ML16257A136: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16257A136 | | number = ML16257A136 | ||
| issue date = 08/25/2016 | | issue date = 08/25/2016 | ||
| title = | | title = Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.6, Figures 15.6-1 Through 15.6-241 | ||
| author name = | | author name = | ||
| author affiliation = Entergy Operations, Inc | | author affiliation = Entergy Operations, Inc | ||
Line 14: | Line 14: | ||
| document type = Final Safety Analysis Report (FSAR) | | document type = Final Safety Analysis Report (FSAR) | ||
| page count = 136 | | page count = 136 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-1 has been deleted. (DRN 05-543, R14) | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Power vs. Time Figure15.6-1a Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Average Heat Flux vs. Time Figure15.6-1b Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Pressure vs. Time Figure15.6-1c | |||
Revision 304 (06/10)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Minimum DNBR vs. Time Figure 15.6-1d Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Temperatures vs. Time Figure15.6-1e Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Pressurizer Level vs. Time Figure 15.6-1f Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Steam Generator Pressure vs. Time Figure15.6-1g Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Break Flow vs. Time Figure15.6-1h Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Integrated Break Flow vs. Time Figure 15.6-1i WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figures 15.6-2 through 15.6-31 have been intentionally deleted. (DRN 05-543, R14) | |||
THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-32 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-33 THIS FIGURE INTENTIONALLY DELETED REVISION 5 I I I Waterford Steom Electric Station Figure 15.6-34 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Woterford Steam Electric Station 3 Figure 15.6-35 Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Power vs. Time Figure 15.6-35A Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Heat Flux vs. Time Figure 15.6-35B WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-35C has been deleted. (DRN 05-543, R14) | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Pressure vs. Time Figure15.6-35D WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-35E has been deleted. (DRN 05-543, R14) | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Temperatures vs. Time Figure15.6-35F WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-35G has been deleted. (DRN 05-543, R14) | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Pressurizer Water Volume vs. Time Figure15.6-35H | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Inventory vs. Time Figure 15.6-35I WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-35J has been deleted. (DRN 05-543, R14) | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Pressure vs. Time Figure 15.6-35K Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Feedwater Flowrate per SG vs. Time Figure15.6-35L WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-35M has been deleted. (DRN 05-543, R14) | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Primary-to-Secondary Leak Rate vs. Time Figure15.6-35N WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-35O has been deleted. (DRN 05-543, R14) | |||
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Liquid Mass vs. Time Figure 15.6-35P Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time Figure15.6-35Q Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Primary-to-Secondary Leak Flow vs. Time Figure15.6-35R | |||
Revision 304 (06/10)Waterford Steam Electric Station #3 SGTR with LOOP Minimum DNBR vs. Time Figure 15.6-35S WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figures 15.6-36 through 15.6-91 have been intentionally deleted. (DRN 05-543, R14) | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Power Figure 15.6-92 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-93 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Leak Flow Rate Figure 15.6-94 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-95 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-96 has been deleted. (DRN 05-543, R14) | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Quality Figure 15.6-97 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Containment Pressure Figure 15.6-98 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-99 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature Figure 15.6-100 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Mid Annulus Flow Rate Figure 15.6-100a | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Quality Above and Below the Core Figure 15.6-100b | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Pressure Drop Figure 15.6-100c | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Safety Injection Flow Rate Into Intact Discharge Legs Figure 15.6-100d | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Water Level in Downcomer During Reflood Figure 15.6-100e | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Gap Conductance Figure 15.6-100f | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Maximum Local Cladding Oxidation Percentage Figure 15.6-100g | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Fuel Centerline, Fuel Average, Cladding, and Coolant Temperature at the Hot Spot Figure 15.6-100h | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Heat Transfer Coefficient Figure 15.6-100i | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Pin Pressure Figure 15.6-100j | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Bulk Channel Flow Rate Figure 15.6-100k | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power Figure 15.6-101 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-102 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate Figure 15.6-103 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-104 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-105 has been deleted. (DRN 05-543, R14) | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality Figure 15.6-106 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure Figure 15.6-107 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-108 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature Figure 15.6-109 WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109a has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109b has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109c has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109d has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109e has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109f has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109g has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109h has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109i has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109j has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
WSES-FSAR-UNIT-3 Revision 15 (03/07) | |||
(DRN 06-1062, R15) | |||
Figure 15.6-109k has been intentionally deleted. | |||
(DRN 06-1062, R15) | |||
FIGURE HAS BEEN INTENTIONALLY DELETED Steam Electric CYCLE 6 ECCS ANALYSIS PEAK CLAD TEMPERATURE VERSUS TIME FOR THE HOT SPOT LOCATION | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power Figure 15.6-110 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-111 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate Figure 15.6-112 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-113 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figure 15.6-114 has been deleted. (DRN 05-543, R14) | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality Figure 15.6-115 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure Figure 15.6-116 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-117 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature Figure 15.6-118 WSES-FSAR-UNIT-3 Revision 302 (12/08) | |||
(EC-9533, R302) | |||
Figure 15.6-118a through Figure 15.6-127 have been deleted. | |||
(EC-9533, R302) | |||
LOUISIANA POWER 8 LIGHT CO. | |||
Station FIGURES THROUGH HAVE BEEN INTENTIONALLY DELETED | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Core Power Figure 15.6-127a | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-127b | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Leak Flow Rate Figure 15.6-127c | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-127d | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Quality Figure 15.6-127e | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Containment Pressure Figure 15.6-127f | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-127g | |||
Revision 307 (7/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Peak Cladding Temperature Figure 15.6-127h | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature Versus Break Size Figure 15.6-128 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figures 15.6-129 through 15.6-176 have been intentionally deleted. (DRN 05-543, R14) | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis Peak Cladding Temperature vs. Break Size Figure 15.6-177 0.25 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO. Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER Figure 15.6-178 J 2400 2000 1600 1200 800 400 1200 2400 3600 TIME, SECONDS 4800 LOUISIANA I POWER LIGHT CO. | |||
INADVERTENT Waterford Steam INNER VE Electric Station OF A PRESSURIZER SAFETY VALVE -- PRESSURE Figure 15.6-179 I I 600 I I I 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO. | |||
Waterford SteamElectric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE LEAK FLOW RATE Figure 60000 45000 30000 0 2400 4800 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO. | |||
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVEINNER VESSEL INLET FLOW RATE Figure 15.6-181 LOUISIANA POWER LIGHT CO. | |||
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE HEIGHT Figure 15.6-l 82 CORE------------ -------1200 2400 TIME, SECONDS 6,000 1 I II I I 1200 2400 3600 6000 LOUISIANA POWER LIGHT CO. | |||
Waterford Steam Electric Station TIME, SECONDS Figure INADVERTENT OPENINGOF A PRESSURIZER SAFETY VALVE HEAT TRANSFER AT HOT SPOT 15.6-183 600 I I I I 1200 2400 3600 TIME, SECONDS 6000 LOUISIANA POWER LIGHT CO. | |||
Waterford Steam INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT Figure 15.6-184 Electric Station I I CLAD SURFACETEMPERATURE, WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14) | |||
Figures 15.6-186 through 15.6-205 have been intentionally deleted. (DRN 05-543, R14) | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Core Power Figure 15.6-206 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Pressure Figure 15.6-207 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Break Flow Rate Figure 15.6-208 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-209 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-210 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-211 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-212 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-213 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Core Power Figure 15.6-214 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Pressure Figure 15.6-215 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Break Flow Rate Figure 15.6-216 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-217 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-218 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-219 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-220 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-221 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1 Pressure Figure 15.6-221a | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2 Pressure Figure 15.6-221b | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1 Secondary Flow Rate Figure 15.6-221c | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2 Secondary Flow Rate Figure 15.6-221d | |||
WSES-FSAR-UNIT-3 Revision 307 (07/13) | |||
(EC-8458, R307) | |||
Figure 15.6-222 through Figure 15.6-233 have been intentionally deleted. | |||
(EC-8458, R307) | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Core Power Figure 15.6-234 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Pressure Figure 15.6-235 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Flow Rate Figure 15.6-236 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-237 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-238 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-239 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-240 | |||
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-241}} |
Latest revision as of 01:56, 27 April 2019
ML16257A136 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/25/2016 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16256A115 | List:
|
References | |
W3F1-2016-0053 | |
Download: ML16257A136 (136) | |
Text
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-1 has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Power vs. Time Figure15.6-1a Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Average Heat Flux vs. Time Figure15.6-1b Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Pressure vs. Time Figure15.6-1c
Revision 304 (06/10)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Minimum DNBR vs. Time Figure 15.6-1d Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Temperatures vs. Time Figure15.6-1e Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Pressurizer Level vs. Time Figure 15.6-1f Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Steam Generator Pressure vs. Time Figure15.6-1g Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Break Flow vs. Time Figure15.6-1h Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Integrated Break Flow vs. Time Figure 15.6-1i WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-2 through 15.6-31 have been intentionally deleted. (DRN 05-543, R14)
THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-32 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-33 THIS FIGURE INTENTIONALLY DELETED REVISION 5 I I I Waterford Steom Electric Station Figure 15.6-34 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Woterford Steam Electric Station 3 Figure 15.6-35 Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Power vs. Time Figure 15.6-35A Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Heat Flux vs. Time Figure 15.6-35B WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35C has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Pressure vs. Time Figure15.6-35D WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35E has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Temperatures vs. Time Figure15.6-35F WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35G has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Pressurizer Water Volume vs. Time Figure15.6-35H
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Inventory vs. Time Figure 15.6-35I WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35J has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Pressure vs. Time Figure 15.6-35K Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Feedwater Flowrate per SG vs. Time Figure15.6-35L WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35M has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Primary-to-Secondary Leak Rate vs. Time Figure15.6-35N WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35O has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Liquid Mass vs. Time Figure 15.6-35P Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time Figure15.6-35Q Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Primary-to-Secondary Leak Flow vs. Time Figure15.6-35R
Revision 304 (06/10)Waterford Steam Electric Station #3 SGTR with LOOP Minimum DNBR vs. Time Figure 15.6-35S WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-36 through 15.6-91 have been intentionally deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Power Figure 15.6-92
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-93
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Leak Flow Rate Figure 15.6-94
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-95 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-96 has been deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Quality Figure 15.6-97
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Containment Pressure Figure 15.6-98
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-99
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature Figure 15.6-100
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Mid Annulus Flow Rate Figure 15.6-100a
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Quality Above and Below the Core Figure 15.6-100b
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Pressure Drop Figure 15.6-100c
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Safety Injection Flow Rate Into Intact Discharge Legs Figure 15.6-100d
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Water Level in Downcomer During Reflood Figure 15.6-100e
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Gap Conductance Figure 15.6-100f
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Maximum Local Cladding Oxidation Percentage Figure 15.6-100g
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Fuel Centerline, Fuel Average, Cladding, and Coolant Temperature at the Hot Spot Figure 15.6-100h
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Heat Transfer Coefficient Figure 15.6-100i
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Pin Pressure Figure 15.6-100j
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Bulk Channel Flow Rate Figure 15.6-100k
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power Figure 15.6-101
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-102
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate Figure 15.6-103
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-104 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-105 has been deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality Figure 15.6-106
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure Figure 15.6-107
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-108
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature Figure 15.6-109 WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109a has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109b has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109c has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109d has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109e has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109f has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109g has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109h has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109i has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109j has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109k has been intentionally deleted.
(DRN 06-1062, R15)
FIGURE HAS BEEN INTENTIONALLY DELETED Steam Electric CYCLE 6 ECCS ANALYSIS PEAK CLAD TEMPERATURE VERSUS TIME FOR THE HOT SPOT LOCATION
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power Figure 15.6-110
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-111
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate Figure 15.6-112
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-113 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-114 has been deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality Figure 15.6-115
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure Figure 15.6-116
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-117
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature Figure 15.6-118 WSES-FSAR-UNIT-3 Revision 302 (12/08)
(EC-9533, R302)
Figure 15.6-118a through Figure 15.6-127 have been deleted.
(EC-9533, R302)
LOUISIANA POWER 8 LIGHT CO.
Station FIGURES THROUGH HAVE BEEN INTENTIONALLY DELETED
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Core Power Figure 15.6-127a
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-127b
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Leak Flow Rate Figure 15.6-127c
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-127d
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Quality Figure 15.6-127e
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Containment Pressure Figure 15.6-127f
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-127g
Revision 307 (7/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Peak Cladding Temperature Figure 15.6-127h
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature Versus Break Size Figure 15.6-128 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-129 through 15.6-176 have been intentionally deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis Peak Cladding Temperature vs. Break Size Figure 15.6-177 0.25 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO. Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER Figure 15.6-178 J 2400 2000 1600 1200 800 400 1200 2400 3600 TIME, SECONDS 4800 LOUISIANA I POWER LIGHT CO.
INADVERTENT Waterford Steam INNER VE Electric Station OF A PRESSURIZER SAFETY VALVE -- PRESSURE Figure 15.6-179 I I 600 I I I 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.
Waterford SteamElectric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE LEAK FLOW RATE Figure 60000 45000 30000 0 2400 4800 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVEINNER VESSEL INLET FLOW RATE Figure 15.6-181 LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE HEIGHT Figure 15.6-l 82 CORE------------ -------1200 2400 TIME, SECONDS 6,000 1 I II I I 1200 2400 3600 6000 LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station TIME, SECONDS Figure INADVERTENT OPENINGOF A PRESSURIZER SAFETY VALVE HEAT TRANSFER AT HOT SPOT 15.6-183 600 I I I I 1200 2400 3600 TIME, SECONDS 6000 LOUISIANA POWER LIGHT CO.
Waterford Steam INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT Figure 15.6-184 Electric Station I I CLAD SURFACETEMPERATURE, WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-186 through 15.6-205 have been intentionally deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Core Power Figure 15.6-206
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Pressure Figure 15.6-207
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Break Flow Rate Figure 15.6-208
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-209
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-210
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-211
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-212
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-213
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Core Power Figure 15.6-214
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Pressure Figure 15.6-215
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Break Flow Rate Figure 15.6-216
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-217
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-218
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-219
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-220
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-221
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1 Pressure Figure 15.6-221a
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2 Pressure Figure 15.6-221b
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1 Secondary Flow Rate Figure 15.6-221c
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2 Secondary Flow Rate Figure 15.6-221d
WSES-FSAR-UNIT-3 Revision 307 (07/13)
(EC-8458, R307)
Figure 15.6-222 through Figure 15.6-233 have been intentionally deleted.
(EC-8458, R307)
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Core Power Figure 15.6-234
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Pressure Figure 15.6-235
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Flow Rate Figure 15.6-236
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-237
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-238
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-239
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-240
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-241