MONTHYEARML24257A0212024-09-11011 September 2024 Document Request for Oconee Nuclear Station - Radiation Protection Inspection - Inspection Report 2024-04 IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) IR 05000269/20240102024-02-21021 February 2024 Information Request- Oconee Nuclear Station, Age Related Degradation Inspection 05000269/2024010, 05000270/2024010 and 05000287/2024010 ML23267A0032023-09-21021 September 2023 RP Inspection Document Request IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 ML22157A0042022-06-0606 June 2022 10 CFR 50.59 Inspection Initial Information Request ML22088A0452022-03-28028 March 2022 Radiation Safety Baseline Inspection Initial Information Request Inspection Report 2022002 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) ML22019A2442022-01-18018 January 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21070A2982021-03-11011 March 2021 Upcoming Oconee POV Inspection (IP71111.21N.02) Information Request IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 ML21043A1402021-02-11011 February 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000269/20200052020-08-17017 August 2020 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2020005, 05000270/2020005, and 05000287/2020005) ML20175A6462020-06-23023 June 2020 Emergency Preparedness Exercise Inspection Request for Information IR 05000269/20190062020-03-0303 March 2020 Annual Assessment Letter or Oconee Nuclear Station, Units 1, 2, and 3 - NRC Inspection Report 05000269/2019006, 05000270/2019006, and 05000287/2019006 ML20056E7362020-02-25025 February 2020 U3 2020002 ISI RFI IR 05000269/20190052019-08-26026 August 2019 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2019005, 05000270/2019005, and 05000287/2019005) ML19120A4592019-04-30030 April 2019 Triennial Fire Protection Inspection Plan IR 05000269/20180062019-03-0404 March 2019 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, and 3 - NRC Inspection Report 05000269/2018006, 05000270/2018006, and 05000287/2018006 ML18264A0242018-09-21021 September 2018 Emailed RFI Notification IR 05000269/20180052018-08-20020 August 2018 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2018005, 05000270/2018005, and 05000287/2018005) ML18074A1082018-03-15015 March 2018 Emailed RP RFI Request 2018002 ML18068A0292018-03-0808 March 2018 Emailed Notification of Inspection and Request for Information ML17115A4642017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information IR 05000269/20160062017-03-0101 March 2017 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 - NRC Inspection Report 05000269/2016006, 05000270/2016006 and 05000287/2016006 ML17055B2572017-02-23023 February 2017 PIR Notification Letter 2017 ML16309A2772016-11-0303 November 2016 Notification of Oconee Nuclear Station Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000269/2017007, 05000270/2017007 and 05000287/2017007 IR 05000269/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2016005, 5000270/2016005 and 05000287/2016005) ML16075A0222016-03-14014 March 2016 Oconee Nuclear Station - Notification of Inspection and Request for Documents IR 05000269/20150062016-03-0202 March 2016 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2015006, 05000270/2015006 and 05000287/2015006) IR 05000269/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2015005, 05000270/2015005 and 05000287/2015005) ML15231A1922015-08-19019 August 2015 NRC June 9 2009 Memo Revision ML15202A0352015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 2 of 3 ONS-2015-086, Relief Request Serial 15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 32015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 3 ML15202A0342015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 1 of 3 IR 05000269/20140012015-03-0404 March 2015 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3, (NRC Inspection Report 05000269/2014001, 05000270/2014001 and 05000287/2014001) ML15061A3352015-03-0202 March 2015 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML14245A1272014-09-0202 September 2014 Mid-Cycle 2014 Letter ML14063A1752014-03-0404 March 2014 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2014001, 05000270/2014001 and 05000287/2014001) ML13246A1492013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000269/20120012013-03-0404 March 2013 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2012001 and 05000270/2012001) ML12248A0852012-09-0404 September 2012 Mid Cycle Assessment Letter Oconee 2012 ML12066A0552012-03-0505 March 2012 Inspection/Activity Plan, 03/01/2012 - 06/30/2013, Report 22 2024-09-11
[Table view] Category:Letter
MONTHYEARIR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds 2024-08-26
[Table view] |
Inspection Report - Oconee - 2015006 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2015006, 05000270/2015006, AND 05000287/2015006)
Dear Mr. Batson:
On February 9, 2016, the NRC completed its end-of-cycle performance review of the Oconee Nuclear Station Units 1, 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Oconee Units 1, 2, and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Oconee Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan.
Additionally, the staff will continue its review of modifications associated with fire, tornado, high energy line break mitigation, external flooding, and the protected service water system. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Oconee Units 1, 2, and 3, and the information gathered will aid staff in development of the Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Frank Ehrhardt at 404-997-4611 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark Franke, Director Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Enclosure: Oconee Inspection/Activity Plan (03/01/2016 - 12/31/2017)
cc: distribution via ListServ
_________________________
ML16062A231 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via Email/RA/MMT2 JGW1 FJE MEF1 NAME M. Toth J. Worosilo F. Ehrhardt M. Franke DATE 2/25/2016 2/25/2016 2/26/2016 2/29/2016 3/ /2016 3/ /2016 3/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Scott Batson from Mark Franke dated March 2, 2016 SUBJECT: ANUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2015006, 05000270/2015006, AND 05000287/2015006)
DISTRIBUTION:
D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 3 Oconee 03/02/2016 08:17:57 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 9 1, 2, 3 02/29/2016 03/04/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial)
1, 2, 3 03/14/2016 03/18/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial)
92702 - EXTERNAL FLOODING CAL CLOSURE 3 1, 2, 3 04/18/2016 04/22/2016 IP 92702 Followup On Corrective Actions For Violations And Deviations ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 05/02/2016 05/06/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2, 3 05/02/2016 05/06/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 05/02/2016 05/06/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation SGISI - UNIT 3 SG IN-SERVICE INSPECTION 1 3 05/09/2016 05/13/2016 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL LICENSE EXAM PREP 3 1 05/16/2016 05/20/2016 V23470 OCONEE JUNE 2016 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC RAD SAFETY BASELINE 2 1, 2, 3 06/06/2016 06/10/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 06/06/2016 06/10/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2, 3 06/06/2016 06/10/2016 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 1 06/13/2016 06/17/2016 V23470 OCONEE JUNE 2016 INITIAL EXAM AT POWER FACILITIES MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2, 3 07/25/2016 07/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2, 3 08/08/2016 08/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP EXERCISE INSPECTION 4 1, 2, 3 10/17/2016 10/21/2016 IP 7111401 Exercise Evaluation 1, 2, 3 10/17/2016 10/21/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 10/17/2016 10/21/2016 IP 7111408 Exercise Evaluation - Scenario Review 1, 2, 3 10/17/2016 10/21/2016 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 11/07/2016 11/11/2016 V23487 OCONEE/DECEMBER 216 INITIAL EXAM AT POWER FACILITIES ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 11/14/2016 11/18/2016 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 3 Oconee 03/02/2016 08:17:57 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 11/21/2016 11/25/2016 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL LICENSE EXAM 3 1 12/05/2016 12/09/2016 V23487 OCONEE/DECEMBER 216 INITIAL EXAM AT POWER FACILITIES 92702 - CONFIRMATORY ORDER / MILESTONE 6 CLOSURE 1 1, 2, 3 01/09/2017 01/13/2017 IP 92702 Followup On Corrective Actions For Violations And Deviations CDBI - COMPONENT DESIGN BASIS INSPECTION 7 1, 2, 3 01/23/2017 01/27/2017 IP 7111121 Component Design Bases Inspection 1, 2, 3 02/13/2017 02/17/2017 IP 7111121 Component Design Bases Inspection 1, 2, 3 03/06/2017 03/10/2017 IP 7111121 Component Design Bases Inspection 1, 2, 3 03/20/2017 03/24/2017 IP 7111121 Component Design Bases Inspection OL RQ - REQUAL INSPECTION 2 1, 2, 3 03/20/2017 03/24/2017 IP 7111111B Licensed Operator Requalification Program PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 04/10/2017 04/14/2017 IP 71152B Problem Identification and Resolution 1, 2 04/24/2017 04/28/2017 IP 71152B Problem Identification and Resolution OL EXAM - INITIAL LICENSE EXAM PREP 3 1 05/15/2017 05/19/2017 V23493 OCONEE/JUNE 2017 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 06/12/2017 06/16/2017 V23493 OCONEE/JUNE 2017 INITIAL EXAM AT POWER FACILITIES EP - EP PROGRAM INSPECTION 3 1, 2, 3 09/25/2017 09/29/2017 IP 7111402 Alert and Notification System Testing 1, 2, 3 09/25/2017 09/29/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 09/25/2017 09/29/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 09/25/2017 09/29/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2, 3 09/25/2017 09/29/2017 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 10/30/2017 11/03/2017 V23504 OCONEE/DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2, 3 10/30/2017 11/03/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 10/30/2017 11/03/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 10/30/2017 11/03/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 10/30/2017 11/03/2017 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 Oconee 03/02/2016 08:17:57 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2, 3 10/30/2017 11/03/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 10/30/2017 11/03/2017 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 11/06/2017 11/10/2017 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 11/13/2017 11/17/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2, 3 12/04/2017 12/08/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 12/04/2017 12/08/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 12/04/2017 12/08/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 12/04/2017 12/08/2017 IP 71124.04 Occupational Dose Assessment 1, 2, 3 12/04/2017 12/08/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 12/04/2017 12/08/2017 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 1 12/04/2017 12/08/2017 V23504 OCONEE/DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.