Line 19: |
Line 19: |
| {{#Wiki_filter:ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued) | | {{#Wiki_filter:ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued) |
| C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on | | C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on |
| *ignal. n . | | *ignal. n . |
| : 7. Verifying the dieael generator opera tea :for at leaat 24 houra*. During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator | | : 7. Verifying the dieael generator opera tea :for at leaat 24 houra*. During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator |
| *hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency | | *hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency |
Line 26: |
Line 26: |
| simultaneoualy*, during ahutdown, and verifyinq that all dieael generator* | | simultaneoualy*, during ahutdown, and verifyinq that all dieael generator* |
| accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda. t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**: Veri:fyinq th* di***l generator atarta and achiev.a 3910 volt* and > 58.8 Hz 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@ '\ J o:f 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz. j.::ttJSl:.(l\ | | accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda. t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**: Veri:fyinq th* di***l generator atarta and achiev.a 3910 volt* and > 58.8 Hz 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@ '\ J o:f 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz. j.::ttJSl:.(l\ |
| A 4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S: | | A 4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S: |
| : a. At l ... t once per 31 day* by: 1. Veri:fyi.nq th* level in each the above required :fuel atorage tank*. 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer | | : a. At l ... t once per 31 day* by: 1. Veri:fyi.nq th* level in each the above required :fuel atorage tank*. 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer |
| :fuel :froa the :fuel atoraqe tank* to the day tank*. SALKM -UNIT 2 ,/ 9907300106 990723 PDR ADOCK 05000272 p PDR 3/4 8-5 Amendment No. 200 | | :fuel :froa the :fuel atoraqe tank* to the day tank*. SALKM -UNIT 2 ,/ 9907300106 990723 PDR ADOCK 05000272 p PDR 3/4 8-5 Amendment No. 200 |
| . il;u:r:'l'Rlc:AL PO!!Zl\ SYSTIMS --:s c) Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a injection actuation signal.. | | . il;u:r:'l'Rlc:AL PO!!Zl\ SYSTIMS --:s c) Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a injection actuation signal.. |
Line 35: |
Line 35: |
| *iqnal override* | | *iqnal override* |
| th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey with ottait. power. e. At l-*t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel. 9enerator* | | th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey with ottait. power. e. At l-*t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel. 9enerator* |
| acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda. | | acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda. |
| : f. At leaet once ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**: Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz. . a .1 3 'l'he c:U.ea.i tuel oil atoraq. and b:anster *ir*t-*hall b9 demonstrated ODMllLI: a. At least once per 31 day* by: 1 . Vuif'yinq the l.v.l in Neb the above reqgired tuel *torage t.mka. 2. Ve:ifyin11 that: :fu.l uan.f'e&-pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks. SALEM -UNZ'l' 1 l/4 1!1-5 Aaendmen t No. 222 | | : f. At leaet once ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**: Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz. . a .1 3 'l'he c:U.ea.i tuel oil atoraq. and b:anster *ir*t-*hall b9 demonstrated ODMllLI: a. At least once per 31 day* by: 1 . Vuif'yinq the l.v.l in Neb the above reqgired tuel *torage t.mka. 2. Ve:ifyin11 that: :fu.l uan.f'e&-pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks. SALEM -UNZ'l' 1 l/4 1!1-5 Aaendmen t No. 222 |
| * El&'S'llRISAL PgWE! SYS'l'!iMS | | * El&'S'llRISAL PgWE! SYS'l'!iMS |
| -----b. At l***t onc:e pez-92 daya by that | | -----b. At l***t onc:e pez-92 daya by that |
| * suiple of cb.enl fu*l :!rma each o:! the above requj.red | | * suiple of cb.enl fu*l :!rma each o:! the above requj.red |
| :!uel *toi:a9e i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 AS'l'M D!J7S-77 when for visco*ity, water and *ediment. | | :!uel *toi:a9e i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 AS'l'M D!J7S-77 when for visco*ity, water and *ediment. |
| 4.8.1.1.4 R!p9rt1 -NOT USl:D | | 4.8.1.1.4 R!p9rt1 -NOT USl:D |
| * Sur.r.illance te* ti.119 may be conductec:l iii | | * Sur.r.illance te* ti.119 may be conductec:l iii |
| *i th th* manufacturer'* | | *i th th* manufacturer'* |
| ;c-*commendatioftl | | ;c-*commendatioftl |
| :eq&Z"ding-anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ... Atl). 0 Thie bmid is meant aa CJUidAnce to rautine o:! th* di**el g911erator aaziufac:turer'* | | :eq&Z"ding-anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ... Atl). 0 Thie bmid is meant aa CJUidAnce to rautine o:! th* di**el g911erator aaziufac:turer'* |
| design ratinqa. Loma in uceas of thi* .band :!or apecj,aJ. | | design ratinqa. Loma in uceas of thi* .band :!or apecj,aJ. |
Similar Documents at Salem |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued)
C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on
- 7. Verifying the dieael generator opera tea :for at leaat 24 houra*. During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator
- hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency
- hall be maintained at 3910 and S 4580 volt* and 60 +/- 1.2 Hz during thia teat. 8. Verifying that the auto-connected loada to each di***l generator do not exceed the two hour rati.nq of 2860 kw. 9. Verifying that with th* di***l generator operatinq in a teat mode (connected to it* bua), a aimulated aatety injecti.on aignal override*
the teat mode by (1) returning th* di***l generator to atandby operati.on and (2) automatically energizinq th* Cllllergency loada with ottaite power. e. At leaat once per 10 year* or attar any modificati.ona which could diesel generator interdependence by atarti.ng all di.***l generator*
simultaneoualy*, during ahutdown, and verifyinq that all dieael generator*
accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda. t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**: Veri:fyinq th* di***l generator atarta and achiev.a 3910 volt* and > 58.8 Hz 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@ '\ J o:f 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz. j.::ttJSl:.(l\
A 4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S:
- a. At l ... t once per 31 day* by: 1. Veri:fyi.nq th* level in each the above required :fuel atorage tank*. 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer
- fuel :froa the :fuel atoraqe tank* to the day tank*. SALKM -UNIT 2 ,/ 9907300106 990723 PDR ADOCK 05000272 p PDR 3/4 8-5 Amendment No. 200
. il;u:r:'l'Rlc:AL PO!!Zl\ SYSTIMS --:s c) Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a injection actuation signal..
the d.;i.eeal operate* for at leaat 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*. During th* ti:st 2 hour* t:hi.* te*t, t:he di.eael generator ehall be loaded to 2760-2850 kw.** During-the 22 hour* ot this te*t, th* di***l generator
- hall be loaded to 2500-2600 kw**. The steady *tat* voltage and :frequency shall be uintained at 3g10 and S 4!80 volt* and 60 +/- 1.2 Hz durinq thi 8. Verifyinq that the auto-connec:ted lo&da to each diesel 9911e:ato:
do not e.c.ed the tvo bou: ratinq of 2860 kv. 51. V*ri:tying that *i th th* diaael qezie::at:or in a teet aode (connected ta it* bus),* sillNiatad safety injection
th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey with ottait. power. e. At l-*t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel. 9enerator*
acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda.
- f. At leaet once ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**: Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz. . a .1 3 'l'he c:U.ea.i tuel oil atoraq. and b:anster *ir*t-*hall b9 demonstrated ODMllLI: a. At least once per 31 day* by: 1 . Vuif'yinq the l.v.l in Neb the above reqgired tuel *torage t.mka. 2. Ve:ifyin11 that: :fu.l uan.f'e&-pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks. SALEM -UNZ'l' 1 l/4 1!1-5 Aaendmen t No. 222
- El&'S'llRISAL PgWE! SYS'l'!iMS
b. At l***t onc:e pez-92 daya by that
- suiple of cb.enl fu*l :!rma each o:! the above requj.red
- !uel *toi:a9e i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 AS'l'M D!J7S-77 when for visco*ity, water and *ediment.
4.8.1.1.4 R!p9rt1 -NOT USl:D
- Sur.r.illance te* ti.119 may be conductec:l iii
- c-*commendatioftl
- eq&Z"ding-anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ... Atl). 0 Thie bmid is meant aa CJUidAnce to rautine o:! th* di**el g911erator aaziufac:turer'*
design ratinqa. Loma in uceas of thi* .band :!or apecj,aJ.
teetinq oz-moanta:y due to c:han11inljJ bu1 loada shall not invalidate th* t.st.
- A one-ti.me eate1Uion to thi* aurveillanc.
requirement is dU%'inq fue.l eycl* thirteen -.llowing Unit 1 operation*
to continue to th* thirteenth refu.liftlJ outaq* (1Jll13).
'l'h* surveillomce i1 to be completed ae the app;c-opriate time during-th* 1R13 outage, prio;c-to the unit to )lode 4 upon outage complet.:i.on.
SALEM -UNI'!' 1 3/4 8-!a Aamidmen t No. 222 -