August 30, 2004 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glenn Allen, VA 23060-6711

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - MILLSTONE POWER STATION UNIT 2 AND UNIT 3

Dear Mr. Christian:

On August 4, 2004, the NRC staff completed its mid-cycle plant performance assessment of Millstone Power Station Unit 2 and Unit 3. The mid-cycle review for Millstone involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Proprietary Information in accordance with 10 CFR 2.390(d)(1)" will include the physical protection review and resultant inspection plan.

Plant performance at Unit 2 for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and the PI for Unplanned Scrams per 7000 Critical Hours exceeding the Green/White threshold. This PI first crossed the Green/White threshold during the first quarter of 2004 due to two unplanned scrams during the fourth quarter of 2003 and two unplanned scrams during the first quarter of 2004. The NRC staff sent an Assessment Follow-Up Letter, dated May 5, 2004, to inform you of your transition into the Regulatory Response Column of NRCs Action Matrix. A Supplemental Inspection is currently in progress to review your actions related to crossing this PI threshold.

Plant performance at Unit 3 for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2006.

The enclosed inspection plan details the inspections scheduled through March 31, 2006. The plan contains an inspection using Temporary Instruction (TI) 2515/159 "Review of Generic Letter 89-13, "Service Water System Problems Affecting Safety-Related Equipment." This TI is in

Mr. Dave A. Christian 2 response to the Davis-Besse Reactor Vessel Head Degradation Lessons-Learned Task Force and is being performed at a sampling of nuclear power plants across the country. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-49

Enclosure:

Millstone Inspection/Activity Plan

Mr. Dave A. Christian 3 cc w/encl:

J. A. Price, Site Vice President - Millstone C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations W. Meinert, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford V. Juliano, Waterford Library J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proisio, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN

Mr. Dave A. Christian 4 Distribution w/encl: VIA E-MAIL:

S. Collins, RA J. Wiggins, DRA C. Miller, OEDO J. Clifford, NRR V. Nerses, PM, NRR S. Wall, Backup, NRR S. Schneider, Senior Resident Inspector E. Bartels, Resident OA R. Bellamy, RI K. Jenison, RI T. Madden, OCA C. ODaniell, DRP D. Screnci, PAO W. Lanning, DRS R. Crlenjak, DRS J. Rogge, DRS L. Doerflein, DRS R. Conte, DRS R. Lorson, DRS J. White, DRS Region I Docket Room (with concurrences)

RidsNrrDipmlipb DOCUMENT NAME: S:\ROP5 Mid-Cycle Review\2004 Mid-Cycle Letters\Millstone ROP-5 Mid-Cycle Letter FINAL.wpd After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME Sschneider/KMJ RBellamy/RRB for DATE 08/26/04 08/30/04 OFFICIAL RECORD COPY

Page 1 of 3 Millstone 08/30/2004 10:36:38 Inspection / Activity Plan Report 22 07/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 40801 - SELF ASSESSMENT AND CORRECTIVE ACTION 1 1 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 01/10/2004 07/31/2004 Other Routine 83750 - OCCUPATIONAL RADIATION EXPOSURE 1 1 IP 83750 Occupational Radiation Exposure 01/10/2004 07/31/2004 Other Routine 7/19 EXM - UNIT3 OPERATOR LICENSING INITIAL EXAM 4 3 U01521 MILLSTONE UNIT 3 INITIAL EXAM (5/1-5/04) 06/28/2004 07/02/2004 Not Applicable 3 U01521 MILLSTONE UNIT 3 INITIAL EXAM (5/1-5/04) 07/19/2004 07/23/2004 Not Applicable 40801 - SELF ASSESSMENT AND CORRECTIVE ACTION 1 1 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 06/01/2004 07/31/2004 Other Routine 62801 - MAINTENANCE AND SURVEILLANCE 1 1 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 06/01/2004 07/31/2004 Other Routine 7112202 - PUB RAD SAFETY - RADWASTE 1 2, 3 IP 7112202 Radioactive Material Processing and Transportation 06/28/2004 07/02/2004 Baseline Inspections 95001 - WHITE PI - UNPLANNED SCRAMS 1 2 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 08/23/2004 08/27/2004 Supplemental Program 7111105T - TRIENNIAL FIRE PROTECTION INSPECTION-U3 4 3 IP 7111105T Fire Protection 07/26/2004 07/30/2004 Baseline Inspections 3 IP 7111105T Fire Protection 08/09/2004 08/13/2004 Baseline Inspections 71002 - LICENSE RENEWAL - SCOPING 6 2, 3 IP 71002 License Renewal Inspection 07/26/2004 07/30/2004 License Renewal Inspectio 7111111B - LO REQUAL PROGRAM UNIT 2 3 2 IP 7111111B Licensed Operator Requalification Program 10/04/2004 10/08/2004 Baseline Inspections 7111111B - LO REQUAL INSPECTION UNIT 3 4 3 IP 7111111B Licensed Operator Requalification Program 10/25/2004 10/29/2004 Baseline Inspections 7111112B - MAINTENANCE RULE 1 2, 3 IP 7111112B Maintenance Effectiveness 08/16/2004 08/20/2004 Baseline Inspections 7111107B - HEAT SINK U2 1 2 IP 7111107B Heat Sink Performance 08/30/2004 09/03/2004 Baseline Inspections TI-159 - DAVIS BESSE ACTION- GL 89-13 REVIEW 4 2 IP 2515/159 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related Equipment 08/30/2004 09/03/2004 Safety Issues 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 7 2, 3 IP 7111401 Exercise Evaluation 09/13/2004 09/17/2004 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 09/13/2004 09/17/2004 Baseline Inspections 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/13/2004 09/17/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Millstone 08/30/2004 10:36:38 Inspection / Activity Plan Report 22 07/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71002 - LICENSE RENEWAL - AGING MGMT 7 2, 3 IP 71002 License Renewal Inspection 09/13/2004 09/17/2004 License Renewal Inspectio 2, 3 IP 71002 License Renewal Inspection 09/27/2004 10/01/2004 License Renewal Inspectio 3/21 EXM - UNIT 2 OPERATOR LICENSING INITIAL EXAM 3 2 U01535 MILLSTONE, UNIT 2 INITIAL EXAM (12/1-5/04) 02/14/2005 02/18/2005 Not Applicable 2 U01535 MILLSTONE, UNIT 2 INITIAL EXAM (12/1-5/04) 03/21/2005 03/25/2005 Not Applicable 7112203 - PUB RAD SAFETY - REMP 1 2, 3 IP 7112203 Radiological Environmental Monitoring Program 10/25/2004 10/29/2004 Baseline Inspections 7111121 - U2 SSDI 6 2 IP 7111121 Safety System Design and Performance Capability 11/01/2004 11/05/2004 Baseline Inspections 2 IP 7111121 Safety System Design and Performance Capability 11/15/2004 11/19/2004 Baseline Inspections 7111107B - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 02/07/2005 02/11/2005 Baseline Inspections 7111108P - INSERVICE INSPECTION - U2 3 2 IP 7111108P Inservice Inspection Activities - PWR 04/11/2005 04/15/2005 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 2 IP 7112102 ALARA Planning and Controls 05/09/2005 05/13/2005 Baseline Inspections 71111.05 - TRIENNIAL FIRE PROTECTION INSPECTION-U2 3 2 IP 7111105T Fire Protection 05/23/2005 05/27/2005 Baseline Inspections 2 IP 7111105T Fire Protection 06/06/2005 06/10/2005 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 2, 3 IP 7112102 ALARA Planning and Controls 08/08/2005 08/12/2005 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/08/2005 08/12/2005 Baseline Inspections 7111117B - MODS & 50.59 U2/3 1 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/15/2005 08/19/2005 Baseline Inspections 2, 3 IP 7111117B Permanent Plant Modifications 08/15/2005 08/19/2005 Baseline Inspections 7111121 - SSDI - U3 6 3 IP 7111121 Safety System Design and Performance Capability 08/29/2005 09/02/2005 Baseline Inspections 3 IP 7111121 Safety System Design and Performance Capability 09/12/2005 09/16/2005 Baseline Inspections 7112101 - OCC RAD SAFETY - ACCESS 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 09/05/2005 09/09/2005 Baseline Inspections 71114 - EP PROGRAM INSP & PI VERIFICATION 1 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/12/2005 09/12/2005 Baseline Inspections 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/12/2005 09/12/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Millstone 08/30/2004 10:36:38 Inspection / Activity Plan Report 22 07/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71114 - EP PROGRAM INSP & PI VERIFICATION 1 2, 3 IP 71151 Performance Indicator Verification 09/12/2005 09/12/2005 Baseline Inspections 2, 3 IP 7111402 Alert and Notification System Testing 09/12/2005 09/16/2005 Baseline Inspections 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 09/12/2005 09/16/2005 Baseline Inspections 7111108P - INSERVICE INSPECTION - U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/17/2005 10/21/2005 Baseline Inspections 7111111B - LO REQUAL PROGRAM INPSECTION 2 3 IP 7111111B Licensed Operator Requalification Program 11/07/2005 11/11/2005 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 1 2, 3 IP 71152B Identification and Resolution of Problems 02/13/2006 02/17/2006 Baseline Inspections 2, 3 IP 71152B Identification and Resolution of Problems 02/27/2006 03/03/2006 Baseline Inspections 7112101 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/27/2006 03/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.