ML082100408: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/01/2008
| issue date = 08/01/2008
| title = 08/27/2008 Notice of Meeting with Entergy Operations Incorporated to Discuss Steam Generator Inspections Results at Arkansas Nuclear One, Unit 1 (ANO-1)
| title = 08/27/2008 Notice of Meeting with Entergy Operations Incorporated to Discuss Steam Generator Inspections Results at Arkansas Nuclear One, Unit 1 (ANO-1)
| author name = Wang A B
| author name = Wang A
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| addressee name = Thadani M C
| addressee name = Thadani M
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLIV
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLIV
| docket = 05000313
| docket = 05000313
Line 68: Line 68:
REGARDING STEAM GENERATOR TUBE INSPECTION RESULTS AT ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1)
REGARDING STEAM GENERATOR TUBE INSPECTION RESULTS AT ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1)
ON WEDNESDAY, AUGUST 27, 2008
ON WEDNESDAY, AUGUST 27, 2008
: 1. Introductions      9:00 AM  
: 1. Introductions      9:00 AM
: 2. Review of 1R20 Results      9:15 AM  
: 2. Review of 1R20 Results      9:15 AM
: 3. Root Cause of Bowed Tie Rods    9:45 AM  
: 3. Root Cause of Bowed Tie Rods    9:45 AM
: 4. Inspection Scope for 1R21    10:15 AM
: 4. Inspection Scope for 1R21    10:15 AM
* Eddy Current of SG tubes
* Eddy Current of SG tubes
* Secondary Visual  
* Secondary Visual
: 5. Acceptance Criteria for Inspection Results  10:45 AM  
: 5. Acceptance Criteria for Inspection Results  10:45 AM
: 6. Potential Repairs Options if Required    11:00 AM  
: 6. Potential Repairs Options if Required    11:00 AM
: 7. Proposed Future Inspections    11:15 AM  
: 7. Proposed Future Inspections    11:15 AM
: 8. Questions        11:30 AM  
: 8. Questions        11:30 AM  



Revision as of 08:55, 12 July 2019

08/27/2008 Notice of Meeting with Entergy Operations Incorporated to Discuss Steam Generator Inspections Results at Arkansas Nuclear One, Unit 1 (ANO-1)
ML082100408
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/01/2008
From: Wang A
NRC/NRR/ADRO/DORL/LPLIV
To: Thadani M
NRC/NRR/ADRO/DORL/LPLIV
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
Download: ML082100408 (5)


Text

August 1, 2008

MEMORANDUM TO: Mohan Thadani, Acting Branch Chief Plant Licensing Branch 4 Division of Operating Reactor Licensing

FROM: Alan Wang, Project Manager /RA by Michael Markley for/ Plant Licensing Branch 4 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING CLOSED MEETING WITH ENTERGY OPERATIONS INCORPORATED TO DISCUSS STEAM GENERATOR INSPECTIONS RESULTS AT ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1)

DATE & TIME: Wednesday, August 27, 2008 9:00 a.m. - 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission Executive Boulevard Building 6003 Executive Boulevard, Room EBB1E03 Rockville, Maryland 20852

PURPOSE: Entergy will discuss proprietary information regarding t he steam generator tube inspection results at ANO-1.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC ENTERGY OPERATIONS,INC. AREVA K. Karwoski D. James J. Brown J. Burke C. Reasoner J. Begley A. Hiser B. Greeson T. Wiger E. Murphy D. Meatheany M. Boudreaux A. Wang, et al A. Buford, et al D. Lang Docket No. 50-313

Enclosure:

Agenda

cc w/encl: See next page

MEETING CONTACT: Alan Wang, NRR 301-415-1436 ABW@nrc.gov August 1, 2008

MEMORANDUM TO: Mohan Thadani, Acting Branch Chief Plant Licensing Branch 4 Division of Operating Reactor Licensing

FROM: Alan Wang, Project Manager /RA by Michael Markley for/ Plant Licensing Branch 4 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING CLOSED MEETING WITH ENTERGY OPERATIONS INCORPORATED TO DISCUSS STEAM GENERATOR INSPECTIONS RESULTS AT ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1)

DATE & TIME: Wednesday, August 27, 2008 9:00 a.m. - 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission Executive Boulevard Building 6003 Executive Boulevard, Room EBB1E03 Rockville, Maryland 20852

PURPOSE: Entergy will discuss proprietary information regarding t he steam generator tube inspection results at ANO-1.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC ENTERGY OPERATIONS,INC. AREVA K. Karwoski D. James J. Brown J. Burke C. Reasoner J. Begley A. Hiser B. Greeson T. Wiger E. Murphy D. Meatheany M. Boudreaux A. Wang, et al A. Buford, et al D. Lang Docket No. 50-313

Enclosure:

Agenda

cc w/encl: See next page

MEETING CONTACT: Alan Wang, NRR 301-415-1436 ABW@nrc.gov DISTRIBUTION:

PUBLIC RidsNrrLADJohnson GHill (2) LPLIV r/f RidsRgn4MailCenter JClark (RIV Plants)

RidsOgcRp RidsNrrPMAWang RidsAcrs&Acnw_MailCenter KKarwoski AHiser GLappert Accession No.: ML082100408 NRC-001 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC (A)

NAME AWang MTM for GLappert MThadani DATE 8/1/08 7/31/08 8/01/08 OFFICIAL RECORD COPY AGENDA FOR MEETING WITH ENTERGY OPERATIONS, INC.

REGARDING STEAM GENERATOR TUBE INSPECTION RESULTS AT ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1)

ON WEDNESDAY, AUGUST 27, 2008

1. Introductions 9:00 AM
2. Review of 1R20 Results 9:15 AM
3. Root Cause of Bowed Tie Rods 9:45 AM
4. Inspection Scope for 1R21 10:15 AM
  • Eddy Current of SG tubes
  • Secondary Visual
5. Acceptance Criteria for Inspection Results 10:45 AM
6. Potential Repairs Options if Required 11:00 AM
7. Proposed Future Inspections 11:15 AM
8. Questions 11:30 AM

Arkansas Nuclear One

cc:

Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

Director, Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867

Winston & Strawn 1700 K Street, N.W.

Washington, DC 20006-3817

Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125

County Judge of Pope County Pope County Courthouse Russellville, AR 72801

Vice President, Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205

Jeffrey S. Forbes Site Vice President

Arkansas Nuclear One Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801