Line 2: |
Line 2: |
| | number = ML112520047 | | | number = ML112520047 |
| | issue date = 09/19/2011 | | | issue date = 09/19/2011 |
| | title = 09/08/11 Summary of Meeting with Pseg Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (TAC Nos. ME6895 and ME6896) | | | title = 09/08/11 Summary of Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (TAC Nos. ME6895 and ME6896) |
| | author name = | | | author name = |
| | author affiliation = PSEG Nuclear, LLC | | | author affiliation = PSEG Nuclear, LLC |
Revision as of 23:04, 8 February 2019
Letter Sequence Meeting |
---|
TAC:ME6895, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Open) TAC:ME6896, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Open) |
|
MONTHYEARML1123511452011-08-24024 August 2011 Forthcoming Meeting with PSEG Nuclear LLC (PSEG) to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Meeting ML1125200472011-09-19019 September 2011 Summary of Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Meeting ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Meeting 2011-08-24
[Table View] |
Similar Documents at Salem |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML17291B0822017-10-18018 October 2017 Supplemental Inspection Results ML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides ML17097A1762017-04-0707 April 2017 PSEG Annual Assessment Meeting Handout Presentation ML16089A0702016-03-30030 March 2016 Public Meeting Slide Presentation ML14162A4402014-06-12012 June 2014 Salem Generating Station, Near-term Task Force Recommendation 2.1 Seismic Hazard Evaluation, Public Meeting Presentation Slides ML14162A4322014-06-11011 June 2014 PSEG Slides for Seismic Reevaluation Public Meeting ML13064A3232013-02-28028 February 2013 NRC Presentation on Bypass Testing ML1125200472011-09-19019 September 2011 Summary of Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11090A0892011-04-0505 April 2011 Approach for Assessing and Managing Fire Risk in (a)(4) ML1032805762010-11-17017 November 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, LRA - Meeting Slides ML1014605102010-05-27027 May 2010 Pseg'S NRC ISFSI Presentation May 27, 2010 ML1014701832010-05-26026 May 2010 PSEG Drop-in May 26, 2010 - NRC Slides ML0933801182009-11-0505 November 2009 Public Meeting Slides from November 5, 2009 ML1029505812009-10-21021 October 2009 Bne Presentation, Buried Pipe Program by Jim Melchionna ML0917003212009-06-18018 June 2009 PSEG Slides from Drop-in Meeting, 6-18-2009 ML0910604822009-05-0505 May 2009 NRC Slides, for 5/5/09 Public Meeting ML0912605532009-05-0505 May 2009 PSEG Nuclear Slides, Salem/Hope Creek Aam, 5/5/09 ML0912702392009-05-0404 May 2009 Calvert County Sheriff- Special Operations Team ML0912406092009-04-23023 April 2009 Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference ML0908200962009-03-16016 March 2009 PSEG Presentation to NRC Public Meeting 3/16/09 in Reference to Planned License Renewal Pre Application Activities for Salem and Hope Creek ML0902600612009-01-26026 January 2009 Slides from PSEG, Salem Public Mtg 01-21-09 ML0812605262008-04-30030 April 2008 Slides from NRC Annual Assessment Meeting 2007 Reactor Oversight Process for Salem Units 1 and 2, and Hope Creek ML0805605392008-03-0404 March 2008 Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0615902582006-06-0101 June 2006 Slides for Meeting Salem Service Water Simplification Project ML0613805762006-05-17017 May 2006 NRC Slides for the Public Meeting with PSEG to Discuss Annual Assessment of Salem and Hope Creek Stations for CY2005 ML0601700752005-12-13013 December 2005 CO2 System Review, December 13, 2005 ML0509601172005-03-15015 March 2005 3/15/05 Hope Creek Generating Station, Slide Presentation for Category 1 Meeting with PSEG Nuclear LLC, Regarding Future Application for Extended Power Uprate ML0521403342005-03-0909 March 2005 RIC 2005 Presentation - B3 - Michael Brothers - Objective Measures of Safety Culture ML0428005412004-09-0909 September 2004 Meeting Handouts on Salem Units 1 & 2 Full AST Implementation ML0605806162004-05-24024 May 2004 E-mail from M. Ferdas of USNRC to Various, Regarding PSEG Leadership Presentation on SCWE Results ML0407902612004-03-18018 March 2004 PSEG Slides Presented at Management Meeting with Region I to Discuss PSEG Assessment Plan for Work Environment Issues at Salem/Hope Creek ML0620201482004-03-16016 March 2004 E-mail from Vito to Jarriel, Pre-PSEG Meeting Discussion ML0403704282004-02-0909 February 2004 01/21-22/2004 - Attachments 7 and 8, Questions & Answers ML0208705842002-03-26026 March 2002 PSEG Nuclear LLC - NRC Annual Assessment Meeting Slides 2023-09-28
[Table view] |
Text
LAR S11-02, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical SpecificationLAR S11-02, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical SpecificationSalem Units 1 and 2 Pre-Application MeetingSalem Units 1 and 2 Pre-Application MeetingEnclosure 2September 8, 2011September 8, 2011 Overview of Proposed ChangeOverview of Proposed Change
- Reactor Coolant System Specific ActivityReplace the current Tech Spec limits on -Average Disintegration Energy with limits on noble gas activity. The noble gas activity would be based on DOSE EQUIVALENT XE-133 and would take into account the noble gas activity in the primary coolant. LiAdtRt(LAR)SbittlStt 2*Li cense A men d men t R eques t (LAR) S u b m itt a l St ra t e gy The technical basis for the proposed change will be plant specific and consistent with the approach provided in TSTF 490, Rev. 1However, PSEG does not plan to reference the TSTF in the LAR.The LAR will maintain consistency with industry precedent.
Current Licensing BasisCurrent Licensing Basis TS Definitions1.10 Dose Equivalent I-1311.11 -Average Disintegration EnergyReactor Coolant System Specific ActivityLCO 3.4.8 (S1) & LCO 3.4.9 (S2)
- Defines limits for specific activity of primary coolant to be:
3- 1.0 Ci/gm DOSE EQUIVALENT I-131
>>Or less than the limit line as shown on Figure 3.4-1 for specific power levels
- 100 / Ci/gm*Applicable in Modes 1, 2, 3, 4, and 5SR 4.4.8 (S1) & SR 4.4.9 (S2)
- Provides Table 4.4-4 for sampling requirement frequencies to determine if the specific activity of the primary coolants is within allowable limits Proposed Licensing BasisProposed Licensing Basis
- TS 1.10 (S1 & S2)Minor text changes to explicitly identify the source for the dose conversion factors (DCFs) to be used to calculate Dose Equivalent I-131
- DCFs shall be the "Thyroid" Committed Dose Equivalent (CDE) inhalation dose conversion factors from Table 2.1 of Federal Guidance Report No. 11 (FGR-11), "Limiting Values of Radionuclide Intake and Air Concentration and Dose Conversion Factors for Inhalation, Submersion, and Ingestion," 1988.
- TS 1.11 (S1 & S2)Delete -Average Disintegration Energy definition and replace with definition for Dose Equivalent Xe-133*DCFs shall be the air submersion "Effective" dose conversion factors from Table III.1 of Federal Guidance Report No. 12, (FGR-12) "External Exposure to Radionuclides in Air, Water, and Soil," EPA, 1993.
- TS Figure 3.4-1 (S1 & S2) 4Delete figure
- LCO 3.4.8 (S1) & LCO 3.4.9 (S2)Revise text to remove reference to Figure 3.4-1, and to replace it with a DEI primary coolant specific activity level of 60 Ci/gmReplace 100/E Bar specific activity limit for primary coolant nuclides other than iodine with a dose equivalent Xe-133 specific activity limit of 601 Ci/gmChange applicability requirements to Modes 1, 2, 3, and 4
- SR 4.4.8 (S1) & SR 4.4.9 (S2)Revised based on industry precedent Effect on SafetyEffect on Safety
- Limits on specific activity of th e reactor coolant ensure that the offsite and control room doses are appropriately limited during analyzed transients and accidents.
- This change will implement a LC O that is consistent with thewholebodyradiologicalconsequenceanalyseswhich 5 the whole body radiological consequence analyses which are sensitive to the noble g as activity in the primary coolant.
Conclusion Conclusion
- No significant hazards considerationNo physical or plant operational changesProposed change ensures consistency with assumptions in the safety analysesProposed change will ensure the monitored values are bddbthiitiltiithftl 6 b oun d e d by th e i n iti a l assump ti ons i n th e sa f e ty ana ly ses