Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys
ML20097F889
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/09/1996
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20097F892 List:
References
ULNRC-3326, NUDOCS 9602200224
Download: ML20097F889 (5)


Text

^

1901 (maew !,wis Pos: Urbcc bou 149 t

e '

St Iows. Masoun 63166 31* [54 2650 REDISTRIBUTED ON 2/13/96 BECAUSE OF INCORRECT ATTACHMENT 3.

UNION February 9,1996 DonaldF Schnell

' ELECTRIC sen,or nec p,egra i

' 352 wow l

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C. 20555-0001 Gentlemen:

ULNRC-3326 CALIAWAY PLANT DOCKET NUMBER 50-483 REVISION TO TECHNICAL SPECIFICATION 4.6.1.2.a - CONTAINMENT SYSTEMS Union Electric Company herewith transmits an application for amendment to Facility Operating License Number NPF-30 for Callaway Plant. This application proposes to change Technical Specifications and their associated Bases to directly reference Regulatory Guide 1.163 as required by 10 CFR 50, Appendix J, Option B for the Type A containment integrated leak rate tests and the Type B and C local leak rate tests.

Implementation of the Containment Integrated Leakage Rate Program would allow the integrated leak rate test presently scheduled for Refuel 8 to be rescheduled,.since the criteria established by Appendix J,

Option B, which requires only one integrated leak rate test in leak integrated 10 years is presently rate test results. satisfied by past Therefore, Union Electric will perform the next during Refuel 10, which is currently scheduledintegrated leak rate test fall of 1999. for the This license amendment request is submitted in parallel with three other similar license amendment requests from Pacific Gas and Electric Company, Texas Utilities Electric and Wolf Creek Nuclear Operating Corporation.

{

- The license amendment requests are '

l submitted in parallel to allow the NRC to review all i four changes together and thereby reduce the amount of l NRC resources required. l nann--

9602200224 960209 PDR p

ADOCK 05000483 PDR / [)[!

llg  ;

'o .

e

, o The Callaway Plant On-Site Review Committee and the  !

Nuclear Safety Review Board have reviewed and approved the amendment request. Attachments 1 through 5 provide ,

the Technical Specification changes, Safety Evaluation, Significant Hazards Evaluation, and Environmental Consideration, respectively. We have concluded that this amendment application.does not involve an unreviewed safety question as defined in 10CFR50.59, nor a significant hazard consideration as determined per 10CFR50.92.

If you have any questions concerning this amendment application, please contact us.

'I Very truly ou s, Donald F. Schnell WEK/

Attachments: 1) Technical Specification Changes (marked-up)

2) Technical Specification Changes (re-typed)
3) Safety Evaluation 4)Significant Hazards Evaluation '
5) Environmental Consideration i

l l i r

i I

P

L .

\ .

o l

l l-i l

STATE OF MISSOURI )

) SS CITY.0F ST. LOUIS )

Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has 1 executed the same for and on behalf of said company with full 1 power and authority to do so; and that the facts therein i stated are true and correct to the best of his knowledge, information and belief.

1

)

By Donald F. Schnell

~

Senior Vice President Nuclear SUBSCRIBED of MMUN and sworn to before me this / -day

, 1996.

V tb/AJ ^ 0. l&

BARBARA PFA NOTARY PUBLIC-STATE OF MISSOURI -l MY COMMIS$10N EXPIRES APRIL 22. 1937, SL LOUIS COUNTX i

a

i .e '..

', e

! cc: T. A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge.

2300 N. Street, N.W.

Washington, D.C. 20037 ,

M. F. Fletcher Professional Nuclear Consulting, Inc.

19041 Raines Drive ,

t Derwood, MD 20855-2432 l

L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV '

611 Ryan Plaza Drive Suite 400 Arlington, TX'76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Regulatory Commission RR#1 Steedman, MO 65077 Kristine M. Thomas (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission I 1 White Flint, North, Mail Stop 13E16 i 11555 Rockville Pike  !

Rockville, MD 20852-2738 i Manager,. Electric Department Missouri P.O. Box Public 360 Service Commission Jefferson City, MO 65102 Ron Kucera Department of' Natural Resources P.O. Box 176 Jefferson City, MO 65102 Don Woodlan TU Electric 1601 Bryan Street Dallas, TX 75201-3411 Pat Nugent Pacific Gas & Electric-Regulatory Services-P.O. Box 56 .

Avila Beach, CA 93424.

I

I ATTACHMENT 1 TECHNICAL SPECIFICATION CHANGES (MARKED UP) l l

l l