NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035
ML22188A178
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/07/2022
From: Thomas Wengert
NRC/NRR/DORL/LPL4
To: Keele R
Entergy Operations
Wengert T
References
L-2022-LLR-0050
Download: ML22188A178 (3)


Text

From: Wengert, Thomas Sent: Thursday, July 7, 2022 12:49 PM To: Keele Jr, Riley D Cc: CLARK, ROBERT W; Dixon-Herrity, Jennifer

Subject:

ANO Acceptance Review of Relief Request ANO1-ISI-035 (EPID L-2022-LLR-0050)

By letter dated May 31, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22151A322), Entergy Operations, Inc. (the licensee) requested that, pursuant to Section 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR),

the Nuclear Regulatory Commission (NRC) authorize an alternative for a one-time extension of the schedule for inservice examination of Control Rod Drive Mechanism (CRDM) Penetration No. 1 in the Arkansas Nuclear One, Unit 1 (ANO-1) reactor vessel closure head (RVCH). The augmented examination requirements of 10 CFR 50.55a(g)(6)(ii)(D) specify that periodic inservice volumetric or surface examinations be performed of RVCH penetrations in accordance with Code Case N-729-6. The licensee stated that the examination of CRDM Penetration No. 1 in accordance with Code Case N-729-6 would present a hardship without a compensating increase in the level of quality and safety.

The regulation in 10 CFR 50.55a(z)(2) states that alternatives to the requirements of 10 CFR 50.55a may be authorized by the NRC if the licensee demonstrates that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated the jobhour expenditures to total approximately 220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br />. The NRC staff expects to complete its review of the request by July 7, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change due to several factors, including requests for additional information, unanticipated

addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Tom Wengert Project Manager - Arkansas Nuclear One NRC/NRR/DORL/LPL4 (301) 415-4037

Hearing Identifier: NRR_DRMA Email Number: 1701 Mail Envelope Properties (MN2PR09MB5449A78B5CE61FD6E7AC77628F839)

Subject:

ANO Acceptance Review of Relief Request ANO1-ISI-035 (EPID L-2022-LLR-0050)

Sent Date: 7/7/2022 12:49:00 PM Received Date: 7/7/2022 12:48:00 PM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients:

"CLARK, ROBERT W" <RCLARK@entergy.com>

Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Keele Jr, Riley D" <rkeele@entergy.com>

Tracking Status: None Post Office: MN2PR09MB5449.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3723 7/7/2022 12:48:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: