MONTHYEARML23349A0272023-12-15015 December 2023 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 5.5.2 ML23284A3322023-10-11011 October 2023 Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) ML23270B8362023-09-26026 September 2023 Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and Standards ML23267A0032023-09-21021 September 2023 RP Inspection Document Request ML23269A0412023-08-22022 August 2023 Code Case N-752 Audit; August 22, 2023, E-mail Providing Additional Information Regarding Design and Quality Program Requirements ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23144A0862023-05-24024 May 2023 Acceptance of Requested Licensing Action Proposed Relief Request (RA-23-0018) to Use ASME Code Case 853 ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23125A1452023-05-0505 May 2023 Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752 ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23095A0052023-04-0404 April 2023 002 Radiation Safety Baseline Inspection Information Request ML23086C0362023-03-27027 March 2023 Request for Additional Information Steam Generator Tube Inspection Report (03R31) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23038A1832023-02-0707 February 2023 Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 ML23031A1552023-01-17017 January 2023 1/17/2023 Email from John Moses, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, to Diane Curran, Counsel to Beyond Nuclear and the Sierra Club, Request for Extension of Scoping Comment Period for Oconee EIS ML22294A0812022-10-21021 October 2022 Nrc/Duke Steam Generator Inspection Call for November 8, 2022 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22251A2902022-09-0808 September 2022 Request for Additional Information Additional Mode Change Limitations Applicable to the Adoption of Technical Specifications Tasks Force Traveler (TSTF) No. 359, Revision 9 ML22235A6552022-08-23023 August 2022 Acceptance of Requested Licensing Action Proposed Alternative to Use ASME Code Case N-752 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22234A1262022-07-0808 July 2022 Email from NRC to Duke - Feedback on Trp 76 RAI Responses - July 8, 2022 ML22234A1272022-06-14014 June 2022 Email from NRC to Duke - Feedback on Trp 76 RAI Responses - June 14, 2022 ML22154A2142022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - 2nd Round RAI B2.1.7-4b ML22157A0012022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Additional NRC Comments on RAI 4.6.1-1a ML22124A2052022-05-0404 May 2022 Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML22124A1612022-05-0303 May 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22122A0192022-04-28028 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A1322022-04-27027 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round Requests for Additional Information (FE 3.5.2.2.2.6 - Irradiation Structural) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22130A0112022-04-25025 April 2022 Email: Oconee SLRA - RAI 4.6.1-1a - NRC Staff Comments ML22112A1892022-04-22022 April 2022 Acceptance Review for Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9 ML22112A0072022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Confirmation of Information 3.5.2.2.2.6-L ML22113A0082022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Additional Information 3.1.2-1 ML22088A0452022-03-28028 March 2022 Radiation Safety Baseline Inspection Initial Information Request Inspection Report 2022002 ML22081A0052022-03-21021 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B4.1-3 ML22080A0792022-03-16016 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Additional Information - Set 4 (2nd Round Rais) ML22075A2032022-03-11011 March 2022 Email from Duke to NRC - Follow-Up Items from March 7, 2022 Public Meeting ML22074A0022022-03-11011 March 2022 Email from Duke to NRC - Follow-up Item from March 7, 2022 Public Meeting - SSW Tendon AMP ML22069A0022022-03-0808 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Confirmation of Information - Set 4 ML22063A4502022-03-0404 March 2022 Request for Additional Information Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump ML22063A1152022-02-23023 February 2022 Email from Duke to NRC - Follow Up Item from February 17, 2022 Public Meeting ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22035A1892022-01-31031 January 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Request for Public Meeting ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22019A1032022-01-18018 January 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Additional Information - Set 3 ML22012A0432022-01-11011 January 2022 SLRA - Requests for Additional Information - Set 2 2023-09-26
[Table view] Category:Inspection Plan
MONTHYEARML23267A0032023-09-21021 September 2023 RP Inspection Document Request IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 ML22157A0042022-06-0606 June 2022 10 CFR 50.59 Inspection Initial Information Request ML22088A0452022-03-28028 March 2022 Radiation Safety Baseline Inspection Initial Information Request Inspection Report 2022002 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) ML22019A2442022-01-18018 January 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21070A2982021-03-11011 March 2021 Upcoming Oconee POV Inspection (IP71111.21N.02) Information Request IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 ML21043A1402021-02-11011 February 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000269/20200052020-08-17017 August 2020 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2020005, 05000270/2020005, and 05000287/2020005) ML20175A6462020-06-23023 June 2020 Emergency Preparedness Exercise Inspection Request for Information IR 05000269/20190062020-03-0303 March 2020 Annual Assessment Letter or Oconee Nuclear Station, Units 1, 2, and 3 - NRC Inspection Report 05000269/2019006, 05000270/2019006, and 05000287/2019006 ML20056E7362020-02-25025 February 2020 U3 2020002 ISI RFI IR 05000269/20190052019-08-26026 August 2019 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2019005, 05000270/2019005, and 05000287/2019005) ML19120A4592019-04-30030 April 2019 Triennial Fire Protection Inspection Plan IR 05000269/20180062019-03-0404 March 2019 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, and 3 - NRC Inspection Report 05000269/2018006, 05000270/2018006, and 05000287/2018006 ML18264A0242018-09-21021 September 2018 Emailed RFI Notification IR 05000269/20180052018-08-20020 August 2018 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2018005, 05000270/2018005, and 05000287/2018005) ML18074A1082018-03-15015 March 2018 Emailed RP RFI Request 2018002 ML18068A0292018-03-0808 March 2018 Emailed Notification of Inspection and Request for Information ML17115A4642017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information IR 05000269/20160062017-03-0101 March 2017 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 - NRC Inspection Report 05000269/2016006, 05000270/2016006 and 05000287/2016006 ML17055B2572017-02-23023 February 2017 PIR Notification Letter 2017 ML16309A2772016-11-0303 November 2016 Notification of Oconee Nuclear Station Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000269/2017007, 05000270/2017007 and 05000287/2017007 IR 05000269/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2016005, 5000270/2016005 and 05000287/2016005) ML16075A0222016-03-14014 March 2016 Oconee Nuclear Station - Notification of Inspection and Request for Documents IR 05000269/20150062016-03-0202 March 2016 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2015006, 05000270/2015006 and 05000287/2015006) IR 05000269/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2015005, 05000270/2015005 and 05000287/2015005) ML15231A1922015-08-19019 August 2015 NRC June 9 2009 Memo Revision ONS-2015-086, Relief Request Serial 15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 32015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 3 ML15202A0342015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 1 of 3 ML15202A0352015-07-15015 July 2015 Relief Request Serial #15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 2 of 3 IR 05000269/20140012015-03-0404 March 2015 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3, (NRC Inspection Report 05000269/2014001, 05000270/2014001 and 05000287/2014001) ML15061A3352015-03-0202 March 2015 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML14245A1272014-09-0202 September 2014 Mid-Cycle 2014 Letter ML14063A1752014-03-0404 March 2014 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2014001, 05000270/2014001 and 05000287/2014001) ML13246A1492013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000269/20120012013-03-0404 March 2013 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2012001 and 05000270/2012001) ML12248A0852012-09-0404 September 2012 Mid Cycle Assessment Letter Oconee 2012 ML12066A0552012-03-0505 March 2012 Inspection/Activity Plan, 03/01/2012 - 06/30/2013, Report 22 ML1124403672011-09-0101 September 2011 Report 22 - Oconee ML14058A0432011-06-0707 June 2011 Inspection Plan - Oconee ML1106303252011-03-0404 March 2011 Inspection/Activity Plan, Report 22 ML1024406702010-09-0101 September 2010 Inspection/Activity Plan, 09/01/2010 - 12/31/2011 2023-09-21
[Table view] |
Text
From: Ottenberg, Geoffrey To: Todd, Laura Frances; Adams, Samuel Lake Cc: Ottenberg, Geoffrey; Baptist, James
Subject:
Upcoming Oconee POV inspection (IP71111.21N.02) information request Date: Monday, March 08, 2021 3:01:12 PM Attachments: 2021 ONS - POV Inspection Information Request.docx Oconee POV Data.docx Good afternoon Laura and Sam, Thank you for working with me to get the POV inspection started. As mentioned previously, attached you will find a Word document containing a notification letter with some general details regarding the inspection, including the inspection procedure we will be using, the planned dates of the inspection, and the current inspection staffing. The notification letter also contains an information request for general references the inspectors will need to prepare for the inspection, and it also requests valve-specific information indicated in the attached Access database (PLEASE NOTE: the Access database is sent as a Word document in order to be able to transmit it via e-mail. You will need to change the file extension of the Oconee POV Data.docx file from .docx to .accdb to convert it back into an Access file.) Please provide as much of the requested information as possible, if it is readily available.
The following information will help when filling out the database with the requested valve-specific information:
You may have to enable content before using- this is only done once and shouldnt pop up again. It is understood that not all fields will be entered. Also please note that when entering data into the various fields there is a text box at the bottom left of the data entry form that details to the person entering the data what needs to be entered. For example, when on the Docket field the text at the bottom will state Enter the Docket number last 3 digits. Also, when entering text in the comment field and it is desired to start a new line, it is necessary to hit control+enter to start a new line.
Feel free to reach out to me with any questions you may have regarding anything related to the inspection (inspection procedure, information request, etc.) and Ill do my best to get any questions/concerns addressed. Im looking forward to the inspection.
Sincerely, Geoff Ottenberg Senior Reactor Inspector - Engineering Branch 1 Division of Reactor Safety U.S. Nuclear Regulatory Commission 404-997-4658 Geoffrey.Ottenberg@nrc.gov
ML21070A298 Oconee Nuclear Station - Design Bases Assurance Inspection (Programs)
Initial Information Request Inspection Procedure: 71111.21N, Design Bases Assurance Inspection (Programs),
Attachment 21N.02, Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements, dated October 9, 2020 (ADAMS ML20220A667)
Inspection Dates: Information Gathering Visit: June 28 - July 2, 2021 Preparation Week: July 26- 30, 2021 Onsite Week 1: August 2- 6, 2021 Onsite Week 2: August 16- 20, 2021 Inspection Report: 05000269, 270, 287/2021010 (Standalone Inspection Report)
Inspectors: G. Ottenberg (Lead/Mechanical), N. Morgan (Mechanical),
and A. Ruh (Mechanical)
The purpose of this letter is to notify you that three inspectors from Region II will conduct an inspection at your site in accordance with Inspection Procedure 71111.21N, Design Bases Assurance Inspection (Programs), Attachment 21N.02, Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements. This is not considered a team inspection. The inspection will evaluate the implementation of the programs regarding power operated valves (POVs) for compliance with 10 CFR 50.55a at the Oconee Nuclear Station.
The inspectors will select samples of components that are risk significant and within the scope of the program.
On June 28, 2021, Mr. Geoffrey Ottenberg, a Senior Reactor Inspector from the NRCs Region II office, will begin the inspection with an information gathering visit to the site, if pandemic conditions allow. The purpose of the visit is to become familiar with your program and procedures which are supposed to ensure your compliance with 10 CFR 50.55a for POVs. This will require meetings with members of your staff to discuss aspects of the program including any specific applicable regulatory commitments made by the site and your use of regulatory guides or industry standards. Your processes for generating field instructions for POV switch settings and test acceptance criteria from design documents is also expected to be discussed. Plant walkdowns to observe the potential inspection sample are expected to occur during the information gathering visit, if a site visit is made.
The enclosure lists documents that are needed prior to the information gathering visit. Please provide the referenced information to the Region II Office by June 14, 2021. Additional documents may be requested during the information gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information should be provided to the Inspectors in the Region II office by July 23, 2021. During the information gathering visit, Mr. Ottenberg will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2) method of tracking inspector requests during the inspection, (3) computer access, (4) working space, (5) arrangements for site access, and (6) other applicable information.
INFORMATION REQUEST FOR OCONEE NUCLEAR STATION DESIGN BASES ASSURANCE INSPECTION (PROGRAMS)
(10 CFR 50.55a POWER OPERATED VALVE PROGRAMS IMPLEMENTATION)
Prior to the information gathering visit, please provide the information electronically in .pdf files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use.
Contact Information: Geoffrey Ottenberg (404) 997-4658 Geoffrey.Ottenberg@nrc.gov Information Gathering Visit: An information gathering visit is currently scheduled the week of June 28- July 2, 2021. During this visit, we would like to identify the component samples for this inspection. Wed like to meet with valve specialists to discuss the upcoming inspection and our sample selection process. Purposes of the site visit are to: (a) discuss the scope of the planned inspection; (b) obtain advance information to review in preparation for the inspection; (c) ensure that the information to be reviewed is available at the beginning of the inspection; and (d) verify that logistical issues (such as obtaining both site and computer system access and arranging the location of the inspection team working area) will be resolved prior to inspector arrival. Assuming that a site visit will be completed, please reserve a room during the scheduled inspection dates. We request the room have a telephone, wireless internet access, and a licensee computer with access to procedures, corrective action program documents, and a printer.
Logistics:
Information gathering visit: June 28- July 2, 2021 Onsite inspection weeks: August 2- 6 and August 16- 20, 2021 Please schedule an entrance meeting for around 3:00 p.m. on Monday, August 2, 2021 (approximately 15 minutes). The date and time of the exit meeting will be discussed at a later date. In addition, Id like to have a daily debrief with your inspection support staff at a convenient time in the afternoons for both onsite inspection weeks (Time TBD, approximately 30 minutes).
We will need a conference room as workspace for the inspectors. We will also need an area available for conducting interviews. Please provide access to your document system (preferably at least one computer in our conference room), nearby printers, and Wi-Fi access.
During the information gathering visit, please provide info on (1) conference room location &
phone number, (2) cafeteria location/hours, and (3) engineering staff normal working hours.
Also, please let me know if there are any potential resource conflicts during our scheduled inspection weeks (Fridays off, EOP drills, management retreats) and well do our best to accommodate.
Team Members: Geoffrey Ottenberg (Inspection Lead, Mechanical)
Nadiyah (Dee) Morgan (Mechanical)
Adam Ruh (Mechanical)
Please verify the status of access authorization and remaining requirements for unescorted access for each inspector. Please provide me with a list of exceptions, and I will take action to address them.
Info Request:
- 1. A word-searchable Updated Final Safety Analysis Report (UFSAR), Technical Specifications (TS), and TS Bases. If each document is not available in a single file, please ensure a collective table of contents is provided.
- 2. Indicate if the NRC has granted a license amendment to categorize structures, systems, and components in accordance with 10 CFR 50.69, and if so, please provide the risk-informed safety category of the POVs important to safety at the site.
- 3. All NRC correspondence regarding the stations response to Generic Letter (GL) 89-10, GL 95-07, and GL 96-05, including any NRC requests for additional information (RAIs) and any NRC Safety Evaluation Report(s) associated with your sites MOV program. Include any NRC inspection reports that were conducted to close out your GL responses.
- 4. Any NRC correspondence regarding the stations commitments for the AOV program (if any). Please include any AOV-related regulatory commitments that are currently being tracked in the stations regulatory commitment management program.
- 5. Site (and corporate if applicable) procedures associated with implementation of the inservice testing (IST) program required by 10 CFR 50.55a
- 6. Site (and corporate if applicable) procedures associated with implementation of the MOV program required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory Appendix III (as applicable).
- 7. Site (and corporate if applicable) procedures associated with implementation of the AOV program.
- 8. List of corrective action documents related to the MOV and AOV programs since January 1, 2016. Please provide list of corrective action program reports that are applicable to programmatic aspects only- no need to provide them for individual valves in the programs.
- 9. List of modifications, repairs, or replacement of safety related power operated valves (motor, air, solenoid, hydraulic, and pyrotechnic operated) completed since January 1, 2016, including date completed.
- 10. Any self-assessments or QA assessments of the MOV/AOV programs (performed since January 1, 2016).
- 11. List of systems (system numbers/designators and corresponding names).
- 12. List of site contacts that will be associated with the inspection
- 13. For the POVs listed in the accompanying database, please fill in as much of the indicated data as possible and provide the database back to the inspectors.
PAPERWORK REDUCTION ACT STATEMENT This letter contains voluntary information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0011). The burden to the public for these information collections is estimated to average 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> per response. Send comments regarding this information collection to the Information Services Branch, Office of the Chief Information Officer, Mail Stop: O-1F13, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.