MONTHYEARCNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-24-008, Emergency Plan Implementing Procedure Revision2024-02-29029 February 2024 Emergency Plan Implementing Procedure Revision WBL-24-004, Emergency Plan Implementing Procedure Revision2024-02-15015 February 2024 Emergency Plan Implementing Procedure Revision ML24038A3342024-02-0707 February 2024 Change to South Texas Project Electric Generating Station (Stepgs) Emergency Plan CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . WBL-23-025, Emergency Plan Implementing Procedure Revision2023-05-0505 May 2023 Emergency Plan Implementing Procedure Revision WBL-22-007, Unit 2 - Emergency Plan Implementing Procedure Revision2022-02-17017 February 2022 Unit 2 - Emergency Plan Implementing Procedure Revision CNL-22-016, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-02-11011 February 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-21-067, Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-01-27027 January 2022 Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change WBL-21-046, Unit 2 -Emergency Plan Implementing Procedure Revision2021-09-30030 September 2021 Unit 2 -Emergency Plan Implementing Procedure Revision WBL-21-042, Unit 2 - Emergency Plan Implementing Procedure Revision2021-09-0202 September 2021 Unit 2 - Emergency Plan Implementing Procedure Revision WBL-21-038, Unit 2 - Emergency Plan Implementing Procedure Revision2021-08-0505 August 2021 Unit 2 - Emergency Plan Implementing Procedure Revision ML20199M3802020-07-17017 July 2020 Tennessee Valley Authority - Radiological Emergency Plan Revision CNL-20-060, Tennessee Valley Authority - Radiological Emergency Plan Revision2020-07-17017 July 2020 Tennessee Valley Authority - Radiological Emergency Plan Revision CNL-20-025, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-03-0404 March 2020 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-20-022, Emergency Preparedness Department Procedure Revision2020-02-24024 February 2020 Emergency Preparedness Department Procedure Revision L-20-006, Unit 2, Emergency Plan Implementing Procedure Revision2020-02-10010 February 2020 Unit 2, Emergency Plan Implementing Procedure Revision CNL-18-096, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2018-07-30030 July 2018 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML18057A0432018-02-23023 February 2018 Unit 2 - Emergency Plan Implementing Procedures Revision CNL-16-099, Radiological Emergency Plan Revision2016-06-20020 June 2016 Radiological Emergency Plan Revision CNL-16-012, Radiological Emergency Revision and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2016-01-14014 January 2016 Radiological Emergency Revision and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-15-104, Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan2015-06-15015 June 2015 Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan ML14357A3182014-04-16016 April 2014 Tennessee Valley Authority - Radiological Emergency Plan Revision ML0935006172009-12-14014 December 2009 Transmittal of Radiological Emergency Plan Additional Information ML14357A3192004-04-26026 April 2004 TVA Nuclear Radiological Emergency Plan (Rep), Revision 73 2024-05-08
[Table view] Category:Letter type:WBL
MONTHYEARWBL-24-047, Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program2024-09-25025 September 2024 Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program WBL-24-043, Emergency Plan Implementing Procedure Revisions2024-09-16016 September 2024 Emergency Plan Implementing Procedure Revisions WBL-24-040, Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2)2024-08-13013 August 2024 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) WBL-24-034, NRC Regulatory Issue Summary (RIS) 2024-01 - Preparation and Scheduling of Operator Licensing Examinations2024-07-25025 July 2024 NRC Regulatory Issue Summary (RIS) 2024-01 - Preparation and Scheduling of Operator Licensing Examinations WBL-24-030, Emergency Plan Implementing Procedure Revisions2024-07-17017 July 2024 Emergency Plan Implementing Procedure Revisions WBL-24-028, Emergency Plan Implementing Procedure Revisions2024-07-0202 July 2024 Emergency Plan Implementing Procedure Revisions WBL-24-025, Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC)2024-05-23023 May 2024 Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC) WBL-24-022, Cycle 5 Steam Generator Tube Inspection Report2024-05-16016 May 2024 Cycle 5 Steam Generator Tube Inspection Report WBL-24-023, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report WBL-24-020, Unit 2 - Annual Non-Radiological Environmental Operating Report - 20232024-05-0707 May 2024 Unit 2 - Annual Non-Radiological Environmental Operating Report - 2023 WBL-24-019, Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2024-04-30030 April 2024 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report WBL-24-021, Unit 2, Annual Radioactive Effluent Release Report2024-04-29029 April 2024 Unit 2, Annual Radioactive Effluent Release Report WBL-24-016, Rev. 60 to Radiological Emergency Plan EPIP 1, Emergency Plan Classification Logic2024-04-11011 April 2024 Rev. 60 to Radiological Emergency Plan EPIP 1, Emergency Plan Classification Logic WBL-24-018, Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response2024-04-11011 April 2024 Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response WBL-24-011, CFR 50.46 - Annual Report2024-03-21021 March 2024 CFR 50.46 - Annual Report WBL-24-007, Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program2024-03-0505 March 2024 Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program WBL-24-008, Emergency Plan Implementing Procedure Revision2024-02-29029 February 2024 Emergency Plan Implementing Procedure Revision WBL-24-004, Emergency Plan Implementing Procedure Revision2024-02-15015 February 2024 Emergency Plan Implementing Procedure Revision WBL-24-005, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 5 Operation2024-02-15015 February 2024 American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 5 Operation WBL-24-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC)2024-01-30030 January 2024 Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC) WBL-23-058, Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency2023-12-19019 December 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency WBL-23-055, Of the Unit 2 Cycle 6 Core Operating Limits Report2023-11-22022 November 2023 Of the Unit 2 Cycle 6 Core Operating Limits Report WBL-23-051, Response to an Apparent Violation (EA-23-117); NRC Special Inspection Report 50-390, 391/2023440, Preliminary Greater than Green and Apparent Violation2023-11-22022 November 2023 Response to an Apparent Violation (EA-23-117); NRC Special Inspection Report 50-390, 391/2023440, Preliminary Greater than Green and Apparent Violation WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual WBL-23-045, 10 CFR 50.59 Summary Report2023-11-0707 November 2023 10 CFR 50.59 Summary Report WBL-23-048, LER 2023-S02-00 for Watts Bar Nuclear Plant, Units 1 and 2, Introduction of Contraband Into the Plant Protected Area2023-11-0202 November 2023 LER 2023-S02-00 for Watts Bar Nuclear Plant, Units 1 and 2, Introduction of Contraband Into the Plant Protected Area WBL-23-042, Update to Fire Protection Report2023-10-19019 October 2023 Update to Fire Protection Report WBL-23-038, American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 18 Operation2023-08-0707 August 2023 American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 18 Operation WBL-23-033, Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic2023-07-13013 July 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic WBL-23-026, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2023-01 - Preparation and Scheduling of Operator Licensing Examinations2023-05-18018 May 2023 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2023-01 - Preparation and Scheduling of Operator Licensing Examinations WBL-23-021, 2022 Annual Radiological Environmental Operating Report2023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report WBL-23-025, Emergency Plan Implementing Procedure Revision2023-05-0505 May 2023 Emergency Plan Implementing Procedure Revision WBL-23-020, Annual Non-Radiological Environmental Operating Report - 20222023-05-0404 May 2023 Annual Non-Radiological Environmental Operating Report - 2022 WBL-23-023, Of Cycle 19 Core Operating Limit Report2023-04-27027 April 2023 Of Cycle 19 Core Operating Limit Report WBL-23-019, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)2023-04-10010 April 2023 Revised Pressure and Temperature Limits Report (PTLR) WBL-23-013, 10 CFR 50.46 Annual Report for 20222023-03-29029 March 2023 10 CFR 50.46 Annual Report for 2022 WBL-23-015, Emergency Plan Implementing Procedure Revision2023-03-21021 March 2023 Emergency Plan Implementing Procedure Revision WBL-23-010, Emergency Plan Implementing Procedure Revisions2023-02-0909 February 2023 Emergency Plan Implementing Procedure Revisions WBL-23-008, Unit 1 Revision 1 of the Cycle 18 Core Operating Limits Report (COLR) and Units 2 Revision 1 of the Cycle 5 Core Operating Limits Report (COLR)2023-02-0707 February 2023 Unit 1 Revision 1 of the Cycle 18 Core Operating Limits Report (COLR) and Units 2 Revision 1 of the Cycle 5 Core Operating Limits Report (COLR) WBL-23-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery2023-01-12012 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery WBL-23-001, Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic2023-01-10010 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic WBL-22-068, Submittal of Emergency Plan Implementing Procedure Revision2022-12-12012 December 2022 Submittal of Emergency Plan Implementing Procedure Revision WBL-22-062, Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies2022-11-0101 November 2022 Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC) WBL-22-057, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 4 Operation2022-09-26026 September 2022 American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 4 Operation WBL-22-046, Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2)2022-09-0808 September 2022 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) WBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022 Update to Fire Protection Report Figures Redacted WBL-22-037, Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies2022-07-14014 July 2022 Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies 2024-09-25
[Table view] |
Text
TENNESSEE 1\14 VALLEY AUTHORITY Post Office Box 2000, Spring City, Tennessee 37381 WBL-21-038 August 5, 2021 10 CFR 50.54(q)(5) 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 and Unit 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048
Subject:
Emergency Plan Implementing Procedure Revision Pursuant to Title 10, Code of Federal Regulations (10 CFR) 50.54(q)(5), and 10 CFR 72.44(f),
the Tennessee Valley Authority (TVA) is submitting a description of changes to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan (REP). The affected documents are the WBN Emergency Plan Implementing Procedures (EPIP) listed below:
EPIP Revision Title Effective Date 2 44 Notification of Unusual Event 07/19/2021 3 47 Alert 07/19/2021 4 45 Site Area Emergency 07/19/2021 5 55 General Emergency 07/19/2021 Description of Changes EPIP-2 revision 44 enacted the following changes:
Revised all Appendices to be Attachments and corrected attachment title capitalization.
Removed underlines from procedure and Attachment references, to align with Writers Guide.
Added steps to perform State Notification if Central Emergency Control Center (CECC) is staffed.
U.S. Nuclear Regulatory Commission WBL-21-038 Page 2 August 5, 2021 Simplified check boxes for release status in Attachment 1 (Notification of Unusual Event Initial Notification Form). Added instructions to Attachment 1 as an aid to fill out the form, and added criteria to determine if a release is in progress.
Revised Attachment 3 (Notification of the Nuclear Regulatory Commission (NRC) (NRC EVENT NOTIFICATION WORKSHEET)) to include specific information for each Unit, and added additional information to a Note to aid in filling out the worksheet.
Added in Attachment 8 (Activation of Emergency Response Organization (ERO) using TVA Enterprise Emergency Notification System (TEENS)) steps to perform alternate activation of TEENS from Main Control Room (MCR) and to perform Alternate Backup ERO Activation using manual call-out.
EPIP-3 revision 47 enacted the following changes:
Changed all Appendix to Attachments to align with Writers Guide. Retitled Section 5.0 (Illustrations /Attachments) from Appendix to Attachments, and changed each reference from Appendix to Attachment throughout procedure.
Removed underlines from procedure and Attachment references, to align with Writers Guide.
Updated Attachment 1 (Alert Initial Notification Form) to a new format, added instructions to fill out the form, and added guidance to determine if a release is in progress.
Changed the format for denoting release in progress.
Reformatted headings and action steps to align with Writers Guide and capitalized all Section Headers and revised incorrect section and subsection to action steps in some Attachments.
Revised Attachment 3 (Notification of the Nuclear Regulatory Commission (NRC) (NRC Event Notification Worksheet)) to include specific information for each Unit and added direction in a Note to obtain information from Operations to fill in the worksheet.
Removed words Plant Extension and entered complete telephone numbers to the notification steps in Attachment 4 (Notification of Site Personnel). Revised wording in some steps to perform applicable steps of EPIP-11 (Security and Access Control) and EPIP-14 (Radiological Control Response).
Renamed old Appendix H to new Attachment 8 (Alternate ERO Activation) and removed information that referred to the Emergency Paging System. Removed all references to the Paging system throughout the procedure. Added steps to have Shift Manager (SM) perform TEENS activation from the MCR
U.S. Nuclear Regulatory Commission WBL-21-038 Page 3 August 5, 2021 EPIP-4 revision 45 enacted the following changes:
Changed all Appendix to Attachments to align with Writers Guide. Retitled Section 5.0 (Illustrations /Attachments) from Appendix to Attachments and changed each reference from Appendix to Attachment throughout procedure.
Removed underlines from procedure and Attachment references to align with Writers Guide.
Updated Attachment 1 (Site Area Emergency Initial Notification Form) to a new format, added instructions to fill out the form, and added guidance to determine if a release is in progress.
Reformatted headings and action steps to align with Writers Guide, capitalized all Section Headers, and revised incorrect section and subsection to action steps in some Attachments.
Revised Attachment 4 (Notification of the Nuclear Regulatory Commission (NRC) (NRC Event Notification Worksheet)) to include specific information for each Unit, and moved steps to different sequence for efficiency. Added direction to a Note to obtain additional information from Operations to fill out the worksheet.
Renamed old Appendix H to new Attachment 8 (Alternate ERO Activation) and removed information that referred to the Emergency Paging System. Removed all reference to the Paging system throughout the procedure. Added steps to have SM perform TEENS activation from the MCR.
EPIP-5 revision 55 enacted the following changes:
Changed all Appendix to Attachments to align with Writers Guide. Retitled Section 5.0 (Illustrations /Attachments) from Appendix to Attachments and changed each reference from Appendix to Attachment throughout procedure.
Removed underlines from procedure and Attachment references, to align with Writers Guide.
Revised the title of subsection 3.1 for efficiency.
Updated Attachment 1 (General Emergency Initial Notification Form) to a new format, added instructions for filling out the form, and guidance for determining if a release is in progress.
Renamed Attachment 4 (Notification of the NRC) and renamed Attachment 7 (Technical Support Center (TSC) General Emergency Classification Instruction) for efficiency.
Added to a Note in Attachment 4 to obtain information from other sources to fill in the worksheet.
Updated Protective Action Recommendation (PAR) Chart with a new picture.
Revised the title of an Appendix to a new Attachment 9 (Alternate ERO Activation) and removed all steps for use of Emergency Paging System. Added steps for the SM to contact a vendor to activate TEENS.
U.S . Nuclear Regulatory Commission WBL-21-038 Page 4 August 5, 2021 The above changes were evaluated in accordance with 10 CFR 50 .54(q)(3) and 10 CFR 72.44(f) . TVA determined that the change did not reduce the effectiveness of the WBN REP .
The WBN REP , as revised , continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b).
There are no new regulatory commitments in this letter. Please direct all questions concerning this matter to Mike White , Emergency Preparedness Manager, at (423) 365-3232 .
G ony L. Willia:
Site Vice President
_s_l_V_ _ _ __
Watts Bar Nuclear Plant cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant NRC Director - Division of Spent Fuel Management, NMSS