ML13022A407: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/14/2013
| issue date = 01/14/2013
| title = Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17)
| title = Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17)
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  

Revision as of 08:55, 22 June 2019

Third 10-Year Interval, Second Period: Owner'S Activity Report for Unit 2 Refueling Outage 17 (U2R17)
ML13022A407
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/14/2013
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06646-TNW/RKR/CJS
Download: ML13022A407 (5)


Text

10 CFR 50.55a Palo Verde Nuclear Generating Station A subsidiary of Pinnacle West Capital Corporation Thomas N. Weber Department Leader Tel. 623-393-5764 Regulatory Affairs Fax 623-393-5442 Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06646-TNW/RKR/CJS January 14, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Second Period: Owner's Activity Report for Unit 2 Refueling Outage 17 (U2R17)Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 17 (U2R1 7). The outage ended on November 9,2012.No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Robert K. Roehler, Licensing Section Leader, at (623)393-5241.

Sincerely, bLýý 4.W lot TNW/RKR/CJS/hsc

Enclosure:

Unit 2 Seventeenth Refueling Outage Owner's Activity Report, Report U2R17 cc: E. E. Collins Jr.L. K. Gibson M. A. Brown NRC Region IV Regional Administrator NRC NRR Project Manager (send electronic and paper)NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Aec34v7 Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde 0 San Onofre 0 South Texas
  • Wolf Creek ENCLOSURE Unit 2 Seventeenth Refueling Outage Owner's Activity Report Report U2R17 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 2R17 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 2 (if applicable)

Commercial service date: Sep 19, 1986 Refueling Outage No.: 17 Current inspection interval Current inspection period _ISI, RR and Pressure Test = 3rd Interval, IWE & IWL* = 2nd Interval (1`, 2 nd, 3 u, 4 tM, other)ISI, RR, Pressure Test and IWE = 2nd Period, IWL* = 1st Period (1S, 2, V3)Edition and Addenda of Section Xl applicable to the inspection plans * = 2001 Ed, 2003 Ad., IWL = 2007 Ed. 2008 Ad Date and revision of inspection plans ISI=9/14/11, R 2, Pres Test=7/20/12, R 3, IWE=3/24/09, R 0, IWL = 11/8/12 R 1 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans 2001 Edition through 2003 Addenda Code Cases used: N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R17 conform to the requirements of Section XI.(refueling outage number)Bayless, John Digitally signed by Bayless, John DN: cn=Bayless, John D(Z07652)D (Z076 52) ..- Reason: I am approving this document Signed D 7" Date: 2013.01.09 13:33:49 -07'00' Date: Jan 9, 2013 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSBCT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Digitally signed by Hogstrom, Hogstrom, Robert(YH2450)

DN: cn=Hogstrom, Robert Robert (YH2450)- (YH2450)-" Date: 2013.01.09 13:47:09 -07'00'D231Commissions NB 9685 "A, N, I, C" Az 264 (Inspector's Signature)

National Board, State, Province, and Endorsements Date: Jan 9, 2013 PV-E0796 V.r 1 Palo Verde Nuclear Generating Station Owners Activity Report -Unit 2 Refueling Outage 17 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description None ......2 Palo Verde Nuclear Generating Station Owners Activity Report -Unit 2 Refueling Outage 17 Table 2 Abstract of repair/replacement activities required for continued service Code Class Item Description Date Repair/Replacement Description of Work Completed Plan Number 2 2PSGEL01 3 -Feedwater Header to Steam Generator A Replace line due to Flow Accelerated Corrosion Prediction 11/02/12 Work Order # 3821198 2 2PSIAL070

-Shutdown Cooling to RC Loop Replace weld due to leakage .10/10/12 Work Order # 4262191 3 2MDGAE04 -Diesel Generator A Lube Oil Cooler Weld repair of corroded area(s) due to coating breakdown 09/19/12 Work Order # 3933351 3 2MDGAF05 -Diesel Generator A Exhaust Silencer Replace tack welds 09/12/12 Work Order # 4177414 3 2MDGBE05 -Jacket Water Cooler for DG B Weld repair of corroded area(s) due to coating breakdown 08/31/12 Work Order # 3908885 3 2PDFAL005

-Diesel Fuel Oil Storage Tank to Day Tank Defect removed by grinding 09/14/12 Work Order # 4246269 3 2PSPBL105

-Spray Pond to Diesel Generator Cooling Water Replace pipe spool due to corrosion.

08/31/12 Work Order # 3393706 3