|
|
Line 2: |
Line 2: |
| | number = ML082490766 | | | number = ML082490766 |
| | issue date = 06/12/2008 | | | issue date = 06/12/2008 |
| | title = Oyster Creek Retake Exam Draft - Outlines (Folder 2) | | | title = Retake Exam Draft - Outlines (Folder 2) |
| | author name = | | | author name = |
| | author affiliation = NRC/RGN-I | | | author affiliation = NRC/RGN-I |
Revision as of 08:02, 17 April 2019
|
---|
Category:License-Operator
MONTHYEARML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17156A5502017-06-0505 June 2017 Requalification Program Inspection - Oyster Creek Nuclear Generating Station RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 RS-16-156, Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-18018 July 2016 Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML17261B0602016-02-16016 February 2016 Final QA Related Forms (Folder 1) ML16064A1772016-02-10010 February 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17216A1722016-02-10010 February 2016 Draft Operating Exam (Sections a, B and C) (Folder 2) ML17216A1742016-02-10010 February 2016 Draft Written Exam (Folder 2) ML17261B1652016-02-10010 February 2016 Final Outlines (Folder 3) ML17261B1672016-02-10010 February 2016 Draft - Outlines (Folder 2) ML17261B1682016-02-10010 February 2016 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML17261B1692016-02-10010 February 2016 NRC Comments of Draft Licensee-Developed Exam (Operating) (Folder 2) ML16064A1712016-02-10010 February 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML16026A5812016-01-26026 January 2016 Initial Operator Licensing Operating Test and Written Examination Approval - Oyster Creek Nuclear Generating Station ML14311A6622014-11-0303 November 2014 September 10, 2014, NRC Generic Fundamentals Examination Results - Oyster Creek Nuclear Generating Station Cover Letter ML15016A1462014-06-0404 June 2014 Miscellaneous Exam Material (Folder 1) ML14163A3872014-05-28028 May 2014 Handouts to Applicants, Summary of References (Folder 3) ML14139A0052014-05-16016 May 2014 Initial Operator Licensing Operating Test and Written Examination Approval-Oyster Creek Nuclear Generating Station ML15016A1522014-05-13013 May 2014 Final Outlines (Folder 3) ML14163A3882014-05-13013 May 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14163A3862014-05-13013 May 2014 Final Written Examination with Answer Key (405-5 Format) (Folder 3) ML14167A3122014-05-0707 May 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14167A3232014-05-0505 May 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14167A3842014-04-0202 April 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14167A2982014-04-0202 April 2014 Draft Outlines (Folder 2) ML14167A3682014-04-0202 April 2014 Draft Written Exam (Folder 2) RS-12-114, (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations2012-07-0505 July 2012 (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations IR 05000219/20123012012-06-18018 June 2012 Er 05000219-12-301; 5/14/2012 - 5/24/2012; Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML12172A0692012-06-13013 June 2012 Final Qa/Related Forms (Folder 1) ML12165A6092012-06-0606 June 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML12165A6012012-06-0606 June 2012 Final Outlines (Folder 3) ML12159A2442012-06-0101 June 2012 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML12159A3912012-06-0101 June 2012 Draft Written Exam (Folder 2) ML12159A2582012-06-0101 June 2012 Draft - Outlines (Folder 2) ML12159A2522012-06-0101 June 2012 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML12165A6352012-06-0101 June 2012 Handouts to Applicants (Folder 3) ML12128A2242012-05-0707 May 2012 Initial Operator Licensing Operating Test and Written Examination Approval - Oyster Creek Nuclear Generating Station, ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates IR 05000219/20113012011-08-11011 August 2011 Er 05000219-11-301, July 11-20, 2011, Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML12017A1642011-07-30030 July 2011 Draft - Outlines (Folder 2) ML1124903532011-07-28028 July 2011 Final Qa/Related Forms (Folder 1) ML1121305252011-07-11011 July 2011 Final Outlines (Folder 3) ML1121305282011-07-0606 July 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML1121305342011-07-0606 July 2011 Summary of Handouts to Applicants (Folder 3) ML1121305412011-07-0606 July 2011 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1118101102011-06-30030 June 2011 Operator Licensing Examination Approval (Oyster Creek) ML1118702612011-06-27027 June 2011 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML1118701862011-06-27027 June 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML1118702782011-05-27027 May 2011 Draft Operating Exam (Sections a, B, and C) (Folder 2) 2018-01-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 RS-16-156, Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-18018 July 2016 Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML17261B0602016-02-16016 February 2016 Final QA Related Forms (Folder 1) ML17261B1692016-02-10010 February 2016 NRC Comments of Draft Licensee-Developed Exam (Operating) (Folder 2) ML17261B1682016-02-10010 February 2016 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML17261B1672016-02-10010 February 2016 Draft - Outlines (Folder 2) ML17261B1652016-02-10010 February 2016 Final Outlines (Folder 3) ML17216A1742016-02-10010 February 2016 Draft Written Exam (Folder 2) ML17216A1722016-02-10010 February 2016 Draft Operating Exam (Sections a, B and C) (Folder 2) ML16064A1772016-02-10010 February 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16064A1712016-02-10010 February 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML16026A5812016-01-26026 January 2016 Initial Operator Licensing Operating Test and Written Examination Approval - Oyster Creek Nuclear Generating Station ML14311A6622014-11-0303 November 2014 September 10, 2014, NRC Generic Fundamentals Examination Results - Oyster Creek Nuclear Generating Station Cover Letter ML15016A1462014-06-0404 June 2014 Miscellaneous Exam Material (Folder 1) ML14163A3872014-05-28028 May 2014 Handouts to Applicants, Summary of References (Folder 3) ML14139A0052014-05-16016 May 2014 Initial Operator Licensing Operating Test and Written Examination Approval-Oyster Creek Nuclear Generating Station ML14163A3882014-05-13013 May 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14163A3862014-05-13013 May 2014 Final Written Examination with Answer Key (405-5 Format) (Folder 3) ML15016A1522014-05-13013 May 2014 Final Outlines (Folder 3) ML14167A3122014-05-0707 May 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14167A3232014-05-0505 May 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14167A3842014-04-0202 April 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14167A3682014-04-0202 April 2014 Draft Written Exam (Folder 2) ML14167A2982014-04-0202 April 2014 Draft Outlines (Folder 2) RS-12-114, (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations2012-07-0505 July 2012 (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations IR 05000219/20123012012-06-18018 June 2012 Er 05000219-12-301; 5/14/2012 - 5/24/2012; Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML12172A0692012-06-13013 June 2012 Final Qa/Related Forms (Folder 1) ML12165A6012012-06-0606 June 2012 Final Outlines (Folder 3) ML12165A6092012-06-0606 June 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML12159A2522012-06-0101 June 2012 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML12159A3912012-06-0101 June 2012 Draft Written Exam (Folder 2) ML12159A2582012-06-0101 June 2012 Draft - Outlines (Folder 2) ML12159A2442012-06-0101 June 2012 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML12165A6352012-06-0101 June 2012 Handouts to Applicants (Folder 3) ML12128A2242012-05-0707 May 2012 Initial Operator Licensing Operating Test and Written Examination Approval - Oyster Creek Nuclear Generating Station, ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates IR 05000219/20113012011-08-11011 August 2011 Er 05000219-11-301, July 11-20, 2011, Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML12017A1642011-07-30030 July 2011 Draft - Outlines (Folder 2) ML1124903532011-07-28028 July 2011 Final Qa/Related Forms (Folder 1) ML1121305252011-07-11011 July 2011 Final Outlines (Folder 3) ML1121305282011-07-0606 July 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML1121305342011-07-0606 July 2011 Summary of Handouts to Applicants (Folder 3) ML1121305412011-07-0606 July 2011 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1118101102011-06-30030 June 2011 Operator Licensing Examination Approval (Oyster Creek) ML1118702612011-06-27027 June 2011 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML1118701862011-06-27027 June 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML1118702672011-05-27027 May 2011 Draft - Outlines (Folder 2) ML1118702782011-05-27027 May 2011 Draft Operating Exam (Sections a, B, and C) (Folder 2) 2018-01-03
[Table view] |
Text
OC NRC Re-Take Exam 2008 Scenario Outline Event No. Facility: Ovster Creek Scenario No.: NRC 1 Op Test No.: NRC 2008-1 Malf. No. Event TY Pe* Examiners: Operators:
S RO-Steve Johnston 1 Initial Conditions:
0 100% Power 0 RWCU Pump "9" 00s 0 RWM is bypassed and 00s Turnover:
0 Perform 602.4.004, Main Steam Isolation Valve 10% Closure Test. NIA N 2 I VLV-RPS004 TS 7 n MAL-EDS003B MAL-CFWO17 R /I 4 I MAL-NIS021F 8 9 1 1 %l05-22-15 1 MAL-SWSOOI B MAL-RCUO13 VLV-RCU001 M VLV-RCUOW MAL-CNS004A c or B or C or D SRO BOP SRO SRO BOP SRO RO SRO RO SRO BOP SRO RO ALL SRO BOP - Event Description Performs 602.4.004, Main Steam Isolation Valve 10% Closure Test.
MSlV NS04B sticks open during Closure Test TS 3.5.3. Respond to Loss of USS 1A2 480V bus. APRM 6 hop. Failure causes
% scram TS 3.7.B, ABN-45 "LOSS of USS 1A2" RAP-G2f Control Rod Drift Out ABN-6 "Control Rod Malfunctions" Respond to trip of Service Water Pump 1-2 ABN-18 "Service Water Failure Response Main Condenser Vacuum Leak Power Reduction required ABN-14 "Loss of Condenser Vacuum" 7. RWCU Leak in the Reactor Building RWCU fails to isolate Secondary Containment Control EOP Emergency Depressurization required A Containment Spray pump trips while in Torus Cooling (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 1 Page 1 of 27 OC NRC Retake Exam 2008 Scenario Outline MAL-CRD005 MAL-RPSOOG
SWI-RPS006 MAL-NSSOI 78 MAL-PCN001 N MAL-RPS007C VLV-CNS008 PMP-CNS008A Facility: Oyster Creek Scenario No.: NRC 2 Op Test No.: NRC 2008-1 Examiners:
Operators:
SRO- Steve Johnston C M C initial Conditions:
90% Power RWM is bypassed and 00s lsophase Bus Fan "A" is 00s 0 Main Generator voltage control is in manual Turnover:
Restore the amplidyne to service and transfer main generator voltage control to automatic IAW 336.1 "24KV Main Gen Electrical System" I Event No. I 2 Malf. No. I Event CRD008-34-11 x C SWI-ADS001C ANN-E6D ANN-E2D VLV-NSSOOG
~~ Restore the amplidyne to service and transfer main generator voltage control to automatic IAW 336.1 "24KV Main Gen Electrical System" Increase reactor power with control rods Uncoupled Control Rod ABN-6 "Control Rod Malfunction" EMRV "A Inadvertently Opens ABN-40 "Stuck Open EMRV'; TS 3.4.8 ~~ ~ ~ ~ Respond to Reactor Recirc Pump "A' Alarms, Pump Discharge Valve fails to close ABN-2 "Recirculation System Failures" TS 3.3.F. Multiple control rod drifts, Manual scram required and fails, ARI required ABNB "Control Rod Malfunction" Steam leak in Primary Containment, DWiTorus Vacuum Breaker fails open Failure of RWCU to Auto isolate, Containment Spray System failures (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 2 Page 1 of 21 OC NRC Re-Take Exam 2008 Scenario Outline Event TY Pe* Facility:
Oyster Creek Scenario No.: NRC 3 Op Test No.: NRC 2008-1 Event Description Examiners: Operators:
RO- Steve Johnston ATC ATC ATC ALL Initial Conditions:
92%Power RWM bypassed and 00s TBCCW pump 2 00s Turnover: Increase reactor power to 100% IAW ReMA Increase Power with Rods
& Recirc Flow to 100% Power Stuck Control Rod CRD Pump 1A Shaft Failure Condensate Pump B Motor Bearing Hi Temp requires power reduction with Recirculation Flow to approx. 65% power Small Steam leak in containment with Hydraulic ATWS Event Malf. No. No. 1 PMP- CRD002A 4 ICH-CW069A MAL- NSSOl7D CRD021A CRD021 B CRDOOI A MAL- MAL- MAL- ATC I CRD FIOW Control Valve fails to 0% i (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Transient (TS) Tech Spec NRC 3 Page 1 of 14