Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML053000226 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML052520245 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors)
- ML052650233 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors)
- ML052630537 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors)
- ML052070118 + (Unit 2 - Closeout Letter for NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- AEP-NRC-2015-37, Unit 2 - Commitment Schedule Change Related to Technical Specification Task Force-523 + (Unit 2 - Commitment Schedule Change Related to Technical Specification Task Force-523)
- ML071300370 + (Unit 2 - Core Operating Limits Report (COLR) for Cycle 15 Operation)
- ML030920378 + (Unit 2 - Core Operating Limits Report (Colr), for Cycle 13 Operation)
- ML19218A327 + (Unit 2 - Correction to Amendment No. 30 Regarding the Use of Optimized ZIRLO Fuel Rod Cladding)
- AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation + (Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation)
- AEP-NRC-2024-86, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation + (Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation)
- ML19224A668 + (Unit 2 - Description of Revision/Change to Emergency Plan Implementing Procedures)
- ML092100647 + (Unit 2 - E-mail to SNC, Acceptance Review of Relief Request Dated July 24, 2009)
- WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC) + (Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC))
- WBL-22-024, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 29 + (Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 29)
- WBL-21-026, Unit 2 - Emergency Plan Implementing Procedure 5, Revision 54 + (Unit 2 - Emergency Plan Implementing Procedure 5, Revision 54)
- ML18012A266 + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- ML14010A191 + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-21-042, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-20-061, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-20-057, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-21-038, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-21-054, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-22-007, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-21-004, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-21-003, Unit 2 - Emergency Plan Implementing Procedure Revision + (Unit 2 - Emergency Plan Implementing Procedure Revision)
- WBL-21-011, Unit 2 - Emergency Plan Implementing Procedure Revisions + (Unit 2 - Emergency Plan Implementing Procedure Revisions)
- WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions + (Unit 2 - Emergency Plan Implementing Procedure Revisions)
- ML18073A041 + (Unit 2 - Emergency Plan Implementing Procedures Revision)
- ML18057A043 + (Unit 2 - Emergency Plan Implementing Procedures Revision)
- WBL-20-037, Unit 2 - Emergency Plan Implementing Procedures Revision + (Unit 2 - Emergency Plan Implementing Procedures Revision)
- WBL-20-048, Unit 2 - Emergency Plan Implementing Procedures Revision + (Unit 2 - Emergency Plan Implementing Procedures Revision)
- WBL-20-030, Unit 2 - Emergency Plan Implementing Procedures Revision + (Unit 2 - Emergency Plan Implementing Procedures Revision)
- WBL-20-043, Unit 2 - Emergency Plan Implementing Procedures Revision + (Unit 2 - Emergency Plan Implementing Procedures Revision)
- WBL-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision + (Unit 2 - Emergency Plan Implementing Procedures Revision)
- ML17150A026 + (Unit 2 - Emergency Plan Implementing Procedure Revision. Includes EPIP 8, Revision 0031, Personnel Accountability and Evacuation)
- ML072910331 + (Unit 2 - Exemptions, Reliefs, Deviations and Exceptions)
- NRC-2012-0258, Unit 2 - Federal Register Notice Director'S Decision 15-09 + (Unit 2 - Federal Register Notice Director'S Decision 15-09)
- ML15293A489 + (Unit 2 - Federal Register Notice Directors Decision 15-09)
- 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan + (Unit 2 - Fifth 10-Year Interval Snubber Program Plan)
- ML110871664 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103, FSAR 2.5-595, Underground Barrier Trench a, STA 3 + 78)
- ML12171A148 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 105, Figure 2.5-579, Miscellaneous ERCW Piping and IE Conduit Soil Borings)
- ML110871533 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. List of Revised Pages 1.1 Through 15.2-1)
- ML12171A081 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 105, Section 6.0, Engineered Safety Features - Pages Continue)
- ML110871659 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103, Figure 2.5-579, Miscellaneous ERCW Piping and IE Conduit Soil Borings)
- ML110871548 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Section 3.8 Design of Category I Structures Through 3.8.4-182 Other Category I Structures)
- ML12171A137 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 105, Figure 2.5-571, ERCW Pipeline, Section A-A. Sheet 1 of 4)
- ML110871534 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Table of Contents - Section 1.0 Introduction and General Description of Plant Through 1.9-12 Nuclear Performance Plan)
- ML110871547 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Section 3.6 - Protection Against Dynamic Effects Associated with Postulated Rupture of Piping Through 3.7-223 Seismic Design)
- ML110871554 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Table of Contents - Section 6.3 Emergency Core Cooling System Through 6.9-2 Motor-Operated Valve (MOV) Programs)
- ML12171A126 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 105, Figure 2.5-281, Sht 2, Category I Conduit Banks Section F-F Sheet 1 of 2)
- ML110871633 + (Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Figure 2.5-3, Subregional Geologic Section)