IR 05000280/2008401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/26/2008
| issue date = 06/26/2008
| title = IR 05000280-08-401, and IR 05000281-08-401, on 04/28/2008 Through 05/01/2008, Surry Power Station, Units 1 & 2, Security Compliance to Nrc'S Reactor Oversight Process, Letter Only
| title = IR 05000280-08-401, and IR 05000281-08-401, on 04/28/2008 Through 05/01/2008, Surry Power Station, Units 1 & 2, Security Compliance to Nrc'S Reactor Oversight Process, Letter Only
| author name = Munday J T
| author name = Munday J
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:une 26, 2008
[[Issue date::June 26, 2008]]


Mr. David Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
==SUBJECT:==
 
SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2008401 AND 05000281/2008401
SUBJECT: SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2008401 AND 05000281/2008401


==Dear Mr. Christian:==
==Dear Mr. Christian:==
Line 40: Line 38:
@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,/RA/ Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-280, 50-281 License No.: DPR-32, DPR-37  
Sincerely,
 
/RA/ Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-280, 50-281 License No.: DPR-32, DPR-37  
===Enclosure:===
Inspection Report 05000280/2008401 and 05000281/2008401


===w/Attachment:===
Enclosure: Inspection Report 05000280/2008401 and 05000281/2008401 w/Attachment: Supplemental Information  
Supplemental Information  


cc w/encl.: See Page 3 VEPCO 3 cc w/Encl:
cc w/encl.: See Page 3 VEPCO 3 cc w/Encl:

Revision as of 10:45, 12 July 2019

IR 05000280-08-401, and IR 05000281-08-401, on 04/28/2008 Through 05/01/2008, Surry Power Station, Units 1 & 2, Security Compliance to Nrc'S Reactor Oversight Process, Letter Only
ML081790047
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/26/2008
From: Joel Munday
NRC/RGN-II/DRS/PSB2
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-401
Download: ML081790047 (4)


Text

une 26, 2008

SUBJECT:

SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2008401 AND 05000281/2008401

Dear Mr. Christian:

On June 5, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Surry Power Station, Units 1 and 2. Portions of the inspection were conducted at the corporate office from April 28, 2008 through May 1, 2008. The inspection covered one or more of the key attributes of the security cornerstone of the NRC

=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. John Grau, Manager, Nuclear Site Services (NSS), and other members of your staff on June 5, 2008.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission

=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter

=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. VEPCO 2 If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information BWithhold Under 10 CFR 2.390

@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/ Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-280, 50-281 License No.: DPR-32, DPR-37

Enclosure: Inspection Report 05000280/2008401 and 05000281/2008401 w/Attachment: Supplemental Information

cc w/encl.: See Page 3 VEPCO 3 cc w/Encl:

Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060

Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company

5570 Hog Island Road Surry, VA 23883

cc w/o Encl:

Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, CT 06385

Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219

_________________________ OFFICE RII:DRS RII:DRS RII:DRP RII:DRS RII:DRS RII: DRS SIGNATURE /RA/ /RA/ /RA/ /RA J. Munday for/ /RA/ /RA/ NAME J. Munday R. Patterson E. Guthrie A. True K. Davis J. Shehee DATE 6/ /200826/20086/13/2008 6/13/2008 6/26/2008 6/13/2008 6/26/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO