Line 47: |
Line 47: |
| Please contact me at 404-997-4 611 with any questions you have regarding this letter. | | Please contact me at 404-997-4 611 with any questions you have regarding this letter. |
|
| |
|
| Sincerely/RA/ Frank Ehrhardt , Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.: | | Sincerely |
| | /RA/ Frank Ehrhardt , Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.: |
| 50-269, 50-270, 50-287 License Nos.: | | 50-269, 50-270, 50-287 License Nos.: |
| DPR-38, DPR-47, DPR-55 | | DPR-38, DPR-47, DPR-55 Enclosure: |
| | |
| ===Enclosure:===
| |
| Oconee Inspection/Activity Plan (0 3/01/201 7 - 12/3 1/201 8) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016 006, 05000270/2016 006, AND 05000287/2016 006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) | | Oconee Inspection/Activity Plan (0 3/01/201 7 - 12/3 1/201 8) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016 006, 05000270/2016 006, AND 05000287/2016 006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) |
| ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD | | ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD |
|
---|
Category:Inspection Plan
MONTHYEARML23267A0032023-09-21021 September 2023 RP Inspection Document Request IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 ML22157A0042022-06-0606 June 2022 10 CFR 50.59 Inspection Initial Information Request ML22088A0452022-03-28028 March 2022 Radiation Safety Baseline Inspection Initial Information Request Inspection Report 2022002 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) ML22019A2442022-01-18018 January 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21070A2982021-03-11011 March 2021 Upcoming Oconee POV Inspection (IP71111.21N.02) Information Request IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 ML21043A1402021-02-11011 February 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000269/20200052020-08-17017 August 2020 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2020005, 05000270/2020005, and 05000287/2020005) ML20175A6462020-06-23023 June 2020 Emergency Preparedness Exercise Inspection Request for Information IR 05000269/20190062020-03-0303 March 2020 Annual Assessment Letter or Oconee Nuclear Station, Units 1, 2, and 3 - NRC Inspection Report 05000269/2019006, 05000270/2019006, and 05000287/2019006 ML20056E7362020-02-25025 February 2020 U3 2020002 ISI RFI IR 05000269/20190052019-08-26026 August 2019 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2019005, 05000270/2019005, and 05000287/2019005) ML19120A4592019-04-30030 April 2019 Triennial Fire Protection Inspection Plan IR 05000269/20180062019-03-0404 March 2019 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, and 3 - NRC Inspection Report 05000269/2018006, 05000270/2018006, and 05000287/2018006 ML18264A0242018-09-21021 September 2018 Emailed RFI Notification IR 05000269/20180052018-08-20020 August 2018 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2018005, 05000270/2018005, and 05000287/2018005) ML18074A1082018-03-15015 March 2018 Emailed RP RFI Request 2018002 ML18068A0292018-03-0808 March 2018 Emailed Notification of Inspection and Request for Information ML17115A4642017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information IR 05000269/20160062017-03-0101 March 2017 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 - NRC Inspection Report 05000269/2016006, 05000270/2016006 and 05000287/2016006 ML17055B2572017-02-23023 February 2017 PIR Notification Letter 2017 ML16309A2772016-11-0303 November 2016 Notification of Oconee Nuclear Station Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000269/2017007, 05000270/2017007 and 05000287/2017007 IR 05000269/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2016005, 5000270/2016005 and 05000287/2016005) ML16075A0222016-03-14014 March 2016 Oconee Nuclear Station - Notification of Inspection and Request for Documents IR 05000269/20150062016-03-0202 March 2016 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2015006, 05000270/2015006 and 05000287/2015006) IR 05000269/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2015005, 05000270/2015005 and 05000287/2015005) ML15231A1922015-08-19019 August 2015 NRC June 9 2009 Memo Revision ONS-2015-086, Relief Request Serial 15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 32015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 3 ML15202A0342015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 1 of 3 ML15202A0352015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 2 of 3 IR 05000269/20140012015-03-0404 March 2015 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3, (NRC Inspection Report 05000269/2014001, 05000270/2014001 and 05000287/2014001) ML15061A3352015-03-0202 March 2015 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML14245A1272014-09-0202 September 2014 Mid-Cycle 2014 Letter ML14063A1752014-03-0404 March 2014 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2014001, 05000270/2014001 and 05000287/2014001) ML13246A1492013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000269/20120012013-03-0404 March 2013 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2012001 and 05000270/2012001) ML12248A0852012-09-0404 September 2012 Mid Cycle Assessment Letter Oconee 2012 ML12066A0552012-03-0505 March 2012 Inspection/Activity Plan, 03/01/2012 - 06/30/2013, Report 22 ML1124403672011-09-0101 September 2011 Report 22 - Oconee ML14058A0432011-06-0707 June 2011 Inspection Plan - Oconee ML1106303252011-03-0404 March 2011 Inspection/Activity Plan, Report 22 ML1024406702010-09-0101 September 2010 Inspection/Activity Plan, 09/01/2010 - 12/31/2011 2023-09-21
[Table view] Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] |
Inspection Report - Oconee - 2016006 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 March 1, 201 7 Mr. Tom Ray Site Vice President Duke Energy Corporation Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672
-0752
SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1 , 2 , AND 3 - NRC INSPECTION REPORT 05000 269/20 1 6 00 6 , 05000 270/20 1 6 00 6 , AND 05000 287/20 1 6 00 6
Dear Mr. Ray:
The NRC completed its end-of-cycle performance review of the Oconee Nuclear Station Units 1 , 2 a nd 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 201 6 through December 31
, 20 1 6. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined that performance at Oconee Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31
, 20 1 8. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.
This inspection plan does not inclu de security-related inspections which will be sent via separate, non-publicly available correspondence.
The NRC will conduct Temporary Instruction (TI) 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans," in the future. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4 611 with any questions you have regarding this letter.
Sincerely
/RA/ Frank Ehrhardt , Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.:
50-269, 50-270, 50-287 License Nos.:
DPR-38, DPR-47, DPR-55 Enclosure:
Oconee Inspection/Activity Plan (0 3/01/201 7 - 12/3 1/201 8) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016 006, 05000270/2016 006, AND 05000287/2016 006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site OconeeInspection / Activity Plan 03/01/2017
-12/31/2018 Page 1 of 2 02/28/2017 06:56:45DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)
7 1, 2, 3 IP Component Design Bases Inspection (Teams)7111121M 03/06/2017 03/10/2017 1, 2, 3 IP Component Design Bases Inspection (Teams)7111121M 03/20/2017 03/24/2017OL RQ-REQUAL INSPECTION 2 1, 2, 3 IP Licensed Operator Requalification Program7111111B 03/20/2017 03/24/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP Problem Identification and Resolution71152B 04/03/2017 04/07/2017 1, 2 IP Problem Identification and Resolution71152B 04/17/2017 04/21/2017 EP-EP PROGRAM INSPECTION 3 1, 2, 3 IP A lert and Notification System Testing7111402 09/25/2017 09/29/2017 1, 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 09/25/2017 09/29/2017 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes7111404 09/25/2017 09/29/2017 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 09/25/2017 09/29/2017 1, 2, 3 IP Performance Indicator Verification71151 09/25/2017 09/29/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 2 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/30/201711/03/2017 1, 2, 3 IP Occupational ALARA Planning and Controls71124.02 10/30/201711/03/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/30/201711/03/2017 1, 2, 3 IP Occupational Dose Assessment71124.04 10/30/201711/03/2017 1, 2, 3 IP Radiation Monitoring Instrumentation71124.05 10/30/201711/03/2017 1, 2, 3 IP Performance Indicator Verification71151 10/30/201711/03/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P11/06/201711/10/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 3 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1, 2, 3 IP Occupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1, 2, 3 IP Occupational Dose Assessment71124.0411/13/201711/17/2017 1, 2, 3 IP Radiation Monitoring Instrumentation71124.0511/13/201711/17/2017 1, 2, 3 IP Performance Indicator Verification7115111/13/201711/17/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P11/13/201711/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site OconeeInspection / Activity Plan 03/01/2017
-12/31/2018 Page 2 of 2 02/28/2017 06:56:45 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 04/30/2018 05/04/2018 RP-RAD HAZARDS AND TRANSPORTATION 2 1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/30/2018 05/04/2018 1, 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 04/30/2018 05/04/2018OL EXAM-INITIAL LICENSE EXAM PREP 6 1 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V23512 05/07/201805/11/2018 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 05/07/201805/11/2018OL EXAM-INITIAL LICENSE EXAM 4 1 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V23512 06/04/2018 06/15/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2, 3 IP Heat Sink Performance7111107T 06/18/2018 06/22/2018 RP-RP PUBLIC INSPECTION 2 1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/18/2018 06/22/2018 1, 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/18/2018 06/22/2018 1, 2, 3 IP Occupational Exposure Control Effectiveness71151-OR01 06/18/2018 06/22/2018 1, 2, 3 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 06/18/2018 06/22/2018 EP-EP EXERCISE 9 1, 2, 3 IP Exercise Evaluation7111401 08/13/2018 08/17/2018 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes7111404 08/13/2018 08/17/2018 1, 2, 3 IP Drill/Exercise Performance71151-EP01 08/13/2018 08/17/2018 1, 2, 3 IP ERO Readiness71151-EP02 08/13/2018 08/17/2018 1, 2, 3 IP A lert & Notification System Reliability71151-EP03 08/13/2018 08/17/2018 1, 2, 3 IP A lert & Notification System Reliability71151-EP03 08/13/2018 08/17/2018 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 3 1, 2, 3 IP Component Design Bases Inspection (Programs)7111121N 08/27/2018 08/31/2018 1, 2, 3 IP Component Design Bases Inspection (Programs)7111121N 09/17/2018 09/21/2018 3 IP Component Design Bases Inspection (Programs)7111121N 10/01/2018 10/05/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P11/05/201811/09/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P11/12/201811/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.