Letter Sequence Other |
---|
|
|
MONTHYEAR1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 Project stage: Request ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 Project stage: Acceptance Review 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 Project stage: Request ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times Project stage: Other ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions Project stage: Other ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda Project stage: Other 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 Project stage: Supplement ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions Project stage: Other ML23305A0922023-12-0707 December 2023 – Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b Project stage: Other ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Project stage: Approval 2023-05-10
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24296A0652024-10-22022 October 2024 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Verbal Authorization of Relief Request for the Proposed Alternative ANO2-RR-24-001 ML24227A0072024-08-13013 August 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 2 - Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) - EPID L-2024-LLR-0048 ML24218A0652024-08-0202 August 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 ML24180A0022024-06-26026 June 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 1 and 2 - Proposed Alternatives for Examinations of SG Pressure Retaining Welds and Full Penetrations Nozzles - EPID L-2024-LLR-0038 ML24149A3672024-05-28028 May 2024 August 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24117A0262024-04-26026 April 2024 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Typographical Errors in Technical Specifications ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping 2024-08-02
[Table view] |
Text
From:
Thomas Wengert Sent:
Monday, July 3, 2023 11:35 AM To:
Keele Jr, Riley D Cc:
REID, MARK; CLARK, ROBERT W; Jennifer Dixon-Herrity
Subject:
Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda (EPID L-2022-LLA-0197)
Attachments:
Audit Agenda - ANO-1 TSTF-505 7-3-23.pdf By letter dated December 22, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22356A249), Entergy Operations, Inc. (Entergy, the licensee) submitted a license amendment request (LAR) for Arkansas Nuclear One, Unit 1 (ANO-1). The proposed amendment would modify Renewed Operating License DPR-51 and the Technical Specifications (TSs) to adopt Technical Specifications Task Force (TSTF) Traveler 505 (TSTF-505), Provide Risk-informed Extended Completion Times, RITSTF Initiative 4b.
By email dated May 10, 2023 (ML23121A301), the NRC staff issued an audit plan that conveyed the intent to conduct a regulatory audit to support its review of the subject licensing actions.
In the audit plan, the NRC staff requested an electronic portal setup and provided a list of documents to be added to the online portal. The audit plan also indicated that the NRC staff may request information and audit meetings/interviews throughout the audit period.
The NRC staff has performed an initial review of the list of documents and developed a list of audit questions that were sent to you via email on June 14, 2023 (ML23166A013). The responses to the questions will be discussed during the audit meetings, which are scheduled from Tuesday July 11, 2023, through Thursday, July 13, 2023. The proposed agenda for the audit is provided in the attached.
Please contact me if you have any questions.
Thank you, Tom Wengert Project Manager - Arkansas Nuclear One NRR/DORL/LPL4 (301) 415-4037
Hearing Identifier:
NRR_DRMA Email Number:
2150 Mail Envelope Properties (PH0PR09MB7403B6CF4E6B4544F093BEF58F29A)
Subject:
Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda (EPID L-2022-LLA-0197)
Sent Date:
7/3/2023 11:34:38 AM Received Date:
7/3/2023 11:34:00 AM From:
Thomas Wengert Created By:
Thomas.Wengert@nrc.gov Recipients:
"REID, MARK" <mreid1@entergy.com>
Tracking Status: None "CLARK, ROBERT W" <RCLARK@entergy.com>
Tracking Status: None "Jennifer Dixon-Herrity" <Jennifer.Dixon-Herrity@nrc.gov>
Tracking Status: None "Keele Jr, Riley D" <rkeele@entergy.com>
Tracking Status: None Post Office:
PH0PR09MB7403.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1532 7/3/2023 11:34:00 AM Audit Agenda - ANO-1 TSTF-505 7-3-23.pdf 144773 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
REGULATORY AUDIT AGENDA LICENSE AMENDMENT REQUEST TO ADOPT TSTF-505, REVISION 2 ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNIT 1 Day 1 - Tuesday, July 11th, 2023 (9:00 am to 4:00 pm EDT)*
Entrance meeting Opening remarks by NRC and Entergy
Introductions
Audit logistics - NRC to describe key elements of the regulatory audit plan, and audit logistics Entergy TSTF-505 presentations:
Real-time risk (RTR) model demonstration, Electrical power distribution presentation, and RICT sample calculations by Entergy Discuss RTR model and calculation of RICT estimates (APLA)
RTR model (including benchmarking, updating, and how seasonal variations and unit cross-ties are accounted for) (APLA Questions 02 and 03)
PRA functional determination and RICT estimates Treatment of common cause failures for planned and emergent conditions Identification of risk management actions Discuss Key Principle 5, Maintenance Rule and Performance Monitoring (APLA Question 5)
Summary of the day (3:30 pm EDT)1 NRC staff internal meeting (4:00 pm EDT)
- Lunch will be tentatively scheduled from 12:00 pm - 1:00 pm EDT 1 If discussion topics are completed early, additional discussions for Day 1 may include seismic from Day 3 and/or design success criteria from Day 3.
2 Day 2 - Wednesday July 12th, 2023 (9:00 am to 4:00 pm EDT)*
Summary of previous day and review open items Discuss reliability for ANO-1 SG experiencing corrosion (SNSB Question)
Discuss internal events PRA technical acceptability (APLA)
Discuss I&C diversity and modeling in PRA (APLA Question 01 and EICB Issues)
Discuss modeling of Open Phase Condition (APLA Question 04)
Discuss use of surrogates in modeling (APLA Question 06)
Discuss fire PRA modeling (APLA Question 07)
Summary of the day (3:30 pm EDT) 2 NRC staff internal meeting (4:00 pm EDT)
Day 3 - Thursday, July 13th, 2023 (9:00 am to 2:30 pm)*
Summary of previous day and review open items Proposed TS 5.5.18 (STSB Question 01)
Discuss selected design success criteria (EEEB Questions 01 to 03)
Discuss high winds penalty (APLC Question 01)
Follow-up on any remaining open action items NRC staff internal meeting Technical summary meeting with Entergys audit team (1:30 pm EDT)
Formal exit meeting (2:00 pm EDT)
Closing remarks by NRC Closing remarks by Entergy
- Lunch will be tentatively scheduled from 12:00 pm - 1:00 pm EDT 2 If discussion topics are completed early, additional discussions for Day 2 may include seismic from Day 3, design-success criteria from Day 3, if not discussed earlier.
3 Common Acronyms:
APLA NRC/NRR/PRA Licensing Branch A APLC NRC/NRR/PRA Licensing Branch C CDF Core Damage Frequency DORL NRR Division of Operating Reactor Licensing DSC Design Success Criterion EDG Emergency Diesel Generator EDT Eastern Daylight Time EEEB NRC/NRR/Electrical Engineering Branch EFIC Emergency Feedwater Initiation and Control System EICB NRC/NRR/Instrumentation & Controls Branch ESAS Engineered Safeguards Actuation System Entergy Entergy Operations, Inc.
F&Os Facts and Observations FLEX Flexible Mitigation Strategies GDC General Design Criteria I&C Instrumentation and Controls LCO Limiting Condition for Operation LERF Large Early Release Frequency LSS Low Safety Significant NRC U.S. Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation OPC Open Phase Condition OPIS Open Phase Isolation System PRA Probabilistic Risk Assessment RICT Risk-informed Completion Time RMTS Risk-Managed Technical Specifications RPS Reactor Protection System RTR Real-time Risk SAR Safety Analysis Report SG Steam Generator SSCs Structures, Systems, and Components STSB NRC/NRR/Technical Specifications Branch TSs Technical Specifications TSTF-505 Technical Specifications Task Force Traveler 505, Provide Risk-informed Extended Completion Times, RITSTF Initiative 4b