IR 05000266/2019410: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 41: Line 41:
-Withhold from public disclosure under Title 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
-Withhold from public disclosure under Title 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No s.: 05000266 and 05000301 License No s.: DPR-24 and DPR
Sincerely,
-27  
/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No s.: 05000266 and 05000301 License No s.: DPR-24 and DPR
 
-27 Enclosure:
===Enclosure:===
IR 05000266/201 9 410; 05000301/
IR 05000266/201 9 410; 05000301/
201 9 4 10 cc: Distribution via LISTSERV
201 9 4 10 cc: Distribution via LISTSERV


ML19106A195 SUNSI Review Complete By: Nate Egan ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE RIII RIII NAME SOrth for NEgan:jw SOrth SIGNATURE /RA/ /RA/ DATE 04/16/19 04/16/19 Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers:
ML19106A195 SUNSI Review Complete By: Nate Egan ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE RIII RIII NAME SOrth for NEgan:jw SOrth SIGNATURE /RA/ /RA/ DATE 04/16/19 04/16/19 Enclosure U.S. NUCLEAR REGULATORY COMMISSION
 
==Inspection Report==
Docket Numbers:
05000266 and 05000301 License Numbers:
05000266 and 05000301 License Numbers:
DPR-24 and DPR
DPR-24 and DPR

Revision as of 21:51, 8 May 2019

NRC Security Baseline Inspection Report 05000266/2019410; 05000301/2019410 (DRS-N.Egan)
ML19106A195
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/16/2019
From: Orth S K
Plant Support Branch II
To: Craven R
Point Beach
References
IR 2019410
Download: ML19106A195 (5)


Text

April 16, 2019

Mr. Robert Craven Site Director NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

-NRC SECURITY BASELINE INSPECTION REPORT 05000266/201 9 4 10; 05000301/201 9 4 10

Dear Mr. Craven:

On March 14, 2019

, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Point Beach Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with M. Wilcox and other members of your staff.

The results of this inspection are documented in the enclosed report. The NRC inspector did not identify any finding or violation of more

-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.

" If you choose to provide a response that contains Security

-Related Information, please mark your entire response "Security

-Related Information

-Withhold from public disclosure under Title 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No s.: 05000266 and 05000301 License No s.: DPR-24 and DPR

-27 Enclosure:

IR 05000266/201 9 410; 05000301/

201 9 4 10 cc: Distribution via LISTSERV

ML19106A195 SUNSI Review Complete By: Nate Egan ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE RIII RIII NAME SOrth for NEgan:jw SOrth SIGNATURE /RA/ /RA/ DATE 04/16/19 04/16/19 Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000266 and 05000301 License Numbers:

DPR-24 and DPR

-27 Report Numbers:

05000266/2019410 and 05000301/2019410 Enterprise Identifier:

I-2019-410-0042 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI 54241 Inspection Dates:

March 4, 2019 , to March 7, 2019 Inspector:

N. Egan, Sr. Physical Security Inspector Approved By:

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a Security Baseline inspection at Point Beach Nuclear Plant, Units and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

Findings and violations being considered in the NRC's assessment are summarized in the table below.

List of Findings and Violations No findings were identified.

Additional Tracking Items None.

3

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading

-rm/doc-collections/insp

-manual/inspection

-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light

-Water Reactor Inspection Program - Operations Phase." The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the security access control program.

The following elements were evaluated from this IP:

Access Control (1 Sample) Tier I: All Tier II: 02.06 a-d, 02.08 a

-d Tier III: 02.10 a

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

On March 14, 2019, the inspector presented the Security Baseline inspection results to M. Wilcox and other members of the licensee staff.

DOCUMENTS REVIEWED

SY-AA-102-1022; Vehicle and Material Searches; Revision

SY-AA-102-10 16; Control of Security Sensitive Equipment; Revision

PBSAP 1.3.2; Vehicle Processing; Revision 36

PBSAP 1.3.4; Personnel Searches; Revision 20

PBSAP 1.8; Security Emergency Response;

Revision 22

PBSAP 1.3.2; Vehicle Processing; Revision 36