PSEG Presentation to NRC Public Meeting 3/16/09 in Reference to Planned License Renewal Pre Application Activities for Salem and Hope Creek
ML090820096
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/16/2009
From: Fricker C
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
References
Download: ML090820096 (17)


Text

1 Salem/Hope Creek License Renewal Presentation to the NRC March 16, 2009 Salem/Hope Creek License Renewal Presentation to the NRC March 16, 2009

2 Agenda Agenda Welcome - Carl Fricker Introductions - Carl Fricker Purpose of the Meeting - Carl Fricker Overview of Salem & Hope Creek License Renewal Applications (LRAs) Preparation - Greg Sosson Environmental Reports - Christine Neely Closing Comments - Carl Fricker

3 Purpose of the meeting Purpose of the meeting Review the status and schedule of the Salem and Hope Creek License Renewal Applications preparations Discuss potential options for the NRC reviews that can take advantage of the many common programs and common elements of the Applications

4 Objectives for LRAs Objectives for LRAs Provide assurance that Salem and Hope Creek can continue safe operation for an additional 20 years Applications will be highly consistent with the Generic Aging Lessons Learned (GALL) Guidance Applications will incorporate recent industry lessons learned

5 Timeline Timeline Jul 2007 Aug 2009 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Salem and Hope Creek License Renewal Applications (LRA's)

LRA Reviews (Safety & Environmental):

  • Industry Peer Reviews
  • Focused Area Self-Assessment
  • Plant Operations Review Committee (PORC)
  • Nuclear Safety Review Board (NSRB)
  • Senior Management Challenge 8/18/09 SHC LRAs Submitted To NRC 3/30/09 Environmental Reports ready to include in LRA's 4/1/09 - 8/18/09 LRA Assembly and Review 7/1/07 Project Kick-Off 4/9/08 Scoping and Screening Completed 3/25/09 Aging Mgt. Program Reviews Completed

6 Common Salem/Hope Creek LRA Preparation Common Salem/Hope Creek LRA Preparation Site Organizations Procedures Programs Environment

7

8 PSEG Nuclear PSEG Nuclear Director Engineering Manager Training Manager Regulatory Assurance Manager Nuclear Projects Assistant Plant Manager Director Operations Director Maintenance Director Work Mgmt Manager Radiation Protectio Manager Chemistry Radwaste and Environmental Plant Manager - Salem Manager Nuclear Oversight Station VP Salem Bob Braun Director Engineering Manager Training Manager Regulatory Assurance Manager Nuclear Projects Assistant Plant Manager Director Operations Director Maintenance Director Work Mgmt Manager Radiation Protection Manager Chemistry Radwaste and Environmental Plant Manager - Hope Creek Manager Nuclear Oversight Station VP Hope Creek George Barnes License Renewal Project Director Engineering Services Greg Sosson Director Performance Improvment Director Nuclear Fuels Director Security Manager Outage Services Manager Maintenance Services Fire Department Supt VP Operations Support Carl Fricker Manager Salem NOS Manager Hope Creek NOS Manager Employee Concerns Manager Audit Manager NOS Programs Director Nuclear Oversight Paul Davison Manager Licensing Manager Emergency Preparedness Environmental CFAM Director Regulatory Affairs Christine Neely President & CNO (1)

Tom Joyce Power President, COO Bill Levis 2/27/09

9 Processes/Procedures Processes/Procedures Policies, Department Descriptions and Higher Level (above Operating) Procedures are common Common License Renewal Application Development Process Scoping and Screening Methodology Aging Management Reviews Aging Management Programs

10 Aging Management Programs Aging Management Programs The majority of Programs are common (37 of the 58 Programs)

One Program Basis Document (PBD) is generated for each common program Common PBDs are prepared by one individual on the Project Team

11 Salem/Hope Creek AMPs List - Common Programs Salem/Hope Creek AMPs List - Common Programs ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD One-Time Inspection Fire Water System Bolting Integrity Compressed Air Monitoring Selective Leaching of Materials External Surfaces Monitoring Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Open-Cycle Cooling Water System Closed-Cycle Cooling Water System Fire Protection Flow-Accelerated Corrosion Buried Piping Inspection Buried Non-Steel Piping Inspection Water Chemistry Fuel Oil Chemistry Lubricating Oil Analysis Reactor Head Closure Studs 10 CFR Part 50, Appendix J Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Periodic Inspection Aboveground Steel Tanks Aboveground Non-Steel Tanks ASME Section XI, Subsection IWE ASME Section XI, Subsection IWF Protective Coating Monitoring and Maintenance Program RG 1.127, Inspection of Water-Control Structures Masonry Wall Structures Monitoring Program Boral Monitoring Program Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Electrical Cables and Connections Not Subject to 10 CFR50.49 Environmental Qualification Requirements Used in Instrumentation Circuits Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Metal-Enclosed Bus Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Environmental Qualification (EQ) of Electrical Components High Voltage Insulators

12 Site Specific AMPs List Site Specific AMPs List Salem One-Time Inspection of ASME Code Class 1 Small-Bore Piping Metal Fatigue of Reactor Coolant Pressure Boundary (PWR)

Boric Acid Corrosion Nickel-Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Steam Generator Tube Integrity Reactor Vessel Surveillance Nickel Alloy Aging Management Program PWR Vessel Internals Flux Thimble Tube Inspection ASME Section XI, Subsection IWL Thermal Aging Embrittlement of CASS Hope Creek Periodic Inspection of ASME Code Class 1 Small-Bore Piping Metal Fatigue of Reactor Coolant Pressure Boundary (BWR)

BWR Vessel ID Attachment Welds BWR Control Rod Drive Return Line Nozzle BWR Stress Corrosion Cracking BWR Penetrations BWR Vessel Internals BWR Feedwater Nozzle Reactor Vessel Surveillance Thermal Aging and Neutron Embrittlement of CASS

13

14

15 Environmental Reports Environmental Reports Part of License Renewal Applications (Appendix E)

Both Salem and Hope Creek Environmental Reports have been prepared by Tetra-Tech NUS Tetra-Tech NUS has prepared more than 70% of the industry License Renewal Environmental Reports filed

16 Environmental Report Contents Environmental Report Contents More than 60% of the report is identical for both plants including:

Location and Features Demography Land Use Planning Social Services and Public Facilities Meteorology and Air Quality Historic and Archaeological Resources Housing Impacts Public Water Supply Impacts Offsite Land Use Impacts Historic & Cultural Resources Impacts Differences between the reports are due primarily to the following:

Different cooling water systems Ownership Ongoing groundwater tritium remediation Transmission Lines Severe Accident Mitigation Alternatives

17 Closing Comments Closing Comments Common Approach Experienced Project Team Incorporating Industry Experience Review Efficiency can be gained due to common programs on a single site Both Applications will be submitted on August 18, 2009