LIC-16-0013, Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 23: Line 23:
==Reference:==
==Reference:==
: 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 through December 31, 2014," dated January 15, 2015 (LIC-15-0005) (ML 15015A615)
: 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 through December 31, 2014," dated January 15, 2015 (LIC-15-0005) (ML 15015A615)
In accordance with 10 CFR 72.48(d)(2), attached is the 10 CFR 72.48 Evaluation Summary Report for the period of January 1, 2015 through December 31, 2015. The previous report (Reference  
In accordance with 10 CFR 72.48(d)(2), attached is the 10 CFR 72.48 Evaluation Summary Report for the period of January 1, 2015 through December 31, 2015. The previous report (Reference
: 1) was submitted on January 15, 2015. No commitments to the NRC are made in this letter. If you should have any questions, please contact Mr. Bradley H. Blome at (402) 533-7270. Respectfully, Urry( Shane M. Marik Site Vice President and CNO  
: 1) was submitted on January 15, 2015. No commitments to the NRC are made in this letter. If you should have any questions, please contact Mr. Bradley H. Blome at (402) 533-7270. Respectfully, Urry( Shane M. Marik Site Vice President and CNO  


Line 36: Line 36:
==Reference:==
==Reference:==
: 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 through December 31, 2014," dated January 15, 2015 (LIC-15-0005) (ML 15015A615)
: 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 through December 31, 2014," dated January 15, 2015 (LIC-15-0005) (ML 15015A615)
In accordance with 10 CFR 72.48(d)(2), attached is the 10 CFR 72.48 Evaluation Summary Report for the period of January 1, 2015 through December 31, 2015. The previous report (Reference  
In accordance with 10 CFR 72.48(d)(2), attached is the 10 CFR 72.48 Evaluation Summary Report for the period of January 1, 2015 through December 31, 2015. The previous report (Reference
: 1) was submitted on January 15, 2015. No commitments to the NRC are made in this letter. If you should have any questions, please contact Mr. Bradley H. Blome at (402) 533-7270. Respectfully, Urry( Shane M. Marik Site Vice President and CNO  
: 1) was submitted on January 15, 2015. No commitments to the NRC are made in this letter. If you should have any questions, please contact Mr. Bradley H. Blome at (402) 533-7270. Respectfully, Urry( Shane M. Marik Site Vice President and CNO  



Revision as of 10:58, 27 April 2019

Ft. Calhoun, Unit 1 and ISFSI - Transmittal of 10CFR72.48 Evaluation Summary Report for January 1, 2015 Through December 31, 2015
ML16041A535
Person / Time
Site: Fort Calhoun  Omaha Public Power District icon.png
Issue date: 02/10/2016
From: Marik S M
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
LIC-16-0013
Download: ML16041A535 (3)


Text

Omaha Public Power District February 10, 2016 LIC-16-0013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No.72-054 10 CFR 72.48(d)(2)

Subject:

Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2015 through December 31, 2015

Reference:

1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 through December 31, 2014," dated January 15, 2015 (LIC-15-0005) (ML 15015A615)

In accordance with 10 CFR 72.48(d)(2), attached is the 10 CFR 72.48 Evaluation Summary Report for the period of January 1, 2015 through December 31, 2015. The previous report (Reference

1) was submitted on January 15, 2015. No commitments to the NRC are made in this letter. If you should have any questions, please contact Mr. Bradley H. Blome at (402) 533-7270. Respectfully, Urry( Shane M. Marik Site Vice President and CNO

Attachment:

10 CFR 72.48 Evaluation Summary Report for January 1 , 2015 through December 31, 2015 SMM/JRD/mle LIC-16-0013 Attachment Page 1 10 CFR 72.48 Evaluation Summary Report For January 1, 2015 through December 31, 2015 LIC-16-0013 Attachment Page2 During this period, there were no changes, tests, or experiments that required an evaluation to be performed under 10 CFR 72.48.

Omaha Public Power District February 10, 2016 LIC-16-0013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No.72-054 10 CFR 72.48(d)(2)

Subject:

Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2015 through December 31, 2015

Reference:

1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2013 through December 31, 2014," dated January 15, 2015 (LIC-15-0005) (ML 15015A615)

In accordance with 10 CFR 72.48(d)(2), attached is the 10 CFR 72.48 Evaluation Summary Report for the period of January 1, 2015 through December 31, 2015. The previous report (Reference

1) was submitted on January 15, 2015. No commitments to the NRC are made in this letter. If you should have any questions, please contact Mr. Bradley H. Blome at (402) 533-7270. Respectfully, Urry( Shane M. Marik Site Vice President and CNO

Attachment:

10 CFR 72.48 Evaluation Summary Report for January 1 , 2015 through December 31, 2015 SMM/JRD/mle LIC-16-0013 Attachment Page 1 10 CFR 72.48 Evaluation Summary Report For January 1, 2015 through December 31, 2015 LIC-16-0013 Attachment Page2 During this period, there were no changes, tests, or experiments that required an evaluation to be performed under 10 CFR 72.48.