Line 3: |
Line 3: |
| | issue date = 06/30/2014 | | | issue date = 06/30/2014 |
| | title = June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS | | | title = June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS |
| | author name = Balazik M F | | | author name = Balazik M |
| | author affiliation = NRC/NRR/JLD | | | author affiliation = NRC/NRR/JLD |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000261 | | | docket = 05000261 |
| | license number = | | | license number = |
| | contact person = Balazik M F, NRR/JLD, 415-2856 | | | contact person = Balazik M, NRR/JLD, 415-2856 |
| | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs |
| | page count = 20 | | | page count = 20 |
Revision as of 11:54, 21 June 2019
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24143A0612024-05-22022 May 2024 NRC Presentation Slides for Topical Reports to Support SLR (5-22-24 Public Meeting) V2 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12331A1782012-11-26026 November 2012 Meeting Slides Re GSI-191 Strainer Fiber Bypass Test Plan Slides for H. B. Robinson Unit 2 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1108908992011-03-30030 March 2011 Attendance List of 03/24/11 Meeting Regarding Annual Assessment of H.B. Robinson Steam Electric Plant ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML1006203162010-03-10010 March 2010 Summary of Meeting with Progress Energy Carolina, Inc. to Discuss Issues Identified During NRC Staff'S Review of H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Responses ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. ML0716505352007-05-21021 May 2007 Enclosure - Slides for NRC CY2006 Annual Assessment Meeting ML0611402602006-04-0404 April 2006 Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides ML0511004362005-03-24024 March 2005 NRC CY2004 Annual Assessment Meeting - Robinson - Hartsville, South Carolina, March 24, 2005 ML0436402692004-12-0909 December 2004 Progress Energy, Meeting Briefing of 12/9/04, Fire Protection Program ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0410600042004-03-30030 March 2004 Presentation of NRC CY2003 Annual Assessment Meeting for H.B. Robinson 2024-05-22
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24143A0612024-05-22022 May 2024 NRC Presentation Slides for Topical Reports to Support SLR (5-22-24 Public Meeting) V2 ML24136A2482024-05-22022 May 2024 NRC Presentation Slides for Topical Reports to Support SLR (5-22-24 Public Meeting) ML24134A0242024-05-22022 May 2024 Duke Presentation Slides Robinson-2 5-22-24 (Trs) ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23087A2922023-04-12012 April 2023 2022 Annual Assessment Meeting ML22301A1662022-09-29029 September 2022 Presentation 4 - Recent Biennial PI&R Team Inspection Insights ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22257A2392022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22151A2652022-05-31031 May 2022 Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22083A1072022-03-30030 March 2022 Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML21053A0472021-02-25025 February 2021 Duke Energy Pre-Submittal Meeting - February 25, 2021 - H. B. Robinson 3rd Interval Containment ISI Relief Request ML20132A0002020-05-11011 May 2020 EOC Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML16105A3342016-04-20020 April 2016 H. B. Robinson Steam Electric Plant, Unit 2 - April 20, 2016, Duke Energy Presentation for 24-Month Fuel Cycle Pre-submittal Meeting (CAC No. MF7503) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML11102A0052011-04-12012 April 2011 Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1032006182010-11-16016 November 2010 Public Meeting Summary - Category One - Regulatory and Enforcement Conference Meeting (Robinson) ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. 2024-05-22
[Table view] |
Text
Near-term Task Force Recommendation21Seismic Recommendation 2.1 Seismic Hazard Evaluation Duke Ener gy gy June 30, 2014 ReferencesforMeetingReferences for Meeting*Licensee Presentation Slides
-ML14181A032
- NRC Presentation Slides -ML141181A078
- Public Meeting Agenda -ML14167A164MtiFdbkF(tffb@)
- M ee ti ng F ee db ac k F orm (reques t from m fb@nrc.gov) *May 9, 2014, NRC letter regarding Seismic Screening and Prioritization Results for central and eastern US Licensees(ML14111A147)
- May 21, 2014, NRC memo providing preliminary staff groundmotionresponsespectraforcentralandground motion response spectra for central and eastern Licensees(ML14136A126)
- Meeting Summary to be issued within 30-day MeetingIntroductionMeeting Introduction Purpose: support information exchange and begin dialog to have ddifhfhidiffcommon un derstan ding o f t he causes o f t h e pr i mary differences between the preliminary NRC and licensee seismic hazard resultsBackground
- NRCandlicenseeseismichazardrequireresolutionBackground
- NRC and licensee seismic hazard require resolution to support a final seismic screening decision and to support related follow-on submittalsOutcomes:
- Begin NRC and licensee resolution to support regulatory decisionsanddevelopmentofseismicriskevaluations,as decisions and development of seismic risk evaluations, as appropriate
- Establish resolution path, including timelines and identification of potential information needs Look-ahead:
lPotentia l Next Steps
- NRCwillconsiderthemeetinginformationNRC will consider the meeting information
- Potential paths:Libitltliftibd-Li censee su b m it s supp l emen t a l i n f orma ti on b ase d on public meeting dialogNRCstaffissuesarequestforinformation
-NRC staff issues a request for information
-Licensee sends a revision or supplement to the seismichazardreport seismic hazard report*NRC completes screening review and issues thfilidtitiltt th e fi na l screen i ng d e t erm i na ti on l e tt er R 2.1-Seismic Hazard Analysis H.B. Robinson NPP Vladimir GraizerSarahTabatabaiSarah TabatabaiJune 30, 2014 5
6 160HB Robinson GMRS 1.40 1.60GMRS Duke SSE appl 1.00 1.20 NRC GMRS NRC Preliminary 0.60 0.80 SA (g)020 0.40 S 0.00 0.200.1110100FreqencH 7 Freq u ency, H zPreliminary run was performed without kappa.
PrimaryDifferencesPrimary Differences
'srevisionofCEUS
-SSC Impact of licensees revision of CEUS SSC *Thickness of Alluvium layer
- NRCVsprofilesbasedonregional
- NRC Vs profiles based on regional measurements of Middendorfformation
- LargeepistemicuncertaintyinLicensee
'sVs*Large epistemic uncertainty in Licensees Vs profiles-BasisforP3shearwavevelocities?
Basis for P3 shear wave velocities?
- Use of EPRI Rock (M3) for Lower Base Case VelocityProfile(P2)Velocity Profile (P2)8 RevisionofSourceModelRevision of Source Model*50.54(f) letter specified use of CEUS-SSC model withoutneedforsitespecificgeologicinvestigations without need for site specific geologic investigations
- Section 2.2 of SPID states that use of CEUS-SSC "as publishedisappropriate "published is appropriate
- CEUS-SSC conducted as Level 3 SSHAC process and endorsedbyNRCendorsed by NRC*Per NUREG-2117 update of SSHAC 3 would need to beperformedasformalSSHACprocessandrequire be performed as formal SSHAC process and require subsequent NRC review
- NRC unable to evaluate im pact of u pdate without pprock hazard curves for Robinson 9
Site Location: Southwest shore of Lake Robinson in northwest Darlington County, South Carolina 10 Comparison of Site Response Profiles H.B. RobinsonControl PointDepth toShear-Wave Velocity Reference G/G max and DampingLicenseeNRC StaffLicenseeNRC StaffLicenseeNRC StaffGround Ground 460 ft 460 ftAlluvium Alluvium (EPRI Surface; above
- 1) 56 ft Alluvium, surface above
- 1) 30 ft Alluvium, (randomiz ed +-93 ft) (randomiz ed with Sig=0.2)(M1=EPRI Soil, M2=Peninsular, M3=EPRI Soil;
equally Soiland Peninsular; equally
weighted);
MiddendorfFm
- 2) 404 ft Middendorf
Fm.,
- 3) Pre-2) 430 ft Middendorf
Fm.,
- 3) Pre-weighted); MiddendorfFm (M1=EPRI Soil, M2=Peninsular, (EPRI Soil, and Peninsular; equally
weighted);
Total kappa =
Cambrian crystalline
rock Cambrian crystalline
rock M3=EPRI Rock; equally weighted);
Hard rock kappa 0.0145 s.
Hard rock kappa =
0.006 s= 0.006 s*Control point defined at the top of alluvium FSAR Appendix 2.5E, letter from Dr. Housner)
- Licensee considered the following modifications from MACTEC (URS, 2012):Allilli56 ftitdf30 ft(ifidithFSAR)All uv i a l layer i s 56 ft i ns t ea d o f 30 ft (as spec ifi e d i n th e FSAR)11 VsProfileDevelopment Vs Profile Development
- Section 2.5.4.1 (p a g e 2.5.4-1) of UFSAR states: (pg)"These sediments are comprised of about 30 ftof surface alluvium over 430 ftof Middendorfformation"formation*Figure 2.5.1-2 of UFSAR also has 30 ftfor alluvium layer and Vs=3600 ft/sec for the Middendorfformation
- Odumet al., 2003 estimates Vs=2840 ft/sec at 89 ftdepthfor Middendorf ft depth for Middendorf
- NRC assumed a factor of 1.29 for epistemic uncertaint y to develo p base case profilesypp 12 Site Profile from FSARTable 1. S-wave velocities at H. B. Robinson NPP (from UFSAR Figure 2.5.1-2).
Depth to Bottom (ft)Thickness (ft)Geologic Formation Assigned S-wave velocity (ft/s)Unit weight (pcf)Comment ()()3030Alluvium750125Moderatelycompact alluvial sandsand gravels. Develo p ed from gpthe MiddendorfFm.460430 Middendorf Formation3600130Sands (compact), siltyand sandy clay (firmto
hard), sandstoneand
)siltstone. Piedmont Crystalline Basement10000170 13 00200040006000800010000Shear-Wave Velocity (ft/sec)
AlluviumSCDOT Geotechnical Design Manual (2008):Information from other sites:
100Dense sand and
gravelVs= 650 to 1,350 ft/s 200 n t (ft)300 w Control Poi nMiddendorfFm. (Tuscaloosa Fm.)Tuscaloosa Fm. Vs=2840 ft/s at 89 ft(Odumet al.,
2003)400 Depth Belo w 500 NRC-BC NRC-LBC 600 NRC-UBC Licensee-BC Licensee-LBC Licensee-UBC 14 KappaDevelopmentKappa Development
's eqntoestimatethetotalNRC used Campbells eqn to estimate the total site kappa
-Usingthicknessof460 ftgiveskappavalueof85
-Using thickness of 460 ftgives kappa value of 8.5 msecfor soil
-Totalsitekappais145 msecTotal site kappa is 14.5 msec-Effective kappa is about 11 msec(for middle base caseprofile)case profile)15 Kappa check Depth (ft)
Thickness (ft)BC VsLBC VsUBC VsG2/D2 Small Strain DampingQ Kappa BC Kappa LBC Kappa UBCG2/D2 Small Strain DampingQKappa BC Kappa LBC Kappa UBC20.0020.0010007741292E soil 0-201.42934.990.00060.00070.0004Pen 0-501.0647.170.000420.000550.0003330.0010.0010007741292E soil 20-501.14243.780.00020.00030.0002Pen 0-501.0647.170.000210.000270.0001650.0020.00349927084521E soil 20-501.14243.780.00010.00020.0001Pen 0-501.0647.170.000120.000160.0000970.0020.00350927154534E soil 50-120150.000.00010.00010.0001Pen 50-5000.683.330.000070.000090.0000590.0020.00351927234547E soil 50-120150.000.00010.00010.0001Pen 50-5000.683.330.000070.000090.00005110.0020.00352927314560E soil 50-120150.000.00010.00010.0001Pen 50-5000.683.330.000070.000090.00005120.0010.00354127414576E soil 50-120150.000.00010.00010.0000Pen 50-5000.683.330.000030.000040.00003140.0020.00354127414576E soil 120-2500.85758.340.00010.00010.0001Pen 50-5000.683.330.000070.000090.00005190.0050.00356127564602E soil 120-2500.85758.340.00020.00030.0002Pen 50-5000.683.330.000170.000220.00013240.0050.00358627754634E soil 120-2500.85758.340.00020.00030.0002Pen 50-5000.683.330.000170.000220.00013250.0010.00361127954666E soil 120-2500.85758.340.00000.00010.0000Pen 50-5000.683.330.000030.000040.00003290.0040.00361127954666E soil 250-5000.78663.610.00020.00020.0001Pen 50-5000.683.330.000130.000170.00010340.0050.00363628144699E soil 250-5000.78663.610.00020.00030.0002Pen 50-5000.683.330.000170.000210.00013390.0050.00366128334731E soil 250-5000.78663.610.00020.00030.0002Pen 50-5000.683.330.000160.000210.00013460.0070.00369128574770E soil 250-5000.78663.610.00030.00040.0002Pen 50-5000.683.330.000230.000290.000180.00290.00370.00220.00210.00270.0016 16H (ft) =460Kappa "budget" =0.0145 kappa BC=0.0120 kappa LBC=0.0113 kappa UBC=0.0126 Comparison of Duke and NRC SAFs from Base ProfilesandEPRIsoilrelationsProfiles and EPRI soil relations.450 HB_Robinson SAF 3.50 4.00 4.50 M1PM1P+sigM1P-sigBase prof, EPRI, bed sig=0.2 EPRI+sig EPRI i 2.50 3.00 n EPRI-s i g 1.00 1.50 2.00 A mplificatio n 0.00 0.500.1110100 A 17Frequency, Hz 1.60HB Robinson GMRS 1.40GMRS DukeSSEappl 1.00 1.20 SSE appl NRC GMRS060 0.80 SA (g)0.40 0.60 S 0.00 0.20 01 1 10 100 0.1 1 10 100Frequency, Hz 18 PrimaryDifferencesPrimary Differences
'supdateofCEUS
-SSC Impact of licensees update of CEUS SSC *Thickness of Alluvium layer
- NRCVsprofilesbasedonregional
- NRC Vs profiles based on regional measurements of Middendorfformation
- LargeepistemicuncertaintyinLicensee
'sVs*Large epistemic uncertainty in Licensees Vs profiles-BasisforP3shearwavevelocities?
Basis for P3 shear wave velocities?
- Use of EPRI Rock (M3) for Lower Base Case VelocityProfile(P2)Velocity Profile (P2)19 ReferencesReferences
- H. B. Robinson Updated FSAR.
- URS , 2012.,*Assessment of Seismic Hazard at 34 U.S, Nuclear Plant Sites. EPRI Final Report, August 2008. 1016736.
- SeismicEalationGidanceScreeningPrioritiationand
- Seismic E v al uation G u idance. Screening , Prioriti zation and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic. 2013 ThilRt T ec h n i ca l R epor t.*USGS OFR 03-043. OdumJ.K. et al., Near-Surface S-wave and P-wave Velocities of Primary Geological Formations on the Piedmont and Atlantic Coastal Plain of South Carolina, USA . 2003.
- GEOTECHNICAL EARTHQUAKE E NGINEERING. SCDOT Geotechnical Design Manual.2008 Manual. 2008 20