Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] |
Text
di j 1901CMuteauAvenue '
Post Office Box !49
' St Louis. Missouri 63166.
314 556 2650 i l
-I
[Q .
Donald F. Schnell ELE'DNC "
~
March 29, 1995 $f,'ar" '
dE U.S. Nuclear Regulatory Commission-Attn: Document Control Desk
. Mail Station P1-137 Washington, DC 20555 . ULNRC-0 318 4 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT REVISIONS TO TECHNICAL' SPECIFICATIONS BASED ON NRC '
FINAL POLICY STATEMENT ON TECH SPEC IMPROVEMENTS
Reference:
ULNRC-3023 dated May 20, 1994 Based on telephone conversations on January '
31 and February 28, 1995 between NRC Staff reviewers and personnel representing Union Electric Company and Wolf Creek Nuclear Operating Corporation, attached are replacement pages for various portions of Attachments 1, 4, and 5 of the referenced amendment application.
These replacement pages respond to concerns raised by the NRC Staff during the review of that amendment application. The conclusions of the previously submitted licensing evaluations performed pursuant to 10CFR50.59, 10CFR50.92,and 10CFR51.22 (c) (9) are unaffected and remain valid for the attached changes.
If you have any questions on the attachments, please contact us. ,
Ve trul our ,
Donald F. Schnell i
GGY/jdg Attachments: 1 - Description of Changes to ULNRC-3023 2 - Replacement Page for Attachment 1 to ULNRC-3023 3 - Replacenant Pages for Attachment 4 to ULNRC-3023 4 - Replacement Pages for Attachment 5 to ULNRC-3023 1 030020 9504040188 950329 PDR ADDCK 05000483 ji P PDR c g
.E l
i STATE OF MISSOURI- )
) SS i CITY OF ST. LOUIS ) -
Donald F. Schnell, of lawful age, being'first duly sworn upon oath says that he is Senior Vice President-Nuclear and j an officer of Union-Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief. ,
-By .
Donald F. Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this $9 - day of '/71/Ld , 1995.
f BARBAftA 1~PMIE M 8 NOTARY PUBUC-STATE OF MISSOURI My COMMISSION EXP!RES APRIL 22.ISH SL LOUIS COUN1% l
n p
cc: T. : A. Baxter, Esq. '
.Shaw, Pittman, Potts & Trowbridge 2300 N. Street,'N.W.
Washington, D.C. 20037 l M. H. Fletcher- l Professional Nuclear Consulting, Inc.
'18225-A' Flower Hill Way-Gaithersburg, MD 20879-5334 M. J. Farber -t Chief, Reactor ProjectsSection III.A U.S. Nuclear' Regulatory Commission <
Region III 801 Warrenville Road Lisle, IL 60532-4351 Bruce Bartlett Callaway Resident Office U.S. Regulatory Commission-RR#1 Steedman, MO 65077 ;
L. R. Wharton (2) [
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ,
1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852-2738 i Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 ,
Ron Kucera ;
Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 l
-i k
t 9
f' ULNRC-0 3184 ATTACHMENT ONE DESCRIPTION OF CHANGES TO ULNRC-3023 i
g<
m ,, y y d
H AttQchment 1.-
.Page:1 of-3' d
~
DESCRIPTION OF CHANGES TO ULNRC-3023
- 1. - The LCO and' Surveillance . Requirements ~ (SR) L for the ' ,
position indicators'on the PORVs and PORV' block:valvas will be relocated from-the PAMS Technical' Specification- ,
3/4.3.3.6 to FSAR Chapter 16. 'There.will be no ,
Surveillance Requirements added to Technical .
'l m Specification 3/4L4.4.. This c.hange is" reflected in revisions to the following pages:from ULNRC-3023: d r:
Attachment 1, page 9 of 11
-0 Attachment'4, page 3/4 4-10 and Insert 4B-(void these changes; no new SRs to be added) .
Attachment 5,' Table 1 Note 5 4 Attachment 5,. Technical Specification-3.3.3.6 Screeningi l Form
- 2. New SRs 4.6.1.1.d and 4.6.1.1.e will be added to Technical Specification 3/4.6.1.1. These SRs will link-the-containment integrity LCO to the performance of leakage rate. testing per.10CFR50, Appendix J and to the performance.of a Containment Tendon Surveillance Program added as new Specification 6.8.5.c, discussedLunder Item 5 below. This change is reflected-in-revisions-to'the- ,
following pages from ULNRC-3023: i Attachment 4, page 1-2-(CONTAINMENT INTEGRITY' definition I revised to reference new SR 4.6.1.1.d and new'Specifica- .
tion 6.8.5.c) !
Attachment 4, page 3/4.6-1 and new Insert-A (new SRs f
^
4.6.1.1.d and 4.6.1.1.e added and SR 4.6.1.1.c. revised to reference new SR 4.6.1.1.d) l Attachment.4, page 3/4 6-12 (SR 4.6.1.7.2 revised to ~I reference new SR 4.6.1.1.d) -7 Attachment-5, Table 1 Notes 12 - 14 Attachment 5, Technical Specifications 3.6.1.2 and 3.6.1.6 Screening Forms .-
- 3. The rod drop. time of 2.7 seconds and the conditions for :
its measurement will be retained in SR 4.1.3.1.3. This '
change is reflected in revisions to the following pages from ULNRC-3023 (note that no revisions are needed for !
the Attachment 5 Technical Specification 3.1.3.4 '!
Screening Form):
j
bgy. -
.i Attachment-1 :
Page.2.of!3 DESCRIPTION OF CHANGES TO ULNRC-3023 Attachment 4, page 3/4 1 (Insert. 2L revised _ to ' include
-the 2.7 second rod. drop time). <
Attachment 5,. Table 1 Note'4 (revised to delete?the reference to the rod drop time beingflisted only in FSAR; Section 16.1.3.2)
- 4. The steam generator LCO and SRs in Technical I Specification.3/4.4.5 will be' retained as is, rather than be' reformatted to the Section 6 criteria. This _
change is reflected in revisions to the following pages from ULNRC-3023-7; Attachment 4, pages'3/4 4-11 through 3/4 4-17 (void these changes;:the LCO and SRs are to remain as currently issued) a n Attachment 5, Table 1 (revised to indicate " Retain") and Note 8.is deleted '
Attachment 5, Table 2 (note added that 3.4.5 is to be l retained)
Attachment 5, Technical Specification 3.4.5 Screening Form
- 5. Proposed Specification 6.8.5 has been revised to.more-fully describe the following programs: Explosive Gas and Storage Tank Radioactivity Monitoring Program; Reactor Coolant Pump Flywheel Inspection Program; and '
Containment Tendon Surveillance Program.- References to the.following. programs (one line listings)~ have been ,
deleted from 6.8.5: Turbine Overspeed Protection -!
Reliability Program;. Steam Generator Tube-Surveillance '
Program (current Technical-Specification 3/4.4.5 will -;
-remain as is); Snubber Inspection' Program; Area Temperature Monitoring Program; and. Primary' Water- j Chemistry Program. These programs will be implemented in' conjunction with.the' relocation of-their associated 3/4- l
' Technical Specifications'to FSAR Chapter 16; however, .!
consistent.with the Standard Technical' Specifications, ;
they.will not be described in Section 6.. This-change is 'i
. reflected in revisions to.the'following pages from. j ULNRC-3023: , '
Attachment 4, Insert 9-(The three programs mentioned i above have been more fully described, similar to the ,
format contained in the Standard Technical '
Specifications. This Insert 9 supersedes the prior .
Insert 9.)
., , c-+ e,.-- . - b- n. ,,--, - . - ~ , . - - - -
Attachment.15
_Page-3 of 3.
DESCRIPTION OF CHANGES TO ULNRC-3023
~
Attachment 5, Table 1 Notes 7, 9, 16,-17, and'20'are deleted'(Note 6 is reworded to incorporate. Note 20)
Attachment'5,. Technical Specifications 3.3.3.10, 3.4.10,
-3.6.1.6, 3.11.1.4','3.11.2.5, and 3.11.2.6 Screening ~
. Forms are revised to refer.to a program descriotionlinL Section 6.8.5,-rather than to a. program statement. -
Attachment.5, Technical Specifications 3.3.4, 3.4 5,.
.3.4.7,.3.7.8, and 3.7.12 Screening-Forms'are revised'to delete the reference to a -program stater.ent being ladded to Section 6.8.5.
- 6. Changes'to the draft FSAR. Chapter 16 mark-ups, transmitted as Attachment.6 to ULNRC-3023,.will be.made l' accordingly. These-changes are not: attached since the only purpose of submitting them originally'in ULNRC-3023.
was to. demonstrate where the relocated requirements would ultimately be. contained.
(,
l I
t 1
ULNRC-0 3184 I
ATTACHMENT TWO REPLACEMENT PAGE FOR ATTACHMENT 1 TO ULNRC-3023 I