ML23271A161
| ML23271A161 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/28/2023 |
| From: | Public Service Enterprise Group, Westinghouse |
| To: | James Kim NRC/NRR/DORL/LPL1 |
| Shared Package | |
| ML23271A159 | List: |
| References | |
| EPID L-2023-LRM-0072, PSE-23-57, Rev 1 | |
| Download: ML23271A161 (1) | |
Text
NRC Pre-Submittal Meeting September 28, 2023 Use of Cobalt Burnable Absorbers (COBAs) in Salem Generating Station Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
2 Meeting Agenda
Introductions
Provide summary overview of scope of Co60 program Describe outline and content of LAR
Change to Operating License
TS changes Dose Consequence Evaluation Topics of interest - Questions from 7/19 Tech Exchange mtg.
Position Stability of Capsule
Evaluation of Seismic Loads
Dose Contribution from Rod Ejection
Thermal-Hydraulic Analysis
Spent Fuel Criticality Analysis Submittal Schedule Questions / Comments Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
3 Overview of Cobalt-60 Program Collaboration between Westinghouse and Nordion Provide a domestic supply of Co60 for irradiation services
Gamma source for sterilization of single-use medical devices
Food and pharmaceutical ingredient irradiation
Global shortage in Co60 sources Cobalt Burnable Absorbers (COBAs) inserted into fuel assemblies
Fuel insert similar to WABAs
Neutron irradiation of inserted/harvested per outage
COBAs reside in core for and harvested
Core location of COBAs optimized for each cycle of irradiation COBA harvesting in SFP by Westinghouse and shipped to Nordion
Blended with other Co-60 slugs to create finished sources of specific activity a,c a,c a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
Cobalt-60 Production Logistics Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved.
PSE-23-57, Rev 1, Enclosure 3a,c
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
5 Digital Serialization of Capsules 10 CFR 20.2207 (a) and (b) Compliance
(a)(3): The manufacturer, model, and serial number of the source;
(b)(4): The manufacturer, model, and serial number of the source or, if not available, other information to uniquely identify the source; Westinghouse proposes to use the following digital serialization approach:
Each stainless steel capsule will be uniquely identified in compliance with 10 CFR 20.2207 a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
6 Outline / Content of LAR LAR to provide overview of key analyses supporting COBA LAR sections will reference Westinghouse Supporting Information
Attachments to LAR - proprietary and redacted versions Site specific assessment and analyses
Chemistry sampling procedures for Co-60
Co-60 impacts to Chapter 15 LOCA dose consequence
Dose analysis for SFP cask pit area
Update to SFP criticality analysis
WCAP for SFP Criticality analysis included as attachment to LAR Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
7 FOL / TS Changes Changes to Salem FOL
Allow for transfer/use of Co60 in accordance with 10 CFR Part 30
Allow for production, possession, receipt and transfer of Co60
Similar changes made for Hope Creek Co60 initiative
Describe minimum distance for irradiated COBAs from SFP wall Changes to Salem TS
Changes to SFP storage requirements as necessary Mark-ups of FOL and TS changes in LAR attachment Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
8 Dose Consequence Evaluations COBA design limits Chapter 15 Impact
Detection of Co-60 via routine RCS sampling
Co-60 source term non-gaseous
Only affects direct RCS release LOCA dose consequences revised for additional Co-60 source term
Expected dose margin at EAB
Reduced margin for control room dose
Resultant impact on margin may require NRC review/approval Detailed description of LOCA dose calc within LAR
Dose calculation available for review via electronic reading room Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
9 Questions Raised During July Tech Exchange Mtg.
a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
10 10 Position Stability of Capsule Within Rodlet a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
11 11 Position Stability of Capsule Within Rodlet (cont.)
a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
12 12 Evaluation of Seismic Loads on the COBA Capsule In reactor conditions makes the COBA design susceptible to seismic Seismic events tend to apply lateral loads to the fuel assembly Lateral loads are also applied to the core components
Formal analysis not warranted
Resulting stresses considered to be small
Core component rods & thimble plugs supported by fuel assembly guide tube along entire length
Core component rodlets protected against damage from these loads
COBAs supported similarly as other Westinghouse core components
Specific evaluation of seismic loads unnecessary Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
13 13 Dose Contribution from Rod Ejection Evaluation performed to determine if cobalt slug could potentially melt during RE accident Slug melt would present a dose contribution from any Co-60 released Analysis performed to calculate cobalt slug temperature during the event The FSAR RE transient was conservatively applied to the cobalt slug
HFP-BOL, HFP-EOL, and HZP-EOL cases were considered No melting of the cobalt slug will occur during a Rod Ejection No impact on the dose analysis for Rod Ejection Accident a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
14 14 DNB Methodology The impact of COBA inserts producing heat in the guide thimble was investigated:
- A more limiting Salem DNBR case was chosen for the impact assessment Locked Rotor - meets DNBR safety analysis limit
- Limiting statepoint analyzed with THINC-IV code Consistent with current safety analysis
- This follows current Salem methodology for analyzing different hot assembly power distributions a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
15 15 DNB Results a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
16 16 Thermal-Hydraulic Analysis a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
COBA Rodlet Annular Regions Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved.
PSE-23-57, Rev 1, Enclosure 3a,c
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
18 Thermal-Hydraulic Analysis (cont.)
a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
19 Thermal-Hydraulic Analysis (cont.)
a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
20 Thermal-Hydraulic Analysis (cont.)
a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
21 Thermal-Hydraulic Analysis (cont.)
a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
22 22 Thermal-Hydraulic Analysis - Consequences a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
23 23 Thermal-Hydraulic Analysis - Consequences (cont.)
a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
24 24 Spent Fuel Criticality Analysis Plant specific SFP Criticality analysis updated with RG 1.240 including operating with COBA Updates the new fuel storage area analysis WCAP report will be generated with all pertinent details Detailed description of analysis will be included in LAR with WCAP a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
25 25 Co-60 Implementation Schedule a,c Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
26 26 Questions / Discussion Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)
27 you Cobalt-60 Pre-Submittal Meeting Westinghouse Non-Proprietary Class 3
© 2023 Westinghouse Electric Company LLC. All Rights Reserved PSE-23-57, Rev 1, Enclosure 3
- This record was final approved on 09/26/2023 14:42:46. (This statement was added by the PRIME system upon its validation)