emergencyaction level scheme.The inspectors reviewed the licensee's action request 00801675 which includedcauses, extent of condition, and corrective actions. No concerns or issues wereidentified and appropriate corrective actions have been implemented. This violation isclosed.4OA6Meetings.1Exit MeetingOn August 17, 2007, at the conclusion of the on-site inspection activities, theinspectors presented preliminary inspection results to Mr. M. Peifer and othermembers of licensee management. The inspectors asked the licensee whether anymaterials examined during the inspection should be considered proprietary. Noproprietary information was identified.ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- M. Peifer, Vice President Site Support Services
- R. Crane, Compliance Supervisor
- H. Etheridge, Regulatory Affairs Specialist
- J. Gebbie, Plant Engineering Director
- C. Graffenius, Emergency Preparedness Coordinator
- Q. Lies, Acting Plant Manager
- J. Newmiller, Regulatory Affairs Specialist
- A. Rodriguez, Emergency Preparedness Manager
- D. Schroeder, Emergency Preparedness Coordinator
- C. Springman, Principal Nuclear Specialist
- R. Sieber, Chemistry Manager
- J. Zwolinski, Performance Assurance ManagerNuclear Regulatory Commission
- B. Kemker, Senior Resident Inspector
- J. Lennartz, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
None
ClosedNOV
- 05000315/316/2006-502-01Failure to Maintain a Standard EAL Scheme.
Discussed
None
2
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather thatselected sections of portions of the documents were evaluated as part of the overallinspection effort.
- Inclusion of a document on this list does not imply NRC acceptance of thedocument or any part of it, unless this is stated in the body of the inspection report.