March 2, 2006 Mr. James H. Lash Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NO. 2 (BVPS-2) - REQUEST FOR ADDITIONAL INFORMATION (RAI) - STATION BATTERY CHARGER UPGRADE (TAC NO. MC8735)
Dear Mr. Lash:
By letter dated October 14, 2005, FirstEnergy Nuclear Operating Company requested an Amendment to the BVPS-2, Technical Specifications (TSs). The proposed changes would revise TSs 3/4.8.2.3 and 3/4.8.2.4 to permit implementation of station battery charger upgrades, including installation of new battery chargers. The Nuclear Regulatory Commission (NRC) staff has determined that the information contained in the enclosed RAI will be needed for the NRC staff to complete its review.
As discussed with your staff, we request your response within 30 days of receipt of this letter in order to maintain our review schedule. If you have any questions, please contact me at 301-415-1402.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-412
Enclosure:
RAI cc w/encl: See next page
- Input received. No substantive changes made.
OFFICE LPLI-1/LA LPLI-1/PM EEEB/BC(A)
LPLI-1/BC NAME SLittle TColburn EBrown*
RLaufer DATE 3/01/06 3/01/06 02/17/06 3/02/06
Enclosure REQUEST FOR ADDITIONAL INFORMATION (RAI)
BEAVER VALLEY POWER STATION, UNIT NO. 2 (BVPS-2)
STATION BATTERY CHARGER UPGRADE DOCKET NO. 50-412 By letter dated October 14, 2005 (Agencywide Documents Access and Management System Accession No. ML052920419), FirstEnergy Nuclear Operating Company requested an amendment to the BVPS-2 Technical Specifications (TSs). The proposed changes would revise TSs 3/4.8.2.3 and 3/4.8.2.4 to permit implementation of station battery charger upgrades, including installation of new battery chargers. The Nuclear Regulatory Commission (NRC) staff has determined that the information contained below is needed for the NRC staff to complete its review.
1.
Provide assurance that any spare charger that could be credited by removing 2-7' from TS 3.8.2.3 ACTION b and the note in TS 3.8.2.4 would be equivalent to what is detailed in the BVPS-2 Updated Final Safety Analysis Report (UFSAR).
2.
The Institute of Electrical and Electronics Engineers (IEEE) Standard - 450 (1987-2002), IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications, states that degradation is indicated when the battery capacity drops more than 10%
from its capacity on the previous performance test, or is below 90% of manufacturers rating.
Provide assurance that the current definition for battery degradation being used at BVPS-2 provides an accurate indication of each batterys condition.
3.
Provide assurance that the BVPS-2 UFSAR will reflect the proposed design change.
4.
Provide an updated electrical one-line diagram that shows the proposed design configuration.
5.
How will you prevent the rectifier assemblies from providing direct current input to the respective 125-volt direct current bus?
Beaver Valley Power Station, Unit Nos. 1 and 2
cc:
Gary R. Leidich President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Joseph J. Hagan Senior Vice Presdient of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333 Lew W. Myers Executive Vice President, Special Projects FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SGRP P.O. Box 4, Route 168 Shippingport, PA 15077 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077