| title = Summer Report 22 - 2010 Mid Cycle Inspection/Activity Plan
| title = Report 22 - 2010 Mid Cycle Inspection/Activity Plan
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II

Revision as of 05:45, 13 April 2019

Report 22 - 2010 Mid Cycle Inspection/Activity Plan
ML102440316
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
South Carolina Electric & Gas Co
Shared Package
ML102440296 List:
References
Download: ML102440316 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2010 08:22:56 Report 22 09/01/2010

-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 2 1 IP A lert and Notification System Testing 7111402 09/13/2010 09/17/2010 1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/13/2010 09/17/2010 1 IP Emergency Action Level and Emergency Plan Changes 7111404 09/13/2010 09/17/2010 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/13/2010 09/17/2010 1 IP Performance Indicator Verification 71151 09/13/2010 09/17/2010 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP Identification and Resolution of Problems 71152B 10/04/2010 10/08/2010 1 IP Identification and Resolution of Problems 71152B 10/18/2010 10/22/2010 CDBI-COMPONENT DESIGN BASES INSPECTION 9 1 IP Component Design Bases Inspection 7111121 01/10/2011 01/14/2011 1 IP Component Design Bases Inspection 7111121 01/31/2011 02/04/2011 1 IP Component Design Bases Inspection 7111121 02/14/2011 02/18/2011 1 IP Component Design Bases Inspection 7111121 02/28/2011 03/04/2011 EB3ISI-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR 7111108P 05/02/2011 05/06/2011 PSB1-RP-RP OCCUPATIONAL WEEK 1 4 1 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 05/02/2011 05/06/2011 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/02/2011 05/06/2011 1 IP Occupational ALARA Planning and Controls 71124.02 05/02/2011 05/06/2011 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/02/2011 05/06/2011 1 IP Occupational Dose Assessment 71124.04 05/02/2011 05/06/2011 1 IP Radiation Monitoring Instrumentation 71124.05 05/02/2011 05/06/2011 1 IP Performance Indicator Verification 71151 05/02/2011 05/06/2011 PSB1-RP-RP OCCUPATIONAL WEEK 2 2 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/16/2011 05/20/2011 1 IP Occupational ALARA Planning and Controls 71124.02 05/16/2011 05/20/2011 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/16/2011 05/20/2011 1 IP Occupational Dose Assessment 71124.04 05/16/2011 05/20/2011 1 IP Radiation Monitoring Instrumentation 71124.05 05/16/2011 05/20/2011 1 IP Performance Indicator Verification 71151 05/16/2011 05/20/2011 PSB1-TI-TI-179 NSTS VERIFICATION 1 1 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 05/16/2011 05/20/2011 OL RQ-REQUAL INSPECTION 2 1 IP Licensed Operator Requalification Program 7111111B 08/08/2011 08/12/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2010 08:22:56 Report 22 09/01/2010

-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer OL EXAM-INITIAL EXAM PREP 3 1 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23356 08/22/2011 08/26/2011 OL EXAM-INITIAL EXAM - WEEK 1 3 1 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23356 09/12/2011 09/16/2011 OL EXAM-INITIAL EXAM - WEEK 2 3 1 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23356 09/19/2011 09/23/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1 IP Exercise Evaluation 7111401 09/26/2011 09/30/2011 1 IP Emergency Action Level and Emergency Plan Changes 7111404 09/26/2011 09/30/2011 1 IP Performance Indicator Verification 71151 09/26/2011 09/30/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.