ML23118A069

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048)
ML23118A069
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/28/2023
From: Thomas Wengert
NRC/NRR/DORL/LPL4
To: Keele R
Office of Nuclear Reactor Regulation
Wengert T
References
L-2023-LLA-0048
Download: ML23118A069 (3)


Text

From:

Thomas Wengert Sent:

Friday, April 28, 2023 8:25 AM To:

Keele Jr, Riley D Cc:

REID, MARK; CLARK, ROBERT W; Jennifer Dixon-Herrity

Subject:

ANO Unit 1 - Acceptance of Requested Licensing Action RE: LAR to Modify ANO-1 TS 3.3.1, "Reactor Protection System Instrumentation" (L-2023-LLA-0048)

By Function on Low Control Oil Pressure|letter dated March 30, 2023]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23089A261), Entergy Operations, Inc. (the licensee) submitted a license amendment request for Arkansas Nuclear One, Unit 1 (ANO-1). Specifically, the proposed amendment would revise the ANO-1 technical specifications (TSs) to modify TS 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 275 hours0.00318 days <br />0.0764 hours <br />4.546958e-4 weeks <br />1.046375e-4 months <br /> to complete. The NRC staff expects to complete this review by March 15, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related

activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-4037.

Tom Wengert Senior Project Manager - Arkansas Nuclear One, Units 1 and 2 U.S. Nuclear Regulatory Commission NRR/DORL/LPL4

Hearing Identifier:

NRR_DRMA Email Number:

2061 Mail Envelope Properties (PH0PR09MB7403354121CE27353CD7F1838F6B9)

Subject:

ANO Unit 1 - Acceptance of Requested Licensing Action RE LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048)

Sent Date:

4/28/2023 8:25:18 AM Received Date:

4/28/2023 8:25:00 AM From:

Thomas Wengert Created By:

Thomas.Wengert@nrc.gov Recipients:

"REID, MARK" <mreid1@entergy.com>

Tracking Status: None "CLARK, ROBERT W" <RCLARK@entergy.com>

Tracking Status: None "Jennifer Dixon-Herrity" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Keele Jr, Riley D" <rkeele@entergy.com>

Tracking Status: None Post Office:

PH0PR09MB7403.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3463 4/28/2023 8:25:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: