ML060580625: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML060580625
| number = ML060580625
| issue date = 03/02/2006
| issue date = 03/02/2006
| title = Beaver Valley Power Station, Unit No. 2 (BVPS-2) - Request for Additional Information (RAI) - Station Battery Charger Upgrade (TAC No. MC8735)
| title = Beaver Valley Power Station, Unit No. 2 (BVPS-2) - Request for Additional Information (RAI) - Station Battery Charger Upgrade
| author name = Colburn T G
| author name = Colburn T G
| author affiliation = NRC/NRR/ADRO/DORL/LPLA
| author affiliation = NRC/NRR/ADRO/DORL/LPLA

Revision as of 22:31, 10 February 2019

Beaver Valley Power Station, Unit No. 2 (BVPS-2) - Request for Additional Information (RAI) - Station Battery Charger Upgrade
ML060580625
Person / Time
Site: Beaver Valley
Issue date: 03/02/2006
From: Colburn T G
NRC/NRR/ADRO/DORL/LPLA
To: Lash J H
FirstEnergy Nuclear Operating Co
Colburn T G, NRR/DLPM, 415-1402
References
Download: ML060580625 (5)


Text

March 2, 2006Mr. James H. LashVice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station

P. O. Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NO. 2 (BVPS-2) - REQUEST FORADDITIONAL INFORMATION (RAI) - STATION BATTERY CHARGER UPGRADE (TAC NO. MC8735)

Dear Mr. Lash:

By letter dated October 14, 2005, FirstEnergy Nuclear Operating Company requested anAmendment to the BVPS-2, Technical Specifications (TSs). The proposed changes would revise TSs 3/4.8.2.3 and 3/4.8.2.4 to permit implementation of station battery charger upgrades,including installation of new battery chargers. The Nuclear Regulatory Commission (NRC) staffhas determined that the information contained in the enclosed RAI will be needed for the NRCstaff to complete its review. As discussed with your staff, we request your response within 30 days of receipt of this letter inorder to maintain our review schedule. If you have any questions, please contact me at 301-415-1402.Sincerely,/RA/Timothy G. Colburn, Senior Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-412

Enclosure:

RAIcc w/encl: See next page

ML060580625*Input received. No substantive changes made.OFFICELPLI-1/LALPLI-1/PMEEEB/BC(A)LPLI-1/BCNAMESLittleTColburnEBrown*RLauferDATE 3/01/063/01/06 02/17/063/02/06 EnclosureREQUEST FOR ADDITIONAL INFORMATION (RAI)BEAVER VALLEY POWER STATION, UNIT NO. 2 (BVPS-2) STATION BATTERY CHARGER UPGRADEDOCKET NO. 50-412 By letter dated October 14, 2005 (Agencywide Documents Access and Management SystemAccession No. ML052920419), FirstEnergy Nuclear Operating Company requested an amendment to the BVPS-2 Technical Specifications (TSs). The proposed changes would revise TSs 3/4.8.2.3 and 3/4.8.2.4 to permit implementation of station battery charger upgrades,including installation of new battery chargers. The Nuclear Regulatory Commission (NRC) staffhas determined that the information contained below is needed for the NRC staff to complete itsreview. 1.Provide assurance that any spare charger that could be credited by removing '2-7' from TS 3.8.2.3 ACTION b and the note in TS 3.8.2.4 would be equivalent towhat is detailed in the BVPS-2 Updated Final Safety Analysis Report (UFSAR). 2.The Institute of Electrical and Electronics Engineers (IEEE) Standard - 450(1987-2002), "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications," states that degradation is indicated when the battery capacity drops more than 10%

from its capacity on the previous performance test, or is below 90% of manufacturer's rating. Provide assurance that the current definition for battery degradation being usedat BVPS-2 provides an accurate indication of each battery's condition.3.Provide assurance that the BVPS-2 UFSAR will reflect the proposed designchange. 4.Provide an updated electrical one-line diagram that shows the proposed designconfiguration.5.How will you prevent the rectifier assemblies from providing direct current i nputto the respective 125-volt direct current bus? Beaver Valley Power Station, Unit Nos. 1 and 2 cc:Gary R. LeidichPresident and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308Joseph J. HaganSenior Vice Presdient of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308Danny L. PaceSenior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308Jeannie M. RinckelVice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308David W. Jenkins, AttorneyFirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308Manager, Fleet LicensingFirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333Lew W. MyersExecutive Vice President, Special ProjectsFirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SGRP P.O. Box 4, Route 168 Shippingport, PA 15077Manager, Site Regulatory ComplianceFirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077Commissioner James R. LewisWest Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305Director, Utilities DepartmentPublic Utilities Commission 180 East Broad Street Columbus, OH 43266-0573Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364Ohio EPA-DERRATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149Dr. Judith JohnsrudEnvironmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:

DirectorBureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Resident InspectorU.S. Nuclear Regulatory Commission

P.O. Box 298 Shippingport, PA 15077