PSEG Presentation to NRC Public Meeting 3/16/09 in Reference to Planned License Renewal Pre Application Activities for Salem and Hope Creek
ML090820096
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/16/2009
From: Fricker C
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
References
Download: ML090820096 (17)


Text

alem/Hope Creek License Renewal esentation to the NRC arch 16, 2009 1

Welcome - Carl Fricker ntroductions - Carl Fricker Purpose of the Meeting - Carl Fricker Overview of Salem & Hope Creek License Renewal Applications LRAs) Preparation - Greg Sosson Environmental Reports - Christine Neely Closing Comments - Carl Fricker 2

Review the status and schedule of the Salem and Hope Creek License Renewal Applications preparations Discuss potential options for the NRC reviews that can take dvantage of the many common programs and common elements of he Applications 3

rovide assurance that Salem and Hope Creek can continue safe peration for an additional 20 years Applications will be highly consistent with the Generic Aging Lessons earned (GALL) Guidance Applications will incorporate recent industry lessons learned 4

Salem and Hope Creek License Renew al A pplications (LRA 's) 7/1/07 8/18/09 Project SHC LR As Kick-O ff Subm itted To N RC 3/30/09 4/9/08 Environm ental Reports ready Scoping and Screening C om pleted to include in LRA's Aug Sep O ct Nov D ec Jan Feb M ar Apr M ay Jun Jul Aug Sep O ct Nov Dec Jan Feb M ar Apr M ay Jun Jul Aug Jul 2007 Aug 2009 4/1/09 - 8/18/09 LRA Review s (Safety & Environm ental): LRA A ssem bly and R eview

  • Industry Peer R eview s 3/25/09
  • Focused A rea Self-Assessm ent
  • Plant O perations R eview C om m ittee (PO RC ) A ging M gt. Program
  • N uclear Safety R eview Board (N SR B) Review s Com pleted
  • Senior M anagem ent Challenge 5

ite Organizations rocedures rograms nvironment 6

7 Power President, COO Bill Levis President & CNO (1)

Tom Joyce Station VP Station VP VP Operations Support Director Nuclear Director Regulatory Salem Hope Creek Oversight Affairs Bob Braun George Barnes Carl Fricker Paul Davison Christine Neely Director Engineering Director Engineering Director Engineering Manager Salem NOS Manager Licensing Services Greg Sosson Manager Training Manager Training Manager Hope Creek Manager Emergency License Renewal NOS Preparedness Project Manager Regulatory Manager Regulatory Manager Employee Environmental CFAM Director Performance Assurance Assurance Concerns Improvment Manager Nuclear Manager Nuclear Manager Audit Director Nuclear Fuels Projects Projects Plant Manager - Salem Plant Manager - Hope Manager NOS Programs Creek Director Security Assistant Plant Manager Assistant Plant Manager Manager Outage Services Director Operations Director Operations Manager Maintenance Services Director Maintenance Director Maintenance Fire Department Supt Director Work Mgmt Director Work Mgmt Manager Radiation Manager Radiation Protectio Protection Manager Chemistry Manager Chemistry Radwaste and Radwaste and Environmental Environmental Manager Nuclear Manager Nuclear Oversight Oversight 2/27/09 8

olicies, Department Descriptions and Higher Level (above Operating) Procedures are common Common License Renewal Application Development Process Scoping and Screening Methodology Aging Management Reviews Aging Management Programs 9

he majority of Programs are common (37 of the 58 Programs) ne Program Basis Document (PBD) is generated for each ommon program ommon PBDs are prepared by one individual on the Project eam 10

ASME Section XI Inservice Inspection, Subsections

  • Periodic Inspection IWB, IWC, and IWD
  • Aboveground Steel Tanks One-Time Inspection
  • Aboveground Non-Steel Tanks Fire Water System
  • Protective Coating Monitoring and Maintenance Program Selective Leaching of Materials
  • RG 1.127, Inspection of Water-Control Structures External Surfaces Monitoring
  • Masonry Wall Inspection of Internal Surfaces in Miscellaneous Piping
  • Structures Monitoring Program and Ducting Components
  • Boral Monitoring Program Open-Cycle Cooling Water System
  • Electrical Cables and Connections Not Subject to 10 CFR Closed-Cycle Cooling Water System 50.49 Environmental Qualification Requirements Fire Protection
  • Electrical Cables and Connections Not Subject to 10 Flow-Accelerated Corrosion CFR50.49 Environmental Qualification Requirements Used Buried Piping Inspection in Instrumentation Circuits Buried Non-Steel Piping Inspection
  • Inaccessible Medium Voltage Cables Not Subject to 10 Water Chemistry CFR 50.49 Environmental Qualification Requirements Fuel Oil Chemistry
  • Metal-Enclosed Bus Lubricating Oil Analysis
  • Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Reactor Head Closure Studs
  • High Voltage Insulators Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems 11

alem Hope Creek One-Time Inspection of ASME Code Class 1 Small-Bore Piping

  • Periodic Inspection of ASME Code Class 1 Small-Bore Piping Metal Fatigue of Reactor Coolant Pressure Boundary (PWR)

Boric Acid Corrosion

  • BWR Vessel ID Attachment Welds Nickel-Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water
  • Reactor Vessel Surveillance Flux Thimble Tube Inspection
  • Thermal Aging and Neutron Embrittlement of CASS ASME Section XI, Subsection IWL Thermal Aging Embrittlement of CASS 12

13 14 Part of License Renewal Applications (Appendix E)

Both Salem and Hope Creek Environmental Reports have been prepared by Tetra-Tech NUS Tetra-Tech NUS has prepared more than 70% of the ndustry License Renewal Environmental Reports filed 15

More than 60% of the report is identical for both plants including:

Location and Features Demography Land Use Planning Social Services and Public Facilities Meteorology and Air Quality Historic and Archaeological Resources Housing Impacts Public Water Supply Impacts Offsite Land Use Impacts Historic & Cultural Resources Impacts ifferences between the reports are due primarily to the following:

Different cooling water systems Ownership Ongoing groundwater tritium remediation Transmission Lines Severe Accident Mitigation Alternatives 16

Common Approach xperienced Project Team ncorporating Industry Experience Review Efficiency can be gained due to common programs on a ingle site Both Applications will be submitted on August 18, 2009 17