ML16257A127: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16257A127
| number = ML16257A127
| issue date = 08/25/2016
| issue date = 08/25/2016
| title = Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.1, Figures 15.1-1 Through 15.1-94
| title = Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.1, Figures 15.1-1 Through 15.1-94
| author name =  
| author name =  
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Core Power vs. Time Figure15.1-1 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Core Average Heat Flux vs. Time Figure15.1-2 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Reactor Coolant System Pressure vs. Time Figure15.1-3 Revision 304 (06/10)Waterford Steam Electric Station #3 Increased Main Steam Flow Minimum DNBR vs. Time Figure 15.1-4 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Reactor Coolant System Temperatures vs. Time Figure15.1-5 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Pressurizer Level vs. Time Figure15.1-6 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Steam Generator Pressure vs. Time Figure15.1-7 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Total Steam Flow vs. Time Figure15.1-8 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Feedwater Flow vs. Time Figure15.1-9 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Feedwater Enthalpy vs. Time Figure15.1-10 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Steam Generator Liquid Mass vs. Time Figure15.1-11 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Power vs. Time Figure15.1-12 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Heat Flux vs. Time Figure15.1-13 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve RCS Pressure vs. Time Figure15.1-14 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Reactor Coolant Temperature vs. Time Figure15.1-15 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Pressurizer Water Volume vs. Time Figure15.1-16 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Pressure vs. Time Figure15.1-17 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Total Main Steam Flow vs. Time Figure15.1-18 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Fluid Mass vs. Time Figure15.1-19   
{{#Wiki_filter:Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Core Power vs. Time Figure 15.1-1 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Core Average Heat Flux vs. Time Figure 15.1-2 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Reactor Coolant System Pressure vs. Time Figure 15.1-3 Revision 304 (06/10)Waterford Steam Electric Station #3 Increased Main Steam Flow Minimum DNBR vs. Time Figure 15.1-4 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Reactor Coolant System Temperatures vs. Time Figure 15.1-5 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Pressurizer Level vs. Time Figure 15.1-6 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Steam Generator Pressure vs. Time Figure 15.1-7 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Total Steam Flow vs. Time Figure 15.1-8 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Feedwater Flow vs. Time Figure 15.1-9 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Feedwater Enthalpy vs. Time Figure15.1-10 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Steam Generator Liquid Mass vs. Time Figure15.1-11 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Power vs. Time Figure15.1-12 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Heat Flux vs. Time Figure15.1-13 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve RCS Pressure vs. Time Figure15.1-14 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Reactor Coolant Temperature vs. Time Figure15.1-15 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Pressurizer Water Volume vs. Time Figure15.1-16 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Pressure vs. Time Figure15.1-17 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Total Main Steam Flow vs. Time Figure15.1-18 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Fluid Mass vs. Time Figure15.1-19   


Revision 304 (06/10)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve DNBR vs. Time Figure 15.1-19a Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure  Core Power vs. Time (Typical NSSS Response)
Revision 304 (06/10)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve DNBR vs. Time Figure 15.1-19a Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure  Core Power vs. Time (Typical NSSS Response)
Line 35: Line 35:
Figure15.1-32 Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Power vs. Time Figure15.1-32a Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Heat Flux vs. Time Figure15.1-32b Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power RCS Pressure vs. Time Figure15.1-32c   
Figure15.1-32 Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Power vs. Time Figure15.1-32a Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Heat Flux vs. Time Figure15.1-32b Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power RCS Pressure vs. Time Figure15.1-32c   


Revision 304 (06/10)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Minimum Hot Channel DNBR vs. Time Figure 15.1-32d  
Revision 304 (06/10)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Minimum Hot Channel DNBR vs. Time Figure 15.1-32d Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Reactor Coolant Temperature vs. Time Figure15.1-32e Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Pressurizer Liquid Volume vs. Time Figure 15.1-32f Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Steam Generator Pressure vs. Time Figure15.1-32g Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Main Steam Flow vs. Time Figure15.1-32h Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Feedwater Flow vs. Time Figure15.1-32i Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Feedwater Enthalpy vs. Time Figure15.1-32j Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Steam Generator Liquid Mass vs. Time Figure15.1-32k Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Total Integrated Safety Valve Flow vs. Time Figure15.1-32l Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening in an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Flow vs. Time Figure15.1-32m   
 
Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Reactor Coolant Temperature vs. Time Figure15.1-32e Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Pressurizer Liquid Volume vs. Time Figure15.1-32f Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Steam Generator Pressure vs. Time Figure15.1-32g Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Main Steam Flow vs. Time Figure15.1-32h Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Feedwater Flow vs. Time Figure15.1-32i Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Feedwater Enthalpy vs. Time Figure15.1-32j Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Steam Generator Liquid Mass vs. Time Figure15.1-32k Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Total Integrated Safety Valve Flow vs. Time Figure15.1-32l Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening in an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Flow vs. Time Figure15.1-32m   


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Power vs. Time Figure 15.1-33   
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Power vs. Time Figure 15.1-33   
Line 51: Line 49:
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactivity vs. Time Figure 15.1-38   
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactivity vs. Time Figure 15.1-38   


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-38a  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-38a  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Flow vs. Time Figure 15.1-38b  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Flow vs. Time Figure 15.1-38b  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-38c  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-38c  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-38d  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-38d  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-38e  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-38e  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Vessel Level vs. Time Figure 15.1-38f  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Vessel Level vs. Time Figure 15.1-38f  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power DNBR vs. Time Figure 15.1-38g  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power DNBR vs. Time Figure 15.1-38g THROUGH HAVE BEEN INTENTIONALLY DELETED  
 
THROUGH HAVE BEEN INTENTIONALLY DELETED  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Core Power vs. Time Figure 15.1-47   
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Core Power vs. Time Figure 15.1-47   
Line 88: Line 84:
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactivity vs. Time Figure 15.1-58   
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactivity vs. Time Figure 15.1-58   


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-58a  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-58a  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-58b  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-58b  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time Figure 15.1-58c  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time Figure 15.1-58c WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
 
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.1-59 has been intentionally deleted. (DRN 05-543, R14)
Figure 15.1-59 has been intentionally deleted. (DRN 05-543, R14)
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Line 119: Line 113:
Figure 15.1-72 has been intentionally deleted. (DRN 05-543, R14)  
Figure 15.1-72 has been intentionally deleted. (DRN 05-543, R14)  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-72a  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-72a  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactor Vessel Level vs. Time Figure 15.1-72b  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactor Vessel Level vs. Time Figure 15.1-72b  


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power DNBR vs. Time Figure 15.1-72c  
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power DNBR vs. Time Figure 15.1-72c Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Power vs. Time Figure 15.1-72d 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Power vs. Time Figure 15.1-72d
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Heat Flux vs. Time Figure 15.1-72e 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Heat Flux vs. Time Figure 15.1-72e
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Pressure vs. Time Figure 15.1-72f 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Pressure vs. Time Figure 15.1-72f
Revision 307 (07/13) Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Coolant System Temperatures vs. Time Figure 15.1-72g 


Revision 307 (07/13) Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Coolant System Temperatures vs. Time Figure 15.1-72g
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Generator Pressure vs. Time Figure 15.1-72h 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Generator Pressure vs. Time Figure 15.1-72h
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactivity vs. Time Figure 15.1-72i 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactivity vs. Time Figure 15.1-72i
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-72j 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-72j
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Flow vs. Time Figure 15.1-72k 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Flow vs. Time Figure 15.1-72k
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-72l Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-72m 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-72l
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-72n 


Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-72m
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time Figure 15.1-72o WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
 
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-72n
 
Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time Figure 15.1-72o  
 
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.1-73 has been intentionally deleted. (DRN 05-543, R14)
Figure 15.1-73 has been intentionally deleted. (DRN 05-543, R14)
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Line 157: Line 145:
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.1-75a has been intentionally deleted. (DRN 05-543, R14)  
Figure 15.1-75a has been intentionally deleted. (DRN 05-543, R14)  
.I loo-s8III32144216288360SECONDSREVISION 10 (10199)
.I loo-s 8 II I 32 144216288 360 SECONDS REVISION 10 (10199)
LOUISIANA POWER  LIGHT CO.
LOUISIANA POWER  LIGHT CO.
MAIN STEAM LINE BREAK MODES 4 SteamFigureWITH LOSS OF ACPOWER Electrical Station 15.1-76CORE POWER VS. TIME 16001200800400tt1REVISION 10 (10199) 7214421628036GTIME, SECONDS POWER  LIGHT CO. SteamElectric StationREACTOR COOLANT SYSTEM PRESSURE VS. TIME 77MAIN STEAM LINE BREAK MODES 3 & 4 IWITH LOSS OF AC POWER 700600'200'CORE INLETCOOLANT TEMPERATURE I72144288360TIME,SECONDSREVISION 10 (10199)
MAIN STEAM LINE BREAK MODES 4 Steam Figure WITH LOSS OF ACPOWER Electrical Station 15.1-76 CORE POWER VS. TIME 1600 1200 800 400 t t 1 REVISION 10 (10199) 72 144 216 280 36G TIME, SECONDS POWER  LIGHT CO. Steam Electric StationREACTOR COOLANT SYSTEM PRESSURE VS. TIME 77 MAIN STEAM LINE BREAK MODES 3 & 4 IWITH LOSS OF AC POWER 700 600'200'CORE INLETCOOLANT TEMPERATURE I 72 144 288 360 TIME, SECONDS REVISION 10 (10199)
LOUISIANA POWER LIGHT CO.
LOUISIANA POWER LIGHT CO.
MAIN STEAM LINE BREAK MODES 3 4WITH LOSS OF AC POWERREACTOR COOLANT TEMPERATURE VS. TIME  
MAIN STEAM LINE BREAK MODES 3 4 WITH LOSS OF AC POWERREACTOR COOLANT TEMPERATURE VS. TIME  
 
1 800200ISOLATEDSTEAM GENERATOR STEAM GENERATOR WITH RUPTURED LINE 72144216288 360TIME,SECONDSREVISION 10 (10199)
LOUPOWER LIGHT CO.
ElectricMAIN STEAM LINE BREAK MODES 3 4IWITH LOSS OF AC POWER STEAM GENERATOR PRESSURE VS. TIME 10000 800C2000POWERMAIN STEAM LINE BREAK MODES 3 i-4 WITH LOSS OF AC POWER STEAM MASS RELEASE FROM BREAK VS. TIME IISTEAMGENERATORWITH RUPTUREDLINE ISOLATED STEAMGENERATOR III72216288TIME, SECONDS REVISION


III72144216288360TIME,SECONDSREVISION 10 (10199)
1 800 200 ISOLATED STEAM GENERATOR STEAM GENERATOR WITH RUPTURED LINE 72 144 216 288 36 0 TIME, SECONDS REVISION 10 (10199)
ANAMAIN STEAM LINE BREAK MODES 3 8 4 WITH LOSS OF AC POWER FEEDWATER FLOW VS. TIME
LOU POWER LIGHT CO.
Electric MAIN STEAM LINE BREAK MODES 3 4 I WITH LOSS OF AC POWER STEAM GENERATOR PRESSURE VS. TIME 10000 800C 2000 POWER MAIN STEAM LINE BREAK MODES 3 i-4 WITH LOSS OF AC POWER STEAM MASS RELEASE FROM BREAK VS. TIME I I STEAMGENERATORWITH RUPTUREDLINE ISOLATED STEAMGENERATOR I I I 72 216 288 TIME, SECONDS REVISION I I I 72 144 216 288 360 TIME, SECONDS REVISION 10 (10199)
ANA MAIN STEAM LINE BREAK MODES 3 8 4 WITH LOSS OF AC POWER FEEDWATER FLOW VS. TIME
  .,
  .,
72144 216TIME, SECONDSMAIN STEAM LINE BREAK MODES 3 & 4 FigureWITH LOSS OF AC POWER FEEDWATER ENTHALPY VS. TIME REVISION 10 (10199) 30000072. ANAMAIN STEAM LINE BREAK MODES 3 4WITH LOSS OF AC POWER STEAM GENERATOR LIQUID INVENTORY VS. TIME UricII144216TIME, SECONDS 288360REVISION 10 3DOPPLERSAFETY INJECTION TOTALS-39IIIIMODERATOR 6-6CEA-9IIII72144216288TIME,SECONDSREVISION 10 (1 MAIN STEAM LINE BREAK MODES 3 4WITH LOSS OF AC POWER REACTIVITY VS. TIME
72 144 216 TIME, SECONDSMAIN STEAM LINE BREAK MODES 3 & 4 FigureWITH LOSS OF AC POWER FEEDWATER ENTHALPY VS. TIME REVISION 10 (10199) 300000 72. ANA MAIN STEAM LINE BREAK MODES 3 4 WITH LOSS OF AC POWER STEAM GENERATOR LIQUID INVENTORY VS. TIME Uric I I144216 TIME, SECONDS 288 360 REVISION 10 3 DOPPLER SAFETY INJECTION TOTAL S-3 9 I I I I MODERATOR 6-6 CEA-9 I II I 72 144216288 TIME, SECONDSREVISION 10 (1 MAIN STEAM LINE BREAK MODES 3 4 WITH LOSS OF AC POWER REACTIVITY VS. TIME
,
,
35000030000015000010000050000TIME, SECONDS REVISION 10 (10199)
350000 300000 150000 100000 50000 TIME, SECONDS REVISION 10 (10199)
MAIN STEAM LINE BREAK MODES 3 8 4WITH LOSS OF AC POWER  INTEGRATED STEAM MASS RELEASE FROM BREAK VS. TIME  
MAIN STEAM LINE BREAK MODES 3 8 4WITH LOSS OF AC POWER  INTEGRATED STEAM MASS RELEASE FROM BREAK VS. TIME  


Line 182: Line 168:


Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion DNBR vs. Time Figure 15.1-93 WSES-FSAR-UNIT-3 Revision 307 (07/13)
Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion DNBR vs. Time Figure 15.1-93 WSES-FSAR-UNIT-3 Revision 307 (07/13)
(EC-8458, R307)
(EC-8458, R307)
Figure 15.1-94 has been Intentionally Deleted.  
Figure 15.1-94 has been Intentionally Deleted.
(EC-8458, R307)}}
(EC-8458, R307)}}

Latest revision as of 01:57, 27 April 2019

Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.1, Figures 15.1-1 Through 15.1-94
ML16257A127
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A127 (128)


Text

Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Core Power vs. Time Figure 15.1-1 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Core Average Heat Flux vs. Time Figure 15.1-2 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Reactor Coolant System Pressure vs. Time Figure 15.1-3 Revision 304 (06/10)Waterford Steam Electric Station #3 Increased Main Steam Flow Minimum DNBR vs. Time Figure 15.1-4 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Reactor Coolant System Temperatures vs. Time Figure 15.1-5 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Pressurizer Level vs. Time Figure 15.1-6 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Steam Generator Pressure vs. Time Figure 15.1-7 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Total Steam Flow vs. Time Figure 15.1-8 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Feedwater Flow vs. Time Figure 15.1-9 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Feedwater Enthalpy vs. Time Figure15.1-10 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow Steam Generator Liquid Mass vs. Time Figure15.1-11 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Power vs. Time Figure15.1-12 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Heat Flux vs. Time Figure15.1-13 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve RCS Pressure vs. Time Figure15.1-14 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Reactor Coolant Temperature vs. Time Figure15.1-15 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Pressurizer Water Volume vs. Time Figure15.1-16 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Pressure vs. Time Figure15.1-17 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Total Main Steam Flow vs. Time Figure15.1-18 Revision 14 (12/05)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Fluid Mass vs. Time Figure15.1-19

Revision 304 (06/10)Waterford Steam Electric Station #3 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve DNBR vs. Time Figure 15.1-19a Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Core Power vs. Time (Typical NSSS Response)

Figure15.1-20 Revision 14 (12/05)Waterford Steam Electric Station #3 Increase Steam Flow with Concurrent Single Failure Core Heat Flux vs. Time (Typical NSSS Response)

Figure15.1-21 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure RCS Pressure vs. Time (Typical NSSS Response)

Figure15.1-22 Revision 309 (06/16)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Minimum Hot Channel DNBR vs. Time Figure 15.1-23 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Reactor Coolant Temperature vs. Time (Typical NSSS Response)

Figure15.1-24 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Pressurizer Liquid Volume vs. Time (Typical NSSS Response)

Figure15.1-25 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Steam Generator Pressure vs. Time (Typical NSSS Response)

Figure15.1-26 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Main Steam Flow vs. Time (Typical NSSS Response)

Figure15.1-27 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Feedwater Flow vs. Time (Typical NSSS Response)

Figure15.1-28 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Feedwater Enthalpy vs. Time (Typical NSSS Response)

Figure15.1-29 Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Steam Generator Liquid Mass vs. Time (Typical NSSS Response)

Figure15.1-30 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-31 has been intentionally deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Total Integrated Safety Valve Flow vs. Time (Typical NSSS Response)

Figure15.1-31a Revision 14 (12/05)Waterford Steam Electric Station #3 Increased Main Steam Flow with Concurrent Single Failure Core Flow vs. Time (Typical NSSS Response)

Figure15.1-32 Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Power vs. Time Figure15.1-32a Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Heat Flux vs. Time Figure15.1-32b Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power RCS Pressure vs. Time Figure15.1-32c

Revision 304 (06/10)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Minimum Hot Channel DNBR vs. Time Figure 15.1-32d Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Reactor Coolant Temperature vs. Time Figure15.1-32e Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Pressurizer Liquid Volume vs. Time Figure 15.1-32f Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Steam Generator Pressure vs. Time Figure15.1-32g Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Main Steam Flow vs. Time Figure15.1-32h Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Feedwater Flow vs. Time Figure15.1-32i Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Feedwater Enthalpy vs. Time Figure15.1-32j Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Steam Generator Liquid Mass vs. Time Figure15.1-32k Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening of an Atmospheric Dump Valve With a Concurrent Loss of AC Power Total Integrated Safety Valve Flow vs. Time Figure15.1-32l Revision 14 (12/05)Waterford Steam Electric Station #3 HFP Inadvertent Opening in an Atmospheric Dump Valve With a Concurrent Loss of AC Power Core Flow vs. Time Figure15.1-32m

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Power vs. Time Figure 15.1-33

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Heat Flux vs. Time Figure 15.1-34

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Pressurizer Pressure vs. Time Figure 15.1-35

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Coolant System Temperature vs. Time Figure 15.1-36

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Generator Pressure vs. Time Figure 15.1-37

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactivity vs. Time Figure 15.1-38

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-38a

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Flow vs. Time Figure 15.1-38b

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-38c

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-38d

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-38e

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Vessel Level vs. Time Figure 15.1-38f

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power DNBR vs. Time Figure 15.1-38g THROUGH HAVE BEEN INTENTIONALLY DELETED

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Core Power vs. Time Figure 15.1-47

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Core Heat Flux vs. Time Figure 15.1-48

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Pressurizer Pressure vs. Time Figure 15.1-49 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-50 has been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactor Coolant System Temperatures vs. Time Figure 15.1-51 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-52 has been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Steam Generator Pressure vs. Time Figure 15.1-53

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Steam Flow vs. Time Figure 15.1-54

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-55 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-56 has been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-57

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactivity vs. Time Figure 15.1-58

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-58a

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-58b

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time Figure 15.1-58c WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-59 has been intentionally deleted. (DRN 05-543, R14)

WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-60 has been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Core Power vs. Time Figure 15.1-61

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Core Heat Flux vs. Time Figure 15.1-62

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Pressurizer Pressure vs. Time Figure 15.1-63

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactor Coolant System Temperature vs. Time Figure 15.1-64

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-65 Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Steam Generator Pressure vs. Time Figure 15.1-66

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Steam Flow vs. Time Figure 15.1-67

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-68 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-69 has been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-70

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactivity vs. Time Figure 15.1-71 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-72 has been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-72a

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactor Vessel Level vs. Time Figure 15.1-72b

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power DNBR vs. Time Figure 15.1-72c Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Power vs. Time Figure 15.1-72d

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Heat Flux vs. Time Figure 15.1-72e

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Pressure vs. Time Figure 15.1-72f

Revision 307 (07/13) Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Coolant System Temperatures vs. Time Figure 15.1-72g

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Generator Pressure vs. Time Figure 15.1-72h

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactivity vs. Time Figure 15.1-72i

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Level vs. Time Figure 15.1-72j

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Flow vs. Time Figure 15.1-72k

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Feedwater Flow vs. Time Figure 15.1-72l Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Generator Mass vs. Time Figure 15.1-72m

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time Figure 15.1-72n

Revision 307 (07/13)Waterford Steam Electric Station #3 Return to Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time Figure 15.1-72o WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-73 has been intentionally deleted. (DRN 05-543, R14)

WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-74 has been intentionally deleted. (DRN 05-543, R14)

WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-75 has been intentionally deleted. (DRN 05-543, R14)

WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.1-75a has been intentionally deleted. (DRN 05-543, R14)

.I loo-s 8 II I 32 144216288 360 SECONDS REVISION 10 (10199)

LOUISIANA POWER LIGHT CO.

MAIN STEAM LINE BREAK MODES 4 Steam Figure WITH LOSS OF ACPOWER Electrical Station 15.1-76 CORE POWER VS. TIME 1600 1200 800 400 t t 1 REVISION 10 (10199) 72 144 216 280 36G TIME, SECONDS POWER LIGHT CO. Steam Electric StationREACTOR COOLANT SYSTEM PRESSURE VS. TIME 77 MAIN STEAM LINE BREAK MODES 3 & 4 IWITH LOSS OF AC POWER 700 600'200'CORE INLETCOOLANT TEMPERATURE I 72 144 288 360 TIME, SECONDS REVISION 10 (10199)

LOUISIANA POWER LIGHT CO.

MAIN STEAM LINE BREAK MODES 3 4 WITH LOSS OF AC POWERREACTOR COOLANT TEMPERATURE VS. TIME

1 800 200 ISOLATED STEAM GENERATOR STEAM GENERATOR WITH RUPTURED LINE 72 144 216 288 36 0 TIME, SECONDS REVISION 10 (10199)

LOU POWER LIGHT CO.

Electric MAIN STEAM LINE BREAK MODES 3 4 I WITH LOSS OF AC POWER STEAM GENERATOR PRESSURE VS. TIME 10000 800C 2000 POWER MAIN STEAM LINE BREAK MODES 3 i-4 WITH LOSS OF AC POWER STEAM MASS RELEASE FROM BREAK VS. TIME I I STEAMGENERATORWITH RUPTUREDLINE ISOLATED STEAMGENERATOR I I I 72 216 288 TIME, SECONDS REVISION I I I 72 144 216 288 360 TIME, SECONDS REVISION 10 (10199)

ANA MAIN STEAM LINE BREAK MODES 3 8 4 WITH LOSS OF AC POWER FEEDWATER FLOW VS. TIME

.,

72 144 216 TIME, SECONDSMAIN STEAM LINE BREAK MODES 3 & 4 FigureWITH LOSS OF AC POWER FEEDWATER ENTHALPY VS. TIME REVISION 10 (10199) 300000 72. ANA MAIN STEAM LINE BREAK MODES 3 4 WITH LOSS OF AC POWER STEAM GENERATOR LIQUID INVENTORY VS. TIME Uric I I144216 TIME, SECONDS 288 360 REVISION 10 3 DOPPLER SAFETY INJECTION TOTAL S-3 9 I I I I MODERATOR 6-6 CEA-9 I II I 72 144216288 TIME, SECONDSREVISION 10 (1 MAIN STEAM LINE BREAK MODES 3 4 WITH LOSS OF AC POWER REACTIVITY VS. TIME

,

350000 300000 150000 100000 50000 TIME, SECONDS REVISION 10 (10199)

MAIN STEAM LINE BREAK MODES 3 8 4WITH LOSS OF AC POWER INTEGRATED STEAM MASS RELEASE FROM BREAK VS. TIME

Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion Core Power vs. Time Figure 15.1-87

Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion Core Heat Flux vs. Time Figure 15.1-88 Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion Reactor Coolant System Temperatures vs. Time Figure 15.1-89

Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion Reactor Coolant System Pressure vs. Time Figure 15.1-90 Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion Reactivity vs. Time Figure 15.1-91 Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion Steam Generator Pressure vs. Time Figure 15.1-92

Revision 307 (07/13)Waterford Steam Electric Station #3 Inside Containment Steam Line Break Pre-Trip Power Excursion DNBR vs. Time Figure 15.1-93 WSES-FSAR-UNIT-3 Revision 307 (07/13)

(EC-8458, R307)

Figure 15.1-94 has been Intentionally Deleted.

(EC-8458, R307)