MONTHYEARML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24052A3902024-02-27027 February 2024 PSEG Presentation for Presubmittal Meeting Regarding Improved Technical Specifications Conversion on February 27, 2024 (Slides) ML24053A1282024-02-27027 February 2024 24 Month Fuel Cycle Pre-Submittal Meeting Presentation ML23291A1392023-10-18018 October 2023 PSEG Presentation Slides for Pre Submittal Meeting on 10-24-2023 ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML20112F2802020-04-21021 April 2020 NRC Review of Seismic Risk Assessment in Hope Creek 50.69 LAR - PRA Licensing Branch C, Division of Risk Assessment, Office of Nuclear Reactor Regulation - May 4, 2020 ML19316B7382019-11-12012 November 2019 CFR 50.69 License Amendment Request, Pre-Submittal Meeting, November 12, 2019, Presentation by PSEG Nuclear LLC ML19127A1702019-05-0707 May 2019 Safety Related UPS Replacement ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18163A3952018-06-13013 June 2018 June 13-14, 20187, Meeting Slide Regarding NRC-Industry MP4 ISG-06 R2 Tabletop, Hope Creek Power Range Neutron Monitor Numac Digital Upgrade Pre-Application Coordination Meeting ML18024B5332018-01-24024 January 2018 PSEG Pre-Submittal Meeting with NRC, January 24, 2018 - Hope Creek Emergency Diesel Generator (EDG) Technical Specification Action ML17291B0822017-10-18018 October 2017 Supplemental Inspection Results ML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides ML17097A1762017-04-0707 April 2017 PSEG Annual Assessment Meeting Handout Presentation ML16355A4992016-12-21021 December 2016 Measurement Uncertainty Recapture (Mur) Power Uprate: Pre-Submittal Meeting ML16190A4012016-06-21021 June 2016 Updated Issues List for June 21, 2016 Public Teleconference Between PSEG LLC and the Nuclear Regulatory Commission - Hope Creek Generating Station Power Range Neutron Monitoring System Digital Upgrade License Amendment Request ML16141A3682016-05-31031 May 2016 Meeting Slides Updated Issues List for April 19, 2016, Hope Creek Public Teleconference Concerning the Digital Prnm Upgrade LAR ML16089A0702016-03-30030 March 2016 Public Meeting Slide Presentation ML14162A4402014-06-12012 June 2014 Salem Generating Station, Near-term Task Force Recommendation 2.1 Seismic Hazard Evaluation, Public Meeting Presentation Slides ML14162A4322014-06-11011 June 2014 PSEG Slides for Seismic Reevaluation Public Meeting ML13064A3232013-02-28028 February 2013 NRC Presentation on Bypass Testing ML1125200472011-09-19019 September 2011 Summary of Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11181A1802011-06-29029 June 2011 Meeting Slides Rev 2, Nuclear Safety Culture Assessment (NSCA) Process: NRC Observations on February 2011 Pilot ML11090A0892011-04-0505 April 2011 Approach for Assessing and Managing Fire Risk in (a)(4) ML1032805762010-11-17017 November 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, LRA - Meeting Slides ML1014605102010-05-27027 May 2010 Pseg'S NRC ISFSI Presentation May 27, 2010 ML1014701832010-05-26026 May 2010 PSEG Drop-in May 26, 2010 - NRC Slides ML0933801182009-11-0505 November 2009 Public Meeting Slides from November 5, 2009 ML1029505812009-10-21021 October 2009 Bne Presentation, Buried Pipe Program by Jim Melchionna ML0917003212009-06-18018 June 2009 PSEG Slides from Drop-in Meeting, 6-18-2009 ML0912605532009-05-0505 May 2009 PSEG Nuclear Slides, Salem/Hope Creek Aam, 5/5/09 ML0910604822009-05-0505 May 2009 NRC Slides, for 5/5/09 Public Meeting ML0912702392009-05-0404 May 2009 Calvert County Sheriff- Special Operations Team ML0912406092009-04-23023 April 2009 Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference ML0908200962009-03-16016 March 2009 PSEG Presentation to NRC Public Meeting 3/16/09 in Reference to Planned License Renewal Pre Application Activities for Salem and Hope Creek ML0902600612009-01-26026 January 2009 Slides from PSEG, Salem Public Mtg 01-21-09 ML0812605262008-04-30030 April 2008 Slides from NRC Annual Assessment Meeting 2007 Reactor Oversight Process for Salem Units 1 and 2, and Hope Creek ML0805605392008-03-0404 March 2008 Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0724204022007-08-17017 August 2007 Slides - Nrc/Pseg Nuclear Meeting ML0615902582006-06-0101 June 2006 Slides for Meeting Salem Service Water Simplification Project 2024-08-20
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24052A3902024-02-27027 February 2024 PSEG Presentation for Presubmittal Meeting Regarding Improved Technical Specifications Conversion on February 27, 2024 (Slides) ML24053A1282024-02-27027 February 2024 24 Month Fuel Cycle Pre-Submittal Meeting Presentation ML23291A1392023-10-18018 October 2023 PSEG Presentation Slides for Pre Submittal Meeting on 10-24-2023 ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22132A0042022-05-26026 May 2022 PSEG Pre-submittal Meeting Slides - May 26, 2022 ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21083A2852021-03-24024 March 2021 Ultimate Heat Sink (UHS) - NRC Pre-submittal Meeting, March 30, 2021 (EPID L-2021-LRM-0036) (Slides) ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML20294A0632020-10-20020 October 2020 Presentation Replacement of SRMs and IRMs with Digital Numac Wide Range Neutron Monitor System for October 27, 2020, Public Meeting ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML20112F2802020-04-21021 April 2020 NRC Review of Seismic Risk Assessment in Hope Creek 50.69 LAR - PRA Licensing Branch C, Division of Risk Assessment, Office of Nuclear Reactor Regulation - May 4, 2020 ML20104C0352020-04-15015 April 2020 Pseg/Nrc Pre-Submittal Meeting, Salem Expanded Scope Leak-Before-Break Amendment Request - April 15, 2020 ML19316B7382019-11-12012 November 2019 CFR 50.69 License Amendment Request, Pre-Submittal Meeting, November 12, 2019, Presentation by PSEG Nuclear LLC ML19127A1702019-05-0707 May 2019 Safety Related UPS Replacement ML19101A3982019-04-10010 April 2019 Annual Assessment Presentation Slides 2019 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18163A3952018-06-13013 June 2018 June 13-14, 20187, Meeting Slide Regarding NRC-Industry MP4 ISG-06 R2 Tabletop, Hope Creek Power Range Neutron Monitor Numac Digital Upgrade Pre-Application Coordination Meeting ML18156A0172018-05-30030 May 2018 Annual Assessment Meeting Slides 05-30-2018 ML18032A3312018-02-0101 February 2018 Presubmittal Meeting Regarding Inverters AOT Slides - February 1, 2018 ML17291B0822017-10-18018 October 2017 Supplemental Inspection Results ML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides ML17194A6912017-07-12012 July 2017 Revised PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17194A6922017-07-12012 July 2017 Insert Page for PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17191A3442017-07-10010 July 2017 PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17191A3932017-07-10010 July 2017 PSEG Handouts for July 13, 2017 Public Meeting on TSTF-542 Proposed License Amendment Request ML17097A1762017-04-0707 April 2017 PSEG Annual Assessment Meeting Handout Presentation ML16355A4992016-12-21021 December 2016 Measurement Uncertainty Recapture (Mur) Power Uprate: Pre-Submittal Meeting ML16202A1442016-07-19019 July 2016 Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System (Meeting Handout) ML16141A3682016-05-31031 May 2016 Meeting Slides Updated Issues List for April 19, 2016, Hope Creek Public Teleconference Concerning the Digital Prnm Upgrade LAR ML16089A0702016-03-30030 March 2016 Public Meeting Slide Presentation LR-N15-0016, Pre-Application Meeting: Installation of Digital Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-062015-01-21021 January 2015 Pre-Application Meeting: Installation of Digital Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-06 ML14162A4402014-06-12012 June 2014 Salem Generating Station, Near-term Task Force Recommendation 2.1 Seismic Hazard Evaluation, Public Meeting Presentation Slides ML14162A4322014-06-11011 June 2014 PSEG Slides for Seismic Reevaluation Public Meeting ML13064A3232013-02-28028 February 2013 NRC Presentation on Bypass Testing ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11181A1802011-06-29029 June 2011 Meeting Slides Rev 2, Nuclear Safety Culture Assessment (NSCA) Process: NRC Observations on February 2011 Pilot ML1113601722011-05-10010 May 2011 NRC Slides for 2011 Aam, Salem/Hope Creek ML1107605812011-03-11011 March 2011 Slides- Audit of Salem'S Use of Westems Fatigue Software ML1032805762010-11-17017 November 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, LRA - Meeting Slides ML1021102682010-08-0404 August 2010 Enclosure 5: PSEG Nuclear LLC - Hope Creek Presentation of July 28, 2010 Public Meeting ML1014605102010-05-27027 May 2010 Pseg'S NRC ISFSI Presentation May 27, 2010 ML1014701832010-05-26026 May 2010 PSEG Drop-in May 26, 2010 - NRC Slides 2024-08-20
[Table view] |
Text
/ \
K)
Buried Pipe Program BNE Presentation Corporate Program Engineer: Jim Melchionna Oct 21 2009
BNE Questions
- .Overall view of your program
- .What piping systems are included in the program?
- What materials are involved in the program (ss, aluminum, etc.)?
What methods are used for inspecting the underground piping?
What success has the program had in finding leaks or near-leaks?
What changes have been made to the program due. to recent industry events (Oyster Creek, Peach Bottom, etc.)? How is Salem and Hope Creek the same/different from the programs used at the stations that are experiencing leaks?
Are there any specific inspections being planned during the Salem 2 outage and the spring Hope Creek outage that are a direct result of license renewal?
Overall View Of Buried Piping Program (BPP)
- PSEG has an established Buried Piping Program
- BPP consists of corrosion control, monitoring, and mitigation elements BPP is comprised of other "subset" programs 89-13, NJAC (Discharge Prevention and Response Program DPRP), American Nuclear Insurance
° BPP Procedures & T&RMs are in place
- ER-AA-5400 BPP Guide
- ER-AA-5400-1002 BPP Examination Guide
- ER-AA-5400-1003 BPP PI's
Overall View Of Buried Piping Program (BPP) (cont'd)
- BPP Basis document, Risk Ranking, & database are in place for both Salem and Hope Creek stations
- Salem and Hope Creek have performed various non-intrusive and opportunistic visual inspections.
- Actively involved in industry:
- PSEG is member of EPRI's Buried Piping Issues Group (BPIG)
- INPO representatives attend BPIG meetings and provide insight/input on their focus
- PSEG benchmarking:
Dresden 2008 (INPO Strength 2007)
- Palo Verde (planned early 2010)
- PSEG BPP process modeled after NACE RP 0502
Overall View Of Buried Piping Program (BPP) (cont'd)
Salem & Hope Creek BPP Managers have attended EPRI's BPP Manager training
- Station BPP Health Reports/Pl's
- Trial issuance 3 rd Qtr 200.9
- Official issuance 4th Qtr 2009
° BPP Manager Cert Guide (Qual Card) issuance 4Q09
Overall View Of Buried Piping Program (BPP)
(cont'd)
PSEG Program Process StepD One P re-assessmentAnalysis
......... -Should ;the piping* systerm be. pa rt .of th e B P P pipgin:g'.
program?
D.ata Collection Where are the anomalies?
Identify Susceptibe 1Step > Three.
syteslnspectj.-iighs ~ DirectEx amiin ati rl
-Evaluate, Indirec tExamn Method?
Susepjtible Systems Adetil Sererity of integrity?
- ___iatiZonneons"For Step LýCom lete Risk 1ioritize Exa*" Post Asess"me nt.
the Progra rn. iethod; A's.ses m ent -Has L iyerit. been suc.- ssfu]I?
Indirectxam ToolExcavte -~ie What is the Examr fre ,qUency.
Seletionrequired?
CreateUp e "E. St-rength
.a . lu...ati ..n Basis .Docdum~ent r -t:
(NACE Recommended Practice 05.02-2002)
Piping systems in the program Hope Creek:
Auxiliary Boiler FO Storage, Aux Steam, Building Sewage, Chemical Waste, CW Acid Injection, CW Hypo chlorination, CW, CST, Cooling Tower Blow down Dechlorination, Cooling Tower Blow down, Demin Water Make-up/Storage. & Transfer, DFO Storage & Transfer, Domestic Water, FP, FW, Hydrogen/Oxygen Water Chemistry, Control Air, Normal Drains, Oily Waste, Process Radiation Monitoring, Service Compressed Air, Service Gases, SW, SW Dechlorination, Storm Drainage
Piping systems in the program (Cont'd)
Salem:
CW, SW, FW, Storm Drains, FP, Demineralized Water, Condensate Polishing, Station Air, Control Air, Fuel Oil (Gas Turbine, House Heating Boilers, TSC Emergency. Diesel Generator, Emergency Diesel Generators, Fire Pump Diesels, Circulating Water Intake Heating Boiler, & Service Water Intake Hot Air Furnace),
Hypo Chlorination, Liquid Waste, Potable Water, Fresh Water, Auxiliary Feed water, Sanitary Drains (Non-Rad Drains)
Materials involved in the program Hope Creek:
- Carbon Steel, Cast Iron, Cement Lined Ductile Iron, Cement Lined Carbon Steel, Copper, Fiberglass, Plastic, Pre-stressed. Concrete, Pre.stressed Concrete Embedded Cylinder, Reinforced Concrete, and Stainless Steel Salem:
- Carbon Steel, Cast Iron, Cast Steel,' Cement Lined Ductile Iron, Cement.Lined Carbon Steel, Copper, PVC, Pre-stressed Concrete, Pre-stressed Concrete Embedded Cylinder, and Stainless Steel
Methods used for inspecting the underground piping
- Opportunistic & Focused both used
- Current InDirect Methods available
- Guided Wave*, C-Scan*, DCVG*, ACVG
- Current Direct methods available
-'UT*, RFTC* LFET, Magnetic Flux Leakage, Tethered Pig, BEM*, Visual*
- Other Assessment techniques
- Tracer Gas, Acoustic Monitoring, Sahara, Gravity Drop Test*, N2 Pressure Decay*, Leak Rate*, GPR*
Fiberscope*
- What success has the program had in finding leaks or near-leaks?
- No leaks have been identified since inception of BPP 89-13 program has noted ID degradation of Nuclear header Bell & Spigot (B&S) joints via visual exams & NDE (Salem & Hope Creek)
Installed WEKO seals in 3 of 4 Salem Nuclear Supply Headers B&S joints
° Cleaned and Epoxy Coated Salem Unit 2 SW Nuclear Discharge Header B&S Joints
° SW manned visual inspections have revealed Salem TGA header ID lining degradation
- RFTC completed, degradation assessment complete
- Repair priorities established, options presented, repairs scheduled
What success has the program had in finding leaks or near-leaks? (Cont'd)
Inspections completed to date Opportunistic:.
Inspections completed at both Salem and Hope Creek
- Salem FO (SW/CW Boilers), Control Air, Liquid Waste, Dewatering line, FP, SW External (12 Nuc Header)
- Hope Creek FP, Domestic Water, Building Sewage Focused (As a result of Risk Ranking/BPP implementation):
- GUL (aka Guided Wave) completed on. Hope Creek CST 2/4/8/12/20" stainless steel lines, 4" DFO (coated carbon steel), Rad Waste (3" stainless steel).
- C-Scan completed on Hope Creek 4" DFO line (coated carbon steel) 4"/6" FP (Ductile Iron), 6" Domestic Water (mortar lined ductile iron), 18" Oily Waste (cement-lined ductile iron)
- RFTC Of Hope Creek CW Buried PCCP
What changes have. been made to the program due to recent industry events?
- More thorough and detailed prejob briefs & walk downs with inspectors
- Detailed drawing reviews with inspectors
- Field walk downs with inspectors
- Closer contact with industry peers
° Added requirement in all excavation orders to:
- Contact Buried Piping program manager for inspection of excavated piping - gives us an engineer with "Eyes On"
- Perform soil sampling on all excavations involving buried piping
- Exercising more rigor in post inspection analysis related to Guided Wave
t How is Salem and Hope Creek the same/different from the programs used at.the stations that are experiencing leaks?
Deltas - Leaking Oyster Creek Hope Creek OC CST Lines Material Carbon Steel (Coated) Stainless Steel Aluminum Piping Coal tar coating Corrosion resistant material Protection Portions encapsulated with foam &
secondary piping Pipe Age Installed 1969 1981 Fill Unknown - Excavated Engineered (easy drainage, non-wicking) many times Inspection Older Generation. G- Newer. Gen GUL Enhanced Technology Wave, 8 channel Circumferential Resolution Guided wave, (16 channel)
Inspection details Vague or inaccurate Detailed piping details provided, onsite detailed discussions on walk downs conducted with inspectors drawing details
How is Salem and Hope Creek the same/different from the programs used at the stations that'are experiencing leaks? ( Cont'd.)
Deltas - Leaking Indian Point Salem Indian Point 2 AFST Line Material Carbon Steel (Coated) Carbon Steel (Coated)
Piping Coal tar coating Coal tar coating Protection Leakage/Inspection Yes - due to coating No identified leakage. Salem Unit 2 Aux failure and subsequent Feed lines excavated in 1994 - piping in metal degradation excellent condition Fill Poor - Fill contained Engineered foreign material, weld rod, metal pieces
How is Salem and Hope Creek the same/different from the programs used at the stations that are experiencing leaks?
(Cont'd)
The elements of the program that select the buried piping scope and perform the risk ranking are essentially the same The indirect inspection techniques are currently available to anyone in the industry from a variety of sources, however:
- PSEG:
- Conducts up to date reviews of Guided Wave Technology prior to each inspection as GUL technology is an emerging technology 0 Conducts reviews of proposed NDE vendors to evaluate their performance at other utilities prior to issuance of a contract
- PSEG conducts onsite prejob planning using familiarization and walk downs prior to conducting these inspections
- Guided Wave companies now asked to have results reviewed &
validated by independent Level 2 Guided Wave analyst
Whatchanges to the program due you expect as a result of License Renewal?
- The Buried & Buried, Non-Steel Piping inspection program will be enhanced to include:
- Adding at least one opportunistic or focused excavation and inspection for inspection of specific piping materials (as well as the Salem buried piping SS bellows between the containment and FHB) within a span of 10 years prior to period of extended operation (PEO) as well as within the first 10 years of operation after the PEO.
- Guidance for inspection of concrete aging affects Salem U2 and -HC are currently not within the, 10 years to PEO
N Are there any specific inspections being planned during 2R17 & RF16 that are a direct result of License Renewal (LR)?
Salem Unit 2 and Hope Creek are not within the 10 years of the PEO, therefore no LR related inspections are scheduled for 2R1 7 or RF16 as a direct result of LR Focused inspections are scheduled in 2R18, 1.R20 & RF16 as a result of the BPP implementation based on risk ranking