| issue date = 08/19/1997
| issue date = 08/19/1997
| title = LER 97-002-00:on 970720,34.5 Kv Offsite Power Circuit 751 Was Lost.Caused by Automatic Actuation of B Emergency DG Due to Undervoltage on Safeguards Buses 16 & 17.Offsite Power Restored to Safeguards Buses 16 & 17.W/970819 Ltr
| title = LER 97-002-00:on 970720,34.5 Kv Offsite Power Circuit 751 Was Lost.Caused by Automatic Actuation of B Emergency DG Due to Undervoltage on Safeguards Buses 16 & 17.Offsite Power Restored to Safeguards Buses 16 & 17.W/970819 Ltr
| author name = MECREDY R C, ST MARTIN J T
| author name = Mecredy R, St Martin J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244

Revision as of 03:13, 19 June 2019

LER 97-002-00:on 970720,34.5 Kv Offsite Power Circuit 751 Was Lost.Caused by Automatic Actuation of B Emergency DG Due to Undervoltage on Safeguards Buses 16 & 17.Offsite Power Restored to Safeguards Buses 16 & 17.W/970819 Ltr
ML17264A994
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/19/1997
From: Mecredy R, St Martin J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-97-002, LER-97-2, NUDOCS 9708270015
Download: ML17264A994 (16)


Text

0 CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9708270015 DOC.DATE: 97/08/19 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAPE AUTHOR AFFILIA.ION ST.HARTIN,J.T.

Rochester Gas&Electric Corp.MECREDY,R,C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISS ING, G.

SUBJECT:

LER 97-002-00:on 970720,34.5 KV offsite.power circuit 751 was lost.Caused by automa;ic actua" ion of"B" emergency DG due ro under;oitage on safeguards buses 16&17.0ffsir.e power restored to safeguards buses 16&17.W/970819 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:ITR J ENCI L SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

c'5000244 6 INTERNAL: RECIPIENT ID CODE/NAME PD1-1 PD ILE CENTE NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN1 FILE 01 COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.

AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R D EXTERNAL: L ST LOBBY WARD NOAC POORE,W.NRC PDR 1 1 1 1 1 1 LITCO BRYCE,J H NOAC QUEENER,DS NUDOCS FULL TXT 1 1 1 1 1 1 C U N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

AND o~("i v.i gqg clap('r ip+~/~i~<<l: "~~wv~hp'g~co'E)r~<v(+of CQc<of 01;s August 19, 1997 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555

Subject:

LER 97-002, Loss of 34.5 KV Offsite Power Circuit 751, Due to External Cause, Results in Automatic Start of"B" Emergency Diesel Generator R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(iv), which requires a report of,"Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF), including the reactor protection system (RPS)", the attached Licensee Event Report LER 97-002 is hereby submitted.

This event has in no way affected the public's health and safety.Very truly yours, Robert C.Mecredy xc: Mr.Guy S.Vissing (Mail Stop 14B2)PWR Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 97082700i5 9708i9 PDR ADQCK 05000244 S PDR lllllllllilllilllllllllllllillllllll

~l NRC FORM 366 (4.95)U.S.NUCLEAR REGULATORY COMMISSIO LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)APPROVED BY OMB No.3150-0104 EXPIRES 04/30/96 ESTIMATED BURDEN PER RESPONSE To COMPLY WITH THIS MANDATORY INFORMATION COLLECTION REQUEST: 50.0 HRS.REPORTED LESSONS LEARNED ARE INCORPORATED INTO THE LICENSING PROCESS AND FED BACK To INDUSTRY.FORWARD COMMENTS REGARDING BURDEN ESTIMATE To THE INFORMATION AND RECORDS MANAGEMENT BRANCH IT-6 F33).U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-000t, AND To THE PAPERWORK REDUCTION PROJECT FACILITY NAME III R.E.Ginna Nuclear Power Plant OOCKEf NUMBER I2)05000244 PAGE I3)1 OF 8 TITLE I4I Loss of 34.5 KV Offsite Power Circuit 751, Due to External Cause, Results in Automatic Start of"B" Emergency Diesel Generator EVENT DATE (5)LER NUMBER (61 REPORT DATE (7l OTHER FACILITIES INVOLVED (Bl DOCKET NUMBER MONTH DAY 07 20 YEAR 97 SEQUENTIAL REVISION NUMBER NUMBER 97-002-00 MONTH 08 DAY 19 YEAR 97 FACILITY NAME FACILITY NAME DOCKET NUMBEII OPERATING MODE (9)POWER LEVEL (10)100 THIS REPORT IS SUBMITTED PUR 20.2201(b) 20.2203(al(1) 20.2203(al(2)(i) 20.2203(a)(2)(iil 20.2203(a)

(2)(iii)SUANT TO THE REQUIREMENTS OF 10 CFR E: (Check one or more)(11)20.2203(a)(2)(v) 50.73(a)(2)(viii)50.73(a)(2)(i) 50.73(a)(2)(x) 50.73(a)(2)(ii) 20.2203(a)

(3)(i)73.71 50.73(a)(2)(iii)20.2203(a)(3)(ii)

OTHER X 50.73(al(2)(iv) 50.73(a)(2)(v)20.2203(a)(4) 50.36(c)(1)

Specity in Abstract below or in NRC Foim 366A 20.2203(a)

(2)(iv)50.36(c)(2)

LICENSEE CONTACT FOR THIS LER (12)50.73(a)(2)(vii)

NAME TELEPHONE NUMBER (Ineiude Ares Codei John T.St.Martin-Technical Assistant (716)771-3641 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN TH(S REPORT (13l CAUSE SYSTEM COMPONENT MANUFACTURER To NPRDS CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE To NPRDS EA CBL5 XOOO N SUPPLEMENTAL REPORT EXPECTED (14)YES (It yes, complete EXPECTED SUBMISSION DATE).X No EXPECTED SUBMISSION DATE (15)MONTH DAY YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximatelY 15 single.spaced typewritten lines)(16)On July 20, 1997, at approximately 0043 EDST, the plant was in Mode 1 at approximately 100%steady state power.Power from Circuit 751 (34.5 KV offsite power source)was lost.This resulted in deenergization of 4160 Volt bus 12B and"B" train 480 Volt safeguards buses 16 and 17.The"B" Emergency Diesel Generator (D/G)automatically started and reenergized buses 16 and 17 as per design.There was no change in reactor power or turbine load.Immediate corrective action was to perform the appropriate actions of Abnormal Procedure AP-ELEC.1 (Loss of 12A And/Or 12B Buses)to stabilize the plant and to verify that the"B" Emergency D/G had started and reenergized buses 16 and 17.The cause of the loss of power from Circuit 751 was determined to be a phase-to-phase fault caused by a raccoon.This fault caused the insulators on an offsite pole for Circuit 75'l to fail.This event is NUREG-1022 Cause Code (C).Corrective action to prevent recurrence is outlined in Section V.B.NRC FORM 366 (4.95)

NRC FORM 366A (4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER I6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 97-,002-00 PAGE I3)2 OF 8 TEXT llf more space is required, use additional copies of NRC Form 366A/I17)PRE-EVENT PLANT CONDITIONS On July 20, 1997, at approximateiy 0043 EDST, the plant was in Mode 1 at approximately 100%steady state reactor power.There were no significant activities in progress.The offsite power configuration to the plant was in the alternate"50%/50%" offsite power lineup: Circuit 751 (34.5 KV offsite power source)was supplying power to the"B" train 480 Volt safeguards buses 16 and 17 through 34.5 KV to 4160 Volt transformer 12A (12A transformer), via circuit breaker 52/12AX, to 4160 Volt bus 12B, and through the safeguards bus 4160 Volt to 480 Volt transformers 16 and 17.Circuit 767 (34.5 KV offsite power source)was supplying power to the"A" train 480 Volt safeguards buses 14 and 18 through 34.5 KV to 4160 Volt transformer 12B (12B transformer), via circuit breaker 52/12BY, to 4160 Volt bus 12A, and through the safeguards bus 4160 Volt to 480 Volt transformers 14 and 18.See the attached sketch of the offsite power distribution system.II.DESCRIPTION OF EVENT A.DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:

July 20, 1997, 0043 EDST: Event date and time.July 20, 1997, 0043 EDST: Discovery date and time.July 20, 1997, 0044 EDST: Control Room operators verify the"B" Emergency Diesel Generator (D/G)operation and that safeguards buses 16 and 17 are energized.

July 20, 1997, 0114 EDST: Safeguards buses 16 and 17 were transferred to Circuit 767 from the"B" Emergency D/G.July 20, 1997, 0124 EDST: The"B" Emergency D/G was stopped and realigned for auto standby.July 20, 1997, 1228 EDST: Circuit 751 was declared operable.July 20, 1997, 1232 EDST: Offsite power configuration was restored to the alternate"50%/50%" lineup.NRC FORM 366A I4.95)

NRC FORM 366A I4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION

~FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER IB)PAGE I3)YEAR SEQUENTIAL REVISION NUMBER NUMBER 3 OF 8 97-002-00 TEXT Ilf more spaceis required, use additional copies of NRC Form 366AI I17)EVENT: On July 20, 1997, at approximately 0043 EDST, the plant was in Mode 1 at approximately 100%steady state full power.The Control Room operators received numerous Main Control Board annunciator alarms.Among these alarms were L-20 (12A XFMR OR 12A BUS TROUBLE), J-5 (¹11 OR¹12 TRANSFORMER OUT OF SYNCH), J-7 (480V MAIN OR TIE BREAKER TRIP), J-9 (SAFEGUARD BREAKER TRIP), and J-32 (EMERGENCY DIESEL GEN 1B PANEL).The Control Room operators determined that the following events had occurred: Circuit 751 (34.5 KV offsite power source)was deenergized"B" train 480 Volt safeguards buses 16 and 17 had lost their power supply from 4160 Volt bus 12B (buses 16 and 17 had been momentarily deenergized)

The"B" Emergency D/G had automatically started and was tied to safeguards buses 16 and 17 The Control Room operators verified that reactor coolant system temperature and pressure were stable, and that there was no change in reactor power or turbine load.They performed the appropriate actions of Abnormal Procedure AP-ELEC.1 (Loss of 12A And/Or 12B Buses)to stabilize the plant.They verified that the"B" Emergency D/G was operating and that safeguards buses 16 and 17 were energized.

The Control Room operators observed that Circuit 751 and bus 128 displayed zero (0)voltage.The loss of power from Circuit 751 resulted in undervoltage on safeguards buses 16 and 17, and the"B" Emergency D/G automatically started as per design and reenergized these buses.Energy Operations personnel also identified the loss of power from Circuit 751, and promptly notified Ginna Control Room operators of the loss of power from Circuit 751.The Control Room operators referred to Equipment Restoration procedure ER-ELEC.1 (Restoration of Offsite Power)to restore offsite power to 4160 Volt bus 12B and 480 Volt safeguards buses 16 and 17.The Control Room operators closed 4160 Volt circuit breaker 52/12BX to energize bus 12B from Circuit 767, via the 12B transformer, at approximately 0053 EDST.At approximately 0114 EDST, safeguards buses 16 and 17 were transferred to Circuit 767 from the"B" Emergency D/G.(Circuit 767 had remained in operation, supplying"A" train 480 Volt safeguards buses 14 and 18, throughout the event.)At approximately 0124 EDST on July 20, the"B" Emergency D/G was stopped and realigned for auto standby.Energy Operations subsequently contacted the Control Room operators and confirmed that the loss of power from Circuit 751 occurred when a raccoon climbed an offsite pole for Circuit 751 and caused a phase-to-phase fault.The fault caused insulators on the pole to fail.(The raccoon perished.)

NRC FORM 366A I4.95)

NRC FORM 366A (4.95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME I1)DOCKET LER NUMBER IB)PAGE I3)R.E.Ginna Nuclear Power Plant 05000244 YEAR SEQUENTIAL REVISION NUMBER NUMBER 4 OF 8 97-002-00 TEXT (If more space is reqtrired, tjse additional copies of NRC Form 366AI I17)Circuit 751 was reenergized and declared operable at approximately 1228 EDST on July 20.Circuit 751 was lined up to supply plant loads, and the offsite power configuration was restored to the alternate"50%/50%" offsite power lineup at approximately 1232 EDST.C.INOPERABLE STRUCTURES, COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE EVENT: None D.OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None E.METHOD OF DISCOVERY'his event was immediately apparent due to numerous Main Control Board alarms and other indications in the Control Room when power from Circuit 751 was lost.F.OPERATOR ACTION: Following the undervoltage condition on buses 16 and 17, the"B" Emergency D/G automatically started and reenergized these buses.The Control Room operators performed the appropriate actions to verify that the"B" Emergency D/G was operating and safeguards buses 16 and 17 were energized.

The Control Room operators manually restarted the"B" and"C" containment recirculation fans, which had tripped due to the loss of bus 16.The momentary loss of power to buses 16 and 17 caused the trip of the common sample pump for monitoring of the containment (CNMT)atmosphere by channels R-10A (iodine), R-11 (particulate) and R-12 (noble gas).The Control Room operator manually restarted the common sample pump at approximately 0100 EDST.The Control Room operators restored offsite power (from Circuit 767)to buses 16 and 17, stopped the"B" Emergency D/G, and realigned it for auto standby.The Shift Supervisor notified highet supervision and the NRC Resident Inspector of the loss of offsite Circuit 751.Subsequently, the Shift Supervisor notified the NRC per 10 CFR 50.72 (b)(2)(ii), non-emergency four hour notification, at approximately 0317 EDST on July 20, 1997.NAC FOAM 366A I4 95)

NRC FORM 366A I4.95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER I6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 97-002-00 PAGE (3)5 OF 8 TEXT ilf more spece is required, use addi tionel copies of NRC Form 368A/I17)G.SAFETY SYSTEM RESPONSES:

AII safeguards equipment functioned properly.The"B" Emergency D/G automatically started due to the undervoltage condition on buses 16 and 17, displayed proper voltage and frequency, and reenergized safeguards buses 16 and 17 to supply emergency power.Running containment recirculation fans on bus 16 tripped as designed and were manually restarted as needed to restore normal cooling to the Containment.

Running service water pumps on bus 17 tripped as designed and the pump selected for autostart started when power was restored to bus 17.III.CAUSE OF EVENT A.IMMEDIATE CAUSE: The automatic actuation of the"B" Emergency D/G was due to undervoltage on safeguards buses 16 and 17.I B.INTERMEDIATE CAUSE: The (jndervoltage on safeguards buses 16 and 17 was due to the loss of power from Circuit 751.C.ROOT CAUSE: The underlying cause of the loss of power from Circuit 751 was a phase-to-phase fault on Circuit 751.This fault occurred when a raccoon climbed an offsite pole for Circuit 751.The fault caused the insulators to fail.The insulator failure affected circuits at offsite Station 204 and tripped relays for Circuit 751, deenergizing Circuit 751.This event is NUREG-1022 Cause Code (C),"External Cause".This loss of power and subsequent start of an Emergency D/G does not meet the NUMARC 93-01,"Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants", definition of a"Maintenance Preventable Functional Failure".IV.ANALYSIS OF EVENT: This event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(iv), which requires a report of,"Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF), including the reactor protection system (RPS)", in that the starting of the"B" Emergency D/G was an automatic actuation of an ESF system.NRC FORM 366A (4 95)

,~

O NRC FORM 366A I4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.s.NUCLEAR REGULATORY COMMISSION FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER I6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 97-002-00 PAGE I3)6 OF 8 TEXT llf more space is required, use additional copies of NRC Form 366Al I17)An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:

There were no operational or safety consequences or implications attributed to the loss of Circuit 751 and start of the Emergency D/G because: o All reactor control and protection systems performed as designed.o The"B" Emergency D/G was available for operation and functioned as designed to reenergize"B" train safeguards buses 16 and 17.o While in this condition, the plant electrical power systems (offsite power sources and the Emergency D/Gs)remained within the requirements of the Ginna Station Improved Technical Specifications (ITS)Limiting Condition for Operation (LCO)Required Action 3.8.1.A.o Circuit 767 remained in operation supplying power to the"A" train safeguards buses;subsequently, Circuit 767 was lined up to supply power to the"B" train safeguards buses also.o Radiation monitor channels R-10A, R-11, and R-12 were temporarily lost.The common sample pump was manually restarted within a few minutes.This response complied with the requirements of ITS LCO Required Action 3.3.5.B.1.

Based on the above, it can be concluded that the plant operated as designed, and that the public's health and safety was assured at all times.V.CORRECTIVE ACTION A..ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS o Offsite power was restored to safeguards buses 16 and 17 from Circuit 767, and the"B" Emergency D/G was stopped and realigned for auto standby.o Circuit 751 was cleared for use by Energy Operations, protective relays for Circuit 751 (at Station 204)were reset by Energy Operations, and Circuit 751 was reenergized and restored to operable status.ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:

Since this was an isolated occurrence, no corrective action is planned.NRc FORM 366A I4.95)

NRC FORM 366A<4-95)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant DOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 97-002-00 PAGE (3)TEXT llf more spaceis required, use additional copies of NRC Form 866A/(17)VI.ADDITIONAL INFORMATION A.FAILED COMPONENTS:

None 8.PREVIOUS LERs ON SIMILAR EVENTS: A similar LER event historical search was conducted with the following results: LERs91-002, 92-007,94-012, 95-006, and 95-007 were similar events with similar root causes (start of an Emergency D/G due to loss of offsite power from external causes).However, none of the external causes for these LERs was due to an animal.C.SPECIAL COMMENTS: None NRC FORM 366A<4-95)

0 NRC FORM 366A (4.95l LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant OOCKET 05000244 LER NUMBER (6)YEAR SEQUENTIAL REVISION NUMBER NUMBER 97-002-00 PAGE (3)8 OF 8 TEXT llf more speceis required, use edditionel copies of lVRC Form 366A1 (17))I 5>V I>>AS+Pc IOC SIAOCW Ill C II)I 5 A>I>AWINSSIIW IOA tttt)tt-121 Sf>IIIW ill~I ICIC)IC$2/15252 I)I I)IC$2/2)I I t llf~I)~CC M 2 A3 5fl WII~I)O)A,SCC IIN~IIOI I)O>2$I I I)\Cv M I CI Sf>WW ICWOfOWCC I)A)I,>N~IN IINI l tlICO I 1A>St/I 2CC Sl/tt5$/1 It>t~tSA/l Sl/I tOf$2/tttl/5 I)if Or/Milt/lt l)O CAAOW OCAAtO Oc/MIWll 22A IAAOW CO/ttO S2/OIS I)C/I~I 255 IC$2/M I)O/I 2$2/Ml)O/)O I ASS IC~IO~Wt$2/MIWI)St/OOSIWIS~IAW IC I f55 IC~2/O/II)A/I~I CSS IC OWOIIWCO Il SIAICW ftt>ICC~IN WO><tIOOSClr>

A3 5 IAICW SCWCCC WWOI>OCO I~~IN ACO>Atl>O)NIC>

II I IO IO~I II~SIAOCW SCWCC>Off>WCON II~IN Wtt A>WOSSC I~>SIAISW ftOICt~~>IN I tlOISSC I~I$1/MI 5/I I~I~IC Sl/OISI 5/I IC CCI~I OOICI OOS OOOWwfSW OACO IOOO fWO))CIS tNC I~St/Ml I/I IO I~IC 52/MII/ICC CCI A I AO 52/OUS I)/2)O I~IC Pg)CCWIWIOO~~>OI M lf Sl/OAWOC tCIC)IC$2/Of)It/1$C CCIO)Wl St/MIC/)IC t Slit IC Q)CAW>AIIW~$2/O/ill/)1$I~WC NAC FOAM 366A (4.95)