IR 05000483/2015405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML15222B305
| number = ML15222B305
| issue date = 08/10/2015
| issue date = 08/10/2015
| title = Callaway Plant - NRC Material Control and Accounting Program Inspection Report 05000483/2015405
| title = NRC Material Control and Accounting Program Inspection Report 05000483/2015405
| author name = Gepford H J
| author name = Gepford H J
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS

Revision as of 11:51, 3 April 2019

NRC Material Control and Accounting Program Inspection Report 05000483/2015405
ML15222B305
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/10/2015
From: Gepford H J
Division of Reactor Safety IV
To: Diya F M
Union Electric Co
J. O'Donnell
References
IR 2015405
Download: ML15222B305 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511

" " August 10, 2015 Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2015405

Dear Mr. Diya:

On July 17, 2015, the U.S. Nuclear Regulator y Commission (NRC) completed a security baseline inspection at the Callaway Plant. The inspection covered a key attribute of the Security Cornerstone of the NRC's Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2015, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/

Heather J. Gepford, Chief

Plant Support Branch 2

Division of Reactor Safety Docket: 50-483 License: NPF-30

Nonpublic

Enclosure:

NRC Inspection Report 05000483/2010405

w/Attachment:

Supplemental Information

cc: w/enclosure:

Mr. Eric Olson

Manager, Security Callaway Plant, Unit 1 5 Miles North of Hwy 94

Portland, MO 65067

cc w/o encl:

Electronic Distribution for Callaway Plant

ML15222B305 SUNSI Review By: MJP ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE HP/PSB2 C: NAME JO'Donnell HGepford/MJP for/ SIGNATURE /RA/ /RA/ DATE 7/6/15 8/10/15 Letter to Fadi Diya from Heather Gepford, dated August 10, 2015

SUBJECT: CALLAWAY PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2015405

Distribution w/o enclosure

Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Andrew. Rosebrook@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)