| REQUEST FOR ADDITIONAL INFORMATION ON THE LICENSE AMENDMENT REQUEST TECHNICAL SPECIFICATION CHANGES AND ANALYSES RELATING TO USE OF ALTERNATIVE SOURCE TERM FOR ENTERGY OPERATIONS, INC. | | REQUEST FOR ADDITIONAL INFORMATION ON THE LICENSE AMENDMENT REQUEST TECHNICAL SPECIFICATION CHANGES AND ANALYSES RELATING TO USE OF ALTERNATIVE SOURCE TERM FOR ENTERGY OPERATIONS, INC. |
| ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NUMBER: 50-368 | | ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NUMBER: 50-368 |
| : 1. Describe the methodology used to verify that the minimum possible post-LOCA sump pH remains greater than 7.0. Specifically, please describe how the following parameters were accounted for in the calculation. | | : 1. Describe the methodology used to verify that the minimum possible post-LOCA sump pH remains greater than 7.0. Specifically, please describe how the following parameters were accounted for in the calculation. |
| : a. What is the maximum, beginning of cycle, boron concentration in the reactor coolant and borated water storage tank? | | : a. What is the maximum, beginning of cycle, boron concentration in the reactor coolant and borated water storage tank? |
| : b. What is the minimum volume of water assumed in the calculation of post-LOCA sump pH? c. What is the minimum quantity of buffering agent contained in the baskets? | | : b. What is the minimum volume of water assumed in the calculation of post-LOCA sump pH? c. What is the minimum quantity of buffering agent contained in the baskets? |
| : d. What is the buffering agent used at ANO-2 (trisodium phosphate or sodium tetraborate)? | | : d. What is the buffering agent used at ANO-2 (trisodium phosphate or sodium tetraborate)? |
| : e. What assumptions are made for the dissolution time of the buffering agent? | | : e. What assumptions are made for the dissolution time of the buffering agent? |
| : f. Describe the analysis used to determine strong acid concentrations in the sump for a period of 30 days post-LOCA. Include a description of the calculations for hydrochloric acid, generated by radiolytic decomposition of Hypalon cable insulation, and nitric acid, produced by irradiation of water and air in the containment. | | : f. Describe the analysis used to determine strong acid concentrations in the sump for a period of 30 days post-LOCA. Include a description of the calculations for hydrochloric acid, generated by radiolytic decomposition of Hypalon cable insulation, and nitric acid, produced by irradiation of water and air in the containment. |
| : 2. How do the calculations for the proposed AST sump pH analysis differ from the previous calculation of sump pH? | | : 2. How do the calculations for the proposed AST sump pH analysis differ from the previous calculation of sump pH? |
| : 3. Provide the time dependant sump pH profile for the full duration of the LOCA analysis. | | : 3. Provide the time dependant sump pH profile for the full duration of the LOCA analysis. |
| E-mail Properties Mail Envelope Properties () | | E-mail Properties Mail Envelope Properties () |
Revision as of 01:25, 1 May 2019
Letter Sequence RAI |
---|
|
|
MONTHYEARML1012506042010-05-0505 May 2010 E-mail Arkansas Nuclear One, Unit 2 - Acceptance Review Email, License Amendment Request, Technical Specification Changes and Analyses Relating to Use of Alternative Source Term Project stage: Acceptance Review ML1014502942010-05-25025 May 2010 Request for Additional Information License Amendment Request for Technical Specification Changes and Analyses Regarding Use of Alternate Source Project stage: RAI 2CAN061004, License Amendment Request Technical Specification Changes and Analyses Relating to Use of Alternative Source Term - Supplemental Information2010-06-23023 June 2010 License Amendment Request Technical Specification Changes and Analyses Relating to Use of Alternative Source Term - Supplemental Information Project stage: Supplement ML1019604922010-07-15015 July 2010 Email, Request for Additional Information License Amendment Request to Implement an Alternative Source Term Project stage: RAI ML1018103452010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-18, Revision 0 Project stage: Withholding Request Acceptance ML1018102182010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-15, Revision 0, TAC No. ME3678 Project stage: Withholding Request Acceptance ML1018102242010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-16, Revision 0, TAC No. ME3678 Project stage: Withholding Request Acceptance ML1018102262010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-17, Revision 0 Project stage: Withholding Request Acceptance ML1018102332010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-57, Revision 0 Project stage: Withholding Request Acceptance ML1018103312010-07-29029 July 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1018103372010-07-29029 July 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2CAN081001, Request for Additional Information, Technical Specification Changes and Analyses Relating to Use of Alternative Source Term2010-08-0909 August 2010 Request for Additional Information, Technical Specification Changes and Analyses Relating to Use of Alternative Source Term Project stage: Request ML1023104312010-08-19019 August 2010 Email, Request for Additional Information, Round 3, License Amendment Request for Technical Specification Changes and Analyses Regarding Use of Alternate Source Term Project stage: RAI 2CAN081007, Request for Additional Information Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-7162010-08-24024 August 2010 Request for Additional Information Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 Project stage: Request 2CAN091002, Request for Additional Information Technical Specification Changes and Analyses Relating to Use of Alternative Source Term2010-09-16016 September 2010 Request for Additional Information Technical Specification Changes and Analyses Relating to Use of Alternative Source Term Project stage: Request ML1109801972011-04-26026 April 2011 Issuance of Amendment No. 293, Technical Specification Changes and Analyses Regarding Use of Alternate Source Term Project stage: Approval ML1115108242011-05-0202 May 2011 Email Correction to the Safety Evaluation (SE) on the Alternate Source Term License Amendment Request, (SE Issued on April 26, 2011) Project stage: Request ML1115110012011-08-0909 August 2011 Correction to Safety Evaluation for Amendment No. 293 Related to Use of Alternate Source Term Project stage: Approval 2010-08-19
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24227A0072024-08-13013 August 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 2 - Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) - EPID L-2024-LLR-0048 ML24218A0652024-08-0202 August 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 ML24180A0022024-06-26026 June 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 1 and 2 - Proposed Alternatives for Examinations of SG Pressure Retaining Welds and Full Penetrations Nozzles - EPID L-2024-LLR-0038 ML24149A3672024-05-28028 May 2024 August 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24117A0262024-04-26026 April 2024 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Typographical Errors in Technical Specifications ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program 2024-08-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21026A2682021-01-26026 January 2021 Request for Information ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20324A6412020-11-19019 November 2020 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 ML20316A0102020-11-0202 November 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 ML20262H0752020-09-17017 September 2020 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20260H4762020-09-0909 September 2020 NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values ML20154K7622020-06-0101 June 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 ML20065H7992020-03-0606 March 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML20055E9092020-02-24024 February 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 ML20013C7472020-01-10010 January 2020 NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19316A0242019-11-0707 November 2019 NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) ML19280A0402019-10-0707 October 2019 NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19339F5902019-09-23023 September 2019 Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection ML19281E0032019-08-0505 August 2019 ANO 2019 PIR Request for Information ML19203A0122019-07-16016 July 2019 Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) ML19106A4322019-04-16016 April 2019 NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump ML19058A8332019-02-27027 February 2019 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 2024-05-22
[Table view] |
Text
From: Kalyanam, Kaly Sent: Tuesday, May 25, 2010 10:22 AM To: CLARK, ROBERT W
Subject:
Request for Additional Information on the AST LAR - ME3678 Bob, By letter dated March 31, 2010, Entergy Operations, Inc. (the licensee), submitted a request for license amendment to implement an alternative source term (AST) for Arkansas Nuclear One, Unit 2 (ANO-2).
The staff, has reviewed and evaluated the information provided by Entergy, in its application.
Based on this review, it was determined that additional information is required to complete the staff's evaluation for the license amendment request. In order for the staff to meet the established due date, the licensee needs to respond to the request for additional information (RAI) within 30 days of the receipt of the RAI.
Thanks Kaly (N) Kalyanam1 PM, ANO-1 and 2 and Waterford 3
REQUEST FOR ADDITIONAL INFORMATION ON THE LICENSE AMENDMENT REQUEST TECHNICAL SPECIFICATION CHANGES AND ANALYSES RELATING TO USE OF ALTERNATIVE SOURCE TERM FOR ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NUMBER: 50-368
- 1. Describe the methodology used to verify that the minimum possible post-LOCA sump pH remains greater than 7.0. Specifically, please describe how the following parameters were accounted for in the calculation.
- a. What is the maximum, beginning of cycle, boron concentration in the reactor coolant and borated water storage tank?
- b. What is the minimum volume of water assumed in the calculation of post-LOCA sump pH? c. What is the minimum quantity of buffering agent contained in the baskets?
- d. What is the buffering agent used at ANO-2 (trisodium phosphate or sodium tetraborate)?
- e. What assumptions are made for the dissolution time of the buffering agent?
- f. Describe the analysis used to determine strong acid concentrations in the sump for a period of 30 days post-LOCA. Include a description of the calculations for hydrochloric acid, generated by radiolytic decomposition of Hypalon cable insulation, and nitric acid, produced by irradiation of water and air in the containment.
- 2. How do the calculations for the proposed AST sump pH analysis differ from the previous calculation of sump pH?
- 3. Provide the time dependant sump pH profile for the full duration of the LOCA analysis.
E-mail Properties Mail Envelope Properties ()
Subject:
Request for Additional Information on the AST LAR - ME3578
Sent Date: 5/25/2010 9:59:55 AM Received Date: 5/25/2010 10:21:00 AM From: Kalyanam, Kaly
Created By: Kaly.Kalyanam@nrc.gov
Recipients:
RCLARK@entergy.com (CLARK, ROBERT W)
Tracking Status: None
Post Office:
Files Size Date & Time
MESSAGE 16010 5/25/2010
Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False
Sensitivity: olNormal Recipients received: