ML17353A819: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/18/1996
| issue date = 07/18/1996
| title = Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-250/96-06 & 50-251/96-06 on 960505-0615
| title = Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-250/96-06 & 50-251/96-06 on 960505-0615
| author name = PLUNKETT T F
| author name = Plunkett T
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 08:37, 18 June 2019

Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-250/96-06 & 50-251/96-06 on 960505-0615
ML17353A819
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/18/1996
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-185, NUDOCS 9607250153
Download: ML17353A819 (5)


See also: IR 05000250/1996006

Text

UA'l'E(90RY

REGULAT Y INFORMATION

DISTRIBUTION

YSTEM (RIDS)PLUNKETT,T.F.

Florida Power!'ight Co.RECIP.NAME

RECIPIENT'AFFILIATION

Document Control Branch (Document Control Desk)SUBJECT: Forwards response to NRC ltr re violations

noted in insp repts 50-250/96-06

6 50-251/96-06

on 960505-0615.

DISTRZBDTZON

CODE: ZE01D COPIES RECEIVED:LTR

l ENCL i SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response NOTES: ACCESSION NBR:9607250153

DOC.DATE: 96/07/18 NOTARIZED:

NO DOCKET FACIL:50-250

Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH NAME AUTHOR AFFILIATION

RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RAB

DEDRO NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAUPR TTC IL NTE FB NRR/DRPM/PERB

OE DIR RGN2 FILE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1~1 0 D 0 U N NOTE TO,ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17

Florida Power 5 Light Company, P.O.Box 14000, Juno Beach, FL 33408.0420

FPL JUL 3 8$996 L-96-185 10 CFR 2.201 U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3&4 Docket Nos.50-250/251

Reply to Notice of Violation NRC Ins ection Re ort 96-06 Florida Power 8 Light Company has reviewed the subject inspection

report and, pursuant to 10 CFR 2.201, the required response is attached.If there are any questions, please contact us.Very truly yours,.g+T.F.Plunkett President Nuclear Division Attachment

cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant 9607250l53

960718 PDR ADQCK 05000250~8 PDR an FPL Group company

Cr+,.Attachment

to L-96-85 Page 1 REPLY TO NOTZCE OF VXOLATXON RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 NRC Inspection

Report 96-06 FINDING"During an NRC inspection

conducted on May 5 through June 15, 1996, a violation of NRC requirements

was identified.

In accordance

with the"General Statement of Policy and Procedure for NRC Enforcement

Actions," NUREG-1600

the violation is listed below: Technical Specification 6.8.1 requires that written procedures

shall be established

in accordance

with Appendix A of Regulato-ry Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2, February 1978.Appendix A of Regulatory

Guide 1.33 section 8.b.(1)(q)

states that implementing

procedures

are required for each surveillance

test listed in the technical specifications, including emergen-cy power tests.Technical Specification 4.8.1.1.2.a.4

requires that each emergency diesel generator shall be demonstrated

operable by verifying that the diesel starts and accelerates

to rated conditions.

Once per 184 days, these conditions

shall be reached within 15 seconds after the start signal from normal conditions.

This requirement

was implemented

by procedures

3 and 4-0SP-023.1, Diesel Generator Operability

Test, sections 7.3 and 7.4, rapid start test.Contrary to the above, prior to May 21, 1996, and since initial.plant startup for Unit 3 and since the Dual Unit Outage for Unit 4, the 184 day rapid start test performed by procedures

3 and 4-OSP-023.1

was not performed from normal conditions

in that the diesel generator fuel priming pumps were operated prior to initiating

the diesel start signal.As a result, portions of the automatic start circuitry had not been demon-strated operable.Subsequent

testing of all four diesels without operating the fuel priming system was successful.

This is a Severity Level IV violation (Supplement

1)." RESPONSE TO FINDING Surveillance

Testing for Emergency Diesel Generato T e issues associated

with violation 96-06-02, including corrective

actions are contained within LER 250/96-08.

1.Florida Power S Light Company (FPL)concurs with the finding.~~2.On June 18, 1996, FPL submitted LER 250/96-08, Inadequate

rs.h