| issue date = 09/01/2009
| issue date = 09/01/2009
| title = Mid-Cycle Performance Review and Inspection Plan - Millstone Power Station
| title = Mid-Cycle Performance Review and Inspection Plan - Millstone Power Station
| author name = Bellamy R R
| author name = Bellamy R
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Resources, Inc
| addressee affiliation = Dominion Resources, Inc
| docket = 05000336, 05000423
| docket = 05000336, 05000423

Revision as of 19:42, 11 July 2019

Mid-Cycle Performance Review and Inspection Plan - Millstone Power Station
ML092440191
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/01/2009
From: Bellamy R
NRC/RGN-I/DRP/PB6
To: Heacock D
Dominion Resources
BELLAMY RR
References
FOIA/PA-2011-0115
Download: ML092440191 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009

Mr. David A. Heacock

President and Chief Nuclear Officer

Dominion Resources

500 Dominion Blvd

Glen Allen, VA 23060-6711

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN MILLSTONE POWER STATION

Dear Mr. Heacock:

On August 11, 2009, the NRC staff completed its performance review of the Millstone Nuclear

Generating Station Units 2 and 3. Our technical staff reviewed performance indicators (PIs) for

the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform y ou of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only - Security Information" will include

the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter of 2009 at Millstone was within the Licensee

Response column of the NRC's Action Matrix, based on all inspection findings being classified

as having very low safety significance (Green) and all PIs indicating performance at a level

requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight

process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. The inspection plan is provided to allow for the

resolution of any scheduling conflicts and personnel availability issues well in advance of

inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and

continuous nature. The inspections in the last nine months of the inspection plan are tentative

and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Avail able Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

D. Heacock 2 As you may know, the NRC is currently evaluating the scope and frequency of all the baseline

inspection procedures as part of our biennial review of the ROP. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 610-337-5200 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ Ronald R. Bellamy, Ph.D., Chief

Division of Reactor Projects

Projects Branch 6

Docket Nos.: 50-336, 50-423 License Nos: DPR-65, NPF-49

Enclosure:

Millstone Inspection/ Activity Plan

cc w/encl: J. Price, Vice President, Engineering, Dominion Fleet

A. Jordan, Site Vice President, Millstone Station

C. Funderburk, Director, Nuclear Licensing and Operations Support

J. Semancik, Plant Manager, Millstone Station

W. Bartron, Supervisor, Station Licensing

J. Spence, Manager Nuclear Training

L. Cuoco, Senior Counsel

C. Brinkman, Manager, Washington Nuclear Operations

J. Roy, Director of Operations, Massachus etts Municipal Wholesale Electric Company First Selectmen, Town of Waterford

B. Sheehan, Chair, NEAC

E. Woollacott, Vice-Chair, NEAC

E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee

J. Buckingham, Department of Public Utility Control

C. Meek-Gallagher, Commissioner, Suffolk Count y, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff

S. Comley, We The People

D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, Citizens Awareness Network (CAN)

P. Eddy, Electric Division, Department of Public Service, State of New York

P. Tonko, President and CEO, New York State Energy Research and Development Authority

J. Spath, SLO Designee, New York State Energy Research and Development Authority

N. Burton, Esq.

Inspection / Activity Plan Page 1 of 2 08/31/2009 16:33:27 Report 22 07/01/2009

-12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone 9/14EXAM-U3 INITIAL OPERATOR LICENSING EXAMS 4 3 FY-09 MILLSTONE UNIT 3 INITIAL OPERTOR LICENSING EXAM U01758 08/10/2009 08/14/2009 3 FY-09 MILLSTONE UNIT 3 INITIAL OPERTOR LICENSING EXAM U01758 09/14/2009 09/25/2009 7111111B-BIENNIAL REQUAL INSP (U3) W/ P/F RESULTS 3 2, 3 IP Licensed Operator Requalification Program 7111111B 08/31/2009 09/04/2009 EP PROGR-EP PROGRAM INSPECTION 2 2, 3 IP A lert and Notification System Testing 7111402 08/23/2009 08/29/2009 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 08/23/2009 08/29/2009 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 08/23/2009 08/29/2009 2, 3 IP Drill/Exercise Performance 71151-EP01 08/23/2009 08/29/2009 2, 3 IP ERO Drill Participation 71151-EP02 08/23/2009 08/29/2009 2, 3 IP A lert & Notification System 71151-EP03 08/23/2009 08/29/2009 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/23/2009 12/31/2009 71122.03-PUB RAD SAFETY - REMP 1 2, 3 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 08/31/2009 09/04/2009 2, 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/31/2009 09/04/2009 7111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 10/13/2009 10/16/2009 TI-172-U2 RCS DISSIMILAR METAL BUTT WELDS 1 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/13/2009 10/23/2009 7111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 71121-OCC RAD SAFETY 1 2 IP A LARA Planning and Controls 7112102 11/02/2009 11/06/2009 71152-PI&R 4 2, 3 IP Identification and Resolution of Problems 71152B 02/08/2010 02/12/2010 2, 3 IP Identification and Resolution of Problems 71152B 02/22/2010 02/26/2010 71121-OCC RAD SAFETY 1 2, 3 IP A ccess Control to Radiologically Significant Areas 7112101 02/08/2010 02/12/2010 2, 3 IP A LARA - Required 7112102-7112102R 02/08/2010 02/12/2010 7111108P-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR 7111108P 04/12/2010 04/23/2010 TI-172-U3 TI 2515/172 DISSIMILAR METAL WELDS 1 3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/12/2010 04/23/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 08/31/2009 16:33:27 Report 22 07/01/2009

-12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone 71121-OCC RAD SAEFTY 1 2, 3 IP A LARA - Required 7112102-7112102R 04/19/2010 04/23/2010 7111107T-TRIENNIAL HEAT SINK 2 2, 3 IP Heat Sink Performance 7111107T 06/14/2010 06/18/2010 TRI FIRE-TRIENNIAL FIRE PROTECTION INSPECTION 3 2, 3 IP Fire Protection [Triennial]

7111105T 07/19/2010 07/23/2010 2, 3 IP Fire Protection [Triennial]

7111105T 08/02/2010 08/06/2010 7111111B-REQUAL INSP (MS2) WITH P/F RESULTS 3 2, 3 IP Licensed Operator Requalification Program 7111111B 09/13/2010 09/17/2010 7112202-PUB RAD SAFETY - RADWASTE 1 2, 3 IP Radioactive Material Processing and Transportation 7112202 08/30/2010 09/03/2010 ISFSI-ANNUAL SAMPLE - ISFSI INSPECTION 1 2 IP Operation Of An ISFSI 60855 10/01/2010 12/31/2010 EP EX-EP EXERCISE EVALUATION 4 2, 3 IP Exercise Evaluation 7111401 10/25/2010 10/29/2010 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 10/25/2010 10/29/2010 2, 3 IP Performance Indicator Verification 71151 10/25/2010 10/29/2010 MODS-PERMANENT PLANT MODIFICATIONS 5 2, 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 11/01/2010 11/05/2010 2, 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 11/15/2010 11/19/2010 7112103-OCC RAD SAFETY - INSTRUMENTS 1 2, 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 11/15/2010 11/19/2010 This report does not include INPO and OUTAGE activities.