U-601380, Forwards 890214 Rev 19 to Licensee Nuclear Program QA Program Manual, Per 10CFR50.54(a)(3)(ii)

From kanterella
Jump to navigation Jump to search
Forwards 890214 Rev 19 to Licensee Nuclear Program QA Program Manual, Per 10CFR50.54(a)(3)(ii)
ML20235N656
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/24/1989
From: Holtzscher D
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20235N659 List:
References
U-601380, NUDOCS 8903010321
Download: ML20235N656 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ - . .- - - .,-- - ____-_- _____ -__- - _.

Q, 1

w s U-601380' L30-89(02-24)-LP 1A.120

/LLINO/S POWER COMPANY

- IP _

CLINTON POWER STATION. P.O. BOX 678, CLINTON. ILLINOIS 61727

-February 24, 1989 10CFR50.54(a)(3)(ii).

Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Illinois Power Nuclear-Program Ouality Assurance Manual - Revision 19

Dear Sir:

Attached'is Revision 19 of the Illinois Power Nuclear Program Quality Assurance Manual, dated February 14, 1989. The changes made in this revision are listed in the attached matrix. This annual submittal is provided in accordance with the requirements of 10CFR50.54(a)(.?)(ii) .

The changes to this Quality As.4urance Manual have been-evaluated by Illinois Power Company as not reducing the quality program commitments. Please contact me if you have any questions on this revision.

Sincerely yours, S. ;7. /

D. L. Holtzscher Acting Manager -

[ Licensing and Safety WSI/krm Attachments t,

f- cc: NRC Resident Office NRC Region III, Regicnal Administrator NRC Clinton Licensing Project Manager Illinois Department of Nuclear Safe y

( 0 I 4 p

m

-^

-e