ML23187A043

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda
ML23187A043
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/03/2023
From: Thomas Wengert
NRC/NRR/DORL/LPL4
To: Keele R
Entergy Operations
Wengert T
References
L-2022-LLA-0197
Download: ML23187A043 (5)


Text

From:

Thomas Wengert Sent:

Monday, July 3, 2023 11:35 AM To:

Keele Jr, Riley D Cc:

REID, MARK; CLARK, ROBERT W; Jennifer Dixon-Herrity

Subject:

Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda (EPID L-2022-LLA-0197)

Attachments:

Audit Agenda - ANO-1 TSTF-505 7-3-23.pdf By letter dated December 22, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22356A249), Entergy Operations, Inc. (Entergy, the licensee) submitted a license amendment request (LAR) for Arkansas Nuclear One, Unit 1 (ANO-1). The proposed amendment would modify Renewed Operating License DPR-51 and the Technical Specifications (TSs) to adopt Technical Specifications Task Force (TSTF) Traveler 505 (TSTF-505), Provide Risk-informed Extended Completion Times, RITSTF Initiative 4b.

By email dated May 10, 2023 (ML23121A301), the NRC staff issued an audit plan that conveyed the intent to conduct a regulatory audit to support its review of the subject licensing actions.

In the audit plan, the NRC staff requested an electronic portal setup and provided a list of documents to be added to the online portal. The audit plan also indicated that the NRC staff may request information and audit meetings/interviews throughout the audit period.

The NRC staff has performed an initial review of the list of documents and developed a list of audit questions that were sent to you via email on June 14, 2023 (ML23166A013). The responses to the questions will be discussed during the audit meetings, which are scheduled from Tuesday July 11, 2023, through Thursday, July 13, 2023. The proposed agenda for the audit is provided in the attached.

Please contact me if you have any questions.

Thank you, Tom Wengert Project Manager - Arkansas Nuclear One NRR/DORL/LPL4 (301) 415-4037

Hearing Identifier:

NRR_DRMA Email Number:

2150 Mail Envelope Properties (PH0PR09MB7403B6CF4E6B4544F093BEF58F29A)

Subject:

Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda (EPID L-2022-LLA-0197)

Sent Date:

7/3/2023 11:34:38 AM Received Date:

7/3/2023 11:34:00 AM From:

Thomas Wengert Created By:

Thomas.Wengert@nrc.gov Recipients:

"REID, MARK" <mreid1@entergy.com>

Tracking Status: None "CLARK, ROBERT W" <RCLARK@entergy.com>

Tracking Status: None "Jennifer Dixon-Herrity" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Keele Jr, Riley D" <rkeele@entergy.com>

Tracking Status: None Post Office:

PH0PR09MB7403.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1532 7/3/2023 11:34:00 AM Audit Agenda - ANO-1 TSTF-505 7-3-23.pdf 144773 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

REGULATORY AUDIT AGENDA LICENSE AMENDMENT REQUEST TO ADOPT TSTF-505, REVISION 2 ENTERGY OPERATIONS, INC.

ARKANSAS NUCLEAR ONE, UNIT 1 Day 1 - Tuesday, July 11th, 2023 (9:00 am to 4:00 pm EDT)*

Entrance meeting Opening remarks by NRC and Entergy

Introductions

Audit logistics - NRC to describe key elements of the regulatory audit plan, and audit logistics Entergy TSTF-505 presentations:

Real-time risk (RTR) model demonstration, Electrical power distribution presentation, and RICT sample calculations by Entergy Discuss RTR model and calculation of RICT estimates (APLA)

RTR model (including benchmarking, updating, and how seasonal variations and unit cross-ties are accounted for) (APLA Questions 02 and 03)

PRA functional determination and RICT estimates Treatment of common cause failures for planned and emergent conditions Identification of risk management actions Discuss Key Principle 5, Maintenance Rule and Performance Monitoring (APLA Question 5)

Summary of the day (3:30 pm EDT)1 NRC staff internal meeting (4:00 pm EDT)

  • Lunch will be tentatively scheduled from 12:00 pm - 1:00 pm EDT 1 If discussion topics are completed early, additional discussions for Day 1 may include seismic from Day 3 and/or design success criteria from Day 3.

2 Day 2 - Wednesday July 12th, 2023 (9:00 am to 4:00 pm EDT)*

Summary of previous day and review open items Discuss reliability for ANO-1 SG experiencing corrosion (SNSB Question)

Discuss internal events PRA technical acceptability (APLA)

Discuss I&C diversity and modeling in PRA (APLA Question 01 and EICB Issues)

Discuss modeling of Open Phase Condition (APLA Question 04)

Discuss use of surrogates in modeling (APLA Question 06)

Discuss fire PRA modeling (APLA Question 07)

Summary of the day (3:30 pm EDT) 2 NRC staff internal meeting (4:00 pm EDT)

Day 3 - Thursday, July 13th, 2023 (9:00 am to 2:30 pm)*

Summary of previous day and review open items Proposed TS 5.5.18 (STSB Question 01)

Discuss selected design success criteria (EEEB Questions 01 to 03)

Discuss high winds penalty (APLC Question 01)

Follow-up on any remaining open action items NRC staff internal meeting Technical summary meeting with Entergys audit team (1:30 pm EDT)

Formal exit meeting (2:00 pm EDT)

Closing remarks by NRC Closing remarks by Entergy

  • Lunch will be tentatively scheduled from 12:00 pm - 1:00 pm EDT 2 If discussion topics are completed early, additional discussions for Day 2 may include seismic from Day 3, design-success criteria from Day 3, if not discussed earlier.

3 Common Acronyms:

APLA NRC/NRR/PRA Licensing Branch A APLC NRC/NRR/PRA Licensing Branch C CDF Core Damage Frequency DORL NRR Division of Operating Reactor Licensing DSC Design Success Criterion EDG Emergency Diesel Generator EDT Eastern Daylight Time EEEB NRC/NRR/Electrical Engineering Branch EFIC Emergency Feedwater Initiation and Control System EICB NRC/NRR/Instrumentation & Controls Branch ESAS Engineered Safeguards Actuation System Entergy Entergy Operations, Inc.

F&Os Facts and Observations FLEX Flexible Mitigation Strategies GDC General Design Criteria I&C Instrumentation and Controls LCO Limiting Condition for Operation LERF Large Early Release Frequency LSS Low Safety Significant NRC U.S. Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation OPC Open Phase Condition OPIS Open Phase Isolation System PRA Probabilistic Risk Assessment RICT Risk-informed Completion Time RMTS Risk-Managed Technical Specifications RPS Reactor Protection System RTR Real-time Risk SAR Safety Analysis Report SG Steam Generator SSCs Structures, Systems, and Components STSB NRC/NRR/Technical Specifications Branch TSs Technical Specifications TSTF-505 Technical Specifications Task Force Traveler 505, Provide Risk-informed Extended Completion Times, RITSTF Initiative 4b