Line 68: Line 68:
Member: -Membet: v.*.::..e..
Member: -Membet: v.*.::..e..
C.J..a..;rPJAJ!):
C.J..a..;rPJAJ!):
Member: Member: Member: Member: Member: Member: :Memher:  
Member: Member: Member: Member: Member: Member: :Memher:
: ALTERNATES Chief Engineer Assistant to Manager Station Operating Engineer Station Performance Engineer Reactor Engineer Senior Senior Supervisor  
: ALTERNATES Chief Engineer Assistant to Manager Station Operating Engineer Station Performance Engineer Reactor Engineer Senior Senior Supervisor  
-i&i"" Senior Supervisor  
-i&i"" Senior Supervisor  
Line 75: Line 75:
SALEM -UNIT Z 6-6 AMENDMENT NO. I I ADMINISTRATIVE CONTROLS QUORUM 6."S. 1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
SALEM -UNIT Z 6-6 AMENDMENT NO. I I ADMINISTRATIVE CONTROLS QUORUM 6."S. 1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
RESPONSIBI LIT! ES £.5. 1.6 The Station Operations Review Committee shall be responsible for: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Station Manager to affect nuclear safety. b. Review of all proposed tests and experiments that affect nuclear safety. c. Review of all proposed changes to Appendix 11 A 11 Technical Specifications.
RESPONSIBI LIT! ES £.5. 1.6 The Station Operations Review Committee shall be responsible for: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Station Manager to affect nuclear safety. b. Review of all proposed tests and experiments that affect nuclear safety. c. Review of all proposed changes to Appendix 11 A 11 Technical Specifications.
* d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety. e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering tion and recommendations to prevent recurrence to the General Manager -Production and to the Chairman of the Nuclear Review Boa rd. NUcJ.uue .. f. Review of events requiring 24 hour written notification to the Commission.  
* d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety. e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering tion and recommendations to prevent recurrence to the General Manager -Production and to the Chairman of the Nuclear Review Boa rd. NUcJ.uue .. f. Review of events requiring 24 hour written notification to the Commission.
: g. Review of facility operations to detect potential nuclear safety hazards. h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Nuclear Review Board. i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. SALEM -UNIT 2 6-7
: g. Review of facility operations to detect potential nuclear safety hazards. h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Nuclear Review Board. i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. SALEM -UNIT 2 6-7
* ADMINISTRATIVE CONTROLS AUTHORITY 6.5. 1.7 The Station Operations Review Committee shall: a. Recommend to the Station Manager written approval or disapproval of items considered under 6.5. l.6(a) through (d) above. b. Render determinations in writing with regard to whether or not each item considered under 6.5. 1.6(a) through (e) above constitutes an unreviewed safety question.  
* ADMINISTRATIVE CONTROLS AUTHORITY 6.5. 1.7 The Station Operations Review Committee shall: a. Recommend to the Station Manager written approval or disapproval of items considered under 6.5. l.6(a) through (d) above. b. Render determinations in writing with regard to whether or not each item considered under 6.5. 1.6(a) through (e) above constitutes an unreviewed safety question.
: c. Provide written notification within 24 hours to the General Manager-fl '1 Ttc Production and the Nuclear Review Board of disagreement between the SORC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such ments pursuant to 6. 1. 1 above. RECORDS 6.5. 1.8 The Station Operations Review Committee shall maintain written minutes of each meeting that, at a minimum, documrnt the results of all SORC activities performed under the responsibility and authority provisions of these technical specifications.
: c. Provide written notification within 24 hours to the General Manager-fl '1 Ttc Production and the Nuclear Review Board of disagreement between the SORC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such ments pursuant to 6. 1. 1 above. RECORDS 6.5. 1.8 The Station Operations Review Committee shall maintain written minutes of each meeting that, at a minimum, documrnt the results of all SORC activities performed under the responsibility and authority provisions of these technical specifications.
Copies shall be provided to the General Manager-il;;1r*c Production and Chairman of the Nuclear Review Board. 6.5.2 NUCLEAR REVIEW BOARD (NRB) FUNCTION 6.5.2. l The Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of: a. nuclear power _plant operations  
Copies shall be provided to the General Manager-il;;1r*c Production and Chairman of the Nuclear Review Board. 6.5.2 NUCLEAR REVIEW BOARD (NRB) FUNCTION 6.5.2. l The Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of: a. nuclear power _plant operations
: b. nuclear engineering  
: b. nuclear engineering
: c. chemistry and radiochemistry  
: c. chemistry and radiochemistry
: d. meta 11 urgy e. instrumentation and control f. radiological safety g. mechanical and electrical engineering  
: d. meta 11 urgy e. instrumentation and control f. radiological safety g. mechanical and electrical engineering
: h. quality assurance practices SALEM -UNIT 2. 6-8 )   
: h. quality assurance practices SALEM -UNIT 2. 6-8 )   
** ..
** ..
Line 95: Line 95:
No more than a minority of the quorum shall have line bility for operation of the facility.
No more than a minority of the quorum shall have line bility for operation of the facility.
REVIEW 6.5.2.7 The NRB shall review: a. The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
REVIEW 6.5.2.7 The NRB shall review: a. The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
SALEM .;, UNIT 2 6-9 l I I ADMINISTRATIVE.CONTROLS  
SALEM .;, UNIT 2 6-9 l I I ADMINISTRATIVE.CONTROLS
: g. Any other area of facility operation considered appropriate by the NRB or the Vice President-Production.  
: g. Any other area of facility operation considered appropriate by the NRB or the Vice President-Production.
: h. The Facility Fire Protection Program and implementing procedures at least once per 24 months. i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm. j. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outs.ide fire consultant at least once per 36 months. AUTHORITY 6.5.2.9 The NRB shall report to and advise the Vice President-Production on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8. RECORDS 6.5.2. 10 Records of NRB activities shall be prepared, approved and distributed as indicated below: a. Minutes of each NRB meeting shall be prepared, approved and forwarded to the Vice President-Production within 14 days following each meeting. b. Reports of reviews encompassed by Section above, shall be prepared, approved and forwarded to the Vice President-Production within 14 days following completion of the review. c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Production and to the management positions responsible for the areas audited within 30 days after completion of the audit. 6.6 REPORTABLE OCCURRENCE ACTION 6.6. l The following actions shall be taken for REPORTABLE OCCURRENCES:  
: h. The Facility Fire Protection Program and implementing procedures at least once per 24 months. i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm. j. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outs.ide fire consultant at least once per 36 months. AUTHORITY 6.5.2.9 The NRB shall report to and advise the Vice President-Production on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8. RECORDS 6.5.2. 10 Records of NRB activities shall be prepared, approved and distributed as indicated below: a. Minutes of each NRB meeting shall be prepared, approved and forwarded to the Vice President-Production within 14 days following each meeting. b. Reports of reviews encompassed by Section above, shall be prepared, approved and forwarded to the Vice President-Production within 14 days following completion of the review. c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Production and to the management positions responsible for the areas audited within 30 days after completion of the audit. 6.6 REPORTABLE OCCURRENCE ACTION 6.6. l The following actions shall be taken for REPORTABLE OCCURRENCES:
: a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9. b. Each REPORTABLE OCCURRENCE requiring 24 hour notification to the Commission shall be reviewed by* the SORC and submitted to the NRB and the General Production.
: a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9. b. Each REPORTABLE OCCURRENCE requiring 24 hour notification to the Commission shall be reviewed by* the SORC and submitted to the NRB and the General Production.
NVe.iEl4R., SALEM -UNIT 2 6-11
NVe.iEl4R., SALEM -UNIT 2 6-11
* L. ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7. l The following actions. shall be taken in the event a Safety Limit is vio*l ated: a. The unit shall be placed in at least HOT STANDBY within one hour. b. The Safety Limit violation shall be reported to the Commission, the General Production and to the NRB within 24 hours. )J uc.LLAe. . c. A Safety Limit Violation Report shall be prepared.
* L. ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7. l The following actions. shall be taken in the event a Safety Limit is vio*l ated: a. The unit shall be placed in at least HOT STANDBY within one hour. b. The Safety Limit violation shall be reported to the Commission, the General Production and to the NRB within 24 hours. )J uc.LLAe. . c. A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the SORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility*components, systems or structures, and (3) corrective action taken to prevent recurrence.  
The report shall be reviewed by the SORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility*components, systems or structures, and (3) corrective action taken to prevent recurrence.
: d. The Safety Limit Violation Report shall be submitted to the Commission, the NRB and the General Manager-Ele=tcic Production within 14 days of the violation. .  
: d. The Safety Limit Violation Report shall be submitted to the Commission, the NRB and the General Manager-Ele=tcic Production within 14 days of the violation. .  


===6.8 PROCEDURES===
===6.8 PROCEDURES===


6.8. l Written procedures shall be established, implemented and maintained covering the activities referenced below: a. The applicable procedures recommended in Appendix 11 A 11 of Regulatory Guide 1.33, Revision 2, February 1978. b. Refueling operations.  
6.8. l Written procedures shall be established, implemented and maintained covering the activities referenced below: a. The applicable procedures recommended in Appendix 11 A 11 of Regulatory Guide 1.33, Revision 2, February 1978. b. Refueling operations.
: c. Surveillance and test activities of safety related equipment.  
: c. Surveillance and test activities of safety related equipment.
: d. Security Plan implementation.  
: d. Security Plan implementation.
: e. Emergency Plan implementation.  
: e. Emergency Plan implementation.
: f. F_ire Protection Program implementation.
: f. F_ire Protection Program implementation.
6.8.2 Each procedure and administrative policy of 6.8. l above, and changes thereto, shall be reviewed by the SORC and approved by the Station Manager prior to implementation and reviewed periodically as set forth in adminis-trative procedures.  
6.8.2 Each procedure and administrative policy of 6.8. l above, and changes thereto, shall be reviewed by the SORC and approved by the Station Manager prior to implementation and reviewed periodically as set forth in adminis-trative procedures.  
*
*
* 6.8.3 Temporary changes to procedures of 6.8. 1 above may be made provided:  
* 6.8.3 Temporary changes to procedures of 6.8. 1 above may be made provided:
: a. The intent of the original procedure is not altered. b. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
: a. The intent of the original procedure is not altered. b. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
SALEM -UNIT 2. 6-12}}
SALEM -UNIT 2. 6-12}}

Revision as of 18:41, 25 April 2019

Proposed Changes to Tech Specs,Section 6 Re Administrative Controls
ML18085A281
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/20/1980
From:
Public Service Enterprise Group
To:
Shared Package
ML18085A273 List:
References
NUDOCS 8011250698
Download: ML18085A281 (9)


Text

The following pages are proposed changes to the Unit 2 Technical Specifications:

1----Vice Presid!lit

-ruel SUWlY General ruel suwty Gmeral Manaqer -Corporate C)illli ty Assunuce "51'1aqer

-Qi\ Servi .... Manooer-a>

Aaditl!I and Tralninq Gereral K!riaqer -Prob:t.im

$1.sJDort Plant Fnu*. Asst. Vice Preeident

-Production -Per9alnel Mfaira

  • ldninistratiml Training Manaqer ft:fr. -M.icle&r (l11e1". support rt.X"lenrf\Jel Cyr.le DYJr. Health l'hy!llr.bt Scnlor Vice f'rnAident

-Dlel"9Y suwly ard Erqineerinq Vice President-ro.aJuctioo r---

-!b:'lear Prcxluctioo Jltrrq. rlamirq ' Security Frqr.

  • Fire Protection SUJvirt General HaMqer -IJ.oenai..ng

!Ind Envirament r--------1 On-Site I Safety 1-------'

Reviev I Group **

Gererat..irq Statim L ______ _ *

  • I.hit 2 Aoqui1:"'11!1lt
  1. Dl.n!ct """""" !or,__ _....,..._.

FIGURE 6.2-1 OFFSITE ORGANIZATION FOR FACILITY MANAGEMENT AND TECHNICAL SUPPORT ------------------------

    • w l ' ' '
  • I I I I Ol'fo-4m .. _.I STATION DUALITY I ASSISTANT TO MANAGER ASSURANCE

-...,If. I SECURITY SAFETY SUl'E RVISOR SRO -lf.llllOR REACTOfl Of'ERATOR RO -REACTOR OPERATOR t 1..-... i:.-1_ ..... 1u1-a.-_1

__

I t*J1t*rtll.....-

.. a.-----... _ _,.._ ____ _ ............

_.._ ** ii.ow. s........

... 05191 .... * *.........

.............

,_.......

.-.......** .,...,(19

......... . _.,._,,_,_.

........ .._.,._, .... __ a ----...........


. .... y ..... ,._ ......... . __ .. , ... .._.., ____ ... _., __ ................

_..._ .... ...,._ .... .....

  • R-IM lor Ille F .. l'1ollc-Protr*m ........ .c.. ... ____

'#.f!. . S "'* ftON REACTOR ENGINEER STAFF I SHIFT TECHNICAL ADVISORS SALEM GENERATING STATION

  • CHIEF ENGINEER I STATION OPERATING ENGINEER t SENIOR SHIFT SRO SHIFT SUPERVISOR-SRO CONTROL oPERATORS-RO EOUll'MfNT OPERATOR I UTILITY OPERATORS I . I I I I 11 ft._,__ r I Ot:°F S1rE. 1 , _____ , __ -* t------T --I I l I STATION PUUOHMANCE ENGINEER SENIOR :r ... c.

..,._ .. c IUl'ERVISOR 16C TECHNICIANS lllrC ASSIST ANTI I I SENIOR SUPERVISOR

-QHiMlli'JA¥ I CHEMISTRI' I CHEMISTRY TECHNICIAN&

I CHEMISTRY ASSISTANT&

1 TECH. HEU'ER -NUCLEAR -I I I I I I -----RADIATION l'ROTECTION ENGINEER "--"'1>* IENIOR SUPERVISOR

-ftAB. PROT. RAD. PROT. StJPt'* RAD. l'ROT. TECHNICIANS RAO.l'ROT.

ASSISTANTS RAOl'ROT.

HELl'ER FIGURE 6.2.2 FACILITY ORGANIZATION

-SALEM GENERATING STATION I . MAINTENANCE EHGINEER SENIOR MAIN TE NANCE SUI'£ RVISOR MAINTENANCE SUPERVISOR BOILER REl'AIR W:CHANIC ELECTRICIANS MACHINISTS STATION MECHANICS UTILITY MECHANICS

< . " .

ADMIM TRAJOR OFFICE IUl'ERVISOR STAFF r-... -' ADMINISTRATIVE CONTROLS ' 6.3 FACILITY STAFF QUALIFICATIONS 6.3. 1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18. 1-1971 for comparable positions.

except for the Radiation Protection who shall meet or exceed tne qualifications of Regulatory Guide 1.8, September 1975. 6. 4 TRAINING r; fllcA rVJJC.T/oAJllL IC ( DE.P/llR.l1t1E.AJT

'1 T TH£. r-Ho11.t'ry 6.4. l A retraining and replacement training program for the facility staff shal 1 be coordinated by istant to Maftager and mafntained under the direction of the shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI Nl8. 1-1971 and Appendix 11 A 11 of 10 CFR Part 55. 6.5 REVIEW AND AUDIT 6.5. 1 STATION OPERATIONS REVIEW COMMITTEE (SORC) FUNCTION 6.5. 1. 1 The Station Operations Review Committee shall function to advise the Station Manager on all matters related to nuclear safety. COMPOSITION 6.5. 1.2 The Station Operations Review Committee shall be composed of the: Chairman:

Vice Chairman:

Member: -Membet: v.*.::..e..

C.J..a..;rPJAJ!):

Member: Member: Member: Member: Member: Member: :Memher:

ALTERNATES Chief Engineer Assistant to Manager Station Operating Engineer Station Performance Engineer Reactor Engineer Senior Senior Supervisor

-i&i"" Senior Supervisor

-

Radiation i>'ro1eciion Engineer Senior Maintenance Maintenance Engineer 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; *however, no more than two alternates shall participate as voting members in SORC activities at any one time. MEETING FREQUENCY 6.5. 1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.

SALEM -UNIT Z 6-6 AMENDMENT NO. I I ADMINISTRATIVE CONTROLS QUORUM 6."S. 1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBI LIT! ES £.5. 1.6 The Station Operations Review Committee shall be responsible for: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Station Manager to affect nuclear safety. b. Review of all proposed tests and experiments that affect nuclear safety. c. Review of all proposed changes to Appendix 11 A 11 Technical Specifications.

  • d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety. e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering tion and recommendations to prevent recurrence to the General Manager -Production and to the Chairman of the Nuclear Review Boa rd. NUcJ.uue .. f. Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.
g. Review of facility operations to detect potential nuclear safety hazards. h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Nuclear Review Board. i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. SALEM -UNIT 2 6-7
  • ADMINISTRATIVE CONTROLS AUTHORITY 6.5. 1.7 The Station Operations Review Committee shall: a. Recommend to the Station Manager written approval or disapproval of items considered under 6.5. l.6(a) through (d) above. b. Render determinations in writing with regard to whether or not each item considered under 6.5. 1.6(a) through (e) above constitutes an unreviewed safety question.
c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the General Manager-fl '1 Ttc Production and the Nuclear Review Board of disagreement between the SORC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such ments pursuant to 6. 1. 1 above. RECORDS 6.5. 1.8 The Station Operations Review Committee shall maintain written minutes of each meeting that, at a minimum, documrnt the results of all SORC activities performed under the responsibility and authority provisions of these technical specifications.

Copies shall be provided to the General Manager-il;;1r*c Production and Chairman of the Nuclear Review Board. 6.5.2 NUCLEAR REVIEW BOARD (NRB) FUNCTION 6.5.2. l The Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of: a. nuclear power _plant operations

b. nuclear engineering
c. chemistry and radiochemistry
d. meta 11 urgy e. instrumentation and control f. radiological safety g. mechanical and electrical engineering
h. quality assurance practices SALEM -UNIT 2. 6-8 )
    • ..
  • ADMINISTRATIVE CONTROLS COMPOSITION 6.5.2.2 The NRB Chairman:

shall be composed of the: . * /1SS1Sl"1>.1I Vic.£ PR.e.S1D£>Jr-Ftco1uc.r10A/

Vice Chairman:

H1111a9e1 fhi,L1 i& PPedw*ti'C>n Assistant to General Manager-Fuel Supply General Manager-Licensing and Environment Member: Member: Member: Member: Member: Member: Member: ALTERNATES Manager-Nuclear Ope rat ions S'v PPoR. r Qbtalit, Ass1.11 at'lee GEJ1£ML

-

r;:>A P-rajeet Mn11ege1 f:tgpe 8PeekG£NEML 111llJl/AGU2. -fl}tJc.UAR.

Manager-Salem Generating Station Principal Engineer Manager-Hope Creek Generating Station 6.5.2.3 All alternate members shall be appointed in writing by the NRB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NRB activities at any one time. CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NRB Chairman to provide expert advice to the NRB. MEETING FREQUENCY 6.5.2.5 The NRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six months thereafter.

QUORUM 6.5.2.6 minimum quorum of NRB necessary for the performance of the NRB review and audit functions of these technical specifications shall consist of the Chairman or his designated alternate and at least 4 NRB members including alternates.

No more than a minority of the quorum shall have line bility for operation of the facility.

REVIEW 6.5.2.7 The NRB shall review: a. The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.

SALEM .;, UNIT 2 6-9 l I I ADMINISTRATIVE.CONTROLS

g. Any other area of facility operation considered appropriate by the NRB or the Vice President-Production.
h. The Facility Fire Protection Program and implementing procedures at least once per 24 months. i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm. j. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outs.ide fire consultant at least once per 36 months. AUTHORITY 6.5.2.9 The NRB shall report to and advise the Vice President-Production on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8. RECORDS 6.5.2. 10 Records of NRB activities shall be prepared, approved and distributed as indicated below: a. Minutes of each NRB meeting shall be prepared, approved and forwarded to the Vice President-Production within 14 days following each meeting. b. Reports of reviews encompassed by Section above, shall be prepared, approved and forwarded to the Vice President-Production within 14 days following completion of the review. c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Production and to the management positions responsible for the areas audited within 30 days after completion of the audit. 6.6 REPORTABLE OCCURRENCE ACTION 6.6. l The following actions shall be taken for REPORTABLE OCCURRENCES:
a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9. b. Each REPORTABLE OCCURRENCE requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by* the SORC and submitted to the NRB and the General Production.

NVe.iEl4R., SALEM -UNIT 2 6-11

  • L. ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7. l The following actions. shall be taken in the event a Safety Limit is vio*l ated: a. The unit shall be placed in at least HOT STANDBY within one hour. b. The Safety Limit violation shall be reported to the Commission, the General Production and to the NRB within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. )J uc.LLAe. . c. A Safety Limit Violation Report shall be prepared.

The report shall be reviewed by the SORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility*components, systems or structures, and (3) corrective action taken to prevent recurrence.

d. The Safety Limit Violation Report shall be submitted to the Commission, the NRB and the General Manager-Ele=tcic Production within 14 days of the violation. .

6.8 PROCEDURES

6.8. l Written procedures shall be established, implemented and maintained covering the activities referenced below: a. The applicable procedures recommended in Appendix 11 A 11 of Regulatory Guide 1.33, Revision 2, February 1978. b. Refueling operations.

c. Surveillance and test activities of safety related equipment.
d. Security Plan implementation.
e. Emergency Plan implementation.
f. F_ire Protection Program implementation.

6.8.2 Each procedure and administrative policy of 6.8. l above, and changes thereto, shall be reviewed by the SORC and approved by the Station Manager prior to implementation and reviewed periodically as set forth in adminis-trative procedures.

  • 6.8.3 Temporary changes to procedures of 6.8. 1 above may be made provided:
a. The intent of the original procedure is not altered. b. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.

SALEM -UNIT 2. 6-12