ML18054B359: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 5: | Line 5: | ||
| author name = | | author name = | ||
| author affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | author affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| addressee name = Purnell B | | addressee name = Purnell B | ||
| addressee affiliation = NRC/NRR/DORL/LPLIII | | addressee affiliation = NRC/NRR/DORL/LPLIII | ||
| docket = 05000010, 05000171, 05000219, 05000220, 05000244, 05000249, 05000254, 05000265, 05000277, 05000278, 05000317, 05000318, 05000352, 05000353, 05000373, 05000374, 05000410, 05000454, 05000455, 05000456, 05000457, 05000461, 07000650, 07200008, 07200015, 07200029, 07200037, 07200053, 07200068, 07200070, 07200073, 07201036 | | docket = 05000010, 05000171, 05000219, 05000220, 05000244, 05000249, 05000254, 05000265, 05000277, 05000278, 05000317, 05000318, 05000352, 05000353, 05000373, 05000374, 05000410, 05000454, 05000455, 05000456, 05000457, 05000461, 07000650, 07200008, 07200015, 07200029, 07200037, 07200053, 07200068, 07200070, 07200073, 07201036 | ||
| license number = DPR-016, DPR-019, DPR-025, DPR-029, DPR-030, DPR-044, DPR-050, DPR-056, DPR-070, DPR-075, MPF-039, NPF-011, NPF-018, NPF-037, NPF-062, NPF-066, NPF-072, NPF-077, NPF-085 | | license number = DPR-016, DPR-019, DPR-025, DPR-029, DPR-030, DPR-044, DPR-050, DPR-056, DPR-070, DPR-075, MPF-039, NPF-011, NPF-018, NPF-037, NPF-062, NPF-066, NPF-072, NPF-077, NPF-085 | ||
| contact person = Purnell B | | contact person = Purnell B, NRR/DORL,/LPLIII, 415-1380 | ||
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | ||
| page count = 9 | | page count = 9 |
Revision as of 20:55, 17 June 2019
ML18054B359 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle, 07201036, 07000650 ![]() |
Issue date: | 02/27/2018 |
From: | Exelon Generation Co, Exelon Nuclear |
To: | Blake Purnell Plant Licensing Branch III |
Purnell B, NRR/DORL,/LPLIII, 415-1380 | |
References | |
Download: ML18054B359 (9) | |
Text
NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate the TS Unit Staff Qualification ANSI Requirements to the Exelon QATR February 27, 2018 Purpose for Discussion*Discuss evolution of current proposed Fleet License Amendment Request (LAR)*Provide overview of current LAR
- Discuss 6-month turnaround request
- Discuss the QATR proposed Mark-ups
- Adoption of ANSI/ANS 3.1-2014 via RG 1.8 Rev 4 QATR revision 2
Opening Remarks*Executive Sponsor for LAR-Julie Sickle*Chair of the ANS working level committee that developed ANSI/ANS-3.1-2014 3
Evolution*11/14ANSI/ANS-3.1-2014 approved*3/22/16Initial Exelon Pre-submittal meeting
- 4/6/16Pre-Submittal NRC meeting summary
- 3/27/17NRC approves TVA LAR to relocate TS ANSI requirements to TVA QAP*Fall/17Exelon decides to change original LAR scope to: Relocate the TS ANSI requirements to the
Exelon Quality Assurance Topical Report*Feb/18Fleet LAR internally reviewed and approved
- 2/27/18Pre-submittal meeting
- 3/1/18Submit Fleet LAR to NRC 4
LAR Overview
- Current Technical Specification Requirements for TS 5/6.3.1(Unit/Plant/Facility Staff Qualifications):ANS-3.1/N18.1-1971*Braidwood, Byron, Calvert Cliffs, Dresden, Ginna, LaSalle, Peach Bottom, Nine Mile Point Unit 1, Quad
Cities ANSI/ANS-3.1-1978*Clinton, Limerick, FitzPatrick, Nine Mile Point Unit 2, Three Mile Island Unit 1
- Proposed Technical Specification Requirements:"Each member of the unit [facility or plant] staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality
Assurance Topical Report" 5
LAR Overview*TS verbatim wording relocated to QATR*Minor exceptions for FitzPatrick
- Oyster Creek not included in Fleet Submittal
- Complies with the requirements of AL 95-06 (Relocation of Technical Specification Administrative Controls Related to
Quality Assurance)*These ANSI Standards are considered quality assurance controls*Consistent with TVA precedence for Browns Ferry and Sequoyah (ML16105A287) 6 6-Month Turnaround*The 6-month turnaround will position Exelon to more efficiently adopt and implement the ANSI-2014 standard upon issuance of
RG 1.8 Rev 4Prevents an additional year delay in Exelon achieving a common fleet standard and alignment for staff qualifications if no LAR is needed at the time RG 1.8 Rev 4 is issued*In 3/22/16 pre-submittal meeting NRC advised not to submit until NRC vetted the ANSI-2014 standard via the RG 1.8 Rev 4 process*In 3/22/16 meeting NRC had anticipated that the draft RG 1.8 Rev 4 would be noticed for public comments by end of May 2016*Draft RG 1.8 Rev 4 was noticed for public comments on 2/12/18
- Exelon has had a project in place for 3 years to adopt the ANSI-2014 standard 7
- TS wording relocated verbatim to QATR*FitzPatrick minor exceptions:Referenced "Entergy" QAP exceptionsTS 5.3.1 is already in most recent QATR revisionTS 5.2.2.f requires STAs at FitzPatrickto comply to the ANSI 1993 standard*Mark-ups throughout QATR Appendix C (Codes, Standards and Guides)*Proposed revisions are consistent with existing format for taking exceptions to RG compliance on a station by station
basis 8 QATR-Mark-ups RG 1.8 Rev 4 QATR revision*Exelon will implement the approved TS amendments within 60 days*No training standards are changed; only change management is to issue revised TS and revise the QATR
as proposed*After ANSI/ANS-3.1-2014 is endorsed via approved RG 1.8 Rev 4, Exelon will again revise the QATR via 10 CFR 50.54(a) evaluation process to adopt it*NRC exceptions to the ANSI/ANS-3.1-2014 that will be in the approved RG 1.8 Rev 4 will be carefully reviewed*It is expected that the subsequent 10 CFR 50.54(a) evaluation will not be a reduction in commitment 9